Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20197F57730 June 1981Forwards Radiological Assessment Branch Input to Facility Des/Ol to Replace Previous Submittal.Open Issue Re Satisfaction of post-TMI Monitoring Requirements for Measurement of Direct Radiation Identified.W/O Encl
ML20197F5876 August 1981Forwards Accident Evaluation Branch Input to DesAnticipated operational occurrence
Fuel cladding
Fatality
ML20197F58929 July 1981Requests Two Copies of Edited & Typed Edition of Pdes for Branch Review.Comments & Concurrence Will Be Submitted within 5 Working Days.If Updated Version Unavailable, Comments on marked-up Version Will Be Forwarded by 810807
ML20197F6235 August 1981Forwards Subagreement 1 Between NRC & Wa State Energy Facility Site Evaluation Council Re Environ Reviews & Subagreement 2 for Protocol for Conduct of Joint Hearings for Facility
ML20197F62826 August 1981Notifies That Review of Facility Des Yielded No Comments
ML20197F68125 November 1981Submits Paragraph for Narrative Answer in App B in Response to Comment 5 on Des
ML20197G06921 November 1983Forwards Sser Based on Containment Sys Branch & Mechanical Engineering Branch Review Re Methodology Used to Calculate Drywell to Wetwell Vacuum Breaker Response to Pool Swell & Chugging Phases of Postulated Loca.Methodology Acceptable
ML20197G07322 November 1983Reviews Util 831104 Submittal Re Justification for Interim Operation.Operation W/O Qualified Equipment Identified in Interim Operation Items JIO-S-1,JIO-S-4 & JIO-S-7 Does Not Represent Undue Risk to Health & Safety of PublicSafe Shutdown
Safe Shutdown Earthquake
ML20197G07717 November 1983Forwards Instrumentation & Control Sys Branch Input for Section 7 (Instrumentation & Controls) for Sser,Addressing Confirmatory Issues 13 & 16Safe Shutdown
Reactor Vessel Water Level
ML20197G08117 November 1983Forwards Draft Sser Input Re Purge & Vent Valves.Info Re Valve Operability Failed to Demonstrate Closure Ability in Event of Dba/LocaSafe Shutdown Earthquake
Operating Basis Earthquake
ML20197G08523 November 1983Forwards Addl Input for Sser 4 Re Overheating of Gadolinia Fuel,Supplementing 830414 Memo.Issue Resolved
ML20197G09221 November 1983Forwards Safety Evaluation of Applicant Responses Re Snubber Preoperational Testing,Analysis of Reactor Internals & Design of Component Supports to Be Included in Next Sser
ML20197G09725 November 1983Forwards Request for Addl Info Re Design Verification Program Pertaining to Structural Engineering Aspects
ML20197G09828 November 1983Forwards List of Human Engineering Discrepancies Applicant Committed to Correct Prior to Licensing,For Transmittal to Licensee.Verification of Design Improvements Should Be Performed by NRC Resident Inspector
ML20197G10328 November 1983Forwards SER Suppl Re Preliminary Design Assessment Audit of Control Room & Remote Shutdown Facility.Applicant Must Submit Detailed Control Room Design Review (Dcrdr) Program & Plan,Conduct post-licensing Dcrdr & Submit Summary Rept
ML20197G10721 November 1983Forwards Sser on Environ Qualification of Electric Equipment Important to Safety & safety-related Mechanical Equipment. Two Open Items Remain Re Conformance to 10CFR50.49 & Justification for Interim OperationSafe Shutdown
ML20197G1122 December 1983Forwards Sser Input,Based on Review of Applicant Response to Confirmatory Issues in Section 3.6.2, Determination of Break Locations & Dynamic Effects Associated W/Postulated Rupture of Piping
ML20197G1175 December 1983Advises That Review of Vital Areas Identified No Concerns Re 10CFR73.55 Requirements.However,App Identifying Vital Areas Needs Clarification.Suppression Pool Constitutes long-term Water Source But UHS Is Spray PondUltimate heat sink
ML20197G1212 December 1983Forwards Sser 4 Based on Inputs from Staff.Comments Requested by 831208.SSER Must Be Issued Shortly Thereafter, in Order to Support Issuance of Initial OL as Early as 831212.W/o Encl
ML20197G12529 November 1983Informs That Div of Licensing Planning to Issue OL in Approx 3-4 Wks.License Will Be Subj to Fee Schedule in Section 170.21(a).A.1 of Current 10CFR170.Invoices Requested
ML20197G12830 November 1983Forwards Mechanical Engineering Branch Evaluation of Issues Identified During IE Const Appraisal Team Insp Re Design & Const of Component Supports
ML20197G13317 November 1983Forwards Sser Input for Section 13.5.2,including Consideration of TMI Action Items I.C.1,I.C.7 & I.C.8 Re ATWS & Procedures.Program for Operating & Maint Procedures Acceptable.Item I.C.8 Resolved
ML20197G13529 November 1983Discusses Justification for Interim Operation W/ safety-related Electrical Equipment Not Fully Qualified for Harsh Environ Created by Accidents.Application Justification Acceptable for Interim OperationReactor Vessel Water Level
ML20197G1405 December 1983Comments on Attachment 2 to 831201 Memo Re Schedule for Completion of Requirements in Connection W/Issuance of Ol. Marked-up Attachment Re Detailed Control Room Program Encl
ML20197G14330 November 1983Forwards Sser Re Licensee Design Reverification Program Rept.Sys Level Reverification Studies of HPCS & RHR Determined Sys Acceptable
ML20197G14829 November 1983Advises That Design Verification Program Task Force Has Performed in-depth Design Review on Electrical Aspects of Three Sys.Overall Design Process Conservative & Produced Plant Design Conforming to FSAR
ML20197G15622 November 1983Advises That Util Should Receive OL in 3-4 Wks.Appropriate Arrangements for Collection of License Fee Prior to Issuance of License Should Be Made
ML20197G16015 December 1983Forwards Instrumentation & Control Sys Branch Input for Sser Chapter 7.Applicant Identified Four Containment Isolation Valves in Nitrogen Inerting Sys That Do Not Comply W/Ie Bulletin 80-06 Requirements
ML20197G16314 December 1983Identifies Fire Protection,Hydrodynamic Load & Equipment qualification-seismic Issues That Require NRC Resolution to Support Licensing Action
ML20197G16713 December 1983Discusses Reinsp Criteria for Structural Steel Weld Deficiencies.Removal & Weld Repair of Imperfections Could Decrease Structural Performance by Introducing Detrimental Residual Stresses
ML20197G1739 December 1983Comments on Ser.Wording in Last Paragraph on Pages 2 & 3 Unsuitable.Sser EnclSafe Shutdown
Earthquake
ML20197G17615 December 1983Discusses Util Indicating Intent to Remove RCIC from Equipment Qualification Program (Eqp).Unless Unavailability of RCIC Will Not Increase Core Melt Frequency,Should Be Included in Eqp
ML20197G17920 December 1983Forwards Comments Re Sser 4 Recommending License Conditions to Compensate for Recently Recognized Deficiencies in Applicant Commitment on Effluent Instruments
ML20197G18215 December 1983Discusses Justification for Interim Operation (Jio) Pending Completion of Environ Qualification Equipment Program.Jios 1-5 Acceptable
ML20197G18520 December 1983Responds to DG Eisenhut 831031 Memo Requesting Review & Comment on Design Verification Program.Design & Analysis Methodology & Procedures Used Satisfactory & Acceptable
ML20197G18821 December 1983Forwards Sser Re Resolution of Containment out-of-roundness Issue.Applicable Code Provisions Met.Structural Integrity & Functionality of Containment Will Not Be Affected by Deviations from Design Configuration.Issue Resolved
ML20197G19119 December 1983Forwards Updated Proposed Safeguards License Condition & SER Input Based on Review of Revs to Security Plans.Encls Withheld
ML20197G19520 December 1983Forwards Sser Re Resolution of Const Discrepancies in Concrete Structures,Identified by Const Appraisal Team.As- Built Category I Structures Meet Intent of FSAR Commitments & SRP Provisions.Issues Resolved
ML20197G19720 December 1983Forwards Complete Tech Specs for Facility License.W/O Encl
ML20197G2013 January 1984Forwards 831215 Memo Re Removal of RCIC Sys from Equipment Qualification Program.Reactor Sys Branch Recommends That RCIC Sys Be Maintained in Facility Equipment Qualification Program
ML20197G20315 December 1983Reviews 831214 Proposed Tech Spec Change Re Reduction in Cold Fast Start Surveillance Testing of Diesel Generators. Changes Acceptable
ML20197G2076 January 1984Requests Name of Contact in State of Wa for NRC Consultation Re Determination of Whether License Amend Involves NSHC
ML20197G21311 January 1984Forwards Mechanical Engineering Branch Input to Sser Re Design Reverification Program for Components,Piping Sys & Supports
ML20197G21517 January 1984Submits Daily Highlight.On 840111,LaSalle Unit 2 Completed Fuel Loading.Wppss Unit 2 Completed Fuel Loading on 840112. Initial Criticality Projected for 840301 for Both Facilities
ML20197G21917 January 1984Forwards Sser & Proposed License Conditions Re Fire Protection Program.Fire Protection Program W/Accepted Deviations,Meets Guidelines of Branch Technical Position Cmeb 9.5-1 & GDC 3Safe Shutdown
Fire Protection Program
ML20197G2225 January 1984Submits Fuel Loading Schedule Daily Highlights.Lasalle Initiated Fuel Loading on 831230.WPPSS Initiated Fuel Loading on 831225
ML20197G22520 January 1984Submits Daily Highlight for 840119.Initial Criticality Achieved
ML20197G22823 January 1984Forwards SER Re Resolution of Magnetic Particle Linear Indications on Containment Weld Pads.Repair of Peripheral Fillet Welds & Allowing Cracks in Remaining Redundant Slot Fillet Welds Acceptable
ML20197G23727 January 1984Forwards Matls Engineering Branch Safety Evaluation of Nuclear Project 2 Engineering Evaluation of Washington Nuclear Project 2 Sacrificial Shield Wall Suppl 3 - Final Rept. Acceptance of Rept RecommendedNondestructive Examination
ML20197G2522 February 1984Discusses Removal of RCIC Sys from Equipment Qualification Program.Removal Based on Approval of Exemption Sys for Other Applicants