Issue date | Title | Topic | |
---|---|---|---|
ML20197F577 | 30 June 1981 | Forwards Radiological Assessment Branch Input to Facility Des/Ol to Replace Previous Submittal.Open Issue Re Satisfaction of post-TMI Monitoring Requirements for Measurement of Direct Radiation Identified.W/O Encl | |
ML20197F587 | 6 August 1981 | Forwards Accident Evaluation Branch Input to Des | Anticipated operational occurrence Fuel cladding Fatality |
ML20197F589 | 29 July 1981 | Requests Two Copies of Edited & Typed Edition of Pdes for Branch Review.Comments & Concurrence Will Be Submitted within 5 Working Days.If Updated Version Unavailable, Comments on marked-up Version Will Be Forwarded by 810807 | |
ML20197F623 | 5 August 1981 | Forwards Subagreement 1 Between NRC & Wa State Energy Facility Site Evaluation Council Re Environ Reviews & Subagreement 2 for Protocol for Conduct of Joint Hearings for Facility | |
ML20197F628 | 26 August 1981 | Notifies That Review of Facility Des Yielded No Comments | |
ML20197F681 | 25 November 1981 | Submits Paragraph for Narrative Answer in App B in Response to Comment 5 on Des | |
ML20197G069 | 21 November 1983 | Forwards Sser Based on Containment Sys Branch & Mechanical Engineering Branch Review Re Methodology Used to Calculate Drywell to Wetwell Vacuum Breaker Response to Pool Swell & Chugging Phases of Postulated Loca.Methodology Acceptable | |
ML20197G073 | 22 November 1983 | Reviews Util 831104 Submittal Re Justification for Interim Operation.Operation W/O Qualified Equipment Identified in Interim Operation Items JIO-S-1,JIO-S-4 & JIO-S-7 Does Not Represent Undue Risk to Health & Safety of Public | Safe Shutdown Safe Shutdown Earthquake |
ML20197G077 | 17 November 1983 | Forwards Instrumentation & Control Sys Branch Input for Section 7 (Instrumentation & Controls) for Sser,Addressing Confirmatory Issues 13 & 16 | Safe Shutdown Reactor Vessel Water Level |
ML20197G081 | 17 November 1983 | Forwards Draft Sser Input Re Purge & Vent Valves.Info Re Valve Operability Failed to Demonstrate Closure Ability in Event of Dba/Loca | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20197G085 | 23 November 1983 | Forwards Addl Input for Sser 4 Re Overheating of Gadolinia Fuel,Supplementing 830414 Memo.Issue Resolved | |
ML20197G092 | 21 November 1983 | Forwards Safety Evaluation of Applicant Responses Re Snubber Preoperational Testing,Analysis of Reactor Internals & Design of Component Supports to Be Included in Next Sser | |
ML20197G097 | 25 November 1983 | Forwards Request for Addl Info Re Design Verification Program Pertaining to Structural Engineering Aspects | |
ML20197G098 | 28 November 1983 | Forwards List of Human Engineering Discrepancies Applicant Committed to Correct Prior to Licensing,For Transmittal to Licensee.Verification of Design Improvements Should Be Performed by NRC Resident Inspector | |
ML20197G103 | 28 November 1983 | Forwards SER Suppl Re Preliminary Design Assessment Audit of Control Room & Remote Shutdown Facility.Applicant Must Submit Detailed Control Room Design Review (Dcrdr) Program & Plan,Conduct post-licensing Dcrdr & Submit Summary Rept | |
ML20197G107 | 21 November 1983 | Forwards Sser on Environ Qualification of Electric Equipment Important to Safety & safety-related Mechanical Equipment. Two Open Items Remain Re Conformance to 10CFR50.49 & Justification for Interim Operation | Safe Shutdown |
ML20197G112 | 2 December 1983 | Forwards Sser Input,Based on Review of Applicant Response to Confirmatory Issues in Section 3.6.2, Determination of Break Locations & Dynamic Effects Associated W/Postulated Rupture of Piping | |
ML20197G117 | 5 December 1983 | Advises That Review of Vital Areas Identified No Concerns Re 10CFR73.55 Requirements.However,App Identifying Vital Areas Needs Clarification.Suppression Pool Constitutes long-term Water Source But UHS Is Spray Pond | Ultimate heat sink |
ML20197G121 | 2 December 1983 | Forwards Sser 4 Based on Inputs from Staff.Comments Requested by 831208.SSER Must Be Issued Shortly Thereafter, in Order to Support Issuance of Initial OL as Early as 831212.W/o Encl | |
ML20197G125 | 29 November 1983 | Informs That Div of Licensing Planning to Issue OL in Approx 3-4 Wks.License Will Be Subj to Fee Schedule in Section 170.21(a).A.1 of Current 10CFR170.Invoices Requested | |
ML20197G128 | 30 November 1983 | Forwards Mechanical Engineering Branch Evaluation of Issues Identified During IE Const Appraisal Team Insp Re Design & Const of Component Supports | |
ML20197G133 | 17 November 1983 | Forwards Sser Input for Section 13.5.2,including Consideration of TMI Action Items I.C.1,I.C.7 & I.C.8 Re ATWS & Procedures.Program for Operating & Maint Procedures Acceptable.Item I.C.8 Resolved | |
ML20197G135 | 29 November 1983 | Discusses Justification for Interim Operation W/ safety-related Electrical Equipment Not Fully Qualified for Harsh Environ Created by Accidents.Application Justification Acceptable for Interim Operation | Reactor Vessel Water Level |
ML20197G140 | 5 December 1983 | Comments on Attachment 2 to 831201 Memo Re Schedule for Completion of Requirements in Connection W/Issuance of Ol. Marked-up Attachment Re Detailed Control Room Program Encl | |
ML20197G143 | 30 November 1983 | Forwards Sser Re Licensee Design Reverification Program Rept.Sys Level Reverification Studies of HPCS & RHR Determined Sys Acceptable | |
ML20197G148 | 29 November 1983 | Advises That Design Verification Program Task Force Has Performed in-depth Design Review on Electrical Aspects of Three Sys.Overall Design Process Conservative & Produced Plant Design Conforming to FSAR | |
ML20197G156 | 22 November 1983 | Advises That Util Should Receive OL in 3-4 Wks.Appropriate Arrangements for Collection of License Fee Prior to Issuance of License Should Be Made | |
ML20197G160 | 15 December 1983 | Forwards Instrumentation & Control Sys Branch Input for Sser Chapter 7.Applicant Identified Four Containment Isolation Valves in Nitrogen Inerting Sys That Do Not Comply W/Ie Bulletin 80-06 Requirements | |
ML20197G163 | 14 December 1983 | Identifies Fire Protection,Hydrodynamic Load & Equipment qualification-seismic Issues That Require NRC Resolution to Support Licensing Action | |
ML20197G167 | 13 December 1983 | Discusses Reinsp Criteria for Structural Steel Weld Deficiencies.Removal & Weld Repair of Imperfections Could Decrease Structural Performance by Introducing Detrimental Residual Stresses | |
ML20197G173 | 9 December 1983 | Comments on Ser.Wording in Last Paragraph on Pages 2 & 3 Unsuitable.Sser Encl | Safe Shutdown Earthquake |
ML20197G176 | 15 December 1983 | Discusses Util Indicating Intent to Remove RCIC from Equipment Qualification Program (Eqp).Unless Unavailability of RCIC Will Not Increase Core Melt Frequency,Should Be Included in Eqp | |
ML20197G179 | 20 December 1983 | Forwards Comments Re Sser 4 Recommending License Conditions to Compensate for Recently Recognized Deficiencies in Applicant Commitment on Effluent Instruments | |
ML20197G182 | 15 December 1983 | Discusses Justification for Interim Operation (Jio) Pending Completion of Environ Qualification Equipment Program.Jios 1-5 Acceptable | |
ML20197G185 | 20 December 1983 | Responds to DG Eisenhut 831031 Memo Requesting Review & Comment on Design Verification Program.Design & Analysis Methodology & Procedures Used Satisfactory & Acceptable | |
ML20197G188 | 21 December 1983 | Forwards Sser Re Resolution of Containment out-of-roundness Issue.Applicable Code Provisions Met.Structural Integrity & Functionality of Containment Will Not Be Affected by Deviations from Design Configuration.Issue Resolved | |
ML20197G191 | 19 December 1983 | Forwards Updated Proposed Safeguards License Condition & SER Input Based on Review of Revs to Security Plans.Encls Withheld | |
ML20197G195 | 20 December 1983 | Forwards Sser Re Resolution of Const Discrepancies in Concrete Structures,Identified by Const Appraisal Team.As- Built Category I Structures Meet Intent of FSAR Commitments & SRP Provisions.Issues Resolved | |
ML20197G197 | 20 December 1983 | Forwards Complete Tech Specs for Facility License.W/O Encl | |
ML20197G201 | 3 January 1984 | Forwards 831215 Memo Re Removal of RCIC Sys from Equipment Qualification Program.Reactor Sys Branch Recommends That RCIC Sys Be Maintained in Facility Equipment Qualification Program | |
ML20197G203 | 15 December 1983 | Reviews 831214 Proposed Tech Spec Change Re Reduction in Cold Fast Start Surveillance Testing of Diesel Generators. Changes Acceptable | |
ML20197G207 | 6 January 1984 | Requests Name of Contact in State of Wa for NRC Consultation Re Determination of Whether License Amend Involves NSHC | |
ML20197G213 | 11 January 1984 | Forwards Mechanical Engineering Branch Input to Sser Re Design Reverification Program for Components,Piping Sys & Supports | |
ML20197G215 | 17 January 1984 | Submits Daily Highlight.On 840111,LaSalle Unit 2 Completed Fuel Loading.Wppss Unit 2 Completed Fuel Loading on 840112. Initial Criticality Projected for 840301 for Both Facilities | |
ML20197G219 | 17 January 1984 | Forwards Sser & Proposed License Conditions Re Fire Protection Program.Fire Protection Program W/Accepted Deviations,Meets Guidelines of Branch Technical Position Cmeb 9.5-1 & GDC 3 | Safe Shutdown Fire Protection Program |
ML20197G222 | 5 January 1984 | Submits Fuel Loading Schedule Daily Highlights.Lasalle Initiated Fuel Loading on 831230.WPPSS Initiated Fuel Loading on 831225 | |
ML20197G225 | 20 January 1984 | Submits Daily Highlight for 840119.Initial Criticality Achieved | |
ML20197G228 | 23 January 1984 | Forwards SER Re Resolution of Magnetic Particle Linear Indications on Containment Weld Pads.Repair of Peripheral Fillet Welds & Allowing Cracks in Remaining Redundant Slot Fillet Welds Acceptable | |
ML20197G237 | 27 January 1984 | Forwards Matls Engineering Branch Safety Evaluation of Nuclear Project 2 Engineering Evaluation of Washington Nuclear Project 2 Sacrificial Shield Wall Suppl 3 - Final Rept. Acceptance of Rept Recommended | Nondestructive Examination |
ML20197G252 | 2 February 1984 | Discusses Removal of RCIC Sys from Equipment Qualification Program.Removal Based on Approval of Exemption Sys for Other Applicants |