Discusses Reinsp Criteria for Structural Steel Weld Deficiencies.Removal & Weld Repair of Imperfections Could Decrease Structural Performance by Introducing Detrimental Residual Stresses
ML20197G167
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/13/1983
From: Johnston W
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0705, CON-WNP-705 NUDOCS 8312230121
Download: ML20197G167 (2)


Text

.

o N

DEC 131983 Docket No. 50-397 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM: William V. Johnston, Assistant Director Materials, Chemical and Environmental Technology Division of Engineering

SUBJECT:

SAFETY EVALAUTION REPORT OF THE' REINSPECTION CRITERIA FOR STRUCTURAL STEEL WELDMENT DEFICIENCIES AT WNP-2 Plant Name: Washington Public Power Supply System, WNP-2 Supplier: General Electric / Brown & Root Docket No. 50-397 Reviewer: D. E. Smith Responsible Branch and Project Manager: LB-2; R. Auluck Description of Task: Evaluation of Proposed Alternative Criteria of Structural Steel Weld Deficiencies of Miscellaneous Steel Weldments Review Status: Complete The Materials Application Section, Materials Engineering Branch, Division of Engineering has completed its review of the proposed standards for rein-spection of the miscellaneous structural steel weldments as proposed in Quality Verification Instruction QVI-09, Revision 1 of March 16, 1983.

QVI-09 was written to address various discrepancies in miscellaneous structural steel weldments. Some of the structures were constructed to the requirements of the American Weiding Society's (AWS) Dl.1, " Structural Welding Code", and other structures were not constructed to any standard.

An example of such structures would be light gauge sheet metal duct work.

The QVI-09 document is to be incorporated.by Amendment 27 of the FSAR and was modified by Amendment 30, which limits the document's applications.

The proposed alternative acceptance criteria for re-inspection of selected structural steel weldments are acceptable with the limitations of Amendment 30 to the FSAR. Welds meeting these alternative criteria will have full struc-tural performance as the imperfections allowed have no structural significance.

Repair of these imperfections would not improve the structional performance of the welds, or the safety of the public. Removal and weld repair of these imperfections could have the effect of decreasing structural performance by introducing detrimental residual stresses.

Contact:

D. E. Smith x - 24553 w~

f/h *N 8312230121 831213 M ADOCK 05000397

_- f

o Thomas M. Novak DEC 131983 The Materials Engineering Branch recommends acceptance of the alternative visual inspection criteria of QVI-09 with the limitations of Amendment 30 to the FSAR.

/

William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering cc: R. Vollmer D. Eisenhut S. Pawlicki R. Auluck J. P. Knight G. Lear A. Schwencer W. Johnston R. Bosnak B. D. Liaw W. Hazelton C. Cheng .

R. Klecker E. Sullivan D. E. Smith DISTRIBUTION:

M MTEB Reading File MTEB WNP-2

  • SEE PREVI US H'EETFORCbNCURRENCE.

DE:MTEB Dl EB \ D$ tjIE Dd//D T JSmith:as iWHaze:Tton BDL'ia' w ' WVJohnston 11/28/83 )['12/

/83 12/, /83 12//)/83

.g ,

DEC 13 1983 4.; ' u : s .. , yzy-MEMORANDUM FOR: A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM: R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing

SUBJECT:

FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

DATE & TIME: Wednesday, December 14, 1983 2:30 - 4:00 LOCATION: P-422 Phillips Building Bethesda, Maryland PURPOSE: Management Meeting with WPPSS PARTICIPANTS *: NRC WPPSS H. R. Denton D. W. Mazur D. G. Eisenhut J. W. Shannon R. J. Mattson R. B. Glasscock R. H. Vollner J. D. Martin H. L. Thompson H. A. Crisp R. C. Deyoung T. M. Novak A. Schwencer R. Auluck Criginc! W/ad2/

R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers, pursuant to "Open Meeting and Statement of NRC Staff Policy", 43 Federal Reaister 28058, 6/28/78.

I DL / 1 DLI /BC ck:pt ASc hw' encer

,$/83 12/l3/83

-eeHi!eNMMiMb G31213 PDR ADOCK 05000397 A PDR

WNP-2 ,

Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc: Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, N. W.

Washington, D. C. 20036 Mr. G. E. Doupe, Esquire

Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Mr. W. G. Conn, Sr. N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 l Mr. Richard Feil I

U.S. NRC Resident Inspector WPPSS-2 NPS P. O. Box 69 Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety & Regulatory Programs t

Washington Public Power Supply System P. O. Box 968, MD 650 Richland, Washington 99352 l

l Mr. J. D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352

AGENDA December 14, 1983

1. Status of Plant Construction Status of Pre-op tests
2. WPPSS Organization and Plant Staffing Staff experience
3. Post licensing action completion defferrals
4. Response to CAT Inspection
5. Open issues to be resolved i

b i

MEETING NOTICE DISTRIBUTION: Date: December 13, 1983 L PDR NSIC PRC LBd2 Reading NRC PARTICIPANTS:

E. Hylton Project Manager RAuluck H. Denton D. Eisenhut H. Denton/E. Case R. Mattson D. Eisenhut/R. Purple T. M. Novak* R. Vollmer B. Youngblood H. Thompson A. Schwencer R. Deyoung G. Knighton T. Novak E. Adensam A. Schwencer G. Lainas R. Auluck F. Miraglia J. P. Knight W. Johnston D. bblier R. Houston L. Rubenstein F. Schroeder M. Ernst D. Ziemann NRR Division Directors

  • OELD Attorney Paton E. L. Jordan, DEQA:IE l J. M. Taylor, DRP:IE l Phillips Building Receptionist **

l ACRS (16)

Region V Resident Inspector cc: Service List F. Ingram, PA

  • 0nly if participant in meeting i **0nly if meeting held in Bethesda l