ML20197G156

From kanterella
Jump to navigation Jump to search
Advises That Util Should Receive OL in 3-4 Wks.Appropriate Arrangements for Collection of License Fee Prior to Issuance of License Should Be Made
ML20197G156
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/22/1983
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8312190381
Download: ML20197G156 (2)


Text

- . -

h 7.p*. "* %,,'c UNITED STATEL

' 8 yg, '. , (, }

NUCLEAR REGULATORY COMMISSION

.*,4,&j o /5 C WASHINGTON, D. ,C. 20555 Eg .us- f

. . . .i;. November 22, 1983 Docket fio.: 50-397 MEMORANDUM FOR: llilliam 0. Miller, Chief License Fee Management Branch Office of Administration FROM: A. Schwencer, Chief Licensing Branch flo. 2 Division of Licensing

SUBJECT:

LICENSE FEE FOR WASHINGT0ft PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 It is expected that the Office of Nuclear Reactor Regulation will issue an operating license in approximately 3 to 4 weeks to Washington Public Power Supply System. for the WPPSS fluclear Project No. 2 permitting operation up to 100'e power with restrictions, or at 3323 megawatts thermal of the reactor core power level.

Therefore, we suggest that your office make the appropriate arrangements for the collection of the license fee due prior to issuance of this license.

The utility contact and other pertinent information follows:

Applicant:  !!ashington Public Power Supply System P. O. Box 96S 3000 George Washington llay Richland, Washington 99352

Contact:

Mr. D. W. Mazur Managing Director Telephone (509) 372-5000 Type of License: -

103 License No.: flPF-21 Power Level: 3323 megawatts thermal (100"; power)

Docket No.: 50-397 Concurrent Unit Review: A concurrent review was not performed at the operatina license stage.

WNP-2 is a custom design plant.

! .. C ' -

83121903g1 831122 h s

.P ADOCK 05000397 )

N w_ W#

i

'T 2- 1 For further information, please contact Raj Auluck, Project Manager for Washington Pubite Power Supply System Nuclear Project No. 2, on Extension 28547.

0"-cinalaign.q g.,

A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing, NRR EHylton RAuluck i

I l

'$ i DL:LB/2/LA ;L l /PM DL:LB#2/BC

, EGHylton:pt piuuck ASchwencer l 11/'I/83 11/;)/83 11/g/83 i

t l

l i

__ ____