Notifies That Review of Facility Des Yielded No Comments
ML20197F628
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/26/1981
From: Gammill W
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
CON-WNP-0852, CON-WNP-852 NUDOCS 8109080464
Download: ML20197F628 (1)


Text

Y DISTRIBUTION:

M ocket File 50-397 ETSB Reading File AUG 2 61981 ETSB Docket File WPGamill Docket No. 50-397 HEMORAllDUM FOR: B. J. Youngblood, Chief Licensing Branch fl. DL FROM: W. P. Gamill, Chief Effluent Treatment Systems Branch, DSI

SUBJECT:

ETSB REVIEW 0F DRAFT ENVIRONMENTAL STATEMENT FOR WASHINGTON NUCLEAR PLANT, UNIT NO. 2 (WNP-2)

PLANT NAME: Washington Nuclear Plant, Unit No. 2 LICENSING STAGE: OL DOCKET NUMBER (S): 50-397 HILESTONE fiUl8ER:

RESPONSIBLE BRAriCH: LBil PROJECT MANAGER: R. Auluck DESCRIPTION OF RESPONSE: Review of Draft Environmental Statement REQUESTED C0'PLETION DATE: August 28, 1931 REVIEW STATUS: Coraplete We have reviewed the Draft Environmental Statement (0L) for Washington Nuclear Plant, Unit No. 2, dated July 1981, and have no corraents.

Original Signed by:

WilliamP. Gammill William P. Gamill, Chief Effluent Treatment Systems Branch Division of Systeras Integration cc: R. Mattson W. Kreger R. Tedesco R. Capra g\l~'9 R. Auluck I C. Willis c' . , ff(g R. Bangart o -( .

, h -

P. Stoddart ~

I; NL ,

U l [ m 011981*y.c E "*WJ3ll^"" //

g l

- ,x /

f 8109080464 810826 OP ADOCK 05000397 4 h / ro ecc se  !

x ~ ,

. , ; .9 PDR -

omce > 0.S.I.;R?.:.EISE.. ..D.S.i . .S B, ,DS.. ': , S B, sua=*=r> ?.S.t9.@.0.tt.;.d o, ,..,,,t,, , W,, g,, . g,1 1,,

onn u .08125L&1... 21$$121.. .. DEI LRA..

NRC FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY /

s g3 DISTRIBUTION kentral rites SAB Rdg 3D i

  1. 1606QS DRMu11er Y(, d

~

61 3 e "locy.

MEMDRANDUM FOR: Richard H. Vollmer. Director N) ' G' /

Division of Engineering / l FRON: Daniel R. Muller, Assistant Director f' i,0G 13ggiw 'rPI I for Environmental Technology J p

Division of Engineering ,,,, p e

SUBJECT:

PROGRESS REPORT ON EXPEDITED ENVIRONMENTAL REVIEW OF SKAGIT/HANFORD SITE cv e rv On July 23, 1980 during the meeting between Harold Denton and Puget Sound Power and Light Company regarding its desire to relocate the plant to a new site on Henford Reservation, it was agreed that because of an advanced stage of the safety review of the plant an expedited environmental review of the site was warranted. Mr. Denton instructed me.to take the lead and prepare to conduct this expedited review in a creative and innovative fashion.

To that end I hav'c: (1) made plans (with the cooperation of the applicant) to utilize to the extent possible the information and site data which was previously submitted and reviewed by us in the process of licensing 3 WPPSS plants located on Hanford Reservation; (2) assigned Jan Norris, who within the last 8. years served as an EPM on all 5 WPPSS plants, to manage this special review; (3) with cooperation of State Programs initiated agreen,en's t with the State of Washington to facilitate and to expedite the environmental l

I review and hearing process; (4) held a number of meetings with the State of Washington agencies, Regional Office of EPA, and Regional Office of BPA '

making plans for the upcoming review, and provided guidance to the applicant in preparation of the amen &ient to the ER.

We have just learned that Subagreement 1, between State of Washington Energy Facility Site Evaluation Council (EFSEC) and NRC, which Harold Denton signed I on July 28, 1981, was signed by Nicholas D. Lewis, Chairman of Washington l

EFSEC, on Friday, July 31, C SI. Accordingly, as the first step of implementation of this Subagreement I have designated Jan Norris to represent NRC on the Management Committee created by Paragraph I of Subagreement 1 (Enclosure). In implementing his assignment he will: (a) establish (in i

l l

1 omcr > .!.

l ,,

~

m yow ggg:sioso6 -

se==t >l , 7 W 'EDOCK 05000 cave >l FDC. , m p ppg.

~

.l-oc rew n ,e em wcu onc OFFICIAL RECORD COPY /

l f .

{ f f f Richard H. Vollmer ~

rAUG. 06 1981 consultation with EFSEC) the schedule for the joint enhironmental review; (b) coordinate and manage the acceptance review of the ER and conduct the scoping process; (c) manage and coordinate the review of alternative sites; (d) m yage the preparation and issuance of the joint DES.and FES* and (e) mMage the joint staff's technical support of the environmental portion of the joint hearing process, ong;nal signed 4 DanM R.Munist Daniel R. Muller, Assistant Director for Environmental Technology Division of Engineering

Enclosure:

As stated cc: D. Eisenhut R. Purple

  • R. Tedesco E. Adensan H. Mallory M. Duncan W. l'egan J. horris R. Ballard A. Toalston L. Soffer D. Cleary R. Samworth H. Shapar E. Reis R. Black D. Kunihiro W. Kerr F. Young A. Robart l

\

o.,;ci> DE IET:SAB DE:ET: AB DE:ADET

'"'""'> @ i .:.c.l. ?. . . M. . e h D, n r om> h/5/31( 8/ d81 8/g/81, l

,,ac,c urs,wec u cve: e OFFICIAL RECORD COPY /