ML19350A210 | 2 March 1981 | Part 21 Rept U-27 Re Loose Bushings in Bergen-Patterson Sway Struts,Initially Reported 810130.Generic Rept Will Be Submitted by Snupps on Behalf of Util & Union Electric Co. Final Rept Will Be Issued by 810601 | |
ML19350A751 | 6 March 1981 | Interim Deficiency Rept U-26 Re Containment Dome Imperfections,Initially Reported on 801205.Meeting Conducted on 810305 Re Insp & Testing.Addl Details & Analysis Will Be Presented in 810401 Final Rept | |
ML19350C240 | 17 March 1981 | Interim Deficiency Rept Re Design Interferences in Bergen Paterson Pipe Support/Shock Arrestor Assembly Used to Support 8-20 Inch Pipe Sections.Caused by Vendor Failure to Notify Users of Revisions | |
ML19350D781 | 14 May 1981 | Final Deficiency Rept Re Generic Deficiencies in Bunker Ramo Electrical Penetration Assemblies,Initially Reported 800506. Addl Assemblies Requiring Site Rework Listed | |
ML19351D613 | 10 September 1980 | Final Deficiency Rept Re Potential Bolt Headpipe Clamp Interference Which Could Hinder Full Function of Bergen- Paterson Pipe Support Strut assemblies.Bergen-Paterson Advised That All Assemblies Corrected Prior to Shipment | |
ML19351E545 | 26 November 1980 | Interim Deficiency Rept Re Failure of Westinghouse 3-inch Gate Valves to Close,First Reported on 801030.Addl Info Is Still Being Obtained & Corrective Mods Are Being Developed. Followup or Final Rept Will Be Sent in First Quarter 1981 | |
ML20003A134 | 23 January 1981 | Summarizes 801224 Telcon Rept Re Generic Deficiency in Analytical Techniques Used by Bechtel in Design of Pipe Whip Restraints Used for Std Power Block.Bechtel Reviewing Design Calculations.Final Rept Not to Be Issued Until 810228 | |
ML20003H334 | 1 May 1981 | Final Deficiency Rept Re Potentially Defective GE Type AKR-30 & AKR-50 Circuit Breakers,Initially Reported on 810401.Bearing Assemblies Will Be Replaced by 811231 | |
ML20004C631 | 1 June 1981 | Final Deficiency Rept Re Bergen-Paterson Support Strut Assembly Design Interference Initially Reported on 810213. Design Changes Examined by Bechtel & Confirmed to Be Free of Interference.Stronger Insp & Mfg Controls Implemented | |
ML20004D893 | 5 June 1981 | Final Deficiency Rept Re Power Block Pipe Whip Restraint Design Discrepancies.Affected Restraints Will Be re-analyzed & Revised.Fsar & Design Guide Will Be Revised | Safe Shutdown |
ML20004D896 | 16 March 1981 | Updated Deficiency Rept Re Power Block Pipe Whip Restraint Design Discrepancies.Design of Potentially Affected Restraints Has Been Reviewed & Revised,Where Necessary.Final Rept Will Be Provided by 810601 | |
ML20005A030 | 19 June 1981 | Followup Deficiency Rept Re Westinghouse Gate Valve Failure to Close,Initially Reported on 801126.Functional Review of Valves Ongoing.Nrc Will Be Kept Informed of Significant Developments & Resolutions | |
ML20009C589 | 13 July 1981 | Interim Deficiency Rept,Initially Reported on 800724,re Defective Corner & Lada Pipe Support Sway Struts.Addl Measures Are Being Taken to Preclude Disengagement of Paddle/Bushing Assembly | |
ML20009D393 | 13 July 1981 | Interim Deficiency Rept Re Weld Discrepancies in Main Control Panels & Auxiliary Relay Racks Furnished by Comsip Customline Corp.Results of Panel & Rack Weld Insp Will Be Evaluated by 811130 | |
ML20024A426 | 1 June 1983 | Final Deficiency & Part 21 Repts U-53 Re Defective Plastic Molding Utilized in Circuit Boards Supplied by Foxboro Co. Initially Reported on 830511.Components Returned to Vendor for Rework/Replacement | |
ML20024B688 | 1 July 1983 | Final Deficiency Rept U-56 & Part 21 Rept Re Metal Bellows Flexible Hose Assembly w/60 Degree Instead of 90 Degree Fitting at Discharge of Reactor Coolant Pump B Motor. Initially Reported on 830602.All Assemblies Inspected | |
ML20024B695 | 30 June 1983 | Part 21 Rept Re Deficiency in Bechtel Design of Ac & Dc Control Circuits for Facilities.Design Changes to Affected Motor Controller & Power Circuit Breaker Compartments Initiated.Also Reported Per 10CFR50.55(e) by Snupps | |
ML20024B742 | 30 June 1983 | Final Deficiency Rept U-40 Re Inaccuracy of wide-range RCS Pressure Transmitters During post-accident Conditions Inside Containment.Transmitters Will Be Relocated from Inside to Outside Containment.Fsar Will Be Revised | |
ML20024D063 | 22 July 1983 | Final Significant Deficiency Rept 83-10 Re Excessive Ac/Dc Control Circuit Voltage Drop in Circuits Designed by Bechtel.Initially Reported on 830623.Also Reportable Under Part 21 | |
ML20024D637 | 29 July 1983 | Final Significant Deficiency Rept 83-09,re 1 1/2-inch Hy-Drop Stainless Steel Valves Furnished by Yarway Corp. Reexam of Design,Procurement & Site Receiving Records Indicates Original Data Based on Inaccurate Info | |
ML20024F574 | 31 August 1983 | Interim Deficiency Rept Re Westinghouse Type SA-1 Differential Relays W/Leaky Capacitors.Initially Reported on 830801.Capacitors Replaced.Final Rept to Be Submitted When Results of Westinghouse Defect Analysis Known | |
ML20027D489 | 25 October 1982 | Amended Final Deficiency Rept Re Cracked Lexan Coil Spools Supplied W/Ge Hfa Type Relays.Initially Reported on 810212. GE Advised That Incorrectly Sized Dropping Resistor Found on Hfa Type Relays.Also Reportable Per Part 21 | |
ML20028E764 | 21 January 1983 | Interim Deficiency Rept 83-01 Re Westinghouse Emd Gate Valve Position Indication.Initially Reported on 821223.Gate Valve Applications in Cold & Hot Leg Safety Injection Lines May Require Mod.Investigation Continuing.Next Rept by 830531 | |
ML20038C265 | 30 November 1981 | Part 21 Rept Re Insp of Colt Pielstick Type PC-2 Diesel Generator Sets Per Revised Drawings Mentioned in 800502 Rept.Both Units Are in Compliance W/Insp Procedure & Free of Reported Potential Defect | |
ML20039C461 | 14 December 1981 | Interim Deficiency Rept Re Failure of Bergen Paterson Size 6 & 15 Sway Strut Assemblies to Provide cone-of-movement, Initially Reported 811104.Tests & Related Analyses Completed.Failures Not Reportable Under 10CFR50.55(e) | |
ML20039F613 | 7 January 1982 | Deficiency Rept Re Error in ECCS Analysis for Facilities. Issue Reviewed by Westinghouse & Util.Determined Not Reportable Per 10CFR50.55e | |
ML20054H562 | 17 June 1982 | Final Deficiency Rept Re Adequacy of Nondestructive Exam Performed by Dravo Pipe Fabrication Div on Piping Spools, Initially Reported on 810501.Surface Too Rough for Adequate Exam.Welds Buffed & re-examined.Deficiency Not Reportable | Liquid penetrant |
ML20058E684 | 21 July 1982 | Interim Deficiency Rept Re Error in Wide Range RCS Pressure Transmitters.Initially Reported on 820409.Alternatives to Insure Functional Requirements of Transmitters in post-accident Environ Being Pursued | |
ML20062D935 | 1 November 1990 | Part 21 Rept Re Failure of 4.16 Kv Vertical Lift Switchgear, cell-mounted Auxiliary Contacts to Operate on Command During Testing of Standby Switchgear at Plant.Caused When Maladjusted Test Link Inserted Between Breaker & Switch | |
ML20063H498 | 21 July 1982 | Potential Deficiency Rept Re Worn Polar Crane Snubber Assembly Pin.Initially Reported on 810819.Condition Not Reportable Per 10CFR50.55(e).AE Concluded That Polar Crane Sys Can Resist Seismic Event Generated Impact Loads | Earthquake |
ML20063L405 | 31 August 1982 | Interim Deficiency Rept 80-2 Re Operation of Centrifugal Charging Pumps Following Secondary Side High Energy Line Breaks.Design Changes Evaluated by Bechtel,Westinghouse & Utils.Final Rept Expected by 821101 | |
ML20063L861 | 3 September 1982 | Interim Deficiency Rept Re Limitorque operators-sheared Pinion Keys.Initially Reported on 820804.Development of Plan to Resolve Concern for All Valves W/Limitorque Operators Underway.Next Rept Expected by 830303 | |
ML20063L886 | 3 September 1982 | Interim Deficiency Rept Re Undetectable Failure in Solid State Protection Sys.Initially Reported on 820804. Recommended Revisions to Testing Procedures & Possible Design Changes Under Review.Next Rept Expected by 830303 | |
ML20063M804 | 3 September 1982 | Final Deficiency Rept Re Failure of Westinghouse EMD Valves, Also Submitted Per IE Bulletin 81-02.Corrective Action Taken or Planned for Affected Valves Prior to Fuel Loading Encl | |
ML20065D128 | 14 September 1982 | Final Part 21 Rept Re Possibility of Defective Potentiometers Utilized in Circuit Boards Supplied by Foxboro Co.Initially Reported on 820903.All Suspect Components Returned to Vendor for Rework/Replacement | |
ML20066A879 | 29 October 1982 | Final Deficiency Rept Re Centrifugal Charging Pump Operation After Secondary Side High Energy Line Rupture.Initially Reported on 800508.Studies Indicate Change in Charging Sys Necessary to Satisfy Requirements | |
ML20066D444 | 2 November 1982 | Interim Deficiency Rept Re RCS wide-range Pressure Transmitter Error in post-accident Environ Exceeding SAR Limit.Initially Reported on 820409.Westinghouse Review Continuing.Final Rept Expected by Feb 1983 | |
ML20066K097 | 28 October 1982 | Part 21 Rept Re Malfunction of safety-related Nuclear Valves Preventing Tight Shutoff of Valve.Plug 040001-285-781 Will Be Replaced by 821124 | |
ML20069B468 | 15 December 1981 | Final Deficiency Rept Re Weld Discrepancies in Main Control Panels & Auxiliary Relay Racks Furnished by Comsip Customline Corp.Seismic Testing & Insp Indicated No Significant Defects or Deficiencies | Earthquake |
ML20069F094 | 7 March 1983 | Interim Deficiency Rept Re Effect of Potential post-accident Errors in wide-range RCS Pressure Instruments on Snupps Plants.Potential Inaccuracies Do Not Constitute Significant Deficiency.Next Rept by 830701 | |
ML20069N099 | 19 November 1982 | Final Deficiency Rept Re Level on Closing Spring Interlock of GE IE 480-volt Akr Breakers Overtraveling Armature Linkage Pin.Initially Reported on 821105.GE Will Replace Levers.Also Reportable Per Part 21 | |
ML20070A686 | 17 January 1991 | Part 21 Rept Re Failure of 4.16 Kv vertical-lift Switchgear Cell Mounted,Auxiliary Contacts to Operate on Demand During Testing of Auxiliary Standby Switchgear at Facility. Initially Reported on 901101.New Test Link Sent to Facility | |
ML20070S296 | 26 January 1983 | Interim Deficiency Rept Re Battery Charger Output Choke Failure.Initially Reported on 830105.Caused by Short Circuit Between Choke Input Lead & Coil.Final Rept Expected by 830215.Also Reportable Per Part 21 | |
ML20071E946 | 3 March 1983 | Interim Significant Deficiency Rept 82-01 Re Sheared Pinion Keys on Limitorque SB-0-25 Motor Operators.Failures Limited to Motor Operators Used in Conjunction W/Westinghouse Valves Subj to Stall Tests Greater than Max Operating Loads | |
ML20071P082 | 27 May 1983 | Final Significant Deficiency Rept Re Lockup of RM-23 Display in Radiation Monitoring Sys.Initially Reported on 830223.Circuit Boards Returned to Vendor for Mod & Testing. Modified Boards Will Be Installed Prior to Fuel Load | |
ML20072A554 | 31 May 1983 | Final Deficiency Rept 83-01 Re Faulty Westinghouse EMD Gate Valve Position Indication.Initially Reported on 830121. Valve Mods & Adjustments to Be Performed Per Westinghouse Field Change Notices SAPM-10605 & SCPM-10602 | |
ML20072D498 | 9 May 1983 | Part 21 Rept Re Defect in Hose Assembly 77379.Assembly Welded w/60-degree Rather 30-degree Elbow Installed. Condition Reported to Bechtel | |
ML20072F015 | 16 June 1983 | Final Deficiency Rept U-54 & Part 21 Rept Re Failure of Closed Limit Switches to Reset on Containment Isolation Valves HV-7126 & HV-7150.Initially Reported on 830516. Compensating Spring Installed on Actuating Arm | |
ML20072H325 | 22 March 1983 | Interim Part 21 Rept Re lock-up of RM-23 Display in Radiation Monitoring Sys Giving Erroneous Indication of Channel Activity.Initially Reported on 830223.Problem Software Related.Final Rept Will Be Submitted by 830531 | |
ML20072K459 | 18 February 1983 | Final Significant Deficiency Rept 83-03 Re Design & Installation of U-bolt Restraints.Initially Reported on 830127.Analysis Revealed Absence of Locknuts on Piping. Double Nut Locking Mechanism Installed | Earthquake |