ML19350A210

From kanterella
Jump to navigation Jump to search
Part 21 Rept U-27 Re Loose Bushings in Bergen-Patterson Sway Struts,Initially Reported 810130.Generic Rept Will Be Submitted by Snupps on Behalf of Util & Union Electric Co. Final Rept Will Be Issued by 810601
ML19350A210
Person / Time
Site: Callaway 
Issue date: 03/02/1981
From: Bryan J
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-81-371-000 10CFR-050.55E, 10CFR-50.55E, PT21-81-371, PT21-81-371-000, U-27, ULNRC-419, NUDOCS 8103130040
Download: ML19350A210 (2)


Text

.. _ -. _. = -

.'PART21IDBRIFICATIb1NO.

f/~ 3 7-4 0 3 C07ANY NVE_ NM Md 5 DATE OF ETIEPs 3/2.///

DOGET NO.

f D ~ Wd

~

bd,d/

~

ORIGIRAL EPORT StP?iEENTARY v DATEDISTRIBUTED DISTRIBLfi10N:

~

EACTOR (R)

REL CYCE &

SAFEC4]ARDS (S)

IE FIES

[RTERIALS (FD IE FIES EES - M 4 v IEFILES AD/SG

'~ AD/FREl AD/RDI EGIONS I,II,III,IV,V EGIONS I,II,III,IV,V EGICNS I,II,III,IV,V VBiDDR BR P.-IV MNODR BR. R-IV V300R BR R IV LCEB / FPA FIG 5715 s'ES / FCFE SS-395 NRR/ DOL EOD NG 76T LEB / FPA t,TG 5715 g.ES / SG SS-881 N?M)0E AE0D FIG 7602 LD B / FFA MG 5715 N?NDSI ASB? E/W 450 AEOD FIG 7602

. NRR/ DST SAo/SP fi8-7210A ASBP E/W 450 -

~

~NRR/ DOL CENT?LFILES 016 CBRPAL FILES 016 ASLBP E/W 450 CENTPAL FILES ( GR000 CBERAL FIES (GR0iG CBERAL FIES 016 PDR CENTRAL FIlfS SS-395 l

CEt#RAL FIES (GROfD LPDR PDR LPDR n

PDR TEFA o

LPDR g[

M

~

MRo9 W

2'

"~

\\

. c.sD.

198y u.e ACTION:

s f4pr.,

S PRELIMItMRY EVALUATION OF THE' ATTACH I

I S LEAD RESPONSIBILITY FOR FOLLOWJP AS SK)hN BELOW:

IE NRR]

RBS [

GTER EES 8103130o @

Pa'. 8/1/80 t

4,\\ so itj d u

UNION ELECTRIC COMPANY 1908 GRA*ICT STREET ST. Louis. MISSOURI e

March 2, 1981 se ~ x...v.~

...w~........

o....

.v.uovi.......va......

Mr. James G. Keppler, Director US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC-419

Dear Mr. Keppler:

INTERIM 10CFR50. 55 (e) /10CFR21 Report No. U-27 CALLAWAY PLANT C'JTT On January 30, 1981, Mr. H. Wescott of Region III was given verbal notification of a significant deficiency regarding loose bushings in Bergen-Paterson sway struts.

Of the eleven (11) loose bushings found, there was a potential for five (5) of these bushings to become completely disengaged from the sway strut paddle end.

A similar problem involving Corner & Lada Co. has already been reported under 10CFR50.55(e) criteria because of the potential to overstress a piping system if the bushings were to beccme ecmpletely disengaged during a seismic event.

We are ad-vised thar recent inspections at the Wolf Creek site have identified similar difficulties with some of the Bergen-Paterson furnished sway struts at that site.

These inspecticn findings were also reported to the NRC as a potential significant deficiency dnder 10CFR50.55(e) criteria by Kansas Gas & Electric.

Further investigations are being undertaken in conjunction with Kansas Gas and Electric to determine the cause of this diffi-culty and to develop a meaningful plan of corrective action.

Ap-plicabiliry to sway struts furnished to Callaway Site by ITT-Grinnell is also being considered.

Inasmuch as these problems are common to both SNUPPS Sites, a generic report involving the Bergen-Paterson units will be' submitted by SNUPPS on behalf of both Kansas Gas &

Electric Company and Union Electric Company.

We anticipate a final report being issued to the NRC on or before June 1, 1981.

ferf)trulyyours,

(

[

Wp%\\

Iohn K. Bryan (

RWD/lli cc:

J.

Konklin,; Region III B. H.

Grier, Region I Victor Stello, Jr., Director I&EA '

W. A. Hansen, NRC Resident Inspection, Callaway Plant Missouri Public' Service Commission j.....--