ML20009D393

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Weld Discrepancies in Main Control Panels & Auxiliary Relay Racks Furnished by Comsip Customline Corp.Results of Panel & Rack Weld Insp Will Be Evaluated by 811130
ML20009D393
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 07/13/1981
From: Bryan J
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, U-25, ULNRC-464, NUDOCS 8107240024
Download: ML20009D393 (1)


Text

$b -4 85l %f

..w UNION ELECTRIC. COMPANY teot onATsoT STREET ST. Louis. Msseoune

']."*d.$.7,*,,.

July 13, 1981 ph

'e "b "*

<l QJ

',\\

Q B'i w

40 Mr. James G.

Keppler, Director-

[0 4 4

g USNRC. Region III y

. p'g//p

,/I,/

799 Roosevelt Road

\\ (^

ULNRC-464

--Glen Ellyn, IL 60137 g,/,blji ? E j

Dear Mr. Keppler:

INTERIM 10CFR50. 55 (e)/10CFR21-REPORT NO. U-25 CALLAWAY PLANT UNIT 1 The. purpose of this letter is to update the reference report and the interim report, dated March 2, 1981 concerning weld discrepancies in the Main Control Panels and Auxiliary Relay Racks furnished to Callaway Unit 1 by Comsip Customline Corporation.

The planned inspection and measurement of the panel and rack welds have been completed and the results are presently being evaluated by the panel designer and by the architect-engineer.

-Preliminary results _of these evaluations appear to confirm - the adequacy of the panel and rack welds.

'We presently anticipate the evaluation will be complete on or about November 30, 1981.

A report summarizing the results'of the inspections and evaluation will be forwarded to the NRC shortly thereafter.

Very truly yours, L

b-Joh ryan MHH/jds cc:

-J.

Konklin, Region III B.

H.

Grier, Region I

-Victor Stello, Jr.,

Director I&E W. A.

Hansen, NRC Resident Inspector, Callaway Plant Missouri Public Service Commission