Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
AECM-85-0354, Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations | 30 June 1982 | Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations | |
B12096, Proposed Tech Spec Changes Re Fire Protection Audits | 31 May 1986 | Proposed Tech Spec Changes Re Fire Protection Audits | Offsite Dose Calculation Manual Fire Protection Program |
B12915, Proposed Tech Specs Re Administrative controls-reporting Requirements | 25 May 1988 | Proposed Tech Specs Re Administrative controls-reporting Requirements | Annual Radiological Environmental Operating Report |
B13098, Proposed Tech Specs Re Administrative Controls & Organizational Charts | 13 March 1989 | Proposed Tech Specs Re Administrative Controls & Organizational Charts | Safe Shutdown High Radiation Area Offsite Dose Calculation Manual Fire Barrier |
B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes | 29 June 1989 | Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes | Operating Basis Earthquake Earthquake |
B13256, Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual | 25 May 1989 | Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual | High Radiation Area Offsite Dose Calculation Manual Process Control Program |
ML15264A157 | 2 January 1990 | Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 | Health Physics Network |
ML16152A895 | 2 January 1990 | Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. | |
ML17194A418 | 12 January 1982 | Revised Tech Spec Tables 4.2.1 & 3.2.4 Re Restoring Inoperable Indication Prior to Startup | |
ML17277A929 | 1 February 1982 | Tech Spec Page 3/4 10-5 Re Oxygen Concentration:Limiting Condition for Operation | |
ML17301A039 | 30 April 1983 | Detailed Control Room Design Reviews Program Plan. | Emergency Lighting Backfit |
ML17342B064 | 30 December 1987 | Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co. | Systematic Assessment of Licensee Performance |
ML17345B406 | 15 December 1983 | Public Version of Revised Emergency Plan Implementing Procedure 1301, Emergency Roster - Offsite Emergency Organization. W/831229 Ltr | |
ML17346A460 | 8 August 1984 | Emergency Plan Implementing Procedure EPIP-1301, Emergency Roster - Offsite Emergency Organization. | |
ML17346A539 | 1 September 1984 | Emergency Plan Implementing Procedure 1107, Duties of Emergency Planning Supervisor,Offsite Emergency Organization. | |
ML17346A540 | 1 September 1984 | Emergency Plan Implementing Procedure 1211, Activation & Use of Emergency News Ctr (Turkey Point),Offsite Emergency Organization. | |
ML17347A224 | 22 December 1986 | Emergency Plan Implementing Procedures,Including Procedure 1101, Duties of Emergency Control Officer,Offsite Emergency Organization & Procedure 1102, Duties of Recovery Officer,Offsite Emergency.... W/861222 Ltr | |
ML18025B852 | 18 March 1982 | Revision a to Qualification Test Rept for Model 1801104-05 PSA 1/4 Shock. | |
ML18025B854 | 9 November 1979 | Revision R to Acceptance Test Procedure IT 527 P/N 1801104. | |
ML18025B855 | 12 December 1979 | Qualification Test Rept for Model 1801104-07 PSA 1/2 Shock Arrestor. | |
ML18025B856 | 18 March 1980 | Revision a to Qualification Test Rept for Model 1801102-05 PSA 1 Shock Arrestor. | |
ML18025B857 | 13 June 1979 | Revision T to Acceptance Test Procedure IT 519 P/N 1801102. | Breakaway torque |
ML18025B858 | 22 January 1980 | Qualification Test Rept for Model 1801106-05 PSA-3 Shock Arrestor. | |
ML18025B859 | 16 February 1979 | Revision R to Acceptance Test Procedure IT 524 for 1801106. | Breakaway torque |
ML18025B860 | 25 January 1980 | Qualification Test Rept for Model 1801103-07 PSA 10 Shock Arrestor. | |
ML18025B861 | 15 August 1979 | Revision R to Acceptance Test Procedure IT 523 P/N 1801103. | |
ML18025B862 | 7 February 1980 | Revision a to Qualification Test Rept for Model 1801112-11 PSA-35 Shock Arrestor. | |
ML18025B865 | 10 May 1977 | Revision J to Acceptance Test Procedure IT 534 P/N 1801112. | Breakaway torque |
ML18025B867 | 12 May 1980 | Qualification Test Rept for Model 1801119-11 PSA-100 Shock Arrestor. | |
ML18025B868 | 7 April 1977 | Revision H to Acceptance Test Procedure IT 533 P/N 1801119. | Safe Shutdown Earthquake Nondestructive Examination Breakaway torque Overtravel Earthquake |
ML18047A324 | 3 May 1982 | Requalification Program - Reactor Operator & Senior Reactor Operator. | Boric Acid Shutdown Margin Fuel cladding Power change |
ML18047A351 | 31 May 1982 | EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package. | |
ML18047A352 | 31 May 1982 | Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept. | Loop seal Stroke time |
ML18047A353 | 31 March 1982 | EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1 | Boric Acid |
ML18047A665 | 5 November 1982 | Proposed Tech Spec Changes to Licenses DPR-6 & DPR-20 Re Administrative Controls,Providing coordinated,company-wide Safety Mgt Program.Proposed Tech Specs Supersede 820720 Submittal | Fire Protection Program |
ML18086B343 | 31 January 1982 | X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept. | |
ML18092B498 | 28 February 1986 | Number 1,Generator Operating Guide. | |
ML18092B499 | 20 March 1987 | Artificial Island Stability Limitation Operating Restrictions. | High winds |
ML18130A403 | 16 December 1981 | Nuclear Environ Qualification of Module Case & Electric & Electronic Components of Pc Boards & Plug-In Modules of Remote Multiplexer Units,Models MC170AD-Q2 & MC370AD-Q2 for Validyne Engineering Corp. | |
ML18139B838 | 8 April 1982 | Emergency Operations Facility. | |
ML18141A045 | 18 May 1983 | Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide. | Boric Acid Health Physics Network Post Accident Monitoring Design basis earthquake Earthquake |
ML18141A530 | 1 March 1984 | Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 | Backfit |
ML18142A092 | 31 October 1982 | Rev B to Nuclear Environ Qualification of Remote Multiplexer Unit Models MC170AD-Q2 & MC370AD-Q2 & Associated Pc Boards & Plug-In Modules. | |
ML18142A093 | 2 October 1981 | Rev 0 to Procedure 466, Insp Record Checklist. | |
ML18142A094 | 19 November 1980 | Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys. | |
ML18142A095 | 8 December 1981 | Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules. | Safe Shutdown Earthquake Earthquake |
ML18142A096 | 5 November 1984 | Procedure 466, Remote Multiplexer Integrated Functional Test Procedure. | Safe Shutdown |
ML18142A097 | 15 January 1981 | Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards). | |
ML18142A098 | 29 October 1981 | Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards). | |
ML18142A099 | 10 December 1980 | Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly. |