Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
AECM-85-0354, Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations30 June 1982Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations
B12096, Proposed Tech Spec Changes Re Fire Protection Audits31 May 1986Proposed Tech Spec Changes Re Fire Protection AuditsOffsite Dose Calculation Manual
Fire Protection Program
B12915, Proposed Tech Specs Re Administrative controls-reporting Requirements25 May 1988Proposed Tech Specs Re Administrative controls-reporting RequirementsAnnual Radiological Environmental Operating Report
B13098, Proposed Tech Specs Re Administrative Controls & Organizational Charts13 March 1989Proposed Tech Specs Re Administrative Controls & Organizational ChartsSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes29 June 1989Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for TubesOperating Basis Earthquake
Earthquake
B13256, Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual25 May 1989Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring ManualHigh Radiation Area
Offsite Dose Calculation Manual
Process Control Program
ML15264A1572 January 1990Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21Health Physics Network
ML16152A8952 January 1990Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations.
ML17194A41812 January 1982Revised Tech Spec Tables 4.2.1 & 3.2.4 Re Restoring Inoperable Indication Prior to Startup
ML17277A9291 February 1982Tech Spec Page 3/4 10-5 Re Oxygen Concentration:Limiting Condition for Operation
ML17301A03930 April 1983Detailed Control Room Design Reviews Program Plan.Emergency Lighting
Backfit
ML17342B06430 December 1987Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co.Systematic Assessment of Licensee Performance
ML17345B40615 December 1983Public Version of Revised Emergency Plan Implementing Procedure 1301, Emergency Roster - Offsite Emergency Organization. W/831229 Ltr
ML17346A4608 August 1984Emergency Plan Implementing Procedure EPIP-1301, Emergency Roster - Offsite Emergency Organization.
ML17346A5391 September 1984Emergency Plan Implementing Procedure 1107, Duties of Emergency Planning Supervisor,Offsite Emergency Organization.
ML17346A5401 September 1984Emergency Plan Implementing Procedure 1211, Activation & Use of Emergency News Ctr (Turkey Point),Offsite Emergency Organization.
ML17347A22422 December 1986Emergency Plan Implementing Procedures,Including Procedure 1101, Duties of Emergency Control Officer,Offsite Emergency Organization & Procedure 1102, Duties of Recovery Officer,Offsite Emergency.... W/861222 Ltr
ML18025B85218 March 1982Revision a to Qualification Test Rept for Model 1801104-05 PSA 1/4 Shock.
ML18025B8549 November 1979Revision R to Acceptance Test Procedure IT 527 P/N 1801104.
ML18025B85512 December 1979Qualification Test Rept for Model 1801104-07 PSA 1/2 Shock Arrestor.
ML18025B85618 March 1980Revision a to Qualification Test Rept for Model 1801102-05 PSA 1 Shock Arrestor.
ML18025B85713 June 1979Revision T to Acceptance Test Procedure IT 519 P/N 1801102.Breakaway torque
ML18025B85822 January 1980Qualification Test Rept for Model 1801106-05 PSA-3 Shock Arrestor.
ML18025B85916 February 1979Revision R to Acceptance Test Procedure IT 524 for 1801106.Breakaway torque
ML18025B86025 January 1980Qualification Test Rept for Model 1801103-07 PSA 10 Shock Arrestor.
ML18025B86115 August 1979Revision R to Acceptance Test Procedure IT 523 P/N 1801103.
ML18025B8627 February 1980Revision a to Qualification Test Rept for Model 1801112-11 PSA-35 Shock Arrestor.
ML18025B86510 May 1977Revision J to Acceptance Test Procedure IT 534 P/N 1801112.Breakaway torque
ML18025B86712 May 1980Qualification Test Rept for Model 1801119-11 PSA-100 Shock Arrestor.
ML18025B8687 April 1977Revision H to Acceptance Test Procedure IT 533 P/N 1801119.Safe Shutdown Earthquake
Nondestructive Examination
Breakaway torque
Overtravel
Earthquake
ML18047A3243 May 1982Requalification Program - Reactor Operator & Senior Reactor Operator.Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML18047A35131 May 1982EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package.
ML18047A35231 May 1982Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept.Loop seal
Stroke time
ML18047A35331 March 1982EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1Boric Acid
ML18047A6655 November 1982Proposed Tech Spec Changes to Licenses DPR-6 & DPR-20 Re Administrative Controls,Providing coordinated,company-wide Safety Mgt Program.Proposed Tech Specs Supersede 820720 SubmittalFire Protection Program
ML18086B34331 January 1982X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept.
ML18092B49828 February 1986Number 1,Generator Operating Guide.
ML18092B49920 March 1987Artificial Island Stability Limitation Operating Restrictions.High winds
ML18130A40316 December 1981Nuclear Environ Qualification of Module Case & Electric & Electronic Components of Pc Boards & Plug-In Modules of Remote Multiplexer Units,Models MC170AD-Q2 & MC370AD-Q2 for Validyne Engineering Corp.
ML18139B8388 April 1982Emergency Operations Facility.
ML18141A04518 May 1983Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide.Boric Acid
Health Physics Network
Post Accident Monitoring
Design basis earthquake
Earthquake
ML18141A5301 March 1984Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737Backfit
ML18142A09231 October 1982Rev B to Nuclear Environ Qualification of Remote Multiplexer Unit Models MC170AD-Q2 & MC370AD-Q2 & Associated Pc Boards & Plug-In Modules.
ML18142A0932 October 1981Rev 0 to Procedure 466, Insp Record Checklist.
ML18142A09419 November 1980Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys.
ML18142A0958 December 1981Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules.Safe Shutdown Earthquake
Earthquake
ML18142A0965 November 1984Procedure 466, Remote Multiplexer Integrated Functional Test Procedure.Safe Shutdown
ML18142A09715 January 1981Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards).
ML18142A09829 October 1981Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards).
ML18142A09910 December 1980Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly.