Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-87-299, Ack Receipt of Util Describing Program for Training & Qualifying Individuals for Dual Role Senior Reactor Operator/Shift Technical Advisor Positions.Future Personnel in Dual Positions Should Meet Listed Criteria | 22 April 1987 | Ack Receipt of Util Describing Program for Training & Qualifying Individuals for Dual Role Senior Reactor Operator/Shift Technical Advisor Positions.Future Personnel in Dual Positions Should Meet Listed Criteria | |
IA-87-368, Marked-up Ltr Re Allegations at Plant by Individual Expressing Concern About Health Physics Practices in Containment Bldg Per 861204 Telcon W/H Kerch of Region I. Investigation to Be Conducted Re Program Problems | 10 December 1986 | Marked-up Ltr Re Allegations at Plant by Individual Expressing Concern About Health Physics Practices in Containment Bldg Per 861204 Telcon W/H Kerch of Region I. Investigation to Be Conducted Re Program Problems | |
IA-87-554, Discusses Schedule for Radiological Safety Review of Application for CPs for Plant.Summary of More Important Radiological Safety Review Milestones Encl for Info & Review | 4 August 1977 | Discusses Schedule for Radiological Safety Review of Application for CPs for Plant.Summary of More Important Radiological Safety Review Milestones Encl for Info & Review | |
IR 05000029/1989014 | 31 August 1989 | Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted | |
IR 05000213/1986004 | 18 June 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/86-06, 50-336/86-06 & 50-213/86-04.Progress & Established Milestones for Training Program Noted | |
IR 05000219/1986015 | 18 June 1986 | Forwards Safety Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted | |
IR 05000219/1988027 | 14 October 1988 | Forwards Insp Repts 50-219/88-27 & 50-289/88-25 on 880913- 19.No Violations Noted | Biofouling |
IR 05000237/1984015 | 15 May 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-373/84-25, 50-374/84-32,50-237/84-15,50-249/84-14,50-254/84-15, 50-265/84-13,50-295/84-19 & 50-304/84-20 | |
IR 05000259/1986001 | 11 August 1986 | Confirmatory Action Ltr Re 860808 Telcon Concerning Encl Corrective Actions from Insp Repts 50-259/86-01, 50-260/86-01,50-296/86-01,50-327/86-01 & 50-328/86-01.Encl Withheld (Ref 10CFR2.790(d) & 73.21) | |
IR 05000277/1985098 | 9 December 1986 | Forwards SALP Repts 50-277/85-98 & 50-278/85-98 for Apr 1985 - Jan 1986 & 50-352/85-99 for Dec 1984 - Jan 1986. Improvement Needed in Limerick Security/Safeguards & Peach Bottom Surveillance,Maint,Licensing & Security/Safeguards | Safe Shutdown Half scram Ultimate heat sink Fire Barrier Stroke time Tornado Missile Weld Overlay Hydrostatic Coatings Nondestructive Examination Missed surveillance Scram Discharge Volume Systematic Assessment of Licensee Performance Excess Flow Check Valve Continuous fire watch Fire Watch Grace period Inattentive Unidentified leak Overexposure Affidavit |
IR 05000293/1984025 | 29 November 1984 | Forwards Order Modifying License & Notices of Violation & Deviation from Insp Repts 50-293/84-25 & 50-293/84-29 on 840806-10 & 840824 | |
IR 05000324/1976008 | 23 April 1976 | Forwards IE Insp Rept 50-324/76-08 on 760322-26 & 0330-0402. Violations Noted.Supporting Documentation Encl | |
IR 05000336/1983017 | 12 June 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Unresolved Item Noted in Insp Rept 50-336/83-17 | |
IR 05000336/1985025 | 14 August 1985 | Forwards Insp Rept 50-336/85-25 for Consideration.Design Change Problem Identified in Rept Detail 2.f Considered to Have Potential Applicability to Work of Plant Design Change Task Group.W/O Encl | |
IR 05000338/1984039 | 4 April 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Repts 50-338/84-39 & 50-339/84-39 | |
IR 05000352/1984048 | 10 June 1985 | Forwards Insp Rept 50-352/84-48 on 840827-30 at Bechtel Corp in San Francisco,Ca Re Allegations Concerning Structural & Piping Design Activities at Hope Creek,Limerick & Susquehanna.No Allegations Re Hope Creek Substantiated | Earthquake |
IR 05000366/1983023 | 6 January 1984 | Forwards Corrected Page 2 to 831227 Proposed Imposition of Civil Penalties Based on Violations Noted in Insp Rept 50-366/83-23 Re Improper Shutdown.Correction Due to Administrative Oversight | Fire Barrier Liquid penetrant |
IR 05000454/1987032 | 30 October 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/87-32, 50-455/87-30 & 50-456/87-28.Assignment of Severity Level IV Appropriate | |
IR 05000482/1985022 | 2 August 1985 | Forwards Insp Rept 50-482/85-22 on 850423-25.No Violations or Deviations Noted.W/O Rept | |
ML20052C111 | 29 April 1982 | Responds to Generic Ltr 81-36,Revised Schedule for Completion of TMI Action Item II.D.1,(Relief & Safety Valve Testing). Valves Tested Represent Safety & Relief Valve Designs | |
ML20054E838 | 1 June 1982 | Advises That Revision 10 to Quad Cities Station Security Plan & Revision 11 to Dresden Nuclear Power Station Security Plan Transmitted by Util 810610 & 1027 Ltrs,Respectively, Consistent W/Provisions of 10CFR50.54(p) & Approved | |
ML20054F254 | 10 June 1982 | Requests Util Address Encl Concerns on Loose Parts Monitoring Program in Final Design Rept | |
ML20054H510 | 17 June 1982 | Approves Util 810518 & 0727 Requests to Withhold Repts YAEC-1249P & YAEC-1265P from Public Disclosure,Per 10CFR2.790 | |
ML20054K127 | 15 June 1982 | Forwards IE Enforcement Meeting Repts 50-269/82-20, 50-270/82-20,50-287/82-21 & 50-369/82-19 on 820521.No Noncompliance Noted | |
ML20054K255 | 23 June 1982 | Forwards IE Safeguards Insp Repts 50-338/82-22,50-339/82-22, 50-280/82-18 & 50-281/82-18 on 820616-18.No Noncompliance Noted | |
ML20054K976 | 22 June 1982 | Notifies That Use of Subsections NC-4427,ND-4427 & NE-4427 in Winter 1981 Addenda to Section III of ASME Boiler & Pressure Vessel Code Acceptable for Use to Meet Fillet Weld Requirements | |
ML20054K991 | 25 June 1982 | Forwards Amends 85,50 & 78 to Licenses DPR-21,DPR-61 & DPR-65,respectively & Notice of Issuance & Availability. Amends Reflect Organizational Changes & Increase in Millstone Plant Fire Brigade from Three to Five Members | |
ML20054M114 | 2 July 1982 | Forwards Systematic Assessment of Licensee Performance for Jul 1980-June 1981.Mgt Attention at Facilities Agressively Oriented Toward Nuclear Safety | Systematic Assessment of Licensee Performance |
ML20054M846 | 9 September 1981 | Expresses Gratitude for Hospitality Extended During Site Visit | |
ML20054M929 | 23 June 1982 | Forwards IE Insp Repts 50-280/82-16,50-281/82-16, 50-338/82-16 & 50-339/82-16 on 820518-19.No Noncompliance Noted | |
ML20054N055 | 1 July 1982 | Forwards IE Insp Repts 50-237/82-08,50-249/82-09, 50-254/82-09 & 50-265/82-10 on 820503-06 & 17-18 & Notice of Violation | |
ML20055A109 | 22 June 1982 | Confirms 820622 Telcon Re Staff Augmentation Times at Facility in Event of Emergency | |
ML20055A615 | 13 July 1982 | Confirms 820714 Meeting W/Util in Glen Ellyn,Il to Discuss Proposals Re Completion of IE Bulletin 79-14 Requirements | |
ML20055A830 | 2 July 1982 | Forwards Control Room Design Review Technical Evaluation Rept.Rept Documents NRC Positions on Snupps Responses to Human Engineering Discrepancies in Control Room | |
ML20055A977 | 14 July 1982 | Confirmatory Action Ltr Re 820714 Meeting to Complete IE Bulletin 79-14 Requirements.Region 3 Will Be Informed of Listed Actions Taken on Any Potential Deviations | |
ML20055B042 | 9 July 1982 | Advises That 10 & 50-mile Radius Emergency Planning Maps & Emergency Response Photographs Will Be Forwarded Under Separate Cover.List of Maps & Explanation of Use Encl | |
ML20055B651 | 7 July 1982 | Forwards IE Insp Repts 50-213/82-13,50-245/82-14, 50-336/82-15 & 50-423/82-07 on 820607 & 08.No Noncompliance Noted | |
ML20055C392 | 26 February 1990 | Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) | |
ML20058C672 | 29 June 1982 | Forwards IE Insp Repts 50-269/82-25,50-270/82-25, 50-287/82-25 & 50-369/82-22 on 820607-09.No Noncompliance Noted | |
ML20062C203 | 27 July 1982 | Forwards Summary of NRC 820721 Meeting W/Westinghouse in Bethesda,Md Re Progress in Resolving Accelerated Tube Wear at Operating Plants W/Westinghouse Model D Steam Generators, Since Facilities Will Utilize Models D-4 & D-5 | |
ML20062E327 | 30 July 1982 | Advises That Fee Sent w/820120 Application for Exemption from Safeguarding Requirements of 10CFR73.21 Will Be Refunded | |
ML20062F100 | 30 July 1982 | Forwards Request for Addl Info Re Water Hammer Prevention Per Event at Krsko Reactor in Yugoslavia.Test Plan to Verify That Water Hammer Will Not Occur Should Be Provided | |
ML20126C599 | 28 February 1980 | Forwards Addl Info Needed to Evaluate Mgt & Technical Resources Available to Licensees.Representative of Teknekron Will Contact Licensees by Telephone to Obtain Data | |
ML20126D360 | 22 June 1984 | Forwards Request for Addl Info to Complete Review of 840604 Application for Exemption to GDC 17,10CFR50,App A.Info Requested by 840706 | Exemption Request |
ML20126D835 | 11 June 1980 | Ltr to All Operating PWRs Requesting Amend to Tech Specs Re Decay Heat Removal Capability.Amend Is Necessary to Provide Permanent long-term Assurance That Redundancy Will Be Maintained |