l JUl. 2 71982 Docket Hos.: STN 50-454, STN 50-455 and STN 50-456, STN 50-457 Mr. Louis 0. DelGeorge Director of Nuclear Licensing Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. DelGeorge:
Subject:
Sumary of Meeting with Westinghouse on !!odel D and E Steam Generators A proprietary meeting was held with Westinghouse on July 21, 1982 to discuss progress made in resolving accelerated tube wear experienced on operating plants with Model D steam generators. Since Byron and Braidwood Stations will utilize Models D-4 and D-5 steam generators a sumary of the issues discussed is attached for your information.
Sincerely, Original signed t7:
N StophenH. Chesnut
}
B. J. Youngblood, Chief Licensing Branch No.1 Division of Licensing
Attachment:
As stated cc: See next page lgj8050193820727 ADOCK 05000454 4
- co /
f o,,.c.,.s
.1
.9ddn.b..u.pg.%
L
. _., sc nuux.t.... m m.....
. ah
../J.)./.82 7
82
.../.8.4/.82 7
7 on.>
OFFIClAL RECORD COPY usoeo: mi-335..e0 NRC FORM 318 (10-80) NRCM 0243
l J
Mr. Louis 0. DelGeorge l
Director of Nuclear Licensing i
Ccm:nonwealth Ediscn Company i.
Post Office Box 767 l
Chicago, Illinois 60590 I
cc:
Mr. William Kortier Atcalic Power Distribution Westinghouse Electric Corporation Post Office Box 355 Pittsburgh, Peansylvania 15230 Paul M. Murphy, Esq.
Isham, Lincoln & Beale j
One First National Plaza i
42nd Floor I
Chicago, Illinois. 60603 C. Allen Bock, Esq.
Post Office Box 342 i
Urbana, Illinois 61801
\\
i Thomas J. Gordon, Esq.
Waaler, Evans & Gordon l
2503 S. Heil Champaign, Illinois 61820 i
Ms. Bridget Little Roreia Appleseed Coordinator l
117 North Linden Street l
Essex, Illinois 60935 i
l Mr. Edward R. Crass j
Nuclear Safeguards and Licensing Division Sargent & Lundy Engineers i
55 East Monroe-Street Chicago, Illinois 60603 U. S. Nuclear Regulatory Commission Pssident Inspectors Office RR#1, Box 79 r
Braceville, Illinois 60407 Mr. James G. Keppler U. S. "RC, Region III I
799 Roosevelt Rcad Glen Ellyn, Illinois 60137 i
t i
i t
e 4
i Mr. Lcuis 0. DelGeorge i
Drisctor of 'uclear Licensing I
Cc conitealth Edican Ccapany I
Post Office Box 767 I
Chicago, Illinois 60690 i
4 3
Mr. Ja:r,es G. Keppler cc:
Mr. William Kortier Atcr.ic Pcwcr Distributien U. S. URC, Region III
!!estinghcuse Electric Corporation 799 Roosevelt Road Post Office Box 355 Glen Ellyn, Illinois 60137 j
Pittsburgh, Pennsylavania 15230 i
1 l
Paul M. Murphy, Esq.
Isha:n, Lincoln & Beale j
Cne First National Plaza 42nd Floor i
Chicago, Illinois 60603 j
Y.rs. Phillip B. Johnson i
1907 Stratford Lane i
Rockford, Illinois 61107 i
i Ms. Bridget Little Rorem l
i Appleseed Coordinator l
117 North Linden Street i
j.
Essex, Illinois 60935 Dr. Bruce von Zellen l
Department of Biological Sciences Northern Illinois University I
CeKalb, Illinois 61107 Mr. Edward R. Crass j
Nuclear Safeguards and Licensing Division Sargent & Lundy Engineers 55 East Monroe Street l
Chicago, Illinois 60603 Myron Cherry, Esq.
Cherry & Flynn Suite 3700 Three First National Plaza l
i Chicago, Illinois 60502 Mr. William Fourney l
U. S. Nuclear Regulatory Ccrxiission Eyron/ Resident Inspectors Orrice l
4443 Gerran Church Road j
1 j
Eyran, Illinois 61010 1
i i
"s.
Diane Chavez j
6Dr Cek. Street, Apt. F4 Reckford, Illinois 61103 1
l 1
ll
- r auq
[{$...f[k UNITED STATES q
NUCLEAR REGULATORY COMMISSION
- p rQg)/7l WAsnmc Ton, o. c. 2cscs 2we e
x.s* f JUL 2 31932 Cocket No.:
50-395 MEMORANDUM FOR:
B. J. Youngblood, Chief, Licensing Branch No.1, OL FROM:
W. F. Kane, Project Manager, Licensing Branch "o. 1, DL
SUBJECT:
SUFF.ARY OF MEETING REGARDING WESTINGHOUSE MODEL D AND E STEAM GENER/sTCRS A meeting was held on July 21, 1982 in Bethesda, Maryland with representatives frca Westinghouse and a nu;r.ber of utilities that had purchased plants utilizing these stean generators. A list of attendees is provided in the enclosure.
The purpose of the neeting was to have Westin5 ouse discuss the progress made h
since our last neeting in resolving the accelerated tube wear experienced on operating plants with Model D steam generators. A summary of the previous meeting which was held on May 14, 1982 is provided in a acmorandum dated May 70,198?. fro, W. Kane to B. J. Youngblood.
The aajor points made by Westinghouse at the meeting for the 02/03 program are as follows:
1.
Ma'ar Developments Preliminary design completed Fabrication develcpment initiated Long lead naterial precured Teoling and procedures development 50% complete Cne month cperation of 75% ccmpleted on McGuire Full scale testing facility (SSPB) ccm.aissioned 2.
Open Itens Full scale verification testing Tube vibration acceptance criteria 3.
Hear Tera Milestones SSP 3 initial tests complete - 7/22/82 Hich temperature tests ccmplete - 7/16/82 Final design review complete - 8/11/82 Third party review ccomplete - 8/16/82 First plant medi;ication hardware conplete - 8/30/82 Tccling, procedures, and trained crcw available - 9/14/82 Maior nilestenes in the 04/05/E program were given as follows:
Generic countert'lew S/G program definiticn - complete Scale mcdel testing - comenced KRSK0 ;ysten r.cdifications - cc.nple te
_Y' D TJfiT"l/
... ~ -
2-i JUL 2 31932 i
r Diagnostic data available fron KRSK0 - 8/15/32 Scale model testing coraplete - 11/1/82 Design review and generic modification selection - 1/3/83 i
It ws agreed that a followup generic meetincJ with Westinghouse would be appro -
priate in about a c.onth.
i
_,l,/'j f i
?$ ~
/' /;
W.
F'. Kane, Project Manacer
[
Licensing Branch No. 1-Division of Licensing
Enclosures:
l As stated cc: See next page i
l 4
i i
i 1
I i
4 i
l 1
1 i
i I;
i I
i i
I i
w -
a y-4w-i-y-s..g-pe,v, ug%-,--..we gp-w.%,.._,g-w,q.,
-y-g-
,%m-y,%,,wp-gm..wg-g,-%p-.,-w,9
.,w-.ewqw 9 m y-g-.e+-,,--eumwp%
y---wsym7i..p.
.4e-g,---g
~ __.
i ENCLOSURE LIST CF ATTENDEES NRC Staff
'!estinghouse Duke Power
^
W. Kane T. Timacas S. Copp R. Tedesco J. Schuities J. Youngblood R. Math T. Ippolito G. Calhoun 3echtel
- 0. Parr P. McDoncugh S. Chesnut W. Cummins N. Chapman 4
C. Liang L. Clements E. Licitra H. Bermudez R. Serbu M. Spennati TSI H. Conrad D. Burns L. Frank N. Singleton J. McEwen*
R. Birkel l
K. Kiper i
D. Sells Argonne National Laboratory CNASCO E. Adensan T. Kenyon M. Wambsganss A. Surillo l
H. Brammer J. Rajan
- 3. Singh TVA Co=nonwealth Edison R. Martin j
S. Eurwell D. Kulisek T. Tramm G. Wiedenhacer S. Stout J. Gallo 4
4 4
6 1
i I
i j
- Part time attendee - not cleared for proprietary information 4.
4
-7
=
w y
.,,,v-..
y.%-i-
,m
--,-m-
1 I
T i
Mr. O. i!, Dixon, Jr, Vice Preside.nt,' Nuclear Operations-l South Carolina Electric & Gas Company
~
Pos.L Office Sox 764 (Mail Coda F-04) j Columbia, South Carolina 29218
. cc:
Mr. Henry Cyrus Scnior Vice President 1
South Carolina Public Service Authority 1
223 North Live Oak Drive l
3 Moncks Ccrner, South Carolina 29461 r
l l
i J. 3. Knotts, Jr., Esq.
l Debevoise & Liberman l
l 12C0 17th Street, N. W.
~
Washington, D. C.
20036 i
Mr. Mark 3. Whitaker, Jr.
Group Manager - Nuclear Engineering & Licensing South Carolina Electric & Gas Company l
Post Office 764 i
Columbia, South Carolina 29218 I
Mr. Brett Allen Bursey i
Route 1, Box 93C I
Little Mcuntain, South Carolina 29076 I
Resident Inspector / Summer NPS c/o U. S. NRC
- ~~
Route 1, Box 64 Jenkinsville, South Carolina 29065 i
i Mr. James P. O'Reilly U. S. NRC, Region II 101 Marietta Street Suite 3100
.30303 l
Atlanta, Georgia I
i k
i l
i e
b
-em-,-,
, - - - - - - - - - - - - - -,. - - - - - - - - - - ~ - - - -
r-F.EETI!;G SU:T.ARY MOREssER6ruF611(STM ?S0?454';35577456 ~snT457F "
- RC P!?R
~~~
JUL 2 7 E32 L PDR TERA I;S IC LBill Rdg.
- '.Rus hb reu k Project P.anager EC11eslui/KKirnr_ _
At.torney, OELD OIE Regicnal A& inistrator, Region 3
PARTICIPA'!TS (!;RC):
SGoldberg 4
l 4