ML20054M929

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-280/82-16,50-281/82-16, 50-338/82-16 & 50-339/82-16 on 820518-19.No Noncompliance Noted
ML20054M929
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 06/23/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20054M930 List:
References
NUDOCS 8207150157
Download: ML20054M929 (2)


See also: IR 05000280/1982016

Text

(

, .-

JUN 2 31992

Virginia Electric and Power Company

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Subject: Report Nos. Q 8/8 M 62 50-339/82-16, 50-280/82-16 and

50-281/82-16

This refers to the special safety inspection conducted by Mr. R. H. Brickley

of the vendor programs branch on May 18-19, 1982, of activities authorized

by NRC Operating License Nos. NPF-4, NPF-7, OPR-23 and DPR-37 for the

North Anna and Surry facilities and to the discussion of our findings held

with Mr. L. M. Girvin, Manager, Nuclear Fuel, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure: See page 2

8207150157 820623

PDR ADOCK 05000280

G PDR

TEol

i

.

.

.*

Virginia Electric and Power Company 2

Enclosure:

Inspection Report Nos. 50-338/82-16,

50-339/82-16, 50-280/82-16 and

50-281/82-16

cc w/ enc 1:

P. G. Godwin, Director. Nuclear Security

J. H. Ferguson, Executive

Vice President

W. R. Cartwright, Station Manager

J. L. Wilson, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

Commonwealth of Virginia

P. T. Burnett, RII

C. Julian, RII

RII RI RII RII RII

W N f3 / y

RHBrickley:gr PTBurnett KLan i CJu l thn HCha%

nt l

'

6/ 7/82 6/f/82 6/d8c 6/g82 6/p3/8