05000400/LER-2016-001 | 1 September 2016 | Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions LER 16-001-00 for Shearon Harris, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions | Safe Shutdown Tornado Missile Enforcement Discretion Tornado-Generated Missile Tornado Missile Protection |
05000400/LER-2016-002 | 19 September 2016 | 'A' Essential Services Chilled Water Chiller Trip due to Oil Leak from Failed Tube Fitting LER 16-002-00 for Shearon Harris, Unit 1, Regarding 'A' Essential Services Chilled Water Chiller Trip Due to Oil Leak from Failed Tube Fitting | Mission time Stress corrosion cracking |
05000400/LER-2016-004 | 7 December 2016 | Reactor Trip and Safety Injection During Turbine Control Testing at Low Power LER 16-004-00 for Shearon Harris, Unit 1, Regarding Reactor Trip and Safety Injection During Turbine Control Testing at Low Power | Probabilistic Risk Assessment Overspeed trip |
05000400/LER-2016-005 | 7 December 2016 | Offsite Power Undervoltage Caused Actuation of Several Systems LER 16-005-00 for Shearon Harris Nuclear Power Plant, Unit 1 Regarding Offsite Power Undervoltage Caused Actuation of Several Systems | High winds Probabilistic Risk Assessment |
05000400/LER-2016-006 | 14 December 2016 | Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void LER 16-006-00 For Shearon Harris Nuclear Plant, Unit 1 Regarding Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void | Nondestructive Examination Stress corrosion cracking Through-Wall Leakage Dissimilar Metal Weld |
05000400/LER-2016-007 | 9 February 2017 | Containment Spray System Valve Actuation LER 16-007-01 for Shearon Harris Unit 1, Regarding Containment Spray System Valve Actuation | |
BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name | 20 April 2013 | License Amendment Request to Facility Operating Licenses for Change of Licensee Name | Safe Shutdown Cyber Security Safeguards Contingency Plan License Renewal Offsite Circuit Fire Protection Program Power Uprate |
HNP-00-008, Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter | 14 January 2000 | Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter | Fitness for Duty Earthquake Siren |
HNP-01-157, Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9) | 7 December 2001 | Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9) | Severe Accident Management Guideline Earthquake Siren |
HNP-02-006, Withdrawal of License Amendment Request Technical Specifications 3/4.3.2, 3/4.3.3.1, 3/4.6.1.1, 3/4.6.1.7, 3/4.6.3, 3/4.9.4 & 3/4.9.9 | 29 January 2002 | Withdrawal of License Amendment Request Technical Specifications 3/4.3.2, 3/4.3.3.1, 3/4.6.1.1, 3/4.6.1.7, 3/4.6.3, 3/4.9.4 & 3/4.9.9 | |
HNP-02-009, Supplemental Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | 28 January 2002 | Supplemental Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | VT-2 |
HNP-02-016, Annual Operating Report for 2001 | 19 February 2002 | Annual Operating Report for 2001 | |
HNP-02-018, January 2002 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 15 February 2002 | January 2002 Monthly Operating Report for Shearon Harris Nuclear Power Plant | Power Uprate |
HNP-02-033, Submittal of Revision 2 to the Physical Security and Safeguards Contingency Plan | 28 March 2002 | Submittal of Revision 2 to the Physical Security and Safeguards Contingency Plan | Safeguards Contingency Plan |
HNP-02-035, Twenty-day Response to Order for Interim Safeguards and Security Compensatory Measures for Shearon Harris Nuclear Power Plant | 18 March 2002 | Twenty-day Response to Order for Interim Safeguards and Security Compensatory Measures for Shearon Harris Nuclear Power Plant | |
HNP-02-049, Revised EPIP PEP-430, Rev 2, Routine Maintenance & Testing of Dialogic System. | 25 March 2002 | Revised EPIP PEP-430, Rev 2, Routine Maintenance & Testing of Dialogic System. | |
HNP-02-050, Request for License Amendment Startup Test Report | 1 April 2002 | Request for License Amendment Startup Test Report | Hydrostatic Eddy Current Testing Power Uprate |
HNP-02-051, Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End | 1 April 2002 | Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End | Hydrostatic VT-2 |
HNP-02-052, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | 2 April 2002 | Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Boric Acid Time of Discovery Hydrostatic VT-2 Stress corrosion cracking Pressure Boundary Leakage Through-Wall Leakage Operational leakage |
HNP-02-055, NRC Correspondence Addressee Change Request | 9 April 2002 | NRC Correspondence Addressee Change Request | |
HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 2001 | 23 April 2002 | Annual Environmental (Non-Radiological) Operating Report for 2001 | Biofouling Power Uprate |
HNP-02-059, Annual Radiological Environmental Operating Report for 2001 | 30 April 2002 | Annual Radiological Environmental Operating Report for 2001 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
HNP-02-060, Annual Radioactive Effluent Release Report for 2001 | 23 April 2002 | Annual Radioactive Effluent Release Report for 2001 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Tritium Power change Power Uprate |
HNP-02-063, 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | 15 May 2002 | 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Boric Acid Hydrostatic VT-2 Stress corrosion cracking Pressure Boundary Leakage Pressure boundary leak Through-Wall Leakage Operational leakage |
HNP-02-066, NPDES Permit Renewal Issued | 6 May 2002 | NPDES Permit Renewal Issued | Grab sample Hydrostatic |
HNP-02-078, Request for Emergency License Amendment, Revises TSs 3/4.3.3.6 | 29 May 2002 | Request for Emergency License Amendment, Revises TSs 3/4.3.3.6 | Reactor Vessel Water Level Post Accident Monitoring |
HNP-02-088, Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 | 8 July 2002 | Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 | Offsite Circuit |
HNP-02-093, Request for License Amendment Technical Specifications 3/4.9.9 | 28 August 2002 | Request for License Amendment Technical Specifications 3/4.9.9 | |
HNP-02-095, Change to Emergency Plan Implementing Procedure | 1 July 2002 | Change to Emergency Plan Implementing Procedure | |
HNP-02-113, Request for License Amendment, Response Time Testing Elimination | 30 August 2002 | Request for License Amendment, Response Time Testing Elimination | Shutdown Margin Packing leak Process Control Program Pressure Boundary Leakage |
HNP-02-115, On-Site Storage of Classified Information for the NRC | 23 August 2002 | On-Site Storage of Classified Information for the NRC | |
HNP-02-118, 30-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs | 12 September 2002 | 30-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs | Boric Acid Non-Destructive Examination Nondestructive Examination VT-2 Stress corrosion cracking Pressure Boundary Leakage Through-Wall Leakage Operational leakage |
HNP-02-119, Notification of Full Compliance with Order for Interim Safeguards and Security Compensatory Measures | 6 September 2002 | Notification of Full Compliance with Order for Interim Safeguards and Security Compensatory Measures | |
HNP-02-124, Cycle 11, Startup Test Report Revision 1 | 19 September 2002 | Cycle 11, Startup Test Report Revision 1 | Hydrostatic Eddy Current Testing Power Uprate |
HNP-02-125, Emergency Core Cooling System Evaluation Changes | 16 September 2002 | Emergency Core Cooling System Evaluation Changes | Power Uprate |
HNP-02-126, Unit No.1, Application for TS Change Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process | 26 September 2002 | Unit No.1, Application for TS Change Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process | Time of Discovery Offsite Dose Calculation Manual Incorporated by reference Missed surveillance Annual Radioactive Effluent Release Report |
HNP-02-129, Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations. | 19 September 2002 | Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations. | Earthquake Siren |
HNP-02-141, Request for License Amendment - Response Time Testing Elimination Supplemental Information | 21 November 2002 | Request for License Amendment - Response Time Testing Elimination Supplemental Information | |
HNP-02-142, Response to RAI Generic Ltr. 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. | 29 October 2002 | Response to RAI Generic Ltr. 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. | Flow Induced Vibration |
HNP-02-150, Approval Requested to Use Later Edition & Addenda of OM Code Approved for Use by NRC for Pressure Relief Devices Subject to IST Requirements for Remainder of Second 10-Year IST Interval | 4 December 2002 | Approval Requested to Use Later Edition & Addenda of OM Code Approved for Use by NRC for Pressure Relief Devices Subject to IST Requirements for Remainder of Second 10-Year IST Interval | |
HNP-02-153, Request for Additional Information on Amendment Application Regarding Addition of Methodology References to the Core Operation Limits Report | 21 November 2002 | Request for Additional Information on Amendment Application Regarding Addition of Methodology References to the Core Operation Limits Report | |
HNP-02-162, Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information | 16 December 2002 | Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information | |
HNP-02-164, Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 24 January 2003 | Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid Weld Overlay VT-2 Stress corrosion cracking Pressure Boundary Leakage Through-Wall Leakage Operational leakage |
HNP-02-172, Conversion to Improved Standard TS Schedule Change | 19 December 2002 | Conversion to Improved Standard TS Schedule Change | |
HNP-03-006, Request for License Amendment - Response Time Testing Elimination Supplemental Information | 23 January 2003 | Request for License Amendment - Response Time Testing Elimination Supplemental Information | |
HNP-03-014, Request for License Amendment TS 5.6.3.d | 14 February 2003 | Request for License Amendment TS 5.6.3.d | Ultimate heat sink Time to boil Fuel cladding Power Uprate |
HNP-03-015, TS Bases Change - Containment Isolation Valves | 19 February 2003 | TS Bases Change - Containment Isolation Valves | |
HNP-03-017, Annual Operating Report - 2002 | 19 February 2003 | Annual Operating Report - 2002 | |
HNP-03-019, Change to Emergency Plan Implementing Procedures | 14 February 2003 | Change to Emergency Plan Implementing Procedures | Earthquake Siren |
HNP-03-020, January 2003 Monthly Operating Report for Shearon Harris | 5 February 2003 | January 2003 Monthly Operating Report for Shearon Harris | |