Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
LIC-94-0164, Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance24 August 1994Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML17348B5069 October 1990Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML18079A95228 October 1978Deficiency Rept:On 780928,during Routine Design Review, Undersizing of Refueling Water Storage Tank Was Discovered. Tank Storage Capacity Has Been Increased.Design Drawings for Tank Piping & Foundation Will Be Modified
ML18081A3755 October 1979Significant Deficiency Rept Re Containment Purge & pressure- Vacuum Relief Valves.Actuator Torque Values Were Insufficient to Move Valves from Open to Closed Positions W/ Design Differential Pressure of 60 Psi.Design Reviewed
ML18081A3785 October 1979Significant Deficiency Rept 79-06 Re Steam Generator Water Level Instrumentation.Pipe Breaks in Containment Could Lead to Elevated Temp Readings Which Could Result in Delayed Protection Sys Actuation.Setpoints to Be Changed
ML18081A7554 October 1979Interim Deficiency Rept Re Max Flow of RHR Pump During post- LOCA Mode.Caused by Low Sys Resistance to Pump Runout Conditions.Sys Resistance Increased by Placement of Resized Orifices
ML18081B04821 December 1979Final Deficiency Rept Re Undetectable Failure in Engineered Safety Features Actuation Sys.Testing Procedures Revised to Include Testing of Permissive Circuitry P4 on Periodic Basis.Unit Will Be Tested Prior to Operation
ML18081B0603 December 1979Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility
ML18082A14215 February 1980Final Deficiency Rept:Check Valve 2DR-7 Failed to Meet Applicable Seismic Class I Loading.Caused by Design Defect. Addl Support Will Be Completed by 800228
ML18093A47223 October 1987Part 21 Rept Re Calibr Gas Leakage Problem in Exo-Sensors, Inc Containment Hydrogen Analyzer Sys.Caused by Design Deficiency Associated W/Calibr Gas Subassembly.Monitoring Program to Be Maintained for Period After Sys Mods
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML18094A44216 May 1989Part 21 Rept Re Defect in Solid State Protection Sys. During Mods in Solid State Protection Sys Cabinets,Noted That Two Wires Became Dislodged from Circuit Board.Visual Insp & Complete Pull Test Performed
ML18094B44627 April 1990Part 21 Rept Re shaft-to-pinion Key Failures in Limitorque Actuators.Initially Reported on 900424.Caused by Reduction of cross-sectional Area & Ultimate Propagation of Cracks. Util Intends to Replace Keys in Actuators W/Keys of Steel
ML18095A22522 May 1990Part 21 Rept Re Insufficient Welds on Pedestal Support Alignment Lug & Slide Shoe for 11,12,21 & 22 Charging/Safety Injection Pumps.Initially Reported on 900516.Windows Cut in Support Pedestals to Gain Access to Affected Areas
ML18095A23224 May 1990Part 21 Rept Re Discrepancies Identified in ECCS Flow Orifice K Factors Supplied by Westinghouse.Initially Reported on 900518.Util Fabricated New Orifice Plates to Original SpecsUnanalyzed Condition
ML18095A4032 August 1990Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency
ML18096B2421 February 1993Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl
ML18100A76813 December 1993Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced
ML18100B19130 June 1994Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability
ML18100B21014 July 1994Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited
ML18100B22725 July 1994Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited
ML18100B23927 July 1994Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented
ML18101A8611 August 1995Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily
ML18101A8774 August 1995Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve
ML18102A33821 August 1996Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor
ML18102A3706 September 1996Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & RepairedDesign basis earthquake
ML18102A5598 August 1996Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection SysDesign basis earthquake
ML18106B04429 January 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables
ML18106B0551 February 1999Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl
ML18106B09325 February 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified
ML18107A3441 June 1999Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716
ML19290B66026 September 1979Interim Significant Deficiency Rept Re Weld Wire Documentation.Electrodes Used in post-weld Heat Treated Condition Were Not Properly Tested.Caused by Discrepancy in Procedures.Procedures Will Be Revised by 800118
ML19290E03218 January 1980Second Interim Rept Re Pittsburgh Des Moines Use of 8018-C3 Weld Filler Metal.New Electrode Spec Issued,Welding Procedures Revised.Investigation Will Be Complete by 800314
ML19305C7533 March 1980Interim Deficiency Rept Re Main Steam Pipe Spools.Ge Issued Instructions to Restore Affected Wall Thickness to Original GE Spec Requirement.Final Rept Will Be Submitted by 800321
ML19309G7662 May 1980Potential Significant Deficiency Rept Re Discrepancy in Procurement of Weld Wire.Wire Used in post-weld,heat-treated Weldments Was Tested for Only as-welded Condition
ML19323G13725 April 1980Interim Deficiency Rept Re Primary Containment Relief Valves Potential Significant Deficiency.Determination of Corrective Action Scheduled for 800522
ML19323G42323 May 1980Second Interim Rept Re Potential Deficiency in Primary Containment Relief Valves.Initial Analysis Indicates Hinge Block Mounting Studs Inadequate.Revised Analysis by 800630
ML19324C1132 November 1989Part 21 Rept Re Defects in Instrument Racks for Use in Hatch,Inc Supplied Emergency Diesel Generator Starting Air & Lube Oil Sys.Verification of All Tube Fittings in Instrument Rack Completed & All Discrepant Fittings Corrected
ML19330B28125 June 1980Potential Significant Deficiency Rept Re Primary Containment Relief Valves Supplied by Gpe Controls.Bechtel Has Completed Review of Revised Stress Analysis Calculations.Expected Completion Date of Actions Is 800815
ML19332A6742 September 1980Part 21 Rept Re Con/Chem Epoxy Surfacer Sys.Suppls 800812 Ltr Re Subj Item Reported by Bechtel Power Corp.Will Advise of Schedule Dates of Completion When Bechtel Engineering Studies Finalized
ML19332C58320 November 1989Part 21 Rept Re Misapplication of Magnetrol Level Switches Supplied by GE W/Hpci & RCIC Turbine Assemblies.Switches Declared Inoperable & Electrically Disconnected.Magnetrol Will Modify Spare Level Switch Assemblies
ML19337B34520 August 1980Interim Deficiency Rept Re Primary Containment Relief Valves Supplied by Gpe Controls.Bechtel Review Showed Calculation Assumptions Re Seismic Analysis Require Further Vendor Justification.Next Rept by 801024
ML19340D88024 October 1980Interim Deficiency Rept Re Primary Containment Relief Valves at Facility,Initially Reported on 800326.Expected Conclusion of Investigation Has Been Postponed Until 801205
ML19340E1323 December 1980Significant Deficiency Rept,Originally Reported on 800326, Re Primary Containment Vacuum Relief Valves.Concludes That Subj Bolting Is Designed within Appropriate Stress Allowables & Conforms W/Spec 10855-M-150(Q)
ML19343A65410 November 1980Interim Deficiency Rept,Originally Reported on 801009,re Two Class 2 Carbon Steel Pipes Supplied by Labarge Inc Lacking Radiography of Longitudinal Weld Seam.Matl Returned to Labarge.Next Rept to Be Submitted on 801209Nondestructive Examination