|
---|
Category:Letter
MONTHYEARIR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, “Provide Risk-Informed Extended Completion Times - Ritstf IR 05000369/20244032024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, “Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20240102024-03-13013 March 2024 Comprehensive Engineering Team Inspection Report 05000369/2024010 and 05000370/2024010 IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits 2024-08-26
[Table view] Category:License-Operator
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents ML15125A4812015-05-0505 May 2015 Initial Exam 2014-301 Final Simulator Scenarios ML15125A4832015-05-0505 May 2015 Initial Exam 2014-301 Final Sim IN-Plant JPMs ML15125A4902015-05-0505 May 2015 Initial Exam 2014-301 Final Administrative JPMs 2024-04-02
[Table view] |
Text
ML21054A187 ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: McGuire Date of Examination: November 2020 Initials Item Task Description a b* c**
- 1. a. Verify that the outline(s) fit(s) the appropriate model in accordance with ES-401. mgd N/A dmb W
R b. Assess whether the outline was systematically and randomly prepared in accordance with mgd N/A dmb I Section D.1 of ES-401 or ES-401N and whether all K/A categories are appropriately sampled.
T T c. Assess whether the outline overemphasizes any systems, evolutions, or generic topics. mgd N/A dmb E d. Assess whether the justifications for deselected or rejected K/A statements are appropriate. mgd N/A dmb N
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major N/A N/A N/A S transients.
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number and U mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using at N/A N/A N/A A least one new or significantly modified scenario, that no scenarios are duplicated from the T applicants audit test(s), and that scenarios will not be repeated on subsequent days.
O
- c. To the extent possible, assess whether the outline(s) conforms with the qualitative and R
quantitative criteria specified on Form ES-301-4 and described in Appendix D and in Section N/A N/A N/A D.5, Specific Instructions for the Simulator Operating Test, of ES-301 (including overlap).
- 3. a. Verify that the systems walkthrough outline meets the criteria specified on Form ES-301-2:
(1) The outline(s) contains the required number of control room and in-plant tasks distributed W among the safety functions as specified on the form.
A (2) Task repetition from the last two NRC examinations is within the limits specified on the form.
N/A N/A N/A L (3) No tasks are duplicated from the applicants audit test(s).
K (4) The number of new or modified tasks meets or exceeds the minimums specified on the form.
T (5) The number of alternate-path, low-power, emergency, and radiologically controlled area H tasks meets the criteria on the form.
R O b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
U (1) The tasks are distributed among the topics as specified on the form.
N/A N/A N/A G (2) At least one task is new or significantly modified.
H (3) No more than one task is repeated from the last two NRC licensing examinations.
- c. Determine whether there are enough different outlines to test the projected number and mix of N/A N/A N/A applicants and ensure that no items are duplicated on subsequent days.
- 4. a. Assess whether plant-specific priorities (including probabilistic risk assessment and individual mgd N/A dmb plant examination insights) are covered in the appropriate exam sections.
G E b. Assess whether the 10 CFR 55.41, 55.43, and 55.45 sampling is appropriate. mgd N/A dmb N
- c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5. mgd N/A dmb E
R d. Check for duplication and overlap among exam sections and the last two NRC exams. mgd N/A dmb A
L e. Check the entire exam for balance of coverage. mgd N/A dmb
- f. Assess whether the exam fits the appropriate job level (RO or SRO). mgd N/A dmb Printed Name/Signature Date Digitally signed by Michael G. Donithan
- a. Author Michael G. Donithan Date: 2020.06.25 12:12:50 -04'00'
- b. Facility Reviewer (*) N/A Daniel M. Bacon Digitally signed by Daniel M. Bacon
- c. NRC Chief Examiner (#) Date: 2020.06.30 10:59:50 -04'00'
- d. NRC Supervisor Gerry J. McCoy Digitally signed by Gerald J. McCoy Date: 2020.06.30 14:30:28 -04'00'
- Not applicable for NRC-prepared examination outlines.
- The independent NRC reviewer initials items in column c; the chief examiners concurrence is required.