ML23307A077 | 3 November 2023 | 301 ADAMS 2B | Job Performance Measure |
ML22347A151 | 13 December 2022 | William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 | |
ML22089A164 | 30 March 2022 | 301 ADAMS 2B | Probabilistic Risk Assessment Job Performance Measure |
ML22070B051 | 11 March 2022 | 301 Post Exam Comments | Operational leakage |
ML22047A181 | 9 February 2022 | 301 Written Exam Approval Letter | |
ML21062A076 | 3 March 2021 | 301 Corporate Notification Letter | |
ML21054A134 | 23 February 2021 | 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) | Boric Acid Loss of condenser vacuum |
ML21054A187 | 23 February 2021 | 302 (Normal release)2B Exam Administrative Items | Probabilistic Risk Assessment |
ML21054A127 | 23 February 2021 | 302 Exam Final Items 2A-2 (2 Year Delayed Release) | |
ML21034A610 | 3 February 2021 | 302 1A Final RO Written Exam & Key (2-Year Delayed Release) | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area FLEX Overspeed trip Loss of condenser vacuum |
ML21034A614 | 3 February 2021 | 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area FLEX Surveillance Frequency Control Program Overspeed trip Loss of condenser vacuum |
ML21019A393 | 11 January 2021 | 1 GFE Annual Letter for Fy 2021 | Generic Fundamentals Examination COVID-19 |
ML20321A191 | 12 November 2020 | 302 Retake Exam Approval Letter | |
ML20140A065 | 19 May 2020 | ADAMS 2B | Unanalyzed Condition Boric Acid Shutdown Margin Loop seal Packing leak FLEX Job Performance Measure Earthquake Offsite Circuit Power change Downpower Overspeed trip |
ML20140A082 | 19 May 2020 | ADAMS 2C | Boric Acid Earthquake Recently irradiated fuel Loss of condenser vacuum |
ML20084L431 | 24 March 2020 | 2020 NRC Exam Post Exam Comments | Surveillance Frequency Control Program |
RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations | 16 March 2020 | Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations | |
ML20007F757 | 7 January 2020 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19058A632 | 1 July 2019 | Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs | High winds Shutdown Margin Anticipated operational occurrence Earthquake |
RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | 15 May 2019 | Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | |
ML19018A088 | 17 January 2019 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 | Generic Fundamentals Examination |
ML18242A699 | 30 August 2018 | 301 ADAMS2D Page 1 Exam Admin Items | Job Performance Measure |
ML18136A776 | 16 May 2018 | 301 Post Exam Comments | Operational leakage |
ML18106A310 | 11 April 2018 | William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 | |
ML17188A280 | 7 July 2017 | Exam Final Items - Delay Release 2 Yrs | Unanalyzed Condition Boric Acid Shutdown Margin Loop seal Packing leak Fire impairment FLEX Job Performance Measure Fuel cladding Offsite Circuit Fire Watch Power change Downpower Overspeed trip |
ML17188A283 | 7 July 2017 | Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs | Boric Acid Packing leak Internal Flooding Fire impairment Job Performance Measure |
ML17188A278 | 7 July 2017 | McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Loop seal Packing leak High Radiation Area Grab sample Slow transfer Internal Flooding Fire impairment Locked High Radiation Area FLEX Job Performance Measure Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Watch Power change Downpower Unidentified leakage Overspeed trip Operational leakage |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17023A344 | 19 January 2017 | December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter | Generic Fundamentals Examination |
IR 05000369/2016301 | 31 May 2016 | William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 | Shutdown Margin |
ML16119A434 | 26 April 2016 | 301 Post Exam Comments | Shutdown Margin |
ML16119A426 | 26 April 2016 | 301 Final RO Written Exam | Safe Shutdown Loop seal High Radiation Area Locked High Radiation Area Surveillance Frequency Control Program Overspeed trip |
ML16119A429 | 26 April 2016 | 301 Final SRO Written Exam | Safe Shutdown Boric Acid Loop seal High Radiation Area Locked High Radiation Area Surveillance Frequency Control Program Overspeed trip Operational leakage |
ML15203B031 | 22 July 2015 | 301 Final Administrative Documents | Job Performance Measure Operability Determination Earthquake Power change |
ML15203B131 | 22 July 2015 | 301 Other Documents for Retention | |
ML15203B127 | 22 July 2015 | 301 General Correspondence | Job Performance Measure |
ML15203B109 | 22 July 2015 | 301 Post Exam Comments | |
ML15203B100 | 22 July 2015 | 301 Final Administrative JPMs | Job Performance Measure Earthquake Pressure Boundary Leakage Unidentified leakage Operational leakage |
ML15203B098 | 22 July 2015 | 301 Final Simulator and in Plant JPMs | FLEX Job Performance Measure Downpower |
ML15203B092 | 22 July 2015 | 301 Final Simulator Scenarios | Unanalyzed Condition Boric Acid Shutdown Margin Fuel cladding Pressure Boundary Leakage Power change Downpower Unidentified leakage Overspeed trip Operational leakage |
ML15203A951 | 22 July 2015 | 301 Draft Administrative Documents | Earthquake |
ML15203B019 | 22 July 2015 | 301 Draft Administrative JPMs | Job Performance Measure Earthquake Pressure Boundary Leakage Unidentified leakage Operational leakage |
ML15203A982 | 22 July 2015 | 301 Draft Simulator and in Plant JPMs | FLEX Job Performance Measure Downpower |
ML15203A970 | 22 July 2015 | 301 Draft Simulator Scenarios | Unanalyzed Condition Boric Acid Shutdown Margin Enforcement Discretion Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Downpower Unidentified leakage Overspeed trip Operational leakage |
ML15203A965 | 22 July 2015 | 301 Draft SRO Written Exam | Safe Shutdown Boric Acid High Radiation Area Post Accident Monitoring Locked High Radiation Area Earthquake Power change |
ML15203A958 | 22 July 2015 | 301 Draft RO Written Exam | High Radiation Area Post Accident Monitoring Locked High Radiation Area Power change |
IR 05000369/2015301 | 3 June 2015 | Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 | |
ML15141A173 | 20 May 2015 | 301 Final SRO As-Given Written Exam | Boric Acid Ultimate heat sink Tornado Generated Missile Surveillance Frequency Control Program Earthquake Pressure Boundary Leakage Power change Unidentified leakage Operational leakage |
ML15141A166 | 20 May 2015 | 301 Final RO As-Given Written Exam | Surveillance Frequency Control Program Power change Operational leakage |
ML15127A415 | 7 May 2015 | Initial Exam 2014-301 Final Administrative Documents | Job Performance Measure |