MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents 2023-11-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents ML15125A4812015-05-0505 May 2015 Initial Exam 2014-301 Final Simulator Scenarios ML15125A4832015-05-0505 May 2015 Initial Exam 2014-301 Final Sim IN-Plant JPMs ML15125A4902015-05-0505 May 2015 Initial Exam 2014-301 Final Administrative JPMs ML15125A4762015-05-0505 May 2015 Initial Exam 2014-301 Draft Adiminstrative JPMs 2023-11-03
[Table view] |
Text
ML20084L431 McGuire Nuclear Station 2020 NRC Exam Post Exam Comments
- 1. Admin JPM RO A1a, Complete a Surveillance for Mode Change: Remove critical step identifying LCO 3.5.1 as applicable.
Explanation:
The Task Standard for Admin JPM RO A1a is as follows:
"The operator will complete Enclosure 13.4 of PT/1/A/4600/003 D in accordance with the attached KEY, determine that all Flex Strategy Administrative Limits are met, and determine that LCO 3.5.1 is not currently met.
Although the JPM name is "complete a surveillance for mode change", the "Initiating Cue" never mentions performing the task for a mode change.
Performing the JPM for the plant conditions listed in the "Initial Conditions" would result in the JPM being performed for Mode 4.
Tech Spec LCO 3.5.1does not apply in Mode 4. Therefore, it is not critical to identify this LCO as not met.
Resolution:
Request that Admin JPM RO A1a, step 17, be updated to remove this step as a critical step.
McGuire Nuclear Station 2020 NRC Exam Post Exam Comments
- 2. Admin JPM RO A2, Partial Loss of Annunciators: Critical data in the table(key) required to be filled out by the applicant.
Explanation:
The Task Standard for Admin JPM RO A2 is as follows:
"The operator will determine that there are Alternative Methods procedurally identified for Surveillance associated with three of these annunciators, that one failure impacts the Semi-Daily Surveillance associated with TS SR 3.6.4.1, that one failure impacts the Daily Surveillance associated with SLC 16.7.3, and that one failure impacts an AP/EP Time Critical Task per the attached KEY".
Per the Task Standard, only the items that are required to be identified in the applicable portion of the table are considered critical.
Identifying additional items in any of the table sections that are no or none would not be critical per the Task Standard.
For example: Identifying SLC 16.9.26 for 1AD-13, C-1 is not correct because SLC 16.9.26 is entered due to inoperable level monitors, not annunciator alarm issues. Therefore, including this information in a block where none is listed in the key would not be critical.
Resolution:
Request the applicable table(key) in JPM RO A2 be updated to state "Identifying no or none in the applicable blocks of the table is NOT critical".
McGuire Nuclear Station 2020 NRC Exam Post Exam Comments
- 3. Systems (Control Room) JPM H, Start and Stop the 1B NCP for NCS Venting: One applicant secured the pump, is this an acceptable response?
Explanation:
Upon starting the 1B NCP per OP/1/A/6150/002 A (Reactor Coolant Pump Operation), one applicant immediately began to monitor NCP motor bearing temperatures on the 1B NCP OAC graphic. Motor bearing temperatures on the 1B NCP OAC graphic rose to a temperature of 207°F. Upon seeing this temperature, the applicant secured the 1B NCP.
Per OP/1/A/6150/002 A (Reactor Coolant Pump Operation) Limits and Precautions, NC Pump trip criteria are: Any pump motor bearing temperature exceeding 195°F.
Per AP-08 (Malfunction of NCP) Case II, NCP trip criteria are: Any pump motor bearing temperature exceeding 195°F.
Resolution:
The facility endorsed position is that the applicants response was acceptable for the conditions present.
McGuire Nuclear Station 2020 NRC Exam Post Exam Comments
- 4. Systems (In-Plant) JPM K, Establish NC Pump Seal Injection from the SSF: This JPM is denoted as time critical. Performing this JPM in a static mode with the examiner having to provide cues for equipment status, Is timing this task for time critical performance valid?
Explanation:
Performance of the" Establish NC Pump Seal Injection from the SSF" task is a short duration time critical action. 3 minutes and 50 seconds is listed in plant documents for this particular portion of the of the task. This JPM should evaluate the correct manipulation of components. With the short duration of the task and the static mode of the JPM, communication of JPM cues and repeat backs will result in increased execution time.
The time critical nature of this task is better evaluated by an active JPM using a simulator.
Resolution:
Request that the time critical criteria for this task be removed.
McGuire Nuclear Station 2020 NRC Exam Post Exam Comments
- 5. Scenario N20-1-1, Event 4 Dropped Rod: During Event 2 Power Range Instrument N-42 fails high. With only three power ranges available and power greater than 75%, can entry conditions into Tech. Spec> 3.2.4 (QPTR) be directly determined?
Explanation:
The original submittal identified Tech Spec 3.2.4 (QPTR) condition A as being an applicable Tech Spec for this failure. It has since been determined that Tech Spec 3.2.4 (QPTR) is not applicable for this particular scenario.
The following information is from Tech Spec 3.2.4 (QPTR) and Tech Spec
3.2.4 Bases
SR 3.2.4.2 NOTE:
"Only required to be performed if input from one or more Power Range Neutron Flux channels are inoperable with THERMAL POWER 75% RTP" Verify QPTR is within limit using the movable incore detectors.
SR 3.2.4.2 BASES:
"This Surveillance is modified by a Note, which states that it is required only when the input from one or more Power Range Neutron Flux channels are inoperable and the THERMAL POWER is 75% RTP.
With an NIS power range channel inoperable, tilt monitoring for a portion of the reactor core becomes degraded. Large tilts are likely detected with the remaining channels, but the capability for detection of small power tilts in some quadrants is decreased. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
For purposes of monitoring the QPTR when one power range channel is inoperable, the moveable incore detectors are used to confirm that the normalized symmetric power distribution is consistent with the indicated QPTR and any previous data indicating a tilt".
Resolution:
Request the applicable ES-D-2 be updated to reflect that entry into Tech Spec 3.2.4 is NOT required.