MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] |
Text
.
Jh u i,k .
AUG 3 019N -
..7 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM: R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration
SUBJECT:
INSTRUMENT SETP0 INT METHODOLOGY FOR WNP-2
References:
- 1) Letter from A. Schwencer (NRC) to D.W. Mazur (WPPSS) dated September 7, 1983, " Request for Additional Information"
- 2) Letter from G.C. Sorensen (WPPSS) to A. Schwencer dated September 23, 1983, "WNP-2, Setpoint Method-ology"
- 3) Letter from G.C. Sorensen to A. Schwencer dated August 2, 1984, "WNP-2, Request for Confirmation of CRGR Review"
- 4) Letter from T.M. Novak to J.F. Carolan (Chairman, ISMG) dated May 15, 1984, "NRC Staff Report on Set-point Methodology"
- 5) Letter from J.F. Carolan to T.M. Novak, dated June 29,1984, " Action Plan to Answer the Staff Con-cerns on Setpoint Methodology"
- 6) Letter from L.T. Gucwa (Georgia Power) to J. Stolz (NRC), dated June 7, 1984, " Response to NRC Staff Questions on Proposed ATTS Technical Specification Changes" Plant Name: Washington Public Power Supply System Nuclear Project No. 2 Docket No.: 50-397 l TAC No.: 55579 l Licensing Stage: OL Project Manager: Raj Auluck l
Review Branch: ICSB Review Status: Complete for TAC No. 55579 The purpose of this memorandum is to provide the background information needed in answering the questions raised by the licensee for WNP-2 regarding CRGR approval and Office of Management and Budget clearance for certain requests for information.
During the OL review of the WNP-2 Technical Specifications, the staff l
1dentified a concern regarding the values selected for protection CONTACT:
M. Virgilio, ICSB l X29454 8409120349840830Xk 4W~ ADOCK 05000397 5 9 :)
T.M. Novak system instrument setpoints. By letter dated September 7, 1983 (Reference 1), this staff concern was transmitted to the Washington Public Power Supply System (the applicant) in the form of a request for additional information, and a proposed license condition. The staff requested that the applicant provide revised Technical Specification instrument setpoint allowable values and proposed a license condition for providing additional information regarding the setpoint methodology, plant specific error allowances that were input to the setpoint methodology, and confirmation that the setpoints selected for WNP-2 ensure that the reactor core and reactor coolant system are prevented from exceeding the licensing safety limits.
By letter dated September 23, 1983 (Reference 2), the applicant responded to the request for information and proposed license condition. In this response, the applicant expressed the opinion that the staff concern was a generic issue, common to all plants with a General Electric nuclear steam supply system (NSSS). The applicant proposed that, in lieu of the plant specific schedule proposed by the staff, they be permitted to join other BWR applicants who had banded together in an effort to conserve resources in answering requests for information. The applicant proposed that the schedule for answering the request for information be based on the generic schedule proposed by this BWR owners group.
On December 20, 1983, WNP-2 was granted an operating license by the NRC.
By letter dated August 2,1984 (Reference 3), the licensee for WNP-2 requested confirmation that CRGR had formally reviewed the NRC staff's request for additional information on the setpoint methodology issue, and l confirmation that the request for information has received an Office of Management and Budget approval.
l The Commission's regulations relevant to the issue of protection system setpoints are General Design Criterion 20,10 CFR Part 50.36 and Part 50.46. Criterion 20, Protection System Functions, states that "the protection system shall be designed (1) to initiate automatically the j operation of appropriate systems including the reactivity control l
systems, to assure that specified acceptable fuel design limits are not l exceeded as a result of anticipated operational occurrences and (2) to l
sense accident conditions and to initiate the operation of systems and components important to safety." Part 50.36 states " limiting safety system settings for nuclear reactors are settings for automatic
, protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting shall be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded." Part 50.46 specifies the performance criteria for the emergency core cooling systems. These criteria include a maximum peak cladding temperature, a maximum cladding l
T.M. Novak oxidation, a maximum total amount of hydrogen generated, and requirements that core geometry remain amenable to cooling for long term decay heat removal. Guidance on acceptable methods for complying with these regulations is contained in Regulatory Guide 1.105, " Instrumentation Setpoints" Revision 1, dated November 1976.
The staff has on an audit basis requested applicants to demonstrate compliance with the above cited regulatory requirements. Documentation dating back to the mid-1970's (prior to CRGR) shows that the NRC staff requested the applicants for 0.C.' Cook - Unit 2, Salem - Unit 2, North Anna - Unit 1, Sequoyah - Unit 1, McGuire - Unit 1, and V.C. Summer reply to a series of detailed questions concerning the methodology for determining instrument setpoints. Each follow-up safety evaluation written by the staff received a thorough NRC management review prior to issuance. The safety evaluations document the details of the setpoint methodologies proposed by the individual utilities to confirm compliance with the applicable regulations and the bases for staff approval. As a result of the interactions between the licensees and the staff on this issue, more conservative than originally proposed setpoints were established for several trip functions.
In August 1982, the staff requested the applicant for GESSAR, General Electric, to reply to a series of questions concerning the methodology for determining instrument setpoints. In response, GE stated that the setpoints were outside of the GESSAR scope and that the instrument set ~
point methodology issue would have to be addressed by individual utility applicants proposing the GESSAR design for licensing. Concurrently, on an audit basis, the staff individually requested several~ applicants with GE supplied NSSS to provide a summary discussion of the methodology used to establish the protection system actuation instrumentation setpoints.
These requests for information were either made during the Q1 phase of the staff review or during the technical specification review. Subse-l quently, meetings were held with several of the applicants individually l to discuss their setpoint methodology. On July 14, 1983 the staff met l with a group of applicants formed to address this and <%er licensing i issues (GE Owners Licensing Review Group [LRG] Instru iltation Setpoint i
Methodology Group [ISMG]) at their request. At this meeting, the ISMG presented an outline of a setpoint methodology specifically developed
, for the ISMG by GE in response to the staff's requests for information.
l In response to questions from the NRC staff, the ISMG agreed to provide more detailed information. On January 31, 1984, the staff met again with the ISMG to address the setpoint methodology. At this meeting, the ISMG presented five examples of instrument channel uncertainty evaluations l to demonstrate the margin to safety provided by the protection system instrumentation setpoints.
By letter dated May 15, 1984 (Reference 4), the staff provided its assessment of the ISMG methodology presented up to that point in time.
The staff evaluation identified several deficiencies in the methodology
.~. .
T.M. Novak presented and requested that the ISMG provide additional information in response to ten specific concerns. Section 4.0 of the evaluation summa-rizes the staff's understanding that past and present practice relies on engineering judgment with some conservatisms to account for uncertain-ties in establishing the NSSS setpoints. The systematic setpoint method-ology presented by the ISMG was developed solely for the ISMG plants to justify the use of engineering judgment.
In response to the staff's evaluation, by letter dated June 29, 1984 (Reference 5), the ISMG provided an action plan for resolving the outstanding issues regarding instrument setpoints for the ISMG member plants. The information to be provided in accordance with the action plan schedule will include plant unique setpoint calculations, assump-tions and input data. It should be noted that the list of participating utilities provided as an enclosure to the action plan did not include the licensee for WNP-2.
In summary, although the setpoint methodology issue is generic to all plants, at present there is no evidence to support a conclusion that it is a generic resolution. This is based on the results of our review of the setpoint methodologies submitted by other licensees with GE NSSS plants to support technical specification changes. For examph, by letter dated June 7, 1984 (Reference 6), the licensee for Edwin I. Hatch Nuclear Power Plant - Unit 2 proposed a setpoint methodology to support certain g technical specification setpoint changes. This methodology was substan-tially different from the ISMG proposed methodology and was approved by the staff for use in establishing the new setpoint values. Further, the staff's request for information does not impose or imply any new require-ments subject to CRGR review. The staff simply requested that the appli-cant furnish sufficient information to support a conclusion that the pro-tection system setpoints satisfy GDC 20, 10 CFR Part 50.36 and Part 50.46.
With regard to the staff's compliance with the Paper Work Reduction Act of 1980, each participating member of the ISMG was individually requested to supply certain information as a part of our OL review process. We are currently addressing seven members of the ISMG as one, at their request.
Although we believe that this is permitted by the Act we recommend that DL investigate this further Since the licensee is not a % ember of the ISMG (contrary to their September response to 23,1983 [ Referent)34 the August 2, 19 (Reference 3) letter, you request an2] co action plan for answering tTe staff's setpoint metnodology questions be provided, with a level of detail consistent with that provided by the t
5
T.M. Novak .
d ISMG in their June 29, 1984 (Reference 5), letter. This action plan should be submitted to the NRC for review within four weeks following receipt of the request.
/5/
R. Wayne Houston, Assistant Director For Reactor Safety Division of Systems Integration
! cc: R. Bernero
- J. Stefano R. Auluck A. Schwencer B.J. Youngblood J. Conran DISTRIBUTION
, Docket File ICSB.Rdg.
ICSB Subject MVirgilio JCalvo FRosa l
ICSB Section B Members
, JJoyce ADRS Rdg.
' /, L f'
! ICSB/DSI MN ICS8/DSI @i ICSB/DSI ADR$f[di!
MVirgilio:ct JCalvo 6 FRosa RWHouston 8/.21 /84 8/as /84 R 8/ /84 8/ y; /84 0FFICIAL RECORD COPY i