ML20198G877

From kanterella
Jump to navigation Jump to search

Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable
ML20198G877
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/16/1986
From: Lainas G
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
References
CON-WNP-0848, CON-WNP-848 TAC-59673, NUDOCS 8601240148
Download: ML20198G877 (2)


Text

.

~

'HWWE.

FAllenspach HSooher JAfl 16 Ei6 ovassallo Glainas l EI.CRAfibuh FCR:

Elinor Adensam, Director BWR Project Directorate No. 3 FR0!':

Gus Lainas, nasistant Directcr for BWR Division of SWR Licensing WASHI.'IGT0tl PUELIC POWER SUPPLY SYSTEM,

SUBJECT:

WhP NO. 2, TEChillCAL SPECIFICATIGri CHAP.GE, ACMINISTRATIVE CCNTROLS SECTI0tt (TAC f;C. 55673) hashington Public Pcwer Supply System (WPPSS) has requested, by letter dated Scotenber 11, 1935, a chdrga to the Administrative Cant.rols Section (Section 6) of the Technical Soccifications for ';hP Unit 2.

The chang" involves i revision to the cor, position of the Corporate huciaar Safet-j Review Board.

The staff has reviewed the prcposed change and found it acceptable.

The enclosure provides a brief description and cur evaluation of the proposed change.

This review was perfore.cd by Frederick R. Allenspach, PBF0, extension 24904.

Gus Lainas, Assistart Girector for BWR Division of bhE Liceniiog

Enclosure:

As stated cc:

J. Bradfute W. Ret;cr, E. Rossi D. Crutchfield F. Reitsome m

.s*-

240148860116Yk s

N ADOCK 05000397 Narm s - M w, 7 f

ftEt:0 TO ADEilSAM:FRAl g. ft/J el g

09FsC, >i IITB. :..D. Hf TI Il!TB : b..HFT I.B..U..R. :.L. '...

I i

AD... '.B...: L. l I

pg..

COM419t )

..,..f..'.

D S.

om y.1.././..'f.../..ti6..... l.U. M.

.1../...l.'..'/. 8. 6_...

...../.. J.f./ 36 1/l l

.l.

.j.

nac er.i:na nm o =o OFFICIAL RECORD COPY

u. e i m - m,.,

r.

~.

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PLANT NO. 2 TECHNICAL SPECIFICATION CHANGE Washington Public Power Supply System (WPPSS) has requested, by letter dated September 11, 1985, a change to the Administrative Controls Section of the Technical Specification for Nuclear Plant No. 2.

This proposed change would revise the composition of the Corporate Nuclear Safety Review Board (Section 6.5.2.2).

WPPSS proposes to delete the sentence that states "the plant organization and the Directorates of Engineering, Support Services, and Licensing and Assurance shall be represented;" and to add the sentence "the qualifications of all members shall meet the minimum requirements of Section 4.7 of ANSI /ANS 3.1-1981 and have, cumulatively, expertise in the areas listed in Specification 6.5.2.1 as a minimum."

The staff finds this change acceptable as it meets the acceptance criteria for Independent Review of Section 13.4 of NUREG-0800, the Standard Review Plan.

?

4 l

- - - -.