ML20209A861

From kanterella
Jump to navigation Jump to search
Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl
ML20209A861
Person / Time
Site: Columbia 
Issue date: 09/02/1986
From: Temple G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Meck B, Prendergast K, Schultz T
NRC
References
NUDOCS 8609080123
Download: ML20209A861 (3)


Text

fT ~

t o

c,'

e

+

,,r.,.,

7

% l, i

i -

s-l 3

5 i

c

(

SEP 0 21986 7

I.

MEMORANDUM FOR:

Kent Prendergast Bob Meck Dave Schultz Tom Lonergan FROM:

Gail M. Temple Emergency Preparedness Analyst (Team Leader)

SUBJECT:

WNP-2 EMERGENCY PREPAREDNESS EXERCISE SEPTEMBER 16-19, 1986 Your Assignment:

Enclosed are the materials you will need to complete your assignment during the subject exercise. These materials consist of the following items:

(1) a copy of IE Inspection Procedure 82301, (2) a copy.of the 1985 exercise report, (3) a copy of the WNP-2 Emergency Response Facilities Appraisal report, (4) portions of the WNP-2 Emergency Plan, (5) an index of WNP-2's EPIPs and, (6) copies'of EPIPs applicable to your assignment. Some of you have also been given portions of the scenario, maps of the Richland, WA area, and/or WNP-2 training material, depending on your specific needs. Each of you will get a complete, final copy of the scenario at the general controllers' briefing on 9/17.

Room reservations have been made in your name at the Rivershor'e Motor Inn, 50 Cerstock, Richland, WA 99352. Their telephone rxrber is (509) 946-4f;61. The reservcticns were inade with Abbie and guaranteed ::ith my credit carr'.

The reservations are as follows: Temple (9/15-19), Lonergan (9/15-18) and Schultz /Prendergast/Meck (9/16-18). If you need to chanFe these reservations, please telephone the Rivershore directly.

I have enclosed a tax exemption certificate for each of you. The certificate shculd be completed and submitted when you check-in. Your rate should be ($29.95/ night with the certificate.

f\\

/

~

.~

8609080123 860902

'/,

i PDR ADOCK 05000397 PDR

\\

p

- 3e 4

k

o SEP 0 21986 The schedule for the week is as foe'ows:

Date Time Activity Participants Location 9/15 7:30 p.m.

Mini-team Temple /Lonergan Motel meeting l

9/16 7:00 a.m.

Entrance Temple /Lonergan EOF

~

Interview 9/16 7:30 a.m.-

Training Temple /Lonergan EOF 3:30 p.m.

9/16 5:30 p.m.

Team Meeting All Motel 9/17 7:30 a.m. -

Misc. (facilities All EOF 9:30 alm.

tour, self-study, other insp. activities) 9/17 10:00 a.m. -

General All WPPSS !!Qs

'11:30 a.m.

Contro11ers' Briefing 9/17 1:00 p.m. -

Plant Controllers' Temple / Schultz /

EOF 1:30 p.m.

Briefing Lonergan Rm 141 9/17 1:00 p.m. -

EOF.'. Cont rolle rs '

Prendergast/

EOF 1:30 p.m.

Briefing Meck Rm 120 9/18 Exercise All Assigned Locations 9/19 8:00 a.m. -

Team Meeting All Motel 10:00 a.m.

9/19 1:00 p.m.-

Utility Critique All EOF l

9/19 2:00 p.m.

Exit Interview All EOF 9/20 8:00 a.m.

FEMA Exit Temple Federal Building l

9/20 10:00 a.m.

Public Briefing Temple Federal Building Please let me know if you need any additional information or answers to questions concerning your assignment or the enclosed material.- I can be reached at (415) 943-3764 or (FTS) 463-3764...

7 CallM.ltAtoll Oph OlLO Temple Emergency Preparedness Analyst

Enclosures:

As stated

C, 3

'bec w/o~ enclosures:

RSB/ Document Control Desk (RIDS)

SEP 021986' Project Inspector Resident Inspectur-State'of.WA.

G. Cook B.,Faulkenberry J. Martin t-r y

9

-x.

Region V 4

i c'

4 GTemple/ dot [

s.

GM 9/Q/86.

3

~

g

. O