Preoperational Physical Security Insp Rept 50-440/85-65 on 850930-1004.No Violation Noted.Major Areas Inspected:Status of Implementation,Installation,Operability of Security & Testing Program.Details Withheld (Ref 10CFR73.21)
ML20133M529
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/22/1985
From: Belanger J, Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133M513 List:
References
50-440-85-65, NUDOCS 8510280113
Download: ML20133M529 (2)


See also: IR 05000930/2010004

Text

._ . . . . . .. . . . . . . - -.

. .

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-440/85065(DRSS) ,

Docket No. 50-440 License No. CPPR-148

Licensee: Cleveland Electric Illuminating Company

Post Office Box 5000

Cleveland, Ohio 44101

Facility Name: Perry Nuclear Power Plant, Unit 1

I

Inspection At: Plant Site ,

Inspection Conducted: September 30 - October 4, 1985

Date of Last Physical Security Inspection: July 8-12, 1985

j Type of Inspection: Announced, Preoperational Physical Security

!

Inspector: hh- M I'

J. R. Kniceley ) Date

j Physical Security Inspector

hL IS&gt /0/.2r/Ls*

4

J. L. Belanger # Date

Physical Security Inspector

i Approved By: /0 6

. R. Creed, Chief Date

Safeguards Section

l

Inspection Summary

Inspection on September 30 - October 4, 1985 (Report No. 50-440/85065(DRSS))

Areas Inspected: Included a review of the status of implementation;

installation; operability of the security program and the preoperational

, testing program for security-related equipment. Specifically, the inspection

'

covered: Security Plan and Implementing Procedures; Management Effectiveness;

Security Organization; Security Program Audit; Records and Reports; Testing

and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected

and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures;

i

Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection

p: P sure cr mains

,

5fm W M ORMATICM

ty,n sc ation this

85 o pgo De ntrollod

0]O

G

_ , __, _ . . _-. - _ _ _ _ _ . _ _. - _ , . _ _

.- =_

. . , _ -

- -

,

.

>

Aids - Protected and Vital. Areas; Alarm Stations; Communications; Personnel

Training and Qualification - General Requirements; and Safeguards' Contingency

Plan Implementation Review. This inspection involved 70 inspector-hours by

two NRC inspectors.

-

Results: The inspectors identified the current status of the security program

the implementation of which appears to be progressing adequately. Some areas

4

that must be completed prior to licensing were identified. No violations were

j identified.

I Sixteen of the remaining twenty-two inspection modules and IE Bulletin 79-16

~

are considered closed. All open items previously ideatified in the 16 modules

being closed have been adequately addressed and are considered closed.

i

!

'

i

.

I

i

i

, .

i

'

.

  1. closure con ins

E*JECUAES ' .FORIMTION

i Ldon 00Pa~at on this

E*US IS CCon rolled

2

-

,

t _ _ - . . - , . . _ _ , _ . . . _ , - _, _ . . , , _ . . ,_ . - . _ , _ , , _ . _ . _ , _ . __