Preoperational Physical Security Insp Rept 50-440/85-65 on 850930-1004.No Violation Noted.Major Areas Inspected:Status of Implementation,Installation,Operability of Security & Testing Program.Details Withheld (Ref 10CFR73.21)
ML20133M529
Person / Time
Site: Perry 
Issue date: 10/22/1985
From: Belanger J, Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133M513 List:
References
50-440-85-65, NUDOCS 8510280113
Download: ML20133M529 (2)


Text

.

.

.

.

.

-

-.

._

....

...

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-440/85065(DRSS)

,

Docket No. 50-440 License No. CPPR-148

Licensee: Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, Ohio 44101 Facility Name:

Perry Nuclear Power Plant, Unit 1 I

Inspection At:

Plant Site

,

Inspection Conducted:

September 30 - October 4, 1985 Date of Last Physical Security Inspection:

July 8-12, 1985 j

Type of Inspection:

Announced, Preoperational Physical Security

!

Inspector: hh-M I'

J. R. Kniceley )

Date

j Physical Security Inspector hL IS&gt

/0/.2r/Ls*

J. L. Belanger

Date

Physical Security Inspector i

Approved By:

/0

. R. Creed, Chief Date l

Safeguards Section Inspection Summary Inspection on September 30 - October 4, 1985 (Report No. 50-440/85065(DRSS))

Areas Inspected:

Included a review of the status of implementation; installation; operability of the security program and the preoperational testing program for security-related equipment.

Specifically, the inspection

,

'

covered:

Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; i

Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection

p: P sure cr mains 5fm W M ORMATICM

,

ty,n sc ation this

o pgo De ntrollod 0]O G

_

,

__,

_..

_-. - _ _ _ _ _. _

_. - _,. _ _

..

..

.

.

.

.-

..,

_

=_

-

-

-

,

.

Aids - Protected and Vital. Areas; Alarm Stations; Communications; Personnel

>

Training and Qualification - General Requirements; and Safeguards' Contingency Plan Implementation Review.

This inspection involved 70 inspector-hours by two NRC inspectors.

Results: The inspectors identified the current status of the security program

-

the implementation of which appears to be progressing adequately.

Some areas that must be completed prior to licensing were identified.

No violations were

j identified.

I Sixteen of the remaining twenty-two inspection modules and IE Bulletin 79-16

are considered closed.

All open items previously ideatified in the 16 modules

~

being closed have been adequately addressed and are considered closed.

i

!'

i

.

I i

i

,.

i

'

.

  1. closure con ins E*JECUAES '.FORIMTION i

Ldon 00Pa~at on this E*US IS CCon rolled

-,

t

-.

_

_

_ -.. -,.. _ _, _..

. _, -

_,

.

_

..,, _..

,_

. -. _, _,,

_. _. _, _. __