U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-440/85065(DRSS)
,
Docket No. 50-440 License No. CPPR-148
Licensee: Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, Ohio 44101 Facility Name:
Perry Nuclear Power Plant, Unit 1 I
Inspection At:
Plant Site
,
Inspection Conducted:
September 30 - October 4, 1985 Date of Last Physical Security Inspection:
July 8-12, 1985 j
Type of Inspection:
Announced, Preoperational Physical Security
!
Inspector: hh-M I'
J. R. Kniceley )
Date
j Physical Security Inspector hL IS>
/0/.2r/Ls*
J. L. Belanger
Date
Physical Security Inspector i
Approved By:
/0
. R. Creed, Chief Date l
Safeguards Section Inspection Summary Inspection on September 30 - October 4, 1985 (Report No. 50-440/85065(DRSS))
Areas Inspected:
Included a review of the status of implementation; installation; operability of the security program and the preoperational testing program for security-related equipment.
Specifically, the inspection
,
'
covered:
Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; i
Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection
p: P sure cr mains 5fm W M ORMATICM
,
ty,n sc ation this
o pgo De ntrollod 0]O G
_
,
__,
_..
_-. - _ _ _ _ _. _
_. - _,. _ _
..
..
.
.
.
.-
..,
_
=_
-
-
- -
,
.
Aids - Protected and Vital. Areas; Alarm Stations; Communications; Personnel
>
Training and Qualification - General Requirements; and Safeguards' Contingency Plan Implementation Review.
This inspection involved 70 inspector-hours by two NRC inspectors.
Results: The inspectors identified the current status of the security program
-
the implementation of which appears to be progressing adequately.
Some areas that must be completed prior to licensing were identified.
No violations were
j identified.
I Sixteen of the remaining twenty-two inspection modules and IE Bulletin 79-16
are considered closed.
All open items previously ideatified in the 16 modules
~
being closed have been adequately addressed and are considered closed.
i
!'
i
.
I i
i
,.
i
'
.
- closure con ins E*JECUAES '.FORIMTION i
Ldon 00Pa~at on this E*US IS CCon rolled
-,
t
-.
_
_
_ -.. -,.. _ _, _..
. _, -
_,
.
_
..,, _..
,_
. -. _, _,,
_. _. _, _. __