ML20080P471

From kanterella
Revision as of 12:08, 21 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Temporary Mod Request T-7400 to Emergency Plan Implementing Procedure Ei 1300-08, Emergency Control Ctr Activation. ,Receipt Form & Rev 32 to Index
ML20080P471
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/06/1983
From: Downing G, Durdel R, Murray T
TOLEDO EDISON CO.
To:
Shared Package
ML20080P456 List:
References
PROC-830906, NUDOCS 8310060595
Download: ML20080P471 (7)


Text

.., ._

, ,a*

  • Di liUTION l

- Origind, Roeponsitale Section Head Action e d Pile Copy, Masear File

% COPIES TO BE MODIFIED POR IMMEDIATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION . UNIT 1 TEMPORARY MODIFICATION REQUEST Emergency Control Center (2)

ED se2e SECTION 1 PROCEDURE TITLE AND NUMBER Emergency Control Center Activation FT 1900.0R REASON FOR CHANGE NRC commitment, as per Toledo Edison response dated June 21, 1983 (Serial No. 1-364).

CHANGE See attached sheets.

8310060595 831005 PDR ADOCK 05000346 p PDR o.--

iS PROCEDURE REVISION REQUIRED PREPARED 8Y DATE Ron Durdel 8/29/83

/

  • t .,

g_g APPROVED 8Y

  • DATE M

5M,,,E. ., m o DATE

,,g DATE RECOMMENDEDfY (SR B Chairman)

Ah , 9/'/83 QA APPROVED BY (Menseer of Quality AssuM)' DATE APPROVED BY (Stetton Superintendent) DATE / / -

p 7/d/ d* M OC 5 n

_. . _ . .--w p 7 &~

~ '

2 EI 1300.08.6 O

c. The ICC contains a terninal of the DADS (Data Acquisi-tion and Display System) for acquiring necessary data '

for dose calculations.

( d. h ICC will serve as an interface with the TID Emergency Response Organization and Local, State, and Federal agencies.

5.2 The first Station management individual to arrive at the ECC shall notify the Control Room that the ECC is manned.

5.3 Emergency Duty Officer Activities 5.3.1 h Emergency Dury Officer (EDO) is responsible for dete-ning the need for and assuring the activation of the ICC. .,

5.3.2 The IDO shall proceed to the ECC and, if NOT previously performed, notify the Control Room that the ICC is manned and perform the steps as indicated in Attachment 3.

5.3.3 The EDO shall ensure the following individuals arrive at the ECC as needed:

' b add

a. Control Ro/or THE RAusasesscas,, Tasrws, insetnTonI (RTL) om t'a==nnicator
b. State and County Communicator

(

c. Teleprinter. Operator
d. Corporate Management Communicator
e. Public Relations Communicatee

'f. Nuclear Regulatory Commission Communicator 5 g. Radiation Monitoring Team Consnunicator and Coordinator *

h. Radiation Monitoring Ter.as
1. Emergency Operations Manager J.' Emergency Planning Supervisor
k. Community Assistance Communicator L. Enosowens. TesTin!* J.ots* win Cena, d e.nrex 5.3.4 The EDO may request r,o the Station kerations Manager that part or all of the telephone communications loops be established.

y - -w- -,.w~p-v-wo-p- v-m-= ww-,w-- ,.m-wm,nw -,,,e-w--w-o w- --omeww-mww-- ---m-,mvww,wo-m-ww---mww-+-w--m ----,-ww m,ww

-. . a l

j. Y 3 EI 1300.08.6 A .e EDO shall assign 'an isdividual(s) to set-up nec ssary emergency equipment..(located in the ECC and Radiological Testing I.ab) as listed in Attachrzent 1. .

The EDO shall assign an individual (s) to perfora dose calculations and dose assessment, and to operate the CRT terminal for the Data Aq'aisition and Display System..

I h EDO shall ensure that Attachment 2 is completed carrectly and supplied to the State and County Disaster S
rvices Agencies.
a. This_shall be accomplished as soon as posaible after the start of the emergency.
b. Updates to Attachment 2 shall be supplied as requested by the State and County Disaster Services Agen:ies. '

!i h EDO shall assume responsibility for distribu-tion of potassium iodide to station persoonal as .

per AD 1827.12 and to Rtff's as per AD 1830.05. -

to h ED0 shall, when necessary, recommend protective

, -*:tions for the plume exposure pathway to the State

( i County Disaster Services Agencies per AD 1827.12, crotective Action Guidelines.

l l 11 h EDO shall assign Radiation Monitoring Teams and inform Federal, State and local officials of the effs::ted areas by sector and zone designators as shown '

cn Attachment 4.

la h EDO shall direct that the ventilation system for ,

the DBAB be placed is the positive or incident mode if icdine levels exceed MPC (9 x lo-* uCi/al) as recommended by the Radeon Operations Manager.

ncy Oparations Manager N primary Emergency Operaticus Manager is the Nuclear Services Director.

l The alternate Emergency operations Manager is the l

Assistant Superintendent - Outage Mgst.

I

'4 The Emergency Operations Manager, upon being informed l that an emergency exists, shall proceed to the ECC.

- to & &%

paQ n e.

- ~ -- ~ ~ - ^ --

k 5 EI 1300.08.6

.6 'c.Joff-duty Diation Monitoring ED0's .Team Coordinator - Assigned from the pool 5.6.1 Coordinates, from the ECC, the activities of the offsite Rttr's.

5.6.2 Dispatches RtfT's as directed by the EDO.

5.6.3 Maintains map of R!fT sample points and results of samples.

5.6.6 Ensures the EDO is informed of sample results.

7 Radiction Monitoring Teams 5.7.1 The first RMT to arrive at the/dC shall perform the functions listed below:

A*

f., g. Le form EDO THar TNE RTL is haWxO.

Using appropriate survey instruments, survey the immediate areas surrounding the ICC and TSC.

c. )(. Standby with a Radiation Monitoring Team'Eit and Protective Clothing Kit. Protective clothing to be used as directed.

, d. g. Check out equipsese for operability.

f .

\ e.g. Perform surveys offsite as directed by the EDO. ,

5.7.2 Other R!ff's that arrive at the

a. During normal working hours:
1. Standby with a Radiaton Monitoring Team -

i Kit and Protective Clothing Kit to be used as directed.

2. Check out equipment for operability.
3. . Perform surveys offsite as directed by the EDO.
b. During off-normal working hours:
1. If not needed as an offsite RMT (as deter-ained by EDO), assignment as onsite RMT's to the Radeon Operations Manager (at the l,

Technical Support Center) or.the Shift < - "

Supervisor (if the TSC is not as yet manned) i

' will be made by the EDO after it is assured that additional aid is needed onsite.

l

.g-,- , , --- c,.-._,y, , - -w.-w,.----sy -----.g-c-.sg.rp -

sp-79 wrwyi,g r

prAvn' 14 EI 1300.08.2 hi ECC CHECKLIST ACTION COMPI.r u.u ACTION REQUIRED DATE TI2fE INITIALS
1. Emergency Duty Officer
2. Perform applicable steps of the ID0/ Shift Supervisor checklist

. in either II 1300.03 (Alert), .

EI 1300.04 (Site), or II 1300.05 (General) depending on the action level of the event.

i 3. Assignment of individuals:

1-

a. Log keeper
b. RMI Offsite Teams 2 c. Dose Assessment Indi-i vidual(s) s
d. Control Room Communicator l

(' e.

f.

NRC Communicator State and County _

Communicator 3 RtfT Communicator

h. Rorr coeasame I. 2. Teleprinter Operator J. RTL commu.a s e.eron
4. Ensure offsite RET's are sent out in downwind direction for survey per AD 1850.05
5. Ensure offsite dose estimates are being made per AD 1827.10
6. Assign a C&RT individual for air-borne iodine counting and analysis l per AD 1850.05 l

l l

l Attachment 3

'Page 1 of 2

. - J. o m.__

DAVIS-BESSE REVISION COVER SHEET September 14, 1983 DATE TO: 1hi ) &N Y k D FROM: e,nr.r.ur.n u t PI.ANNING & PREPAREDNESS SUPV.

SUBJECT:

Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURE Manu.r1 Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual. Control Copy 8 .

Instructions for the material are as follows:

REMOVE AND RETURN INSERT Revision Index, Revision 31 Revision Index, Revision 32 T-7400 in front of EI 1300.08 l

l l

Date Revision Entered Addressee Signature - i 4 RETURN TO THE OFFICE MANAGER - STOP #3030

~

1 l

J h 1 i ,

THE TOLEDO EDISON COMPANY OM p'

DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN IMPLE'.ENTLNG PROCEDURES 8

REVISION INDEI PAGE. REVISION PROCEDURES REVISION TEMPORARY }ODIFICATIONS

' 1 0 EI 1300.00 4 EI 1300.01 5 t

II 1300.02 4 .

EI 1300.03 4 EI 1200.04 4 EI 1300.05 4 EI 1300.06 4 EI 1300.07 ,

4 T-7104 .

_ EI 1300.08* 6 T-7400 n.

j(

EI 1300.09 1 EI 1300.10 1

. EI 1300.11 1 EI 1300.12 3 I

,

  • 4 'a Revision 32 September, 1983 b4 f

. , - . , , , , n.. ,y- - . , - .-