03/10/2006, Meeting Handouts for Summary of Meeting W/Carolina Power & Light Regarding the Fuel Transition Process and Licensing Submittals for Brunswick, Units 1 & 2
ML060790305
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/10/2006
From:
Nuclear Generation Group, Progress Energy Co
To:
Carolina Power & Light Co, Office of Nuclear Reactor Regulation
Mozafari B, NRR/ADRO/DORL, 415-2020
Shared Package
ML061290361 List:
References
Download: ML060790305 (18)


Text

. 5ni Transition to Framatome ANP Fuel Carolina Power & Light-Company Brunswick Steam Electric Plant, Units 1 and 2 77, ,' 7 W E ___ - ___

March 10, 2006 Nuclear IGeneration IGroup I2 Progress Energy

Meeting Agenda

  • Purpose
  • Background
  • Transition approach P Licensing o Analysis o Methodology
  • Licensing submittals and schedule
  • Summary b2 . Progress Energy

Purpose

  • Describe the transition process from GNF to Framatome ANP fuel supply
  • Communicate transition plan
  • Discuss licensing activities and schedule i

U3 Progress Energy A*b 3

Background

Fuel supplier change

. Progress Energy fuel bid

. Proposals requested Summer 2004.

) Bids received Winter 2004

. Framatome ANP awarded Brunswick fuel supply Fall 2005

. Transition to FANP fuel supply March 2008 A% 4

&5 Progress Energy

=

Background===

GE14 11Ills In.

II RI Iffimm= pS jm 11 Key Features

  • 1Ox10 lattice
  • Large central water rods (2) is14 nprt lanrgth rodz (~2/3 lonrgth
  • 8 spacers
  • Debris filter lower tie plate 179 kgU i Extensive operating experience 5 @ Progress Energy

=

Background===

ATRIUM-1 0 Key Features

  • 1Ox1 0 lattice
  • Square internal water channel 8nr pa lengt rods(rI3I nr le/"ngth)
  • 8 8spacers

%J J LA I I filter

  • Debris ,II LIII i J tie plate lower

%.,: K O

  • 178 kgU
  • Extensive operating experience 6 ~ Progress Energy

Background

Brunswick Plant

  • 24 month fuel cycles
  • Extended power uprate to 120% of original license o Unit 1 Cycle 15; Spring 2004 i Unit 2 Cycle 17; Spring 2005
  • Current licensing basis fuel designs o GE13 9x9
  • GE14 10x1O (full core in each unit)
  • ATRIUM'-10 lead use assemblies Unit 2 Cycle 14
  • Transition to Framatome ANP ATRIUMTM-10 o Unit 1 Cycle 17; March 2008 o Unit 2 Cycle 19; March 2009 (j 7 -gB Progress Energy

=

Background===

Core monitoring

  • PPX-ll in use since 1994
  • PPX-lll upgrade prior to fuel transition i CASMO-4
  • iviiIROUK3UN-B2
  • uO" R 0U BR__ -

N B

  • Benchmark past cycles o EPUR operation o Methodology uncertainty validation
  • Implementation under 50.59 8 A ProgsEnergy

Transition to ATRIUMT m-10 Fuel

, .- . _ -

  • Licensing approach
  • Analysis approach
  • eApproved methodologies A%& 9 O .Progress Energy

Licensing Approach

  • Minimize changes to the current plant licensing basis
  • Technical Specification changes o Update references to NRC-approved methods i LHGR operating limit addition o SLMCPR, scram speed option changes o Remove vendor-specific criticality analysis methods (k-infinity)

P Design features update

  • Cycle specific submittals
  • SLMCPR o 50.46 annual report o Periodic FSAR updates k 10 § Progress Energy

Licensing Approach MELLLA+

  • MELLLA+ separate from fuel transition
  • Reload analyses will bound MELLLA+
  • Operation contingent upon additional license
  • " LO%

Wf LO AV N - I 'f

  • Schedule determined by methodology review and approval Progress Energy A% 11

Analysis approach __

  • Review all event analyses identified in FSAR
  • Disposition analyses as:

o Not impacted by the change in fuel design

^ Bounded by the UouiSquences of another event

- Potentially limiting

  • Analyze potentially limiting events with NRC approved Framatome ANP methodology
  • Current licensing basis retained for events not impacted by the change in fuel design (Gb 12 Progress Energy

Approved Methodologies COLR TS References - Mechanical Analysis

  • XN-NF-81-58(P)(A), RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model.
  • XN-NF-85-67(P)(A), Ge neric Mechanical Design for Exxon Nurc1laqr 1kt Pum p BWR Reload Fut!L
  • EMF-85-74(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model
  • ANF-89-98(P)(A), Generic Mechanical Design Criteria for BWR Fuel Designs Aib 13 w Progress Energy

Approved Methodologies COLR TS References - Neutronic Analysis XN-NF-80-19(P)CA) Volume 1, Exxon Nuclear Methodology for oiling Water Reactors - Neutronic Methods for Design and Analysis.

  • XN-NF-80-1 9(P)(A) Volume 4, Exxon Nuclear.

Methodoinn\/ for Boiling W\Aater Reactors: Applcation of the ENU O/Aethodology to BWR Reloads.

  • EMF-2158(P)(A),,-Siemens Power Corporation Methodology for Boilinq Water Reactors: Evaluation and Validation of CAS 0-4/MICROBURN-B2.

o XN-NF-80-19(P)(A) Volume 3, Exxon Nuclear Methodology for boiling Water Reactors THERMEX:

Thermal Limits Methocology Summary Description G 14 . Progress Energy

Approved Methodologies COLR TS References - Transient Analysis o XN-NF-84-105(P)(A) Volume 1, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis.

o ANF-524(P)(A), ANF Critical Power Methodology for Boiling Water Reactors.

P ANF-913(P)(A) Volume 1, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses.

o ANF-1 358(P)(A), The Los's of Feedwater Heating Transient in Boiling Water Reactors.

d,&b 15 . Progress Energy

Approved Methodologies COLR TS References - CPR and LOCA P EMF-2209(P)(A) , SPCB Critical Power Correlation o EMF-2245(P)(A), Application of Siemens Power Corporation's Critical Power Correlations to Co-I ROIdetI ILFue,.

o EMF-2361 (P)(A), EXEM BWR-2000 ECCS Evaluation Model.

o EMF-2292(P)(A), ATRIUMTM-10: Appendix K Spray Heat Transfer Coefficients.

K3 Progress Energy d,4 16

Licensing Submittals Schedule

  • TS amendment request o Submit January 2007 o Request approval by January 2008

..ACPRP amendmeint reus I kilyy L-"I

5. IVbI JulyI I, IAEI I II L I ,;L II2007U i Submit July 2007 o Request approval by January 2008 Ab 17 Q Progress Energy

Summary.

  • Established ATRIUM-1 0 transition process OBrowns Ferry (2004) 0 Columbia Generating Station (2003)

I River Bend and Grand Gulf (2001)

  • NRC-approved methodology will be used for the transition
  • 'Progress Energy and Framatome ANP are committed to support the NRC's review 18 . Progress Energy