Letter Sequence Other |
---|
|
|
MONTHYEARML15197A4872015-07-13013 July 2015 to 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015) Project stage: Other ML16119A5092016-04-20020 April 2016 LTR-15-0319, LTR-15-0375-1 - Transcript of 10 CFR 2.206 Petition Review Board Teleconference on 4/20/16 with Pilgrim Watch, Cape Downwinders, the Town of Duxbury Nuclear Advisory Committee Pilgrim Severe Weather, Emergency Response - Pages Project stage: Meeting 2015-07-13
[Table View] |
|
---|
Category:2.206 Petition
MONTHYEARML18158A2252018-06-0707 June 2018 (OEDO-15-00479) Pilgrim Nuclear Power Station - 2.206 Petition Regarding Pilgrim Nuclear Power Station - Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) ML17345A9362017-12-11011 December 2017 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15197A4872015-07-13013 July 2015 to 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015) ML16029A4072015-06-24024 June 2015 ODEO-15-00479: 2.206 Petition on Current Licensing Basis for Flooding at Pilgrim ML15162A8832015-06-11011 June 2015 LTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency Planning ML14260A4822014-09-16016 September 2014 LTR-14-0535 - Mary Lampert, Pilgrim Watch; William Maurer, Cape Downwinders; Diane Turco, Cape Downwinders Email 2.206 - Pilgrim Security ML14122A1502014-04-16016 April 2014 LTR-14-0249 - Mary Pat Flynn Et Al., County Commissioners, Barnstable County, Massachusetts Ltr. Potential Threats to Cape Cod Associated with the Pilgrim Nuclear Power Station ML13294A4002013-10-16016 October 2013 G20130211 - 10/16/13 Supplement #4 Information to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont - Email from T.Judson to R.Guzman ML13267A2342013-08-30030 August 2013 G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) ML13189A0572013-06-11011 June 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 6/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13133A2072013-04-23023 April 2013 G20130211 - Timothy Judson E-mail to R.Guzman 2.206 Supplemental Information Dated April 23, 2013 - James A. Fitzpatrick/Pilgrim/Vermont Yankee Nuclear Power Stations ML13113A2432013-04-22022 April 2013 G20130211 - Paul Gunter E-mail Re 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13112B0552013-04-11011 April 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 4/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13105A0602013-04-10010 April 2013 G20100454 - Mary Lampert, Pilgrim Watch Ltr. Pilgrim Watch'S Request for Extension to Reply to Proposed Director'S Decision Under 10 CFR 2.206 (7590-01-P) - Docket No. 50-293 ML13128A3052013-04-0909 April 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Nuclear Decommissioning Discussion with the NRC Staff: Conference Call Transcript (April 9, 2013) ML13079A0222013-03-18018 March 2013 G20130211 - Timothy Judson E-mail 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13070A0552013-03-0707 March 2013 G20130174 - Michael Mulligan E-mail 2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown ML13128A3022013-02-20020 February 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: in Search of Washington'S Latest Realities: DC Fieldtrip Takeaways (February 20, 2013) ML13128A3002013-01-0202 January 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Re-evaluating Merchant Nuclear (January 2, 2013) ML12178A0722012-06-25025 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012); CR-PNP-2012-02693 Waiver Fire Brigade ML12173A2022012-06-20020 June 2012 G20120327 - Mary Lampert Ltr. Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012) - Monthly Communication Test Failure ML12170B0212012-06-17017 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute Pilgrim NPS (Submitted May 16, 2012) - Condition Reports ML12170B0222012-06-16016 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute Pilgrim NPS (Submitted May 16, 2012) - Emergency Response ML12167A2222012-06-13013 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim Nps (Submitted May 16, 2012) ML12166A3482012-06-12012 June 2012 G20120327 - Mary Lampert Ltr. Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012) ML1216004412012-06-0606 June 2012 G20120327/EDATS: OEDO-2012-0282 - Supplemental Information Mary Lampert 2.206 Regarding Labor Dispute - Pilgrim Nuclear Power Station ML1217700412012-05-18018 May 2012 G20120327/EDATS: OEDO-2012-0282 - Mary Lampert - Supplement to 2.206 Enforcement Petition Regarding Labor Dispute - Pilgrim Nuclear Power Station - Security ML12138A1792012-05-16016 May 2012 G20120327/EDATS: OEDO-2012-0282 - Mary Lampert, Margaret Sheehan, Pine Dubois & Wedge Bramhall, Re 2.206 - Enforcement Petition Regarding Labor Dispute - Pilgrim Nuclear Power Station ML11213A0302011-07-29029 July 2011 G20110563/EDATS: OEDO-2011-0535 - David Lochbaum Ltr. 2.206 - Boiling Water Reactors with Mark I and Mark II Containment Designs ML1032102282010-11-15015 November 2010 G20100689/EDATS: OEDO-2010-0929 - Mary Lampert Ltr. Re Pilgrim Nuclear Power Station - Petitioner'S Request for Review of the Petition Review Board Denial 2.206 Regarding Request Require Hydrological-Geological Subsurface Study ML1028104692010-10-0606 October 2010 G20100527/EDATS: OEDO-2010-0688 - Pilgrim Watch - 2.206 Petition Regarding Hydrogeologic Assessment Pilgrim NPS - Supplement ML1022805682010-08-13013 August 2010 G20100527/EDATS: OEDO-2010-0688 - Mary Lampert and Rebecca Chin Ltr. Re 2.206 - Hydrogeologic Assessment at Pilgrim Nuclear Power Station ML1022104112010-08-0606 August 2010 G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Supplement (1) to Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station ML1020202752010-07-19019 July 2010 G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML0914000642009-05-14014 May 2009 G20090292/LTR-09-0210/EDATS: SECY-2009-0248 - Mary E. Lampert, Rebecca J. Chin Pilgrim NPS RFO 2009: 2.206 Petition Requesting That NRC Require All Work Packages Inspected Prior to Pilgrim'S Re-start - Urgent Action Requested Due to Timing ML0814002822008-05-14014 May 2008 G20080352/EDATS: OEDO-2008-0390 - Scott H. Strauss Ltr. Re 2.206 Pilgrim Petition of Utility Workers Union of America, Local 369 ML0814001022008-05-13013 May 2008 G20080347/LTR-08-0283/EDATS: SECY-2008-0303 - Ltr., Mary Elizabeth Lampert, Re 2.206 Petition Regarding Potential Worker Strike Pilgrim Station 2018-06-07
[Table view] Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: Mary Lampert To: Guzman, Richard Cc: NRCExecSec Resource
Subject:
[External_Sender] SUPPLEMENT NO. 1 TO PILGRIM WATCH, CAPE DOWNWINDERS AND THE TOWN OF DUXBURY NUCLEAR AFFAIRS COMMITTEE 2.206 PETITION TO MODIFY, SUSPEND, OR TAKE ANY OTHER
ACTION TO THE OPERATING LICENSE OF PILGRIM STATION UNTIL THE NRC CAN PROVIDE RE...
Date: Monday, July 13, 2015 10:08:33 AM Attachments:
SUPPLEMENT TO 2 206 PETITION EMERGENCY PLANNING PW CAPE DOWNWINDERS DNAC 07 .13.15.pdf Hello:
Attached please find SUPPLEMENT NO. 1 TO PILGRIM WATCH, CAPE DOWNWINDERS AND THE TOWN OF DUXBURY NUCLEAR AFFAIRS COMMITTEE 2.206 PETITION TO MODIFY, SUSPEND, OR TAKE ANY OTHER ACTION TO THE OPERATING LICENSE OF PILGRIM STATION UNTIL THE NRC CAN PROVIDE REASONABLE ASSURANCE THAT ADEQUATE PROTECTIVE MEASURES BASED ON ACCURATE INFORMATION CAN AND WILL BE TAKEN TO SATISFY THE NRC'S OBLIGATION TO PROTECT PUBLIC HEALTH & SAFETY.
If you have difficulty downloading the document, please call Mary Lampert at 781-934-0389.
Acknowledgement of receipt by return email appreciated.
Enjoy the day.
Mary
July 13, 2015 Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 By Email: NrcExecSec@nrc.gov SUPPLEMENT NO. 1 TO PILGRIM WATCH, CAPE DOWNWINDERS AND THE TOWN OF DUXBURY NUCLEAR AFFAIRS COMMITTEE 2.206 PETITION TO MODIFY, SUSPEND, OR TAKE ANY OTHER ACTION TO THE OPERATING LICENSE OF PILGRIM STATION UNTIL THE NRC CAN PROVIDE REASONABLE ASSURANCE THAT ADEQUATE PROTECTIVE MEASURES BASED ON ACCURATE INFORMATION CAN AND WILL BE TAKEN TO SATISFY OBLIGATION TO PROTECT PUBLIC HEALTH & SAFETY I. INTRODUCTION The NRC should require, by agreement or amendment of its operating license that Pilgrim is required to do a precautionary shut down when severe weather cond It is clear that any time state government institutes a travel ban or travel restrictions for Southeastern Massachusetts this should apply. In addition, should travel conditions significantly reduce speed, visibility, and road quality, this directive should be implemented. NRC should create a clear policy as to when and how this order would be issued. Implementing this policy is not suggesting that every significant storm would create a public safety issue at Pilgrim. It is acknowledging that if any public safety issue did arise during such an event, either related to weather or coincidental, neither the state nor the local community would be able to implement the evacuation and emergency response procedures it is required to have in place. This is especially important in consideration of the following: The number of loss of power events at the station indicating occurrence during severe weather storms. . The probability that there is no reasonable assurance of a timely evacuation in severe storm conditions as demonstrated by petitioners in the discussion of winter storm Juno.
2 II. Argument A. Offsite Power Events Since 1972, Pilgrim has experienced twenty-one LOOP failures during its forty two years of operation. Fifteen (74%) of these were weather related, eight of the fifteen weather related (38%) were caused by Nor'easters presenting blizzard conditions, severe weather being the so called BDBEE. Each of the eight Pilgrim LOOP emergency shutdowns caused by the blizzard conditions during Nor'easters began with electrical faults and equipment failures in Pilgrim's switchyard. These switchyard events were characterized as "flashovers" meaning electrical faults, arching and sparking, and required varied degrees of intervention by the Plymouth Fire Department. The most recent example occurred this past winter on January 27, 2015 during Juno which caused an unplanned automatic shutdown that was complicated by subsequent failures of at least three additional pieces of critical equipment and systems during shutdown. B. Flashovers during Severe Storms Record Feb 06, 1978 (- Blizzard of 78) - The reactor automatically scrammed when heavy snowfall caused electrical breakers in the 345 kilovolt switchyard to flashover and trip. Feb 13, 1983 ( - With the reactor shut down, there was a loss of offsite power. High winds caused salt accumulation on electrical equipment that led to an electrical fault and a loss of offsite power lasting about 1 minute. suggests flashover). - Perfect Storm) - The operators shut down the reactor when a severe storm blew seaweed into the intake structure, clogging the circulating water pumps, and causing a loss of condenser vacuum. Weather-related loss 3 of offsite power lasting 120 minutes (Switchyard flashover reported in LER #91-024-00). ster/Blizzard) - The reactor automatically scrammed on a generator load rejection caused by flashovers in the switchyard due to salt deposits during a severe storm. -storm/Blizzard - Storm of the Century) - The reactor automatically scrammed on a generator load rejection caused by flashovers in the switchyard due to wind-packed snow during blizzard conditions. - The reactor automatically scrammed when a winter storm caused icing in the main switchyard.(Switchyard flashover reported in 1/26/15 Supplemental Inspection Report) - NEMO) - The reactor automatically scrammed at 9:17 pm when a blizzard caused offsite power to be lost. (Switchyard flashover reported in 1/26/15 Supplemental Inspection Report and warehouse storage screw up) Jan 27, 2015 (Nor'easter/Blizzard - Juno) (Switchyard Flashover) Flashovers are not a trivial matter. They result in loss of offsite power needed to both operate safety systems and to transmit power out. Flashovers result in automatic shutdowns, scrams. Every shutdown and startup has a risk of error or failure of equipment. Like aircraft, accidents are most likely during takeoff and landing. Second flashovers are very dangerous to workers in the yard and could cause severe burns or death. Third, flashovers can cause fires. Cause: 1 following the automatic scram during winter storm The root cause of the event is that the design of the PNPS switchyard does not prevent flashover when impacted by certain weather conditions experienced during severe winter storms. A modification of the switchyard is planned to address the susceptibility of the PNPS switchyard to flashovers durthose occurring in winter. The reason that the design of the switchyard is a problem is as follows, refer to diagram: 1 LER 2-15-001-00 Licensee Event Report 2015-001-00, Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno, April 1, 2015 (ML15097A259) 4 1. yard at the angle shown, bringing salt spray and/or snow into the switchyard. 2. The switch yard is located such that it is surrounded by hills. 3. There is a 2- story warehouse next to the switch yard 4. Big buildings such as the power plant tend to draw the wind down around them. All those factors (1-4) are reasons the wind swirls around in the switch yard. More evidence of the wind swirling around in the switch yard is the big lightening arrestors in the switch yard have fallen over in the past and landed on the bus bars in the switch yard. Those lightening arrestors historically swayed and vibrated in high wind. Years ago anti-sway attachments were made to the top of those lightening arrestors to prevent them from falling over. ers can stand near the screen house and see the waves of salt spray heading towards the switch yard. Salt spray from a northeast direction heads right into the switch yard and the hills and the 2 story warehouse tend to make the salt spray and/or snow swirl around in the yard and thus cause the insulators to become coated with salt and/or ice in a storm.
5 The unfortunate location of the switchyard explains its susceptibility to flashovers. In contrast, the insulators on the electrical transmission towers up and over the Pine Hills do not get Solutions 1. Shut Reactor Prior to Severe Storms, as requested in the petition: As said in the introduction, petitioners request that NRC provides either a license amendment or guidance requiring Entergy to place the reactor in cold shutdown prior to the anticipated arrival of certain severe storms (irrespective of the season) that make timely evacuation infeasible or impossible. Obviously, any time state government institutes a travel ban or travel restrictions for Southeastern Massachusetts this should apply. In addition, should travel conditions significantly reduce speed, visibility, and road quality, this directive should be implemented. NRC should create a clear policy as to when and how this order would be issued. Implementing this policy is not suggesting that every significant storm would create a public safety issue at Pilgrim. It is acknowledging that if any public safety issue did arise during such an event, either related to weather or coincidental, neither the state nor the local community would be able to implement the evacuation and emergency response procedures it is required to have in place. This is especially important because switchyards provide reasonable assurance that the problem will be fixed. 2. Switchyard Design Change: Implement not limit it to snowstorms but instead simply any severe storm. The problem will get worse. Severe storms are predicted to be more frequent and severe due to climate change. The single design change that would solve the problem is to enclose the entire yard. It would cost money; but flashovers result in automatic scrams. Every shutdown and startup has a risk of error or failure of equipment as well as lost revenue to Entergy; along with adverse publicity and increased attention by the NRC and public. Second, scrams are dangerous and if a worker or several workers are severely burned or die, that properly will cost the company money too.
6 But that is not what severe storm. -Up Inspection report 05000293/2015009 describes The report says that Entergy plans to address the icing in the switchyard with portable heaters, pressure washing and /or manual brushing. Regarding the heaters: The report fails to say whether Entergy is buying more heaters; and if so will there be a sufficient number and whether the plan to store them are in locations that they can be brought to the yard in a time effective manner in a severe winter storm; or, are they dragging the heater(s) around and refreezing behind it? How many heaters does the NRC feel are sufficient to avoid re-freezing? Has NRC analyzed the storage location of the heaters and time required under harsh conditions to transport the heaters to location? Regarding Power Washing: There is no explanation how power washing avoids re-freezing. If heaters are the answer; again, how many are required? Where is the water to power wash coming from? What assurance does NRC have that the power washing equipment and personnel can get to location in a severe winter storm, like Juno? Brushing: How can the NRC assure energized lines will not be mistakenly brushed by Entergy workers manually brushing lines in the switchyard? What assurance does NRC have that the personnel can get to location in a severe winter storm, like Juno? Insulator Service Life Issue Although the report says that the Doble Engineering, the testing company, said that the insulator expected service life was (30) years and therefore all insulators should be tested, Entergy decided not to follow its advice and got into trouble. The Supplemental Report says that Entergy will test them all by 2016. We see this as a lack of commitment for not doing testing in the first place (money); a relaxed schedule to finally get it done; and invitation by the NRC to the industry to run equipment to failure.
7 The NRC and its Office of Inspector General (OIG) both chronicled this problem. David Lochbaum, Union of Concerned Scientists, blogged about it ( http://allthingsnuclear.org/nuclear-plants-and-nuclear-excuses-this-is-getting-old/) and outlined how the NRC and its OIG found that some owners replace components before the service lifetimes while other owners run equipment to failure. While NRC prefers the former, they don't sanction the latter. Bottom line - NRC inaction is driving more and more owners toward bad behavior. Lochbaum concludes that the NRC seems pleased to allow the practice to continue until it kills someone, and then use ways. C. Emergency Response During Severe Storm Conditions evacuation was not possible for days. For example: The Massachusetts Governor Charlie Baker had declared a state of emergency, including a travel ban, in the Commonwealth of Massachusetts due to Winter Storm Juno. In his televised announcement, The Governor said: White-out conditions and treacherous roads will make driving anywhere extremely starting late tonight and through much of tomorrow. I can't stress this part enough. Please stay off the roads. Everyone should expect impassable roads across the state. We are also preparing for major coastal flooding along our entire coastline. High tide is conveniently coming at about 4 a.m. in most places, which will be right at the peak of the storm and the threat of coastal flooding is very real. We can see damage to coastal roads as well. It's extremely important that everyone stay off the roads. We have declared a state of emergency effective immediately. We will implement a state wide travel ban. (Petition, 4) Chief Nord, EMD Duxbury, said that he: stated clearly that the days following the storm that Duxbury could not implement its evacuation component of the plan due to the snow amounts (and) during that could implement the plan during that snow event. (Petition, 7) 8 During previous severe storms, there were occasions when timely evacuation was not possible mainly consists of wood-frame single family houses. EPA shows that dose reduction is limited and in a short period the dose inside and outside become equivalent. Notification of a nuclear event requiring emergency response and instructions to the public is limited during severe storms due to loss of power, that is exacerbated by the fact few people have fixed telephones. Further, the emergency sirens are unlikely to be heard, if in fact they sound, because windows will be shut during storm conditions and competing noise is generated from storm winds. A Town of Duxbury Emergency Management Department November 20, 2014 telephone survey in Duxbury followed a siren test. The day was a warm day so that some were outside, others inside without air conditioners running and perhaps open windows. It showed that the Pilgrim ETE incorrectly assumed that mobilization of the general population will commence within 15 minutes after siren notification (ETE, 2-5, 5-1). However the survey showed, despite media notices of the time and date of the test, that approximately 1/3 of the respondents did not hear the siren and only about 1/2 of those that heard the siren heard and .
9 III. Conclusion Timely evacuation is unlikely during severe storms. Severe storms increase the odds of an severe storms. Climate change increases the likelihood of an increased number of severe storms. sceptible to flashover due to severe storms resulting in LOOPS and scrams. assurance that the switchyard flashover problem has been resolved by covering the switchyard and then demonstrating success by actual experience during a couple of severe storms, the NRC should provide either a license amendment or guidance requiring Entergy to place the reactor in cold shutdown prior to the anticipated arrival of certain severe storms irrespective of the season. Respectfully submitted on July 13, 2015, Mary Lampert Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 Tel 781-934-0389 Email: mary.lampert@comcast.net William Maurer Cape Downwinders 140 Gifford Street Falmouth, MA 02540 Tel. 508-548-6221 Email: wmmaurer@comcast.net Rebecca Chin Co-Chair Town of Duxbury Nuclear Advisory Committee 31 Deerpath Trail, North-Duxbury, MA 02332 Tel. 781-837-0009 Email: rebeccajchin@hotmail.com Diane Turco Cape Downwinders 157 Long Road Harwich, MA 02645 Tel 508-776-3132 Email: tturco@comcast.net