Winter Storm Juno
Jump to navigation
Jump to search
| Start date | Site | Title | |
|---|---|---|---|
| ML22061A105 | 18 February 2022 | Duane Arnold | 4A-3_of_4-Hunter-Duane_Arnold_ASP_Analysis-SLIDES |
| ML18173A026 | 19 June 2018 | M180619: Transcript - Briefing on Results of the Agency Action Review Meeting (Public) | |
| 05000293/LER-2018-004, Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power | 14 May 2018 | Pilgrim | Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power |
| ML18066A082 | 19 March 2018 | Pilgrim | Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station |
| 05000293/LER-2018-001, Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line | 5 March 2018 | Pilgrim | Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line |
| ML16153A372 | 20 June 2016 | Pilgrim | Final ASP Analysis Pilgrim (LER 293-15-001) |
| ML16153A276 | 20 June 2016 | Pilgrim | Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis |
| ML16144A000 | 16 June 2016 | Pilgrim | LTR-15-0319-1, LTR-15-0375-1 - Response Letter 2.206 Petition Pilgrim Severe Weather Emergency Preparedness (Pilgrim Watch, Cape Downwinders, Town of Duxbury Nuclear Advisory Committee) |
| ML16091A487 | 31 March 2016 | Pilgrim | E-mail from R.Guzman to M. Lampert 2.206 Petition - Pilgrim Emergency Planning, Petition Review Board Initial Recommendation (MF6462) |
| ML16050A039 | 18 February 2016 | Pilgrim | Response to William Maurer Letter Regarding Pilgrim |
| IR 05000293/2015004 | 11 February 2016 | Pilgrim | Integrated Inspection Report 05000293/2015004, October 1, 2015 Through December 31, 2015 |
| 05000293/FIN-2015004-01 | 31 December 2015 23:59:59 | Pilgrim | Inadequate Implementation of Corrective Action following Winter Storm Juno |
| IR 05000293/2015002 | 11 August 2015 | Pilgrim | IR 05000293-15-002; 04/01/2015 - 06/30/2015; Pilgrim Nuclear Power Station (Pilgrim); Equipment Alignment, Operability Determinations and Functionality Assessments, and Follow-Up of Events and Notices of Enforcement Discretion |
| ML15217A270 | 4 August 2015 | Pilgrim | Region I Response Letter - M. Lampert/Pilgrim Watch, Comments Regarding NRC IP 95002 Follow-Up Inspection Report |
| 05000293/LER-2015-005, Regarding Degrading Condenser Vacuum Resulting in Manual Reactor Scram | 21 July 2015 | Pilgrim | Regarding Degrading Condenser Vacuum Resulting in Manual Reactor Scram |
| ML15197A487 | 13 July 2015 | Pilgrim | To 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015) |
| ML15208A587 | 9 July 2015 | Pilgrim | LTR-15-0319 - Transcript of 10 CFR 2.206 Petition Review Board Teleconference on 7/9/15 with Pilgrim Watch, Cape Downwinders, the Town of Duxbury Nuclear Advisory Committee Pilgrim Emergency Response Plan - Pages 1-29 |
| ML15208A460 | 8 July 2015 | Pilgrim | Slides of Regulatory Conference for July 8, 2015 |
| ML15176A317 | 24 June 2015 | Pilgrim | LTR-15-0344 - Mary Lampert, Director, Pilgrim Watch, E-mail Request to Withdraw NRCs 95002 Supplemental Follow-Up Inspection Report 05000293/2015009 Issued June 18, 2015, and Issue a New Report |
| IR 05000293/2015009 | 18 June 2015 | Pilgrim | IR 05000293/2015009; 05/04/2015 - 05/08/2015; Pilgrim Nuclear Power Station (Pilgrim); Follow-up Supplemental Inspection - Inspection Procedure (IP) 95002 |
| ML15162A883 | 11 June 2015 | Pilgrim | LTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency Planning |
| 05000293/LER-2015-002, Regarding Main Steam Safety Relief Valves Determined to Be Inoperable Following Evaluation | 12 May 2015 | Pilgrim | Regarding Main Steam Safety Relief Valves Determined to Be Inoperable Following Evaluation |
| ML15112A135 | 14 April 2015 | Pilgrim | Region I Reply Email - L. Frantin (Citizen) Email - Pilgrims Problems: Juno, Scrams, and Useless Back-Up Plans |
| 05000293/LER-2015-001, Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno | 1 April 2015 | Pilgrim | Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno |
| ML15056A356 | 24 February 2015 | Pilgrim | 2/24/15 - Region I/Drp/Pb 5 Response to M. Lampert, Pilgrim Watch -Comments and Questions Regarding Pilgrims Delay in Restart - Tube Plugs Falling Out - 2/23/15 |
| ENS 50790 | 5 February 2015 18:00:00 | Pilgrim | Loss of Sea Water Intake Bay Level Instrumentation Due to Loss of Instrument Air |
| ML15034A443 | 2 February 2015 | Pilgrim | LTR-15-0060 Diane Turco Email Cape Downwinders/Pilgrim Coalition/Cape Cod Bay Watch/Concerned Neighbors of Plymouth, E-mail Request That NRC Not Allow Pilgrim Reactor to Restart Until Public Safety Can Be Assured |
| ML15082A055 | 30 January 2015 | Pilgrim | L. Frantin (Citizen) Email - Pilgrims Problems: Juno, Scrams, and Useless Back-Up Plans |