Winter Storm Juno

From kanterella
Jump to navigation Jump to search
 Start dateSiteTitle
ML22061A10518 February 2022Duane Arnold4A-3_of_4-Hunter-Duane_Arnold_ASP_Analysis-SLIDES
ML18173A02619 June 2018M180619: Transcript - Briefing on Results of the Agency Action Review Meeting (Public)
05000293/LER-2018-004, Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power14 May 2018PilgrimAutomatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power
ML18066A08219 March 2018PilgrimEnclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station
05000293/LER-2018-001, Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line5 March 2018PilgrimRegarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line
ML16153A37220 June 2016PilgrimFinal ASP Analysis Pilgrim (LER 293-15-001)
ML16153A27620 June 2016PilgrimMemo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis
ML16144A00016 June 2016PilgrimLTR-15-0319-1, LTR-15-0375-1 - Response Letter 2.206 Petition Pilgrim Severe Weather Emergency Preparedness (Pilgrim Watch, Cape Downwinders, Town of Duxbury Nuclear Advisory Committee)
ML16091A48731 March 2016PilgrimE-mail from R.Guzman to M. Lampert 2.206 Petition - Pilgrim Emergency Planning, Petition Review Board Initial Recommendation (MF6462)
ML16050A03918 February 2016PilgrimResponse to William Maurer Letter Regarding Pilgrim
IR 05000293/201500411 February 2016PilgrimIntegrated Inspection Report 05000293/2015004, October 1, 2015 Through December 31, 2015
05000293/FIN-2015004-0131 December 2015 23:59:59PilgrimInadequate Implementation of Corrective Action following Winter Storm Juno
IR 05000293/201500211 August 2015PilgrimIR 05000293-15-002; 04/01/2015 - 06/30/2015; Pilgrim Nuclear Power Station (Pilgrim); Equipment Alignment, Operability Determinations and Functionality Assessments, and Follow-Up of Events and Notices of Enforcement Discretion
ML15217A2704 August 2015PilgrimRegion I Response Letter - M. Lampert/Pilgrim Watch, Comments Regarding NRC IP 95002 Follow-Up Inspection Report
05000293/LER-2015-005, Regarding Degrading Condenser Vacuum Resulting in Manual Reactor Scram21 July 2015PilgrimRegarding Degrading Condenser Vacuum Resulting in Manual Reactor Scram
ML15197A48713 July 2015PilgrimTo 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015)
ML15208A5879 July 2015PilgrimLTR-15-0319 - Transcript of 10 CFR 2.206 Petition Review Board Teleconference on 7/9/15 with Pilgrim Watch, Cape Downwinders, the Town of Duxbury Nuclear Advisory Committee Pilgrim Emergency Response Plan - Pages 1-29
ML15208A4608 July 2015PilgrimSlides of Regulatory Conference for July 8, 2015
ML15176A31724 June 2015PilgrimLTR-15-0344 - Mary Lampert, Director, Pilgrim Watch, E-mail Request to Withdraw NRCs 95002 Supplemental Follow-Up Inspection Report 05000293/2015009 Issued June 18, 2015, and Issue a New Report
IR 05000293/201500918 June 2015PilgrimIR 05000293/2015009; 05/04/2015 - 05/08/2015; Pilgrim Nuclear Power Station (Pilgrim); Follow-up Supplemental Inspection - Inspection Procedure (IP) 95002
ML15162A88311 June 2015PilgrimLTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency Planning
05000293/LER-2015-002, Regarding Main Steam Safety Relief Valves Determined to Be Inoperable Following Evaluation12 May 2015PilgrimRegarding Main Steam Safety Relief Valves Determined to Be Inoperable Following Evaluation
ML15112A13514 April 2015PilgrimRegion I Reply Email - L. Frantin (Citizen) Email - Pilgrims Problems: Juno, Scrams, and Useless Back-Up Plans
05000293/LER-2015-001, Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno1 April 2015PilgrimRegarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno
ML15056A35624 February 2015Pilgrim2/24/15 - Region I/Drp/Pb 5 Response to M. Lampert, Pilgrim Watch -Comments and Questions Regarding Pilgrims Delay in Restart - Tube Plugs Falling Out - 2/23/15
ENS 507905 February 2015 18:00:00PilgrimLoss of Sea Water Intake Bay Level Instrumentation Due to Loss of Instrument Air
ML15034A4432 February 2015PilgrimLTR-15-0060 Diane Turco Email Cape Downwinders/Pilgrim Coalition/Cape Cod Bay Watch/Concerned Neighbors of Plymouth, E-mail Request That NRC Not Allow Pilgrim Reactor to Restart Until Public Safety Can Be Assured
ML15082A05530 January 2015PilgrimL. Frantin (Citizen) Email - Pilgrims Problems: Juno, Scrams, and Useless Back-Up Plans