|
---|
Category:2.206 Petition
MONTHYEARML18158A2252018-06-0707 June 2018 (OEDO-15-00479) Pilgrim Nuclear Power Station - 2.206 Petition Regarding Pilgrim Nuclear Power Station - Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) ML17345A9362017-12-11011 December 2017 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15197A4872015-07-13013 July 2015 to 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015) ML16029A4072015-06-24024 June 2015 ODEO-15-00479: 2.206 Petition on Current Licensing Basis for Flooding at Pilgrim ML15162A8832015-06-11011 June 2015 LTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency Planning ML14260A4822014-09-16016 September 2014 LTR-14-0535 - Mary Lampert, Pilgrim Watch; William Maurer, Cape Downwinders; Diane Turco, Cape Downwinders Email 2.206 - Pilgrim Security ML14122A1502014-04-16016 April 2014 LTR-14-0249 - Mary Pat Flynn Et Al., County Commissioners, Barnstable County, Massachusetts Ltr. Potential Threats to Cape Cod Associated with the Pilgrim Nuclear Power Station ML13294A4002013-10-16016 October 2013 G20130211 - 10/16/13 Supplement #4 Information to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont - Email from T.Judson to R.Guzman ML13267A2342013-08-30030 August 2013 G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) ML13189A0572013-06-11011 June 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 6/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13133A2072013-04-23023 April 2013 G20130211 - Timothy Judson E-mail to R.Guzman 2.206 Supplemental Information Dated April 23, 2013 - James A. Fitzpatrick/Pilgrim/Vermont Yankee Nuclear Power Stations ML13113A2432013-04-22022 April 2013 G20130211 - Paul Gunter E-mail Re 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13112B0552013-04-11011 April 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 4/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13105A0602013-04-10010 April 2013 G20100454 - Mary Lampert, Pilgrim Watch Ltr. Pilgrim Watch'S Request for Extension to Reply to Proposed Director'S Decision Under 10 CFR 2.206 (7590-01-P) - Docket No. 50-293 ML13128A3052013-04-0909 April 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Nuclear Decommissioning Discussion with the NRC Staff: Conference Call Transcript (April 9, 2013) ML13079A0222013-03-18018 March 2013 G20130211 - Timothy Judson E-mail 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13070A0552013-03-0707 March 2013 G20130174 - Michael Mulligan E-mail 2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown ML13128A3022013-02-20020 February 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: in Search of Washington'S Latest Realities: DC Fieldtrip Takeaways (February 20, 2013) ML13128A3002013-01-0202 January 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Re-evaluating Merchant Nuclear (January 2, 2013) ML12178A0722012-06-25025 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012); CR-PNP-2012-02693 Waiver Fire Brigade ML12173A2022012-06-20020 June 2012 G20120327 - Mary Lampert Ltr. Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012) - Monthly Communication Test Failure ML12170B0212012-06-17017 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute Pilgrim NPS (Submitted May 16, 2012) - Condition Reports ML12170B0222012-06-16016 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute Pilgrim NPS (Submitted May 16, 2012) - Emergency Response ML12167A2222012-06-13013 June 2012 G20120327 - Mary Lampert Ltr. Re Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim Nps (Submitted May 16, 2012) ML12166A3482012-06-12012 June 2012 G20120327 - Mary Lampert Ltr. Supplement to 2.206 Enforcement Petition Regarding Labor Dispute-Pilgrim NPS (Submitted May 16, 2012) ML1216004412012-06-0606 June 2012 G20120327/EDATS: OEDO-2012-0282 - Supplemental Information Mary Lampert 2.206 Regarding Labor Dispute - Pilgrim Nuclear Power Station ML1217700412012-05-18018 May 2012 G20120327/EDATS: OEDO-2012-0282 - Mary Lampert - Supplement to 2.206 Enforcement Petition Regarding Labor Dispute - Pilgrim Nuclear Power Station - Security ML12138A1792012-05-16016 May 2012 G20120327/EDATS: OEDO-2012-0282 - Mary Lampert, Margaret Sheehan, Pine Dubois & Wedge Bramhall, Re 2.206 - Enforcement Petition Regarding Labor Dispute - Pilgrim Nuclear Power Station ML11213A0302011-07-29029 July 2011 G20110563/EDATS: OEDO-2011-0535 - David Lochbaum Ltr. 2.206 - Boiling Water Reactors with Mark I and Mark II Containment Designs ML1032102282010-11-15015 November 2010 G20100689/EDATS: OEDO-2010-0929 - Mary Lampert Ltr. Re Pilgrim Nuclear Power Station - Petitioner'S Request for Review of the Petition Review Board Denial 2.206 Regarding Request Require Hydrological-Geological Subsurface Study ML1028104692010-10-0606 October 2010 G20100527/EDATS: OEDO-2010-0688 - Pilgrim Watch - 2.206 Petition Regarding Hydrogeologic Assessment Pilgrim NPS - Supplement ML1022805682010-08-13013 August 2010 G20100527/EDATS: OEDO-2010-0688 - Mary Lampert and Rebecca Chin Ltr. Re 2.206 - Hydrogeologic Assessment at Pilgrim Nuclear Power Station ML1022104112010-08-0606 August 2010 G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Supplement (1) to Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station ML1020202752010-07-19019 July 2010 G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML0914000642009-05-14014 May 2009 G20090292/LTR-09-0210/EDATS: SECY-2009-0248 - Mary E. Lampert, Rebecca J. Chin Pilgrim NPS RFO 2009: 2.206 Petition Requesting That NRC Require All Work Packages Inspected Prior to Pilgrim'S Re-start - Urgent Action Requested Due to Timing ML0814002822008-05-14014 May 2008 G20080352/EDATS: OEDO-2008-0390 - Scott H. Strauss Ltr. Re 2.206 Pilgrim Petition of Utility Workers Union of America, Local 369 ML0814001022008-05-13013 May 2008 G20080347/LTR-08-0283/EDATS: SECY-2008-0303 - Ltr., Mary Elizabeth Lampert, Re 2.206 Petition Regarding Potential Worker Strike Pilgrim Station 2018-06-07
[Table view] Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
ETS .U.S.NRC Ticket No: G20130174 ProtertingPeoph and the Fnvironent 2105 Inom
-,;,eea to Assigned Office: NRR OEDO Due Date: 04/08/2013 Other Assignees: SECY Due Date:
Date Response Requested by Originator:
Other Parties: Tanya.Mensah@nrc.gov
Subject:
2.206 - Pilgrim Nuclear Plant
Description:
CC Routing: OGC, Regionl ADAMS Accession Numbers - Incoming: Response / Package:
he infrmaio Cross Reference No: SRM\Other: No IN oes Inforatio Action Type: 2.206 Review OEDO Concurrence: No Signature Level: NRR OCM Concurrence: No Special Instructions: OCA Concurrence: No S. Inomto
.cmn Originator Name: Michale Mulligan Date of Incoming: 03/07/2013 Originator Org: Citizens Document Received by OEDO Date: 03/07/2013 Addressee: NRC Allegation Incoming Task: E-mail OEDO POC: Dan Merzke MP f(& E2 i.- .... e bS E
.... -6
From: Michael Mulligan [1]
Sent: Thursday, March 07, 2013 12:33 PM To: newstip~globe.com; NRC Allegation
Subject:
2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown
Dear sir,
I called this into your hotline by telephone and left a message to a reporter an hour or so ago. This is just a follow-up.
I'd like to get Gov Patrick to demand an immediate Pilgrim shutdown and demand a special investigation of these events.
Mike So the below is my 2.206 request to the NRC. You'd do me a favor if the BG calls our region I public relation people.. .Neil Shaheen.
March 7, 2013 Bill Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Mr. Bochardt,
Request an emergency and for a exigent bases, that the Pilgrim Nuclear plant be immediately shut down.
Don't tell me just before Nor'easter Nimo struck the Pilgrim plant with a leaking safety relief valve and down at 80%, Entergy was intending to operate that plant with a defective leaking safety relief valve till the next refuel outage. Tell it ain't so. It certainly looks like with the current leaktoday that are intending to operate till next month.
Is the game plan today to incrementally increase reactor power from 94% by 1%
to see if a new SRV leak is getting worse?
Timeline:
- 1) New three stage safety relief valves installed in the plant around May 2011.
- 2) First leak and shut down on Dec, 26. 2011 (SRV RV-203-3D).
- 3) Second leak and shut down on Jan 20, 2013 (SRV RV-203-3B).
- 4) Third leak occurred a few weeks later and the Nemo blizzard tripped the plant.. .the NRC promised these valves would be fixed. (SRV RV-203-3B).
- 5) Basically they operated for 20 days at 100% power operation post shutdown, then reported on Feb 27 the plant is operating at 94% power with no explained reason until today. The reason for the down power was kept secret from the public.
EDO -- G20130174
Don't forget the repetitive nature of the recently broken scram discharge volume vent and drain valves.. .implies Entergy is incapable of maintaining safety components of a nuclear plant.
The repeated nature of the failure of the safety relief valves means Entergy doesn't know the mechanism of the failure.. .it is a common mode failure. The design and manufacture of these valves are defective and it is extremely unsafe to operate a nuclear plant with all safety relief valves being INOP. A condition adverse to quality...
The NRC should have made a public comment about the new leaking safety relief when they first became aware of th leak. The implication is the agency was going to allow the plant to operate with unsafe SRVs until the refueling outage next month. The NRC is involved in a serious cover-up of an extremely unsafe operation of a nuclear power.
- 1) Request an immediate shutdown the Pilgrim Plant.
- 2) The is the second time I requested a special NRC inspection concerning the defective SRV valves.
- 3) Not allow the plant to restart Pilgrim until they fully understand the past failure mechanisms of the four bad new three stage safety relief valves.
- 4) Request the OIG investigate this cover-up to keep an unsafe nuclear plant at power.
References:
The Popperville Town Hall (my blog):
http://steamshovel2002. blogspot.com/
"Pilgrim's Safety Relief Valve Leaking Boondoggle" http: //steamshovel2002.blogspot.com/2013/02/pilgrims-safety-relief-valve-leaking.html Sincerely, Michael Mulligan PO Box 161 Hinsdale, NH 03541 16033368320 steamshovel2002@vahoo.com