MONTHYEARML20294A2402020-10-16016 October 2020 OEDO-20-00413 - 2.206 Petition-Beyond Nuclear - GE Mark I Hardened Vents ML18158A2252018-06-0707 June 2018 (OEDO-15-00479) Pilgrim Nuclear Power Station - 2.206 Petition Regarding Pilgrim Nuclear Power Station - Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) ML17345A9362017-12-11011 December 2017 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) ML17044A0722017-03-23023 March 2017 G20120172 - Closure Letter to Gunter, Et Al 2.206 Petition on Containment Ventilation for James A. FitzPatrick Nuclear Power Plant ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15197A4872015-07-13013 July 2015 to 2.206 Petition Pilgrim Emergency Planning (LTR-15-0319), Mary Lampert Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders (07/13/2015) ML16029A4072015-06-24024 June 2015 ODEO-15-00479: 2.206 Petition on Current Licensing Basis for Flooding at Pilgrim ML15162A8832015-06-11011 June 2015 LTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency Planning ML14260A4822014-09-16016 September 2014 LTR-14-0535 - Mary Lampert, Pilgrim Watch; William Maurer, Cape Downwinders; Diane Turco, Cape Downwinders Email 2.206 - Pilgrim Security ML14122A1502014-04-16016 April 2014 LTR-14-0249 - Mary Pat Flynn Et Al., County Commissioners, Barnstable County, Massachusetts Ltr. Potential Threats to Cape Cod Associated with the Pilgrim Nuclear Power Station ML14034A2572014-01-31031 January 2014 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Gay Nicholson ML14028A2212014-01-26026 January 2014 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Amy Harper ML13322A4602013-11-15015 November 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Robert Swiatek ML13294A4002013-10-16016 October 2013 G20130211 - 10/16/13 Supplement #4 Information to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont - Email from T.Judson to R.Guzman ML13253A1302013-09-0909 September 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Elaine Davis ML13267A2342013-08-30030 August 2013 G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) ML13239A4552013-08-27027 August 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Gary Shaw ML13239A1712013-08-23023 August 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Hali Jones ML13217A0612013-07-25025 July 2013 G20130561 - David Lochbaum E-mail Re Tanya Mensah, NRR, Merrilee Banic, NRR; Andrea Russell, NRR, David Pelton, NRR; Mary Spencer; OGC ML13203A1192013-07-19019 July 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Branden Ramer ML13189A0572013-06-11011 June 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 6/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13119A0602013-04-24024 April 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Diane Lombardi ML13119A0612013-04-23023 April 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Jonathan Dwyer ML13133A2072013-04-23023 April 2013 G20130211 - Timothy Judson E-mail to R.Guzman 2.206 Supplemental Information Dated April 23, 2013 - James A. Fitzpatrick/Pilgrim/Vermont Yankee Nuclear Power Stations ML13113A2432013-04-22022 April 2013 G20130211 - Paul Gunter E-mail Re 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13106A1622013-04-12012 April 2013 G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Antonio Caniano, in the Matter of the James A. FitzPatrick Nuclear Power Plant, ME8189 ML13112B0552013-04-11011 April 2013 G20130174 - Micheal Mulligan 2.206 Petition Transcript of 4/11/13 Teleconference Safety Relief Valves at Pilgrim Nuclear Power Station ML13105A0602013-04-10010 April 2013 G20100454 - Mary Lampert, Pilgrim Watch Ltr. Pilgrim Watch'S Request for Extension to Reply to Proposed Director'S Decision Under 10 CFR 2.206 (7590-01-P) - Docket No. 50-293 ML13128A3052013-04-0909 April 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Nuclear Decommissioning Discussion with the NRC Staff: Conference Call Transcript (April 9, 2013) ML13100A2572013-04-0606 April 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Terri Tuers ML13086A4812013-03-27027 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Sally Moore, Et Al ML13085A0602013-03-22022 March 2013 G20120172/EDATS: OEDO-2012-0147 - E-mail from 90 Additional Co-Petitioners with Alliance for a Green Economy and Beyond Nuclear'S March 9, 2012 Emergency Enforcement Petition to Suspend Operation of James A. FitzPatrick Nuclear Plant ML13079A0222013-03-18018 March 2013 G20130211 - Timothy Judson E-mail 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13071A0642013-03-10010 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Hector Lopez ML13071A0712013-03-0909 March 2013 James a, FitzPatrick Nuclear Power Plant, ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner,Connie Hogarth ML13071A0702013-03-0909 March 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Dave Morrison ML13071A0692013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner H Patricia Hynes ML13071A0682013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Ellin Feld ML13071A0672013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Maureen Headington ML13071A0662013-03-0909 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Gary Sachs ML13071A0652013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Barbara Antonoplos ML13070A0552013-03-0707 March 2013 G20130174 - Michael Mulligan E-mail 2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown ML13063A0452013-03-0101 March 2013 ME8189 - G20120172/EDATS: 0EDO-2012-047 - E-mail from Additional Co-Petitioner Anne Mathot ML13063A0482013-02-28028 February 2013 ME8189 - G20120172/EDATS: 0EDO-2012-047 - E-mail from Additional Co-Petitioner Ramona Gillings ML13063A0462013-02-28028 February 2013 G20120172/EDATS: OEDO-2012-0147 - E-Mail from Bernard Yozwiak Wishing to Co-Petition with Alliance for a Green Economy and Beyond Nuclear'S March 9, 2012 Emergency Enforcement Petition to Suspend Operation of James A. FitzPatrick Nuclear Pl ML13063A0472013-02-28028 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, William G. Gonzalez ML13059A2222013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Ann Prival ML13059A2212013-02-27027 February 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Augie Abel ML13059A2162013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Marcella Crysler 2020-10-16
[Table view] Category:E-Mail
MONTHYEARML24298A1382024-10-24024 October 2024 Final RAI for FitzPatrick JAFP-24-0047 (L-2024-LLA-0134) ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A1072024-06-0404 June 2024 NRR E-mail Capture - (External_Sender) Supplement for FitzPatrick TS 3.4.2-2 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24060A0512024-02-28028 February 2024 NRR E-mail Capture - FitzPatrick - Final Arcb RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24033A0542024-02-0101 February 2024 NRR E-mail Capture - FitzPatrick - Final HFE RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application 2024-09-06
[Table view] |
Text
TF0 . LeeAZ4 / K)Ž a 0 Jaegers, Cathy ,eX From: Paul Gunter <paul@beyondnuclear.org >
Sent: Monday, April 22, 2013 12:04 PM C11. mvirtk-(
To: Guzman, Richard; Borchardt, Bill owO
Subject:
Emergency Enforcement Petition for Entergy Nuclear on lack of financial qualification Beyond Nuclear signs on as a co-petitioner in the following matter concerning Entergy's Vermont Yankee and FitzPatrick nuclear power plant.
Thank you, Paul Gunter Mr. James Borchardt Executive Director of Operations U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Borchardt:
I wish to join the petition submitted by Alliance for a Green Economy, Citizens Awareness Network, Pilgrim Watch, and Vermont Citizens Action Network for emergency enforcement action against Entergy Nuclear Operations, Entergy Nuclear FitzPatrick, LLC, Entergy Nuclear Vermont Yankee, LLC, and Entergy Generation Co. The petition calls for the Nuclear Regulatory Commission (NRC) to suspend licenses for the James A. FitzPatrick Nuclear Power Plant and the Vermont Yankee Nuclear Power Station. The petition also requests NRC begin an investigation to determine whether the operating license for the Pilgrim Nuclear Power Station must also be suspended.
Entergy is operating FitzPatrick and Vermont Yankee in violation of the terms and conditions of the licenses.
Specifically, Entergy no longer meets the financial qualifications requirements to possess the licenses and operate FitzPatrick and Vermont Yankee. Entergy may no longer meet the same licensing requirements for Pilgrim. These regulations require that licensees demonstrate they are financially qualified, in order to ensure they can afford to operate and maintain reactors safely.
In January and February 2013, UBS Investment Research (UBS) issued consecutive reports enumerating strong concerns about the performance of Entergy's merchant nuclear business. In particular, UBS names two Entergy reactors that are unable to generate sufficient revenue to meet their operating costs: FitzPatrick and Vermont Yankee. In the February report, UBS also notes that Pilgrim is at risk of falling into this category. UBS projects that, unless Entergy closes FitzPatrick and/or Vermont Yankee, Entergy will have to operate them at a loss through at least 2016.
If UBS is correct that FitzPatrick and VY have been operating at a net loss, and will continue to do for at least the next four years, then Entergy is no longer financially qualified to operate the reactors under the licenses and the terms of their transfers. An investigation of Pilgrim under 10 CFR 50.33(f)(5) is necessary to determine whether the same is true of the Pilgrim licensees.
FitzPatrick is experiencing performance problems that affect the plant's ability to generate revenue reliably. In February 2013, NRC placed FitzPatrick under Increased Regulatory Response for the Unplanned Power Changes (UPC) performance indicator. NRC tracks UPC under the Initiating Events Cornerstone under its IN
Reactor Oversight Process, because they "upset plant stability and challenge critical safety functions," making it more likely that an accident could occur. With an average of 6.4 UPC per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of operation, FitzPatrick has had eight times the industry average number of these initiating events.
As part of its investigation of FitzPatrick's financial qualifications, NRC should determine whether these plant reliability problems are connected to economic pressures on Entergy to reduce operating and maintenance costs and outage time. For instance, the frequency of Unplanned Power Changes caused by problems with the main condenser makes it appear that Entergy is tolerating a high rate of initiating events in order to defer maintenance on, or replacement of, a major piece of equipment.
There has also been a surprisingly large number of emergencies, plant shutdowns, and equipment failures at Pilgrim in recent months, as documented in daily event reports since January 1, 2013. This recent performance trend should also be reviewed with respect to Entergy's financial qualifications, as part of the 10 CFR 50.33(0(5) investigation.
In addition to the main condenser at FitzPatrick, Entergy may be forced to incur other large costs for plant maintenance and upgrades. FitzPatrick is unique among reactors of its type in never having installed a so-called "hardened vent" (containment bypass system) to address known deficiencies in the design of its containment system. FitzPatrick will need to complete upgrades to the containment bypass system and other post-Fukushima requirements before the end of 2016 - during the same period in which UBS anticipates Entergy will not be able to operate FitzPatrick profitably. NRC's post-Fukushima safety review may yet require other investments in maintenance and upgrades.
Vermont Yankee is also known to require replacement of the main condenser sometime before 2016, at an estimated cost of $150 million and requiring substantial outage time. In addition, the policy environment affecting VY's operating costs involve substantial uncertainty, with policymakers considering several measures that could create significant new expenses: fees or penalties for thermal discharges into the Connecticut River,levies on spent fuel storage, and/or prepayment for post-closure spent fuel storage and site remediation.
Both VY and Pilgrim, like FitzPatrick, are Mark I boiling water reactors and will have to complete a number post-Fukushima upgrades within the 2013-2016 period and beyond.
Entergy's financial qualifications and the impact of maintenance costs and outage time are not of concern because of their impact on Entergy's profitability, stock price, or bond rating. Rather, they are relevant because of their impact on nuclear plant safety and the decisions Entergy makes about how it operates and maintains FitzPatrick, Vermont Yankee, and Pilgrim while minimizing its financial losses. Entergy may, as UBS anticipates, decide to retire one or more of the plants in 2013 and defer making major investments such as replacing the condensers - in essence, deciding to tolerate problems that contribute to more Unplanned Power Changes and Initiating Events, and compromising mitigating systems and other safety cornerstones.
The licensees must not be allowed to endanger the public health and safety as a result of the fact that Entergy is not financially qualified to operate Vermont Yankee and FitzPatrick, and possibly Pilgrim, per 10 CFR 50.33(f)(2). NRC must therefore suspend the FitzParick and VY licenses to prevent further violations, per 10 CFR 110(a)(3), and investigate Entergy's financial qualifications to continue operating Pilgrim, per 10 CFR 50.33(0(5).
I understand that my name may be made public in connection with this petition and I designate CAN's Tim Judson as my point of contact.
Sincerely, 2
Paul Gunter, Director Reactor Oversight Project Beyond Nuclear 6930 Carroll Avenue Suite 400 Takoma Park, MD 20912 Tel. 301 270 2209 www.beyondnuclear.org 3