NRC 2015-0045, Submits Technical Requirements Manual Change Summary

From kanterella
Revision as of 19:54, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Submits Technical Requirements Manual Change Summary
ML15223B293
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/11/2015
From: Woyak B
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2015-0045
Download: ML15223B293 (2)


Text

August 11, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary NRC 2015-0045 10 CFR 50.71(e) In accordance with 10 CFR 50.71(e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2014, through December 31, 2014. NextEra previously submitted the TRM change summary for January 1, 2013, through December 31, 2013, on August 21, 2014 (ML14233A426).

This letter contains no new commitments and no revisions to existing commitments.

If you have questions or require additional information, please contact me at (920) 755-7599.

Very truly yours, NextEra Energy Point Beach, LLC

/11-'/.::L./?

/I ,b__, Bryan Woyak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Affected Section 2.1 (U1) 2.1 (U2) 2.2 3.4.5 3.7.7 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE

SUMMARY

FOR 2014 Date of Affected Change Pages(s) Summary 10/15/14 All New Core Operating Limits for Unit 1 Cycle 36. 3/26/14 All New Core Operating Limits for Unit 2 Cycle 34. 11/20/14 All Revised Reactor Coolant System Pressure and Temperature Limits Report to reflect issuance of Amendments 250 and 254. 9/18/14 3.4.5-1' 3 Corrected the Technical Requirements Manual (TRM) Limiting Condition for Operation (TLCO) Applicability verbiage for chloride, fluoride and oxygen concentration limits. 6/26/14 3.7.7-1' Removed reference to Auxiliary Feedwater Pump 2P-29. 7, 9 This pump is no longer impacted by Service Water limitations due to a station modification that resulted in no longer using Service Water for pump bearing cooling. Page 1 of 1