ML111730225

From kanterella
Revision as of 13:59, 30 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to Regulatory Issue Summary (RIS) 2011-04
ML111730225
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/20/2011
From: Bauder D R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2011-04
Download: ML111730225 (2)


Text

SO UTHERN CALIFORNIA EDISON.....An EDISON INTERNATIONAL Company ATTN: Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555-0001 June 20, 2011 Douglas R.BauderSiteVice President&Station Manager San OnofreNuclear Generating Sta tion10CFR 55.40

Subject:

DocketNos.50-361and50-362 Response to Regulatory Issue Summary (RIS)2011-04 San Onofre Nuclear GeneratingStation,Units2and3

Reference:

RIS2011-04,"Preparat ion and Scheduling of Operator Licensing Examinations,"datedMay25,2011 Gentlemen:

This le tter provides the Southern CaliforniaEdison(SCE) responsetoU.S.Nuclear Regulatory Commission Regulatory Issue Summary 2011-04,"Preparationand Scheduling of Operato r Licens ing Examinations,"datedMay25

, 2011.The scheduleshownonNRCForm536

,"Ope rator Licensing Examination Data," is enclosed and provides SCE's best estimate to meet our operator licensing needs through calenda r year 2016.Ifyouhaveany questions, pleasefeelfreeto contactmeorMr.Ryan Treadway at(949)368-9985.Sincerely ,

Enclosure:

As Stated cc:E.E.Collins, Regional Administrator,NRCRegionIVMarkS.Haire , Chief , Operations Branch ,NRCRegionIVR.Hall , NRC Project Manager , San OnofreUnits2and3G.G.Warnkk ,NRCSen ior Resident Inspector, San OnofreUnits2and3 P.O.Box128SanClemente,CA 92672 (949)368-9275PAX892 75Fax:(9 49)368-9881 Doug.Bauder@sce.com NRCFORM536 U.S.NUCLEAR REGULATORY COMMISS ION AP PROVEDBYOMB:NO.3150-0131 EXPIRES: 10/31/2011 (10-2008)Est imatedburden perresponsetocomply with this v o luntaryin formatio n collectionrequest:1 hour.This i nformation collectionisusedtop lan budgets a nd resourcesfor operato r examinations

.Sendcommentsrega rding burden OPERA TOR LICENSING estimateto theRecordsandFOIAlPri vacyServicesBranch(T-5 F53), U.S.Nuclear Regulatory Commission,W ashing ton, DC20555-0001 ,orby i nterne t EXAMINATION DATA e-ma il toinfocollects@nrc.go v , an d t o theDesk Office r , O ffice ofInformationandRegulatory A ff airs, NEOB-10202,(3150-0131), OfficeofManagement and Budget, W a shingto n , DC20 503.Ifa mea nsusedtoimposea n information collection doesnotdisplayacurrently val idOM B contr ol number , theNRCmay notconductorspo nsor , anda personisno t re quiredtorespondt o , the information collection.F AC ILITY NRCREGION Sa n OnofreNuclear Generating Station, Units 2 and 3 Region IV A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBERCY2013 Cy 2014 Cy 2015 Cy 2016--------ESTI MATEDNUMBEROF 0 1 LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATEDNUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBERCY2013 Cy2014CY2015CY2016--------NUMBEROFREACTOR 1 0 0 10.10 OPERATORSNUMBEROFSENIORREACTOR 5 0 5 5 OPERATORS-INSTANT NU MBEROFSEN IOR REACTOR 5 0 5 5 OPERATORS-UPGRADE NUMB ER O FSENIORREACTOR 0 0 0 0 OPERATORS-LI MITEDPROPOSEDDATES PRIMARY D ATE 10/2112013 N/A 10/1912015 10/1 7120 16 ALTERNATE D ATE 11/0 412013 N/A 11/02/2015 10/3112016 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE C Y 2013 CY 20 14 PROPOSED------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES NRC FOR M 5 36 (10-200 8)PR INTEDON REC Y CLED PA P E R