ML16201A223

From kanterella
Revision as of 21:28, 6 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML16201A223
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 07/15/2016
From: Barbee A T
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
RIS 2016-09
Download: ML16201A223 (3)


See also: RIS 2016-09

Text

  • .' Andy T. Barbee Director, Nuclear Training 803.345.4034

A SCANA COMPANY U.S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam: Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING

LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, RIS 2016-09 PREPARATION

AND SCHEDULING

OF OPERATOR LICENSING

EXAMINATIONS

July 15, 2016 Attached please find South Carolina Electric & Gas Company's

anticipated

schedule for operator licensing

examinations

for V. C. Summer Units 1, 2 and 3. As previously

discussed

with Region II, V. C. Summer Units 2 and 3 plan two examinations

for calendar year 2017. The proposed dates are 01/17/17 (alternate

01/30/17)

and 12/04/17 (alternate

12/11/17).

Should you have any questions

concerning

Unit 1 exams, please call Mr. Neil E. Constance

at (803) 345-4028.

For questions

concerning

Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm

Attachments

(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance

P. A Mathena NRC Resident Inspector

K. M. Sutton NSRC RTS (CR-16-03121)

File (814. 04, RR 1150) PRSF (RC-16-0114)

DCRM V. C. Summer Nuclear Station* P. 0. Box 88 * Jenkinsville, SC* 29065 * F (803) 941-9776

f.' NRC FORM536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 10/31/2017

(05-2016)

rJP" R<G"<., Estimated

burden per response to comply with this voluntary

information

collection

request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This >'\ OPERA TOR LICENSING

information

collection

is used to plan budgets and resources

for operator examinations.

Send comments

burden estimate to the FOIA, Privacy, and Information

Collections

Branch (T-5 c F53), U.S. Nuclear Regulatory

Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION

DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory

Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information

collection

does not display a currently

valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED

NUMBER OF LICENSEE-PREPARED

l 1 .1 0 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

-B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018

10/28/2019.

10/26/2020

ALTERNATE

DATE 06/04/2018

11/04/2019

11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER

MARCH SEPTEMBER

ESTIMATED

NUMBER OF 0 0 6 0 CANDIDATES

NRC FORM 536 (05-2016)

4 v * NRC FORM536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 10/31/2017

(05-2016) ... ",. Estimated

burden per response to comply with this voluntary

information

collection

request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERA TOR LICENSING

information

collection

is used to plan budgets and resources

for operator examinations.

Send ti comments regarding

burden estimate to the FOIA, Privacy, and Information

Collections

Branch (T-5 :; ll F53), U.S. Nuclear Regulatory

Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION

DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory

Affairs, ..

NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. If a means '*"'**°'.

used to impose an information

collection

does not display a currenijy

valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRCREGION

Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED

NUMBER OF LICENSEE-PREPARED

1 1 1 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS

NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018

09116/2019

09/14/2020

09/13/2021

ALTERNATE

DATE 10/22/2018

09/30/2019

09/28/2020

09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER

MARCH SEPTEMBER

ESTIMATED

NUMBER OF 0 24 0 24 CANDIDATES

NRG FORM 536 (05-2016)