ML081160094
From kanterella
Revision as of 04:47, 30 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML081160094 | |
Person / Time | |
---|---|
Site: | Oconee ![]() |
Issue date: | 04/21/2008 |
From: | Baxter D Duke Energy Carolinas, Duke Power Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RR 04-ON-012, R1 | |
Download: ML081160094 (25) | |
Similar Documents at Oconee | |
---|---|
Category:Drawing
MONTHYEARML22124A2052022-05-0404 May 2022
[Table view]Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML20189A0912020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures ML20189A0882020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures ML20189A0852020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) ML20189A0822020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures ML20189A0792020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML20189A0762020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML20189A0732020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML20189A0702020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) ONS-2018-038, Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 272018-06-29029 June 2018 Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27 ML18192A9722017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures ML18192A8942017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted) ML18192A9012017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML18192A9072017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML18192A9152017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML18192A9482017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 9B, Figures (Redacted) ML18192A9542017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures ML18192A9622017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures ML17003A1222017-01-0303 January 2017 Drawing No. PO-107B-3, Rev. 10, Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion). ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-2322016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17234A1242016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ML17234A1202016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ML17234A1142016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ONS-2017-048, Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted2016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ML17234A1292016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ML17234A1352016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17361A4102016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-82016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-62016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ML1101806672011-01-0505 January 2011 Enclosure 2 (Part 2) - Major Projects Slides ML0900203552008-12-22022 December 2008 Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006 ML0900203582008-12-22022 December 2008 Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System. ML0900203562008-12-22022 December 2008 Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System. ML0908907922008-04-29029 April 2008 Drawing OFD-124A-3.1, Rev 33, Flow Diagram of Low Pressure Service Water System Turbine Bldg (Low Pressure Service Water Pumps). ML0811600942008-04-21021 April 2008 Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection Interval ML0908907842005-11-0707 November 2005 Drawing OFD-133A-2.1, Rev 26, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). ML1019602852005-10-0101 October 2005 Monitoring Well Locations ML0908907932005-06-16016 June 2005 Drawing OFD-133A-1.1, Rev 28, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). 2022-05-04 Category:Inservice/Preservice Inspection and Test Report MONTHYEARRA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023
[Table view]Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0052, Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2023-02-22022 February 2023 Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2022-11-21021 November 2022 Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-22-0255, Refuel 31 (O3R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2022-08-29029 August 2022 Refuel 31 (O3R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-22-0123, Refuel 30 (O2R30) Steam Generator Tube Inspection Report2022-05-26026 May 2022 Refuel 30 (O2R30) Steam Generator Tube Inspection Report RA-22-0066, Refuel 30 (O2R30) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2022-03-0707 March 2022 Refuel 30 (O2R30) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-19-0396, Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval2021-02-11011 February 2021 Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval RA-19-0394, Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval2020-03-10010 March 2020 Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval RA-19-0426, Supplement to RA-18-0138, Oconee Unit 3, Refuel 29 (O3R29) Inservice Inspection and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2019-12-0909 December 2019 Supplement to RA-18-0138, Oconee Unit 3, Refuel 29 (O3R29) Inservice Inspection and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval RA-18-0138, Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-08-15015 August 2018 Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ML16232A0662016-08-15015 August 2016 End of Cycle 28 (3EOC28) Refueling Outage In-service Inspection(Isi)And Steam Generator Service Inspection(SG-ISI) Report, Firth 10-Year ISI Interval ONS-2016-014, End of Cycle 27 (2EOC27) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2016-02-10010 February 2016 End of Cycle 27 (2EOC27) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ML15271A3382015-09-30030 September 2015 Review of the Fall 2014 Steam Generator Tube Inservice Inspection Report for Refueling Outage 28 ML15202A0332015-07-15015 July 2015 Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-002, Limited Volume Inspections from 1 EOC27 and 2EOC26 Outages ONS-2015-039, Fifth Ten Year Inservice Inspection Interval, Relief Request No. 14-ON-001; Inspection Impracticality of Letdown Cooler Nozzle Inside Radius Sections2015-05-0404 May 2015 Fifth Ten Year Inservice Inspection Interval, Relief Request No. 14-ON-001; Inspection Impracticality of Letdown Cooler Nozzle Inside Radius Sections ONS-2015-037, Fifth Ten Year Inservice Inspection Interval, Relief Request No. 14-ON-002; Alternative Requirements for Specific Residual Heat Removal System Welds2015-05-0404 May 2015 Fifth Ten Year Inservice Inspection Interval, Relief Request No. 14-ON-002; Alternative Requirements for Specific Residual Heat Removal System Welds ML15072A2182015-03-13013 March 2015 Steam Generator In-service Inspection Summary Report Oconee Nuclear Station Unit 1 EOC 28 Fall Outage 2014 ONS-2015-031, End of Cycle 28 (11EOC28) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2015-03-0606 March 2015 End of Cycle 28 (11EOC28) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2015-031, Oconee, Unit 1 - End of Cycle 28 (11EOC28) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2015-03-0606 March 2015 Oconee, Unit 1 - End of Cycle 28 (11EOC28) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2014-114, End of Cycle 27 (3EOC27) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fourth 10-Year ISI Interval2014-08-12012 August 2014 End of Cycle 27 (3EOC27) Refueling Outage Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Report, Fourth 10-Year ISI Interval ML14202A0092014-07-15015 July 2014 Fifth Interval Inservice Inspection Plan ONS-2014-098, Oconee, Units 1, 2 and 3 - Fifth Interval Inservice Inspection Plan2014-07-15015 July 2014 Oconee, Units 1, 2 and 3 - Fifth Interval Inservice Inspection Plan ML14202A0102014-06-18018 June 2014 Oconee, Units 1, 2 and 3 - Fifth Interval Inservice Inspection Plan, Attachment a ONS-2014-098, Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Revision 0, Attachment B2014-05-12012 May 2014 Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Revision 0, Attachment B ONS-2014-098, Oconee, Units 1, 2 and 3 - Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Revision 0, Attachment B2014-05-12012 May 2014 Oconee, Units 1, 2 and 3 - Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Revision 0, Attachment B ML14202A0122014-05-12012 May 2014 Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Revision 0, Attachment C ONS-2014-033, End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report2014-03-0303 March 2014 End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report ML14066A0692014-03-0303 March 2014 End of Cycle 26 Refueling Outage, Inservice Inspection Summary Report; Fourth Ten Year Inspection Interval ML13273A0372013-09-26026 September 2013 Fourth Ten-Year Inservice Inspection Plan, Request for Relief No. 13-ON-001 ML13239A0732013-08-15015 August 2013 End of Cycle (EOC) 26 Refueling Outage Inservice Inspection (ISI) Report, Fourth Ten-Year Inservice Inspection Interval Revision 1 ML13064A4102013-02-27027 February 2013 End of Cycle (EOC) 27 Refueling Outage Inservice Inspection (ISI) Report Fourth Ten-Year Inservice Inspection Interval ML13066A1002013-02-27027 February 2013 End of Cycle (EOC) 27 Refueling Outage Steam Generator Inservice Inspection Report ML12242A5522012-08-27027 August 2012 End of Cycle (EOC) 26 Refueling Outage Inservice Inspection (ISI) Report Fourth Ten-Year Inservice Inspection Interval ML12195A3212012-07-0202 July 2012 Transmittal of Fifth 10 Year Inservice Testing Interval ML12066A1752012-02-29029 February 2012 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-002 ML12048B4102012-02-15015 February 2012 Unit 2 End of Cycle (EOC) 25 Refueling Outage, Inservice Inspection (ISI) Report Fourth Ten-Year Inservice Inspection Interval ML12009A0912011-12-23023 December 2011 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-001 ML11301A1122011-10-26026 October 2011 End of Cycle (EOC) 26 Refueling Outage Steam Generator Inservice Inspection Report ML11257A2612011-09-0707 September 2011 Unit 1 End of Cycle (EOC) 26 Refueling Outage, Inservice Inspection (ISI) Report, Fourth Ten-Year Inservice Inspection Interval ML11124A1312011-04-29029 April 2011 Fourth Ten Year Interval -- Inservice Inspection Plan Request for Relief No. 10-ON-002 ML1105403112011-02-17017 February 2011 EOC 25 Refueling Outage Inservice Inspection Report, Fourth Ten-Year Inservice Inspection Interval ML1105305122011-02-17017 February 2011 EOC25 Refueling Outage Steam Generator Inservice Inspection Report ML1024305292010-08-27027 August 2010 EOC 24 Refueling Outage Inservice Inspection Report, Fourth Ten-Year Inservice Inspection Interval ML1024305302010-08-27027 August 2010 2EOC24 Refueling Outage Steam Generator Inservice Inspection Report ML1009702702010-04-0101 April 2010 EOC25 Refueling Outage, Steam Generator Inservice Inspection Report ML1007704312010-03-11011 March 2010 Third Ten-Year Inservice Test Program Interval, Pump Specific Relief Request No. ON-SRP-HPI-03 ML1006401432010-03-0303 March 2010 Submittal of Steam Generator Inservice Inspection Report Conducted During EOC25 Refueling Outage ML1006401262010-02-0909 February 2010 Inservice Inspection Report, EOC25 Refueling Outage, Fourth Ten-Year Inservice Inspection Interval 2023-09-29 Category:Letter MONTHYEARML23304A1422024-02-0101 February 2024
[Table view]Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML081160094&oldid=1002143"