ML18192A907

From kanterella
Jump to navigation Jump to search
Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures
ML18192A907
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/31/2017
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18192A809 List:
References
ONS 2018-026
Download: ML18192A907 (60)


Text

Oconee Nuclear Station UFSAR Appendix 3B. Figures Appendix 3B. Figures

Oconee Nuclear Station UFSAR Figure 3-1 (Page 1 of 1)

Figure 3-1. Frequency and Mode Shapes - Auxiliary Building - North South Direction (Sheet 1 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-2 (Page 1 of 1)

Figure 3-2. Frequency and Mode Shapes - Auxiliary Building - East West Direction (Sheet 2 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-3 (Page 1 of 1)

Figure 3-3. Auxiliary Building Mass Model (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-4 (Page 1 of 1)

Figure 3-4. Auxiliary Building - East West Direction - Seismic Model Results (Sheet 1 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-5 (Page 1 of 1)

Figure 3-5. Auxiliary Building - North South Direction - Seismic Model Results (Sheet 2 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-6 (Page 1 of 1)

Figure 3-6. Example Spectrum Curves (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-7 (Page 1 of 1)

Figure 3-7. Reactor Building - Seismic Model Results (Sheet 1 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-8 (Page 1 of 1)

Figure 3-8. Reactor Building - Seismic Model Results (Sheet 2 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-9 (Page 1 of 1)

Figure 3-9. Main Steam System West Generator Problem Number 1-01-08. Calculation OSC 1296-06 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-10 (Page 1 of 1)

Figure 3-10. Core Flooding Tank 1A Problem Number 1-53-9. Calculation OSC 1300-06 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-11 (Page 1 of 1)

Figure 3-11. Low Pressure Injection System West Generator Problem Number 1-53-9. Calculation OSC 1300-06 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-12 (Page 1 of 1)

Figure 3-12. RCP Piping to HPI Letdown Coolers Problem Number 1-55-03. Calculation OSC 1660-11 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-13 (Page 1 of 1)

Figure 3-13. RCP Piping to HPI Letdown Coolers Problem Number 1-55-03. Calculation OSC 1660-11 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-14 (Page 1 of 1)

Figure 3-14. RCP Piping to HPI Letdown Coolers Problem Number 1-55-03. Calculation OSC 1660-11 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-15 (Page 1 of 1)

Figure 3-15. RCP Piping to HPI Letdown Coolers Problem Number 1-55-03. Calculation OSC 1660-11 "HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED" (31 DEC 2006)

Oconee Nuclear Station UFSAR Figure 3-16 (Page 1 of 1)

Figure 3-16. Seismic Analysis of Component Coolers (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-17 (Page 1 of 1)

Figure 3-17. Seismic Analysis of Component Coolers (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-18 (Page 1 of 1)

Figure 3-18. Seismic Analysis of Component Coolers (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-19 (Page 1 of 3)

Figure 3-19. Reactor Building Typical Details (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-19 (Page 2 of 3)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-19 (Page 3 of 3)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-20 (Page 1 of 1)

Figure 3-20. Typical Electrical and Piping Penetrations (31 DEC 2011)

Oconee Nuclear Station UFSAR Figure 3-21 (Page 1 of 1)

Figure 3-21. Details of Equipment Hatch and Personnel Hatch (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-22 (Page 1 of 1)

Figure 3-22. Reactor Building Finite Element Mesh (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-23 (Page 1 of 1)

Figure 3-23. Reactor Building Finite Element Mesh (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-24 (Page 1 of 1)

Figure 3-24. Reactor Building Thermal Gradient (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-25 (Page 1 of 4)

Figure 3-25. Reactor Building Isostress Plot Wall and Dome (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-25 (Page 2 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-25 (Page 3 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-25 (Page 4 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 1 of 6)

Figure 3-26. Reactor Building Isostress Plot Wall and Base (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 2 of 6)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 3 of 6)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 4 of 6)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 5 of 6)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-26 (Page 6 of 6)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-27 (Page 1 of 1)

Figure 3-27. Reactor Building Finite Element Mesh Wall Buttresses (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-28 (Page 1 of 2)

Figure 3-28. Reactor Building Isostress Plot for Buttresses (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-28 (Page 2 of 2)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-29 (Page 1 of 1)

Figure 3-29. Temperature Gradient at Buttress (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-30 (Page 1 of 1)

Figure 3-30. Buttress Reinforcing Details (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-31 (Page 1 of 1)

Figure 3-31. Reactor Building Equipment Hatch Mesh (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-32 (Page 1 of 1)

Figure 3-32. Reactor Building Penetration Loads (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-33 (Page 1 of 1)

Figure 3-33. Reactor Building Model for Liner Plate Analysis for Radial Displacement (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-34 (Page 1 of 1)

Figure 3-34. Reactor Building Model for Liner Analysis for Anchor Displacement (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-35 (Page 1 of 1)

Figure 3-35. Reactor Building - Results from Tests on Liner Plate Anchors (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-36 (Page 1 of 1)

Figure 3-36. Location of Plugged Sheaths (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-37 (Page 1 of 4)

Figure 3-37. Reactor Building Instrumentation for Unit 1 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-37 (Page 2 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-37 (Page 3 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-37 (Page 4 of 4)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-38 (Page 1 of 1)

Figure 3-38. Turbine Building Cross-Section at Line 21 (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3 3-51 (Page 1 of 1)

Figure 3-39. Deleted Per 1996 Update Figure 3-40. Deleted Per 1996 Update Figure 3-41. Deleted Per 1996 Update Figure 3-42. Deleted Per 1996 Update Figure 3-43. Deleted Per 1996 Update Figure 3-44. Deleted Per 1996 Update Figure 3-45. Deleted Per 1996 Update Figure 3-46. Deleted Per 1996 Update Figure 3-47. Deleted Per 1996 Update Figure 3-48. Deleted Per 1996 Update Figure 3-49. Deleted Per 2004 Update Figure 3-50. Deleted Per 2004 Update Figure 3-51. Deleted Per 2004 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-52 (Page 1 of 1)

Figure 3-52. Seismic, Thermal, and Dead Load Analytical Model for the Pressurizer Surge Line Piping (Units 2 and 3)

(31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 3 3-56 (Page 1 of 1)

Figure 3-53. Deleted Per 2003 Update Figure 3-54. Deleted Per 2003 Update Figure 3-55. Deleted Per 2004 Update Figure 3-56. Deleted Per 2004 Update (31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 3-57 (Page 1 of 1)

Figure 3-57. Directions and Velocities of the Coolant Flow in the Reactor (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-58 (Page 1 of 1)

Figure 3-58. Location of Instrumentation Surveillance Specimen Holder Tubes and the Plenum Cylinder Tubes (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-59 (Page 1 of 1)

Figure 3-59. Location of the Instrumentation in the Specimen Holder Tube (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 3-60 (Page 1 of 1)

Figure 3-60. Location of the Accelerometer in Plenum Cylinder Tube (31 DEC 2000)