Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22124A205 | 4 May 2022 | Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System | |
ML20189A091 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures | |
ML20189A088 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures | |
ML20189A085 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) | |
ML20189A082 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures | |
ML20189A079 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures | |
ML20189A076 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures | |
ML20189A073 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures | Earthquake |
ML20189A070 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) | |
ONS-2018-038, Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27 | 29 June 2018 | Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27 | |
ML18192A972 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures | |
ML18192A894 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted) | |
ML18192A901 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures | Earthquake |
ML18192A907 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures | |
ML18192A915 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures | |
ML18192A948 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 9B, Figures (Redacted) | |
ML18192A954 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures | |
ML18192A962 | 31 December 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures | |
ML17003A122 | 3 January 2017 | Drawing No. PO-107B-3, Rev. 10, Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion). | |
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 | 31 December 2016 | Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 | |
ML17234A124 | 31 December 2016 | Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 | |
ML17234A120 | 31 December 2016 | Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 | |
ML17234A114 | 31 December 2016 | Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 | |
ONS-2017-048, Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted | 31 December 2016 | Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted | |
ML17234A129 | 31 December 2016 | Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 | |
ML17234A135 | 31 December 2016 | Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 | |
ML17361A410 | 31 December 2016 | Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted | |
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 | 31 December 2016 | Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 | |
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 | 31 December 2016 | Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 | |
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 | 31 December 2016 | Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 | |
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 | 31 December 2016 | Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 | |
ML110180667 | 5 January 2011 | Enclosure 2 (Part 2) - Major Projects Slides | |
ML090020355 | 22 December 2008 | Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006 | Safe Shutdown Boric Acid Internal Flooding Flow Accelerated Corrosion Earthquake GOTHIC |
ML090020358 | 22 December 2008 | Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System. | |
ML090020356 | 22 December 2008 | Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System. | |
ML090890792 | 29 April 2008 | Drawing OFD-124A-3.1, Rev 33, Flow Diagram of Low Pressure Service Water System Turbine Bldg (Low Pressure Service Water Pumps). | |
ML081160094 | 21 April 2008 | Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection Interval | Hydrostatic VT-2 Through Wall Leak Operational leakage |
ML090890784 | 7 November 2005 | Drawing OFD-133A-2.1, Rev 26, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). | |
ML101960285 | 1 October 2005 | Monitoring Well Locations | |
ML090890793 | 16 June 2005 | Drawing OFD-133A-1.1, Rev 28, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). |