Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22124A2054 May 2022Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System
ML20189A09129 June 20208 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures
ML20189A08829 June 20208 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures
ML20189A08529 June 20208 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version)
ML20189A08229 June 20208 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures
ML20189A07929 June 20208 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures
ML20189A07629 June 20208 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures
ML20189A07329 June 20208 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, FiguresEarthquake
ML20189A07029 June 20208 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version)
ONS-2018-038, Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 2729 June 2018Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27
ML18192A97231 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures
ML18192A89431 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted)
ML18192A90131 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, FiguresEarthquake
ML18192A90731 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures
ML18192A91531 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures
ML18192A94831 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 9B, Figures (Redacted)
ML18192A95431 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures
ML18192A96231 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures
ML17003A1223 January 2017Drawing No. PO-107B-3, Rev. 10, Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion).
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-23231 December 2016Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232
ML17234A12431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6
ML17234A12031 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9
ML17234A11431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9
ONS-2017-048, Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted31 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted
ML17234A12931 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8
ML17234A13531 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232
ML17361A41031 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-831 December 2016Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-631 December 2016Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-931 December 2016Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9
ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-931 December 2016Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9
ML1101806675 January 2011Enclosure 2 (Part 2) - Major Projects Slides
ML09002035522 December 2008Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006Safe Shutdown
Boric Acid
Internal Flooding
Flow Accelerated Corrosion
Earthquake
GOTHIC
ML09002035822 December 2008Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System.
ML09002035622 December 2008Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System.
ML09089079229 April 2008Drawing OFD-124A-3.1, Rev 33, Flow Diagram of Low Pressure Service Water System Turbine Bldg (Low Pressure Service Water Pumps).
ML08116009421 April 2008Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection IntervalHydrostatic
VT-2
Through Wall Leak
Operational leakage
ML0908907847 November 2005Drawing OFD-133A-2.1, Rev 26, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge).
ML1019602851 October 2005Monitoring Well Locations
ML09089079316 June 2005Drawing OFD-133A-1.1, Rev 28, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge).