ML15030A250
From kanterella
Revision as of 07:31, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML15030A250 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 09/22/2014 |
From: | ARCADIS U.S. |
To: | Office of Nuclear Reactor Regulation, Public Service Enterprise Group |
Shared Package | |
ML15030A230 | List: |
References | |
NP000571.2014 | |
Download: ML15030A250 (1) | |
Similar Documents at Salem | |
---|---|
Category:Drawing
MONTHYEARLR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023
[Table view]and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-242017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-132017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-252017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-352017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-12017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-132017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-172017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A3502017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-72017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-4 LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-92017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-562017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B2017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-102017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-10 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-112017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-82017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-8 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-92017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-9 ML17139C1692017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 ML17046A4142017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 ML17046A4242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 ML17046A3462017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A4692017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B ML17046A4542017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-8 ML17046A4622017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 ML17046A3432017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 ML17046A3392017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 ML17046A4492017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 ML17046A4712017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-2 ML17046A4182017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-4 ML17046A2992017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 ML17046A3082017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 ML17046A4302017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-9 ML17046A2942017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 ML17139C0052017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 ML17046A4652017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-10 ML17046A3542017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 ML17046A3362017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' 2023-01-05 Category:Graphics incl Charts and Tables MONTHYEARLR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024
[Table view]Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary ML23249A2642023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 ML23249A2632023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 ML23249A2662023-09-0606 September 2023 Attachment 2: Salem Pavan Input File ML23249A2682023-09-0606 September 2023 Attachment 4: Hope Creek Pavan Input File ML23249A2672023-09-0606 September 2023 Attachment 3: Salem Pavan Output File LR-N23-0050, Attachment 5: Hope Creek Pavan Output File2023-09-0606 September 2023 Attachment 5: Hope Creek Pavan Output File ML23249A2652023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 ML17335A1182018-01-25025 January 2018 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident ML17046A2962017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-112017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)2017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-32017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 ML17046A3072017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) ML17046A3112017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16102A2772016-03-11011 March 2016 Submittal of Annual Incidental Take Report ML15238B7042015-09-10010 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation ML15243A4472015-09-10010 September 2015 Master Report - Tables 1 and 2 ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML13052A6822012-11-28028 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-1492012-11-28028 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 ML12284A4272012-10-0404 October 2012 PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 LR-N12-0027, Submittal of RCS Dei Graphs Report2012-03-0202 March 2012 Submittal of RCS Dei Graphs Report ML1030002022010-05-0303 May 2010 1R20 NRC Items of Interest Punchlist ML1029803702010-04-21021 April 2010 Graphs of Salem - Unit 2 Ffdp Exam ML1030002002010-04-20020 April 2010 Document: Nbu Weld Joint Notice #80101382, Salem Unit 1 ML1030001962010-04-11011 April 2010 Document Schedule: Subject: Buried AFW Pipe Schedule LR-N09-0103, Submittal of 2008 Summary of Revised Regulatory Commitments2009-05-0505 May 2009 Submittal of 2008 Summary of Revised Regulatory Commitments ML0805605392008-03-0404 March 2008 Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2024-04-05 Category:Report MONTHYEARML23249A2622023-09-0606 September 2023
[Table view]Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature ML21179A2352021-06-25025 June 2021 PSEG Salem Generating Station - Incidental Take Report Atlantic Sturgeon 6/24/2021 ML21078A0002021-03-25025 March 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report LR-N21-0004, U.S Additional Protocol for Salem, Unit 12021-01-31031 January 2021 U.S Additional Protocol for Salem, Unit 1 LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report ML20274A0762020-09-25025 September 2020 PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML20121A1332020-03-0303 March 2020 Biological Opinion 2019 Annual Incidental Take Report LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20192019-11-26026 November 2019 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 LR-N19-0010, U.S. Additional Protocol for Salem Unit 1 2018 Report2019-01-31031 January 2019 U.S. Additional Protocol for Salem Unit 1 2018 Report ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design ML18337A3262018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) ML18337A3252018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 ML18337A3242018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 LR-N17-0076, Focused Evaluation of External Flooding2017-06-30030 June 2017 Focused Evaluation of External Flooding LR-N17-0051, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2017-02-16016 February 2017 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal ML16280A5232016-08-31031 August 2016 Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2016-02-26026 February 2016 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N15-0218, Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-21021 October 2015 Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report LR-N15-0207, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-0707 October 2015 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report ML15119A1612015-04-17017 April 2015 Report of Impingement of Atlantic Sturgeon LR-N14-0268, Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days2014-12-24024 December 2014 Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days ML15030A1632014-09-22022 September 2014 Remedial Action Progress Report First Quarter 2014 ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2792014-09-22022 September 2014 Figure 13, Tritium Isoconcentration Map - March 2014 ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' 2023-09-06 Category:Technical MONTHYEARML23249A2622023-09-0606 September 2023
[Table view]Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N21-0004, U.S Additional Protocol for Salem, Unit 12021-01-31031 January 2021 U.S Additional Protocol for Salem, Unit 1 LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report ML20274A0762020-09-25025 September 2020 PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML20121A1332020-03-0303 March 2020 Biological Opinion 2019 Annual Incidental Take Report LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20192019-11-26026 November 2019 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design ML18337A3242018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 ML18337A3252018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 ML18337A3262018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) ML16280A5232016-08-31031 August 2016 Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A1632014-09-22022 September 2014 Remedial Action Progress Report First Quarter 2014 ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 ML15030A2792014-09-22022 September 2014 Figure 13, Tritium Isoconcentration Map - March 2014 ML14010A3432014-01-13013 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Salem Generating Station, Units 1 and 2, TAC Nos.: MF0868 and MF0869 LR-N13-0172, Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic2013-12-20020 December 2013 Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic LR-N13-0122, Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19)2013-05-0909 May 2013 Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19) LR-N13-0020, SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated Plan2013-02-25025 February 2013 SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated Plan LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G2012-11-30030 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 52012-11-30030 November 2012 Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 92012-11-30030 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 ML13052A6772012-11-30030 November 2012 Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 ML13052A6782012-11-30030 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 ML13052A6792012-11-30030 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N2012-11-28028 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N 2023-09-06 Category:Status Report MONTHYEARLR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024
[Table view]Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report ML22076A0502022-03-17017 March 2022 and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report LR-N21-0015, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-03-25025 March 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N19-0014, Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2019-03-25025 March 2019 Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N18-0041, Annual Property Insurance Status Report2018-04-0505 April 2018 Annual Property Insurance Status Report RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-30030 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0043, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-29029 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0041, Annual Property Insurance Status Report2017-03-24024 March 2017 Annual Property Insurance Status Report LR-N16-0043, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-29029 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-15-1620, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N15-0167, PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA2015-08-26026 August 2015 PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12 ML15089A4262015-03-30030 March 2015 Annual Property Insurance Status Report LR-N15-0048, Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report2015-03-30030 March 2015 Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report LR-N15-0023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2015-02-18018 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) ML15051A2702015-02-18018 February 2015 PSEG Nuclear Llc'S Fourth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A1632014-09-22022 September 2014 Remedial Action Progress Report First Quarter 2014 ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2792014-09-22022 September 2014 Figure 13, Tritium Isoconcentration Map - March 2014 ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 LR-N14-0187, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-26026 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N14-0033, PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Order Number EA-12-051)2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Order Number EA-12-051) LR-N14-0027, PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) LR-N13-0175, PSEG Nuclear Llc'S First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-2013-08-25025 August 2013 PSEG Nuclear Llc'S First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12- LR-N13-0176, PSEG Nuclear Llc'S First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-08-25025 August 2013 PSEG Nuclear Llc'S First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) RS-13-100, Report on Status of Decommissioning Funding for Reactors2013-04-0101 April 2013 Report on Status of Decommissioning Funding for Reactors LR-N13-0059, NRC Decommissioning Funding Status Report2013-03-26026 March 2013 NRC Decommissioning Funding Status Report LR-N12-0329, PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2012-10-31031 October 2012 PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) LR-N12-0331, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051)2012-10-31031 October 2012 Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) 2024-03-07 |
Text
1 2 24 23 22 D8 REMEDIAL ACTION PROGRESS REPORT SALEM GENERATING STATION HYDROGEOLOGIC CROSS SECTION D-D'
Retrieved from "https://kanterella.com/w/index.php?title=ML15030A250&oldid=865836"