LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56
(Redirected from ML17139C005)
Jump to navigation
Jump to search
Similar Documents at Salem | |
---|---|
Category:Drawing
MONTHYEARLR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023
[Table view]And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-242017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-132017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-252017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-352017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-12017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-132017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-172017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A3502017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-72017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-42017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-4 LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-92017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-562017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B2017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-102017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-10 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-112017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-82017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-8 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-22017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-92017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-9 ML17139C1692017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 ML17046A4142017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 ML17046A4242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 ML17046A3462017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A4692017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B ML17046A4542017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 8.3-1 Through 8.3-8 ML17046A4622017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 ML17046A3432017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 ML17046A3392017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 ML17046A4492017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 ML17046A4712017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.5-1 and 9.5-2 ML17046A4182017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.3-1 Through 7.3-4 ML17046A2992017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 ML17046A3082017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 ML17046A4302017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.7-1 Through 7.7-9 ML17046A2942017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 ML17139C0052017-01-30030 January 2017 Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 ML17046A4652017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.3-1A Through 9.3-10 ML17046A3542017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 ML17046A3362017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' 2023-01-05 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARLR-N23-0027, Updated Final Safety Analysis Report, Rev. 26,2023-04-13013 April 2023
[Table view]Updated Final Safety Analysis Report, Rev. 26, ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0086, – Unit 1 and Unit 2, Updated Final Safety Analysis Report, Revision 332022-10-24024 October 2022 – Unit 1 and Unit 2, Updated Final Safety Analysis Report, Revision 33 ML22298A0542022-10-24024 October 2022 – Units 1 and 2, Hope Creek Generating Station, Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results LR-N21-0046, Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2021-06-17017 June 2021 Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N19-0102, Revision 31 to Updated Final Safety Analysis Report, Chapter 4, Reactor2019-12-0505 December 2019 Revision 31 to Updated Final Safety Analysis Report, Chapter 4, Reactor LR-N18-0053, Revision 30 to Updated Final Safety Analysis Report, Appendix a, TMI Lessons Learned2018-05-11011 May 2018 Revision 30 to Updated Final Safety Analysis Report, Appendix a, TMI Lessons Learned ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17046A4632017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.3, Process Auxiliaries ML17046A3462017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 ML17046A2802017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3.3, Wind and Tornado Loadings ML17046A5902017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables A-1 to A-5 ML17046A4332017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7.9, Physical Separation and Electrical Isolation ML17046A4982017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 11.3, Gaseous Waste System ML17046A4622017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.2-1A Through 9.2-11 ML17046A2552017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 2.3, Figure 2.3-1, Sources of Meteorological Records ML17046A2772017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3, Table of Contents ML17046A4102017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7, Table of Contents ML17046A4832017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 10.2, Turbine Generator ML17046A5012017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 11.4, Radiological Monitoring ML17046A4162017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables 7.3-1 Through 7.3-9 ML17046A5292017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 12.4, ALARA Program ML17046A5892017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson Learned ML17046A2852017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 3.5, Missile Protection ML17046A4602017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.2, Water Systems ML17046A4732017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System - Summary Description ML17139C0442017-01-30030 January 2017 Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-7 ML17046A5582017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.5, Test Program Organization, Unit 1 ML17046A4662017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 9.4, Heating, Ventilation, and Air Conditioning Systems ML17046A5562017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.4, Initial Testing of the Operating Reactor ML17046A5312017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 13, Table of Contents ML17046A5722017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-68 ML17046A3472017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML17046A5592017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.5, Figure 14.5-1 Through Figure 14.5-2 ML17046A5522017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 14.2, Table 14.2-1, Tests Performed Prior to Initial Reactor Fueling ML17046A4142017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 7.2-1 Through 7.2-7 ML17046A5242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 12, Radiation Protection ML17046A5402017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 13.4, Review and Audit ML17046A3992017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 6, Table of Contents ML17046A5682017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-46 ML17046A5912017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures A-1 to A-6, Intentionally Deleted ML17046A2322017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Master Table of Contents ML17046A4692017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figures 9.4-1A Through 9.4-6B ML17046A3502017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 ML17046A4152017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 7.3, Engineered Safety Features Instrumentation ML17046A4962017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Tables 11.2-1, Liquid Waste System Performance Data to 11.2-9 ML17046A5822017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Section 17.1, Quality Assurance During the Design and Construction Phases ML17046A4242017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 2023-04-13 |