LR-N13-0172, Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic

From kanterella
Jump to navigation Jump to search
Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic
ML13364A183
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/20/2013
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13364A181 List:
References
12800-217, LR-N13-0172 SL-011549, Rev. 3
Download: ML13364A183 (171)


Text

LR-N13-0172 Enclosure 1 Salem Nuclear Generating Station Unit I Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachments be withheld from public disclosure.

PSEG NUCLEAR LLC Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Report SL-011549 Revision 3 The signatures below document PSEG Nuclear LLC review and approval of this report:

Reviewed By:

/3-/3 1/-

PSEG Fuk ~sima Res2?ý gineering - Salem Date

/I2-*z -/,

PSEG Fukushima Response Licensing Date Approved B

"/ " (3 PSEG ukushiVY es nse Manager - Corporate bate Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachments be withheld from public disclosure.

O PSEG NUCLEAR LLC PSEG NUCLEAR Salem Nuclear Generating Station Unit 1 Response to the 50.54(0 Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Report SL-011549 Revision 3 R3 December 12, 2013 Project No. 12800-217 Nuclear Safety Related Prepared by S arge nrt 5, LUIIdyLL C

S&L Report No. SL-0 11549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC Page No. ii Salem Nuclear Generating Station Unit I Project No. 12800-217 Seismic Walkdown Report LEGAL NOTICE This "Seismic Walkdown Report" was prepared by Sargent & Lundy, L.L.C. ("S&L"), expressly for the sole use of PSEG Nuclear ("PSEG") in accordance with the agreement between S&L and PSEG. This Deliverable was prepared using the degree of skill and care ordinarily exercised by engineers practicing under similar circumstances. PSEG acknowledges: (1) S&L prepared this Deliverable subject to the particular scope limitations, budgetary and time constraints, and business objectives of the PSEG; (2) information and data provided by others may not have been independently verified by S&L; and (3) the information and data contained in this Deliverable are time sensitive and changes in the data, applicable codes, standards, and acceptable engineering practices may invalidate the findings of this Deliverable.

Any use or reliance upon this Deliverable by third parties shall be at their sole risk.

S&L Report No. S.-O 11549 Rev. 3 December 12, 2013 NUCLEAR LLC Page No. iii Salem Nuclear Generating Station Unit I Project No. 12800-217 Seismic Walkdown Report PSEG Nuclear (PSFG)

Salem Nuclear Generating Station Unit I Seismic Walkdown Report ISSUE

SUMMARY

AND APPROVAL PAGE This is to certify that Revision 3 to the Seismic T"'a/lcdown. Report has been prepared, reviewed and approved in accordance with Sargent & Lundy's Standard Operating Procedure SOP-0405, which is based on ANSI/ISO/ASSQC Q9001 Quality Management Systems.

CONTRIBITORS Rev. 3 Prepared by:

"/"&

~ Cd14ic~.<12/12/2013 _

Date Senior Project Associate J.'koruo-ruelba Date Sen ior Project Associate Lead Peer Reviewer:

Dzlt 13 11 1 Moslemian Date Senior Manager Approved by:

M, Shervin Date Program Manager

S&L Report No. SL-0 11549 0 PSEG Rev. 3 December 12, 2013 NUCLEAR LLC Page No. iv Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report PURPOSE/OBJECTIVE FOR REVISION 3 The purpose of revision 3 is to: 1) Update the table of Potentially Adverse Seismic Conditions (PASC's)

(Table 6-1) to include the results of the seismic walkdowns that were performed during the Unit I refueling outage, 1R22. 2) Update the Seismic Walkdown Equipment List (SWEL) and Attachment 6 to include a component substitution made during the Unit 1 refueling outage, 1R22. 3) Include a PASC in the SWEL that was resolved through the Corrective Active Program during the original walkdowns.

LIST OF AFFECTED PAGES FOR REVISION 3 The following pages were affected/revised by Revision 3: Cover Sheet (page i), page iii, page iv, page vi, page 13, Attachment 2 page 1, Attachment 6, pages A2, A4 & A5.

The following pages were deleted by Revision 3: page iii.a, page iv.a R3 The following pages from Rev. 2 were assigned different page numbers by Revision 3: Page iv.b as iv.a, Pages 14 to 18 as 15 to 19 respectively.

The following pages were inserted by Revision 3: Page 14

SUMMARY

OF REVISION 3 The table of contents was revised to add a second sheet to table 6-1. Table 6-1 was revised to add the Potentially Adverse Seismic Conditions from the walkdowns conducted during 1R22 and add a PASC that was found during the original walkdowns performed in 2012. The Seismic Walkdown Equipment List (SWEL) (Attachment 2) and section A.6.3.1 are revised to include a component substitutions made during the 1R22 refueling outage.

S&L Report No. SL-01 1549 0 PSEG Rev.2 November 22, ý013 NUCLEAR LLC Page No. iv.a I R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report PURPOSE/OBJECTIVE FOR REVISION 2 The purpose of revision 2 is to reflect completion of the Salem Generating Station (SGS) Unit I seismic walkdowns by providing: 1) the results of the seismic walkdowns that were performed during the Unit 1 refueling outage, I R22; and 2) an update of the status of potentially adverse seismic conditions that were identified during the seismic walkdowns and entered into PSEG's Corrective Action Program. The final results of the walkdown are included in Attachment 6.

LIST OF AFFECTED PAGES FOR REVISION 2 The following pages were affected/revised by Revision 2: Cover Sheet (page i), page vi, pages 11-13, Attachment Index Sheet, Attachment 2 (SWEL), Seismic Walkdown Checklist (SWC) for component 11133 in Attachment 3.

The following pages from Rev. 1 were assigned different page numbers by Revision 2: page iii renumbered as page iii.a, page iv renumbered as page iv.a The following pages were inserted by Revision 2: page iii, page iv, page iv.b, Attachment 6

SUMMARY

OF REVISION 2 The table of contents and the attachment index sheet were revised to add Attachment 6. The main body of the report is revised to update the disposition of Corrective Action Program items that were identified during the original walkdowns. The Seismic Walkdown Equipment List (SWEL) (Attachment 2) is revised to include the component substitutions made during the 1R22 refueling outage. Attachment 3 is revised to show the open compartment photos for component I1133. Attachment 6 is added to document the walkdowns conducted during 1R22.

RESULTS See Attachment 6 for the results of the walkdowns performed during the Unit 1 refueling outage, 1R22.

S&L Report No. SL-01 1549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC Page No. v Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report PSEG Nuclear (PSEG)

Salem Generating Station Unit I Seismic Walkdown Report TABLE OF CONTENTS SECTION PAGE

1. IN TROD UC TIO N ...................................................................................................................... 1
2. PURPOSE/OBJECTIVE ................................................................................................... 1
3. SEISMIC LICENSING BASIS .............................................................................................. 1 3.1. SEISM IC DESIGN ................................................................................................. 1 3.2. SEISMIC CATEGORY I STRUCTURES AND EQUIPMENT ............................... 2 3.3. CODES AND STANDARDS ..................................................................................... 3
4. PERSONNEL QUALIFICATION ........................................................................................ 3
5. SELECTION OF SSCS ...................................................................................................... 5 5.1. M ETHODOLOGY ..................................................................................................... 5 5.2. SWEL 1 - SAMPLE OF REQUIRED ITEMS FOR THE FIVE SAFETY FU N CTION S ................................................................................................................... 6 5.2.1. SCREEN] THROUGH 3- SEISMIC CATEGORYI, EQUIPMENT OR SYSTEMS, SUPPORT OF THE FIVE SAFETY FUNCTIONS 6 5.2.2. SCREEN 4- SAMPLE CONSIDERATIONS 6 5.3. SWEL 2 - SPENT FUEL POOL RELATED ITEMS ................................................. 8 5.3.1. SCREEN ] -SEISMIC CATEGORYI 8 5.3.2. SCREEN 2 - EQUIPMENTOR SYSTEMS 8 5.3.3. SCREEN 3- SAMPLE CONSIDERATIONS 8 5.3.4. SCREEN 4: RAPID DRAIN-DOWN 10 5.4. SW EL ............................................................................................................................ 10
6. SEISMIC WALKDOWNS AND AREA WALK-BYS ..................................................... 11 6.1. PREPA RA TION ............................................................................................................ 11 6.2. AREA WALK-BYS (AWB) AND SEISMIC WALKDOWNS ............................... 11 6.3. RESU LT S ...................................................................................................................... 11 6.3.1. SEISMIC WALKDO WNS .......................................................................................... 11

S&L Report No. SL-0 11549 0 PSEG Rev. 3 December 12, 2013 NUCLEAR LLC Page No. vi Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report 6.3.2. ANCHORAGE VERIFICATION ................................................................................ 12 6.3.3. POTENTIALLY AD VERSE SEISMIC CONDITIONS .............................................. 12

7. LICENSING BASIS EVALUATIONS ............................................................................. 15
8. IPEEE VULUNERABILITY RESOLUTION REPORT ................................................ 15
9. PEER RE V IEW ........................................................................................................................ 15 9.1. REVIEW THE SELECTION OF SSC'S INCLUDED IN THE SWEL ................... 15 9.2. REVIEW A SAMPLE OF THE CHECKLIST PREPARED FOR THE SEISMIC WALKDOWNS AND AREA WALK-BYS ............................................................. 17 R3 9.3. REVIEW THE LICENSING BASIS EVALUATIONS ......................................... 18 9.4. REVIEW THE DECISION FOR ENTERING THE POTENTIALLY ADVERSE SEISMIC CONDITIONS INTO CAP PROCESS ................................................... 18 9.5. REVIEW THE SUBMITTAL REPORT .................................................................. 18
10. REFEREN CES ......................................................................................................................... 19 ATTACHMENTS ATTACHMENT ]A - SALEM UNIT 1 "BASE LIST 1", SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

ATTACHMENT lB - SALEM UNIT 1 "BASE LIST 2", COMPONENTS ASSOCIATED WITH SPENT FUEL POOL ATTACHMENT 2 - SEISMIC WALKDOWN EQUIPMENT LIST (SWEL)

ATTACHMENT 3 - AREA WALK-BY CHECKLISTS (AWC) AND SEISMIC WALKDOWN CHECKLISTS (SWC)

ATTACHMENT 4 - SEISMIC WALKDOWN ENGINEER CERTIFICATIONS ATTACHMENT 5 - CHECKLIST FOR PEER REVIEW OF SSC SELECTION ATTACHMENT 6 - WALKDOWNS PERFORMED DURING 1R22 OUTAGE R2

SL Report No.: SL-0 11549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. I ofl9 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report

1. INTRODUCTION Following the accident at the Fukushima Daiichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the NRC established the Near Term Task Force (NTTF) in response to Commission direction. The NTTF issued a report that made a series of recommendations to the Commission. The Commission prioritized these recommendations in three tiers.

Tier 1 recommendations were to be acted upon "without unnecessary delay." Subsequently, the NRC issued a 50.54(f) Letter (Reference 10.2) that requests information to assure that these recommendations are addressed by the U.S. nuclear power plants. EPRI prepared Technical Report 1025286, entitled "Seismic Walkdown Guidance" (Reference 10.1), to provide guidance to conduct Seismic Walkdowns required in the 50.54(f) Letter, Enclosure 3, Recommendation 2.3: Seismic. The seismic walkdowns are to identify and address degraded, non-conforming or unanalyzed conditions and to verify the current plant configuration with the current licensing basis.

2. PURPOSE/OBJECTIVE This report provides the results of the seismic walkdowns at PSEG, Salem Nuclear Generating Station, Unit 1 performed in response to the NRC request for information pursuant to title 10 of the Code of Federal Regulations 50.54(f) letter dated March 12, "Enclosure 3, Recommendation 2.3: Seismic.

The approach and methodologies used in this report follows the EPRI Seismic Walkdown Guidance as documented in Ref. 10.1.

3. SEISMIC LICENSING BASIS 3.1. SEISMIC DESIGN Salem UFSAR, Ref. 10.3 in Sec. 3.7 provides the Salem Plant licensing basis and design criteria as follows, "Plant structures and components are designed according to the criteria described herein to resist the dynamic forces resulting from the earthquake conditions postulated for the site. These structures and components are analyzed either dynamically or statically for the respective equivalent loadings according to their classification."

"Two types of seismic loadings are considered: Operational Basis Earthquake (OBE) and Design Basis Earthquake (DBE)." The DBE is synonymous with the Safe Shutdown Earthquake (SSE) used in Ref. 10.1.

"For the OBE loading condition, the nuclear steam supply system is designed to be capable of continued safe operation. Therefore, for this loading condition critical structures and equipment needed for this purpose are required to operate within design limit. The seismic design for the DBE is intended to provide a margin in design that assures capability to shut down and maintain the nuclear facility in a safe condition. In this case, it is only necessary to ensure that required critical structures and components do not lose their capability to perform their safety function.

SL Report No.: SL-01 1549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC PageNo. 2 of 19 1R3 Salem Nuclear Generating Station Unit I Project No. 12800-217 Seismic Walkdown Report This has come to be referred to as the "no-loss-of-function" criteria and the loading condition as the "design basis earthquake" loading condition.

Design Response Spectra UFSAR Sec. 3.7.1.1 states, "The El Centro ground motion of May 18, 1940, was recommended by Dames and Moore as the most appropriate motion for the site. Its peak horizontal acceleration was normalized to 0.10g and 0.20g for Operating and Design Basis Earthquake, respectively. Two-thirds of the above mentioned values are used for vertical ground motions, and they are considered to be acting simultaneously with the horizontal ground motion."

Damping Values Used in Seismic Analysis UFSAR Sec. 3.7.1.2 Component Damping Values SSE OBE Salem RG 1.61 Salem RG 1.61 Large Diameter Piping 1.0 3.0 0.5 2.0 Systems Greater than 12" Small Diameter Piping 0.5 2.0 0.5 1.0 Systems 12" or less Concrete Structures 5.0 7.0 2.0 4.0 Bolted or Riveted Steel 5.0 8.0 2.5 4.0 Welded Steel 3.0 4.0 1.0 2.0 3.2. SEISMIC CATEGORY I STRUCTURES AND EQUIPMENT Section 3 of the Salem Unit 1 UFSAR, Ref. 10.3 documents the seismic licensing basis and criteria used to design the Seismic Category I structures, systems, and components (SSCs).

Safety related mechanical equipment was analyzed for seismic conditions. However, complex mechanical equipment was qualified by type testing as recommended in WCAP-7558, "Seismic Vibration Testing with Sine Beats", UFSAR, Sec. 3.9.1.2.

"Seismic Category I instrumentation and electrical equipment is identified in Table 3.10-1.

Electrical equipment that is not designed to seismic Category I criteria and whose structural failure could affect the operation of seismic Category I equipment is located, physically restrained, or structurally designed, such that its postulated structural failure during seismic

SL Report No.: SL-0 11549 0PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 3 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report conditions does not prevent Category I electrical equipment from performing its safety function",

UFSAR, Sec. 3.10.

"The methods of meeting the general requirements for seismic qualification of Category I instruments and electrical equipment as described by General Design Criteria (GDC) 1, 2, and 23 are described in Section 3.1. The general methods of implementing the requirements of Appendix B to 10CFR Part 50 are described in Section 17", UFSAR, Sec. 3.10.1.1 "The seismic Category I instrumentation and electrical equipment and their supports as listed in Table 3.10-1 are qualified in accordance with the methods described in IEEE Standard 344-1971", UFSAR, Sec. 3.10.1.1 In addition, Seismic Category I Balance of Plant (BOP) equipment was tested in accordance with IEEE Standard 344-1971, UFSAR Sec. 3.6.

3.3. CODES AND STANDARDS This section summarizes some of the codes and standards for the seismic qualification of structures, systems and components at Salem Unit 1. Others are included in applicable sections of the UFSAR.

Reinforced concrete: ACI 318-63, Building Code Requirements for Reinforced Concrete Concrete Structures: ACI 301-66, Specification for Structural Concrete for Building Steel Structures: AISC Manual of Steel Construction, 6 d1 Edition or later Edition, as applicable Electrical Equipment: IEEE Standard 344-1971, "Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations"

4. PERSONNEL QUALIFICATION The activities to be performed by qualified personnel and their responsibilities and qualifications are described in the EPRI guidance, Ref. 10.1. These responsibilities are:
  • Selecting the SSCs that should be placed on the Seismic Walkdown Equipment List, as described in Section 3: Selection of SSCs

" Perfonning the Seismic Walkdowns and Area Walk-Bys, as described in Section 4: Seismic Walkdowns and Area Walk-Bys

  • Performing the seismic licensing basis evaluations, as described in Section 5: Seismic Licensing Basis Evaluation (performed by PSEG)

" Identifying the list of plant-specific vulnerabilities identified during the IPEEE program and reporting the status of actions taken to eliminate or reduce them, as described in Section 7:

IPEEE Vulnerabilities

SL Report No.: SL-0 11549 0 PSEGRev. 2 November 22, 2013 NUCLEAR LLC Page No. 4 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report 0 Peer Review as described in Section 6: Peer Review.

Table 4-1 below summarizes the roles of personnel who participated in the implementation of NTTF 2.3 Seismic Walkdowns.

Table 4-1 Personnel Roles Equipment Plant Seismic Name Selection Operation Walkdown IPEEE Peer Personnel Personnel Engineer Reviewer Reviewer (SWE)

Arie Blum X X X John Skomorucha X X Jeffery Puskar X Alexander Coologeorgen X William Wallace X X Javad Mosleiman (1) X Bryan Morgan X Notes: 1. Peer Reviewer Team Leader.

The qualification and experience of above personnel is listed below:

Arie Blum, Phd, PE: Dr. Blum is a Senior Project Associate in the S&L Wilmington, DE office with 37 years experience in the nuclear industry in various Design Engineering roles and responsibilities; including design and analysis of structures and components, environmental and seismic qualification programs, design change modifications, Steam Generator replacement Project and Dry Cask Storage Project.

John Skomorucha, PE: Mr. Skomorucha is a Senior Project Associate in the S&L office in Wilmington, DE office with 24 years of experience in the civil/structural field of which 14 years are associated with the nuclear industry. His experience includes; civil/structural lead for various PSEG Salem Unit 1 & 2 and Hope Creek projects. These projects were; ISFSI dry cask storage system, security and various other projects associated with design change modifications of structures and components.

SL Report No.: SL-.01 1549 0PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 5 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report Jeffery Puskar, PE: Mr. Puskar is a Senior Associate in the S&L Wilmington, DE office with 10 years experience in structural/civil engineering field and 4 years experience in structural design and implementation of design change packages for several nuclear plants.

Alexander Coologeor2en: Mr. Coologeorgen is a Structural Associate in the S&L Chicago, IL office with 3 years of experience; he is currently involved with structural analysis efforts to support modification packages for the Entergy Corporation Palisades Nuclear Power Plant.

Bryan Mor2an, PE: Mr. Morgan is Senior Associate in the S&L Wilmington, DE office with 12 years experience in structural/civil engineering field of which 6 years are in the nuclear industry. His experience includes: lead structural engineer on the security upgrade project, various plant modification projects for PSEG.

William Wallace: Mr. Wallace is a retired Licensed Reactor Operator at Salem Generating Station with over 25 years of licensed experience. He is currently working with the PSEG Fukushima Response Team.

Javad Moslemian: Mr. Moslemian is a Senior Manager in the S&L Chicago office with more than 29 years of experience in the analysis, design and construction of new and existing nuclear power plants. He has significant amount of experience in seismic analysis and design. He is a registered professional engineer in the state of Illinois and successfully completed Seismic Qualification Utility Group (SQUG) training in December of 2001. In addition, Mr. Moslemian is a member of the AISC N690 Code Committee TC12 and a process owner responsible for several Sargent & Lundy engineering processes.

Mr. Moslemian is currently the structural engineering manager responsible for preparation of responses to NRC RAIs on Chapters 3.7 and 3.8 of STP Units 3 & 4. In his prior assignment as the structural engineering manager for South Texas Project (STP) Units 3 & 4, Mr. Moslemian was supervising the seismic analysis and design for all Seismic Category I structures.

The Seismic walkdowns personnel training certifications are included in Attachment 4.

5. SELECTION OF SSCs 5.1. METHODOLOGY The methodology and process used in the selection of SSCs and in the development of the Seismic Walkdown Equipment List (SWEL) follows the guidance provided in Section 3:

"Selection of SSCs" of Ref. 10.1. The SWEL consists of samples from two groups of components. The first group, which is the largest group,' contains a sample of components that satisfy the five safety functions described in Ref. 10.1 and is referred to as SWEL 1. The second group is a sample of components related to Spent Fuel Pool (SFP), referred to as SWEL 2. The components from SWEL 1 and from SWEL 2 are combined to establish the SWEL, defining the scope of the seismic walkdowns.

The development of the SWEL was performed by qualified personnel as described in Section 4.0 of this report.

SL Report No.: SL-0 11549 PSEGv. 2 November 22, 2013 NUCLEAR LLC Page No. 6 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report 5.2. SWEL 1 - SAMPLE OF REQUIRED ITEMS FOR THE FIVE SAFETY FUNCTIONS SWEL I is developed from the four screens identified in Section 3 of Ref. 10.1.

5.2.1 SCREENS 1 THROUGH 3- SEISMIC CATEGORY I, EQUIPMENT OR SYSTEMS, SUPPORTTHE FIVE FUNCTIONS Screens 1 through 3 are used to select Seismic Category I equipment that support the five safety functions and do not undergo regular inspections. The equipment coming out of Screens 1 through 3 is referred to as "Base List 1."

Section 3 of Ref. 10.1 indicates that previously developed equipment lists can be used as a starting point for selecting components for SWEL 1. Salem Unit I developed a Safe Shutdown Equipment List (SSEL) for resolution of NRC unresolved safety issue USI A-46, "Seismic Qualification of Equipment in Operating Plants", as required by NRC Generic Letter 87-02, utilizing the methodology in Ref. 10.4. Although, the previous SSEL was not developed with the intent to specifically address containment function equipment, Selection Personnel reviewed the SSEL and identified components that satisfy the containment function. Consequently the SSEL addresses all of the following five safety functions:

1. Reactor reactivity control
2. Reactor coolant pressure control
3. Reactor coolant inventory control
4. Decay heat removal
5. Containment Function Thus, the previous SSEL is considered as the "Base List 1", for the selection of the sample of components for SWEL 1. Attachment IA provides Base List 1.

5.2.2 SCREEN 4 - SAMPLE CONSIDERATIONS The equipment selection personnel used the five sample selection considerations described in Ref. 10.1 to select components for SWEL 1:

SL Report No.: SL-01 1549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 7 of 19 1R3 Salem Nuclear Generating Station Unit I Project No. 12800-217 Seismic Walkdown Report

1. A variety of systems A sample of components from each of the systems listed in Base List 1, Attachment IA, was selected. SWEL 1 includes equipment in a variety of systems such as Main Steam, Feedwater, Component Cooling Water System, Residual Heat Removal System, Service Water, AC Power, and DC Power.
2. Maior new and replacement equipment The SAP data base for Work Orders was used to identify new and replaced components as indicated in the SWEL, Attachment 2.
3. A variety of types of equipment Appendix B of the Ref. 10.1 provides the classes of equipment for the SSCs. The equipment selection personnel selected equipment classes based on the relative percentage of equipment classes in each system of the Base List 1. For example, SWEL 1 contains a large percentage of Motor Operated Valves (MOVs, Class 8) since there is a large percentage of MOVs in Base List 1.

At least one component from each equipment class was selected from each system listed in Base List 1. Upon completion of this process all equipment types have been represented except Motor Generators (Equipment Class 13) because Salem Unit 1 does not have any Seismic Category I equipment in this class of equipment.

4. A variety of environment For each equipment type, as applicable, a variety of environments are represented.

These environments include: Harsh (e.g. Containment), Mild (e.g. Control Room, Auxiliary Building), Outdoor/Intake Structure (e.g. Yard, Service Water Intake Structure).

5. Equipment enhanced due to vulnerability identified during the IPEEE program As stated in Ref. 10.6 and Section 8.0 of this report, "no vulnerabilities have been identified" as part of the IPEEE program. Consequently, SWEL I does not include equipment that meets this sampling consideration.

Utilizing the above sampling consideration, a preliminary SWEL 1 was developed and reviewed by a Salem Licensed Operator. Items were selected or replaced based on a

SL Report No.: SL-0 11549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 8 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report channelized work week process. In addition, some items were selected or rejected based on accessibility. For example, items were excluded that would require disassembling of equipment or an item was on a protected train, so the similar item on the non-protected train was selected. The review resulted in 22 components and 16 AWBs for which accessibility to perform the inspection were deferred to the Refueling Outage (RFO).

Deferred components are those located inside containment or are electrically energized equipment containing sensitive components.

5.3. SWEL 2- SPENT FUEL POOL RELATED ITEMS The Seismic Walkdown Equipment List 2 (SWEL 2) is a sample of the site Spent Fuel Pool (SFP) associated SSCs. The process for SWEL 2 development is defined in the Seismic Walkdown Guidance, Ref. 10.1 and consists of four screens:

" Screen 1: Seismic Category I

" Screen 2: Equipment or Systems

" Screen 3: Sample Considerations In addition, SWEL 2 also includes a screen that considers SFP SSCs that can cause rapid drain-down of the SFP.

0 Screen 4: Rapid drain-down The subsections below document the screening of SSCs for SWEL 2.

5.3.1 SCREEN 1- SEISMIC CA TEGORYI For Salem Unit 1, the SAP database was used to identify seismic category I SSCs that are associated with Spent Fuel Pool.

5.3.2 SCREEN 2 - EQUIPMENTOR SYSTEMS From Screen 1, components were excluded that were not appropriate for seismic walkdowns. After Screen I & 2, a "Base List 2" is developed and included in Attachment lB. It is from this Base List 2 that a small sampling of SF components was selected in Screen 3.

5.3.3 SCREEN 3 - SAMPLE CONSIDERATIONS The equipment selection personnel used the following considerations described in Ref. 10.1 to select components for SWEL 2:

PSEG SL Report No.: SL-0 11549 Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 9 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report

1. A variety of systems A sample of components from each of the systems listed in Base List 2, Attachment 1B, was selected. SWEL 2 includes equipment of several systems such as Component Cooling, Spent Fuel Cooling and Safety Injection.
2. Major new and replacement equipment The SAP data base for Work Orders was used to identify new and replaced components as indicated in the SWEL, Attachment 2.
3. A variety of types of equipment Appendix B of Ref. 10.1 provides the classes of equipment for the SSCs. The equipment selection personnel selected equipment classes based on the relative percentage of equipment classes in each system of the Base List 2.

From each associated Spent Fuel Pool related systems, at least one component was selected. Most items in Base List 2 were pipe and piping systems. The selection process eliminated similar or redundant items of a system. Other eliminated items were pipe, indicators, and orifice plates. Of all the safety related components, a sample of a valve, check valve and a heat exchanger was selected as listed below.

4. A variety of environment It is expected to have each equipment type, as applicable, represent a variety of environments. For most SF components, the environment is mostly harsh.
5. Equipment enhanced due to vulnerability identified during the IPEEE program As stated in Ref. 10.6 and Section 8.0 of this report, "no vulnerabilities have been identified" as part of the IPEEE program. Consequently, SWEL 2 does not include equipment that meets this sampling consideration.

Utilizing the above sampling consideration, a preliminary SWEL 2 was developed and reviewed by a Salem Licensed Operator. Items were selected or replaced based on a

SL Report No.: SL-O11549 PSEGv. 2 November 22, 2013 NUCLEAR LLC Page No. 10 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report channelized work week process. In addition, some items were selected or rejected based on accessibility. The review resulted in 3 components and 3 AWBs.

5.3.4. SCREEN 4: RAPID DRAIN-DOWN The Salem Unit 1 Spent Fuel Pool contains no penetrations below about 10 ft. above the top of the fuel assemblies. Therefore, no components were added to SWEL 2. Per the guidance of Ref. 10.1, "if it is determined that there are no such penetrations, then no rapid drain-down items would be added to SWEL 2."

The SSCs included in the SWEL 2 after completing the screening process are as follows,

  • Refueling Water Purification Pump (RWPP) Spent Fuel Demineralization Valve
  • Spent Fuel Cooling Refuel Canal to Purifier Pump

" Spent Fuel Cooling Pit Heat Exchanger SWEL 2 components are identified on the SWEL via a reference to a note in the note column.

5.4 SWVEL SWEL 1 and SWEL 2 were combined to establish the final SWEL, defining the scope of the seismic walkdowns. The final SWEL for Salem Unit 1 contains 99 components. The SWEL, Attachment 2, was reviewed to determine the population of anchored components and ensure that at least 50% of these components have been selected for anchorage verification during the seismic walkdowns, in accordance with the EPRI guidance, Ref.

10.1.

The SWEL identifies components that are potentially risk significant. The risk significance of a component was determined from the IPEEE report, Ref. 10.6, and utilizing the M-Rule criteria. The SWEL also identifies the components' applicable safety function for each component; this validates that components associated with all five functions are represented in the SWEL.

SL Report No.: SL-O1 11549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC PageNo. I Iof19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report

6. SEISMIC WALKDOWVNS AND AREA WALK-BYS 6.1 PREPARATION In preparation for the seismic walkdowns, the Seismic Walkdown Engineers identified the rooms that contained the SWEL items or (for large rooms) defined distinct areas of the plant within approximately 35 feet of each SWEL item. The SWEs assigned a unique number for each room or area of the plant, e.g. Area Walk-Bys (AWB) #S1-01 to catalog each area with the associated Area Walk-By Checklist (AWC) and Seismic Walkdown Checklist (SWC) for components located in the area. For Salem Unit 1, a total of 50 areas were defined for the 99 SWEL items.

The walkdowns were scheduled based on the protected equipment plant channel for each week; this resulted in some areas to be visited more than once to capture selected components from different channels.

Based on AWBs, walkdown packages were prepared. The walkdown packages included pertinent information about the components (e.g. design drawings, calculations, results from previous walkdowns) and the corresponding AWCs and SWCs.

6.2 AREA WALK-BYS (AWVB) AND SEISMIC WALKDOWNS Seismic walkdowns were performed by a team of two SWEs in accordance with the EPRI guidance Ref. 10.1. The focus of the seismic walkdowns was to perform visual inspections to identify potentially adverse seismic conditions. The SWEs relied upon their engineering judgment and training to identify potentially adverse anchorage conditions, adverse seismic spatial interactions, and any other adverse conditions as described in Ref. 10.1. The SWEs also verified that the anchorage configuration of at least 50% of the anchored components is consistent with the plant documentation.

Seismic walkdowns will be performed for all 99 components on the final SWEL and for all 50 areas that contain the components.

6.3 RESULTS 6.3.L SEISMIC WALKDOWNS The results of the area walk-bys and the seismic walkdowns are documented on the associated AWCs and SWCs, which are contained in Attachment 3 and Attachment 6.

A total of 77 components and 34 AWC's are included in Attachment 3. A total of 22 components and 16 AWCs, that were deferred to the Unit 1 RF022 in the spring of 2013, R2 are included in Attachment 6. Components deferred to the RFO are identified in the SWEL (notes column).

SL Report No.: SL-0 11549 0 PSEG Rev. 2 November 22, 2013 NUCLEAR LLC Page No. 12 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report 6.3.2. ANCHORAGE VERIFICATION As required by the EPRI guidance, Ref. 10.1, at least 50% of the anchored components require verification of the anchorage to ensure its seismic adequacy and to verify its configuration against design documents.

The following is a summary of the anchorage verification:

  • Total number of anchored components = 50 of which 15 are deferred to RFO
  • Total number of anchorage verified components = 21
  • Percentage of verified anchorage = 60% of components walked down

= 42% completed of total anchored components Additional anchorage verification was completed during the Unit 1 RF022 outage, see section A.6.3.2 of Attachment 6. R2 6.3.3. POTENTIALL Y ADVERSE SEISMIC CONDITIONS Issues and concerns identified during the walkdowns have been documented on the applicable checklists. Checklist boxes that have been checked "No" indicate a "potentially adverse seismic condition" may exist. All potentially adverse seismic conditions were entered into the Corrective Action Program (CAP) prior to completing a detailed licensing basis evaluation of the condition. Table 6-1 summarizes the potentially adverse conditions and the status of the condition.

Most of the potentially adverse seismic conditions identified during the walkdowns are associated with seismic interaction concerns between a component and its surroundings.

The other issues are associated with pipe supports and a column in corroded condition and one component with a cracked pedestal.

These issues have been assessed and judged not to involve a significant adverse seismic condition and thus, immediate actions were not required. Some will require supplemental evaluations, as discussed in Section 7.0, and some will require corrective actions. These issues have been entered into the Corrective Action Program (CAP). Corrective actions have been scheduled and supplemental evaluations assigned Order numbers. These issues are summarized in Table 6-1 and in section A.6.3.3 of Attachment 6. R2 All non-seismic conditions identified during the walkdowns were brought to the attention of plant personnel and Notifications were written as necessary. An example of non-seismic conditions includes housekeeping items (e.g. trash or' small tools left in plant areas). These items are not specifically documented in this report, but are available through PSEG's CAP database.

SL Report No.: SL-0 11549 0 PSEG Rev. 3 December 12, 2013 NUCLEAR LLC PageNo. 13 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report Table 6-1: Salem Unit 1 - Potentially Adverse Seismic Conditions Notification Date AWB SWC No. Created No. No. Description of Condition Status Comments 20575538 9/19/2012 S1-1 Small bore pipe support for OPEN Note 1 11SW11 in corroded condition 20575539 9/19/2012 $1-1 Small bore pipe support for OPEN Note 1 11SW12 in corroded condition 20575540 9/19/2012 51-1 Small bore pipe support for COMPLETED Duplicate of 20258764. Hanger replaced.

13SW11 in corroded condition 20575541 9/19/2012 $1-1 Small bore pipe support for COMPLETED Duplicate of 20258764. Hanger replaced.

13SW12 in corroded condition Engineering Evaluation determined design function 20575858 9/24/2012 12MS10 Valve actuator is butting against COMPLETED not impaired as -is, however, field work was also R2 steel beam completed in order to provide 3/4" cold gap 20576064 9/24/2012 1CCE5 11CC HX pedestal crack COMPLETED Crack determined to be non-structural, regrouted Fan moved to another area 20576382 9/27/2012 S1-25 Portable fan could fall on pipe COMPLETED Chair was properly secured 9/28/2012 S1-25 Chair w/wheels not restrained COMPLETED 20576393 R3 20578431 10/11/2012 1SWE1 Pipe support for 1SW828 has 1/2" COMPLETED Engineering Evaluation determined that gap was gap sufficient Note 1: Subject to condition-based monitoring until condition is corrected as part of long term Service Water Intake Structure material condition improvements. R3

SL Report No.: SL-0 11549 0 PSEG Rev. 3 December 12, 2013 NUCLEAR LLC PageNo. 14 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report Table 6-1: Salem Unit 1 - Potentially Adverse Seismic Conditions (Continued)

Notification Date AWB SWC Description of Condition Status Comments No. Created No. No.

20578432 10/11/2012 1SWE1 Tube sheet support for Valve COMPLETED Engineering Evaluation determined that gap was 11 SW1 1 is 1 1/4"away from motor sufficient 20578436 10/11/2012 Sl-47 Valve 1CC243 too close to the COMPLETED Engineering Evaluation determined that gap was floor sufficient Note 1 20583685 11/13/2012 Sl-31 Corroded Columns in Service Water Intake Structure at El. 130' OPEN R3 Added to Table 6-1 in Revision 3 for consistency 20583601 11/14/2012 S1-31 Overhead duct configuration at COMPLETED with as-found documented in AWC S1-31.

SWIS El. 133' Subsequently determined to be consistent with design.

20603757 4/16/13 S1-12 Loose vav anchor bolts on support for 1W1COMPLETED Identified during the Unit 1, 22nd refueling outage valve 11SW71 (1R22) walkdown.

20604980 4/24/13 S1-38 Unrestrained cart in front of panel COMPLETED Identified during the 1R22 walkdown.

335-1 Note 1: Subject to condition-based monitoring until condition is corrected as part of long term Service Water Intake Structure material condition improvements.

SL Report No.: SL-01 11549 0 PSEG Rev.I November 21, 2012 NUCLEAR LLC Page No. 15 of19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report

7. LICENSING BASIS EVALUATIONS All potentially adverse seismic conditions identified during the walkdowns were entered into the site CAP for review and disposition in accordance with plant's existing process and procedures. Licensing basis reviews were performed as part of the CAP process by PSEG personnel familiar with the seismic licensing basis and safety-functions of the equipment. Table 6-1 lists all potentially adverse seismic conditions and the status of each item in the CAP process.

No plant design modifications resulted from the potentially adverse seismic conditions. Any corrective actions performed to enhance equipment are classified as repairs.

8. IPEEE VULUNERABILITY RESOLUTION REPORT In its response to GL 88-20 Ref. 10.6 PSEG states that "no vulnerabilities have been identified" and therefore no enhancements to address seismic vulnerability were required. Consequently, the SWEL does not include any equipment enhanced or updated per the IPEEE program.
9. PEER REVIEW Peer review was conducted in accordance with EPRI 1025286 guidance (Ref. 10.1). The peer review team consisted of two qualified individuals. The following peer reviews were performed:

- Review the selection of the SSCs included on the SWEL

- Review a sample of the checklists prepared for the Seismic Walkdowns and Area Walk-Bys

- Review the licensing basis evaluations (Within PSEG's CAP process, not available at the time of this review,)

- Review the decisions for entering the potentially adverse conditions into the CAP process

- Review the submittal report Each of the above peer review activities were performed by both members of the peer review team.

9.1 REVIEW THE SELECTION OF SSC'S INCLUDED IN THE SWEL A peer review of the Seismic Walkdown List (SWEL) SSCs was performed to ensure the SSCs were selected in accordance with the guidance in Section 3: Selection of SSCs of EPRI 1025286, Seismic Walkdown Guidance.

The peer review of the SWEL SSCs was conducted by performing the following steps:

- Verifying the basis for the "Base List 1" for SWEL 1 The base list of SSCs used to develop SWEL I was obtained using the list of items generated in response to NRC Unresolved Safety Issue USI A-46, "Seismic Qualification

SL Report No.: SL-01 1549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC PageNo. 16of19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report of Equipment in Operating Plants" (Ref. 10.4) as required by NRC Generic Letter 87-02 which was developed into a Safe Shutdown Equipment List (SSEL) for Salem Unit 1.

Per Section 3: Selection of SSCs of the EPRI Seismic Walkdown Guidance, this is acceptable for establishing a base list.

- Verifying SSCs selected for SWEL 1 are Seismic Category I (Screen #1)

The items listed in the USI A-46 list were used to develop a Safe Shutdown Equipment List which consists of Seismic Category I items and meets the criteria of Screen #1 as defined in Section 3: Selection of SSCs, in the EPRI Seismic Walkdown Guidance.

- Verifying SSCs selected for SWEL I are equipment or systems (i.e. valves, pumps, panels, tanks, batteries) (Screen #2)

A review of SWEL 1 revealed no Seismic Category I Structures, Containment Penetrations or Seismic Category I Piping Systems were included. The list consists of mechanical and electrical equipment (i.e. pumps, valves, chillers, power supplies, tanks, MCCs) and therefore meets the criteria of Screen #2.

- Verifying SCCs selected for SWEL 1 support the 5 Safety Functions (Screen #3)

A review of SWEL 1 shows the items listed support the 5 Safety Functions. Some items support more than one Safety Function and some Safety Functions are supported by more than one item. Therefore, SWEL 1 meets the criteria for Screen #3.

- Verifying SSCs selected for SWEL 1 include a variety of types of systems, major new and replacement equipment, a variety of types of equipment, a variety of environmients and equipment enhanced due to vulnerabilities identified during the IPEEE program (Screen #4)

  • Items from each system listed in the Base List were chosen for SWEL 1.
  • New or replaced items have been identified on SWEL 1.
  • Items from all classes of equipment were selected for SWEL 1 with the exception of Class 13 (Motor Generators) as Salem Unit 1 does not have any Seismic Category I equipment in these equipment classes.

Items were chosen that are located in harsh environments (Containment), mild environments (Control Room, Auxiliary Building) and outside buildings (Service Water Intake Structure).

Per "PSEG Response to Generic Letter 88-20, Supplement 4, Individual Plant Examination for External Events (IPEEE) for Severe Accident Vulnerabilities, Salem Nuclear Generating Station" (Ref. 10.5), Section 7, no plant improvements involving plant equipment were required at SGS. Therefore, no IPEEE enhanced equipment was selected for SWEL 1.

SL Report No.: SL-0 11549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC Page No. 17 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report As shown, SWEL 1 meets the criteria for Screen #4.

- Verifying SSCs selected for SWEL 2 relating to the Spent Fuel Pool (SFP) meet Screens

  1. 1 - #3 for SWEL 2 per EPRI 1025286 SSCs associated with the SFP were identified using the SAP Database to create "Base List 2". The screening process in EPRI 1025286 was followed to develop SWEL 2.

No penetrations below about 10ft above the top of the fuel assemblies were identified for Salem Unit 1. Therefore, in accordance with Section 3: Selection of SSCs of the EPRI Seismic Walkdown Guidance, no rapid drain-down items were added to SWEL 2.

Therefore, SWEL 2 meets the criteria for Screen #4.

The lists for SWEL 1 and SWEL 2 were then combined to form the SWEL used for the Seismic Walkdowns.

No issues requiring resolution were found during the peer review of the selection of SSCs.

The SWEL meets all requirements set forth in Section 3: Selection of SSCs of the EPRI Seismic Walkdown Guidance.

Attachment F: Checklist for Peer Review of SSC Selection has been completed with all questions being answered yes. (See Attachment 5) 9.2 REVIEW A SAMPLE OF THE CHECKLIST PREPARED FOR THE SEISMIC WALKDOWNS AND AREA WALK-BYS Considering the experience and qualification of the Seismic Walkdown Engineers (SWEs), the peer review team selected 15% of the completed seismic walkdown and walk-bys for review.

The selection included a number of components and areas with reported potential adverse seismic conditions. In addition the SWEs were interviewed by the peer review team to ensure that the seismic walkdowns and area walk-bys were conducted in accordance with EPRI 1025286 guidelines.

The review resulted in a number of editorial comments for further clarity and consistency of the seismic walkdown and area walk-by checklists. These editorial comments were satisfactorily resolved. The review did not result in the identification of any new potentially adverse seismic conditions.

Based on this review and satisfactory resolution of peer review comments, it was concluded that the seismic walkdown of the components and area walk-bys were conducted properly in accordance with Section 4 of EPRI 1025286 guidance.

SL Report No.: SL-01 1549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC Page No. 18 of 19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report 9.3 REVIEW THE LICENSING BASIS EVALUATIONS All potentially adverse seismic conditions identified during the seismic walkdown of components and area walk-bys were entered in the CAP program through creation of notifications in SAP for further evaluations. No licensing basis evaluations were performed outside the CAP process.

9.4 REVIEW THE DECISION FOR ENTERING THE POTENTIALLY ADVERSE SEISMIC CONDITIONS INTO CAP PROCESS During the Seismic Walkdowns and Area Walk-Bys, the following steps were taken when Potentially Adverse Conditions were identified:

- Any potentially adverse seismic conditions found in the field were noted on the AWCs and SWCs.

- Upon returning from the walkdown, the SWEs reported the issues and PSEG created the notification in CAP.

- As required these notifications were then reviewed by engineering which entailed reviewing the as-installed condition found in the field against Seismic Qualification Documentation (SQD), i.e. calculation, to determine if the as-installed condition was consistent with the SQD and thereby the Current Licensing Basis (CLB).

- If the as-installed condition was determined to be consistent with the SQD, the notification was dispositioned stating that fact and no further action was taken. If the as-installed condition was determined not to be consistent with the SQD, a work order was created to perform further technical evaluations and any corrective actions require, i.e. revise calculations.

This process ensured any potential licensing basis issue was documented and reviewed by the appropriate personnel.

9.5 REVIEW THE SUBMITTAL REPORT The submittal report was reviewed in detail to ensure that the objectives and requirements of the 50.54(f) letter were met. The editorial comments provided by the peer review team were satisfactorily resolved and it was concluded that the report met the objectives and requirements of the 50.54(f) letter.

SL Report No.: SL-0 11549 0 PSEG Rev. 1 November 21, 2012 NUCLEAR LLC PageNo. 19of19 1R3 Salem Nuclear Generating Station Unit 1 Project No. 12800-217 Seismic Walkdown Report

10. REFERENCES 10.1

Reference:

EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, June 2012 10.2 NRC Letter dated March 12, 2012, "Request for Information Pursuant to Title 10 of the Code of Federal regulations 50.54 (f), Recommendation 2.1, 2.3 and 9.3 of Near -Term Task Force Review of the Insights from the Fukushima Dauichi Accident", Enclosure 3, "Recommendation 2.3: Seismic."

10.3 Salem UFSAR, Rev. 26 10.4 Seismic Qualification Utility Group SQUG), "Generic Implementation Procedure (GIP)",

Rev. 2, February 14, 1992.

10.5 PSEG, Generic Letter 87-02 and Supplement I USI A-46 Walkdown Summary Report Salem Generating Station Units Nos. 1 and 2, Docket Nos. 50-272 and 50-311 Supplemental Submittal, March 29, 1996 10.6 PSEG Response to Generic Letter 88-20, Supplement 4, "Individual Plant Examination for External Events (IPEEE) for Severe Accident Vulnerabilities," Salem Nuclear Generating Station, Unit Nos. 1 and 2, Docket Nos. 50-272 and 50-311, January 29, 1996.

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-0 11549 Project No. 12800-217 Rev. 2 Seismic Walkdown Report ATTACHMENTS ATTACHMENT IA - SALEM UNIT 1 - "BASE LIST 1", SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

ATTACHMENT lB - SALEM UNIT I - "BASE LIST 2", COMPONENTS ASSOCIATED WITH SPENT FUEL POOL ATTACHMENT 2 - SEISMIC WALKDOWN EQUIPMENT LIST (SWEL)

ATTACHMENT 3 - AREA WALK-BY CHECKLISTS (AWC) AND SEISMIC WALKDOWN CHECKLISTS (SWC)

ATTACHMENT 4 - SEISMIC WALKDOWNS ENGINEER CERTIFICATIONS ATTACHMENT 5 - CHECKLIST FOR PEER REVIEW OF SSC SELECTION ATTACHMENT 6 - WALKDOWNS PERFORMED DURING 1R22 OUTAGE I R2

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-01 1549 Project No. 12800-217 Rev. 1 Seismic Walkdown Report ATTACHMENT 1A - SALEM UNIT 1 "BASE LIST 1", SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SAFE SHUTDOWN EQUIPMENT LIST REPORT FOR SALEM GENERATING STATION ATTACHMENT A SALEM UNIT I SAFE SHUTDOWN EQUIPMENT LIST (122 Pages)

Report 0014-00078-ROOI, Rev. 2 A

Attachment A Report 0014-00078-ROO1, Rev. 2

PAGE NO.

  • SALEM GENERATIOTATION - UNIT 1 DOCUMENT NO. 0014- 9

&DO001 DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYTSEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING RBQUIRED CL ID NUMB NUMBER SYIIEM SUPPORT ELEVATION NOTES REQD STATE UNIT CONTROL I'WE DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 18 101-I EP 11 EHRINSTRUMENT PANEL Aux I IVA N/A NIA I 045 21 NIA N/A 9117 I11IRR mr & Inst PASSIVE Rack 101 18 102-1 EP 12 BEERINSTRUMENT PANEL A- I NIA N/A IVA 045 0 21 N/A NIA 9118 l.asbneat Rarc PAeSSiV 102 20 103-1 EP I RAD WASTE LQUID AUX SUPM TNK LVL Aux 1 S ENERG N/A PANEL S122 ENERG NIA 1 Control am ACTIVE 1 7 I1AFl1 A? AUX FEED - S/G LEVEL CONTROL V 205238 Aux I NIA OPEN NIA 1FA39G8 0084 OPEN N(A 4021 13 Az Fd PumpRom PASSIVE 2 7 IIAF21 AF AUX FEED - SfG LEVEL CONITROLV 205236 Aux 1 S CLOSED N/A IFAS9e1 1 084 OPEN NIA 4015 3 Aux Fd Prpm ACTIVE 3 1 1BF22 AF I I SG FW STOP CHECK ISO VALVE (MOV) 20520Z SET. 3 IPA I N/A CLOSED NIA 1 100 CLOSED NIA 4009 MS Pen Area PASSIVE 3 a 11C16 CC IlIRU IR EASYCMANaCOWTONENT* 105231, SB)T. 1 Amml SR CL(OSED 11136 (.A)

I COOLING OUTLET VAVLE (MOV) 056 OPEN 1ADE 5143 11 RHR Vlv Rm ACTIVE 3 8 11CC3 CC 1i-I3EEADEX-.OVERVLV 205231, S'HT. 1 Aux SR OPENCLOSED 1113 (E) 084 OPEN IADE 5108 11 CC Pep REm ACTIVE CERTIFICATION:

The informatin idealling the equipmemt requwed to bring the plant to a eafe ahutoawn conition on this Sara Shutdown Equipment List (SSEL) is. to the best of my knowledge and bela!, comat an accurate. (One ommere signature of Syst-m or OP-owaio Engineers)

John 0. CNellJe nteOC 511Dt95 Stephen P. Reirhle I Tedihal Manae SIR 5/11Es Print or Type Name/thin Signabire Date Print or Type Nameflitle signature Date

PAGE NO. @ SALEM GENERATIL'ATION - UNIT I DOCUMENT NO. 0014,-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PiW SUPPORTING REQUIRED NUMBER SUPPORT CL ID NUMBER ELEVATION NOTES REQD UNIT STATE CONTROL P[R DRAWINGS SYSTEMS LINE NOS LOCALMI ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 11CS2 CV 1ICS PMUP DISCH MOV 205235 A=ml R CLOSED NR 1 084 1 CLOSED NE 3007 L107 2109 lCO=Sp*ray'Pmp PASSIVE Itm 3 8 1ICS36 CV 11 RR TO C.5. STOP VLV, 205235 2OV IPA I R CLOSED NR 1 078 1 CLOSED NR 2018 1118 2120 itRm qppv Lvl PASSIVE 1 8 11DA13A DA I1A DIESELrSTARTAIMMOTORSOLVALVE 205241, SHT. 1 Aux 1 BR DEENERG 3AAI)C 1 1SVr7B 100 ENERG IADE iDAE4 1A DIG Rrn ACTIVE ISWGRIADC 5015 1 8 I1DAI3B DA 12A DIEL START AIR MOTOR SOL VALVE 205241, SET. 2 Ara I BE DZENEROG IBB)c I 100 ENERG 1BDE 1DAE23 1B DIG Rm ACTIVE ISWGRIBDC 5039 1 8 11DAI3C DA 13A DIESEL START AIR MOTOR SOL VALVE 205241, SET. 3 A-. I BR DEENERG ICCDC 1 100 ENERG ICDR IDAE38 IC D/G Rm ACTIVE LSWGRlCDC 5063 1 8 Z.DA24A DA IIA DIESEL START AIR MOTOR SOL VALVE 205241. SHT. I Aat I RR DERNERG IAADC 1 100 ENEltG IADE IDAE4 IA DIG Rm ACTIVE ISWORLADC 5013 1 8 11DAI4B DA 12A DIESEL START AIR MOTOR SOL VALVE 205241, SRT. 2 A= 1 BR DEENEUG 1BBDC 1 100 ENERG IBDE 5037 IDAE23 1B DIG Rm ACTIVE jSWGEIRDC 1 8 IIDAI4C DA 13A DIESEL START AIR MOTOR SOL VALVE 205241, SHET.3 Aux I BR DEENERG 1CCDC 1 100 ENERG ICDE 506I IDAEWa IC DIG Em ACTIVE ISWGRICDC CERTIFCATION: 12, The idnfimmaou ieotairvig the ewuimeat required to brine &e plant Soa 8&&e shutdmmu taaditim cn tlis Sa& Shetdom Equwipmet List (SSEIýI i%to thie beAt of my knowlefte ae.d md acurte.(One or more -aignatareof Sstems or OPerations Engineers) andbelaf John G. Connolly I SeiarEngineer JGC 5/1195 Steplenl P-AfkeieleTecbnienlManager SPE 5/1185 Print ar Type Nameflide Signature Date Print or TyrpeNameffisle Sigsnaiure Kee

PAGE NO. 0 SALEM GENERATI 9 TATION - UNIT 1 DOCUMENT NO. O01 4 -OfDo'01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM Equip DESCRwTON DRAWING BUILDING RVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT ELEVATION NOTES REQD STATE CONTROLPIWII DRAWINGS SYSTEMS UNIT LINE NOS LCLI ROB COMPONENT NO. LOCATION EQ FUNCTION I I I1DASA DA IIA DIESEL START AIR RCVR I7ILTICHK 205241, SliT$ I Aux I N/A N/A NIA VALVE 1 100 NIA N/A 5011 IA DIG Rm PASSIVE I I IIDA5B DA 12A DIESEL START AIR RCVB INLET CtE 2115241,SHT. 2 Am&1 N/A N/A N/A VALVE I 100 NIA NIA 5035 1lBD/G IM PASSIVE I I 11DASC DA I3A DIESEL STARTAIR RCVR INLET CHK 205241. SEIT. 3 Aux I N/A N/A W/A VALVE I 1to N/A N/A 5059 IC D/G Rum PASSIVE 3 I 11GB O1 11 SG ELOWDOWN OUWETHDR GATE VLV 2D5225, SET. I OCnunt] N/IA OPEN NIA WA NWA I 07a 19 OPEN/CLOSED N/A 4502 Co at is 1 ACTIVE Accumulator 3 11G4 GB I I S/G BLOWDOWN ISO VLV 20525. SHET.2 TPA 1 3 OPEN NIA ISV706 1 078 CLOSED NIA 45 ME& Pen Area ACTIVE 1 7 1iMSio MS MSPWRIRELrTFV 205203, SEP. 1 IPA 1 8 CLOSED NA 2 100 OPEN N/A 4103 MS Pen Area ACTIVE lop 7 1I.MS11 MS MS SAFETY VLV 205203. SET. I IPA 1 S OFF N/A 1 100 OFFION N/A 4102B MS Pen Ana ACTIVE lOP 7 l1MsIZ MS MS SAFETY VLV 205203. SET. I IPA I S OFF NIA I 10o OFF)ON N/A 4102C MS Pen Area ACTIVE CERTIFICATION: 5*.

The information idenlaryintihe equipment required to bring the plant toe a ea&

shutdoowA anon tim/a SafS tde wu Equiment lift MEL) i% to the best of my howledge and be casedt and aawu te. (One or more alnatare afSystem* erOpveatonms Enginews)

John G. Conaully / Sesim-Engnet JGC B/I119S Stephen P. Reichl) /Techunla Manager sTE 5/11/95 Printor Type Namenlise Signature Date Print or Type Namer1le Sigatnume Date

PAGE NO.* SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014- 9 8-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER SOERIN SUPPORT CL ID NUMBER .EELEVATION NOTES UNIT REQI STATE CONTROL PWR DRAWINGS LINE NOS LOCALI ROB COMPONENT NO. LOCATION EQ FUNCTION lOP 7 I1M113 MS MSSAFETYVLV 205203. SET. 1 IPA I S OFF NIA 1 100 OFFION NIA 4102D IS Pen Area ACTIVE lOP 7 ZIM1S4 MS MSSAFETY VLV 205203, SM. I IPA 1 S OFF N/A I 10o OFF/ON N/A 41025 MS Pea Aa ACTIVE 10p 7 .11M315 MS MS SAFW1Y VLV 205203, SHT. I IPA I S OFF NIA 1 100 OFFION NIA 4102F MS Pen Area ACTIVE 1 7 IIMS167 MS MS ISOL V 205203, SET. I IPA I S OPEN NfA 1 100 CLOSED N/A 4104 MS Pen Area ACTIVE 1 7 11m169 MS MS INLET V 3-WAY MOV AIROPED SM 205203. SET. 1 MA 1 S CLOSED N/A ISV274 ASSISVLV 1 100 OPEN N/A 4108 MS Pen Area ACTIVE 1 7 1lm31II MS MS INLT V3-WAY MOV AIR OPRD STU 202003. ST. 1 IPA I S CLOSED N/A ISV275 1 ASSIST VLV 100 OPEN N/A 4208 MS Pen Area ACTIVE I I IIMSSI8 MS IS STOP BYP V 205203, SHT. I IPA I N/A CLOSED NIA 1SV587 1 100 CLOSED N/A 4110 MS Pen Arem PASSIVE 3 1 1=1W12 CV R[R EX YP ISOL 205232, SflT. I Aux I N/A CLOSED N/A 1 045 1 CLOSED NIA 301G 1116 2118 I ERRPmpRm PASSIVE

a' CERTIFICATION

The jeformatian idenfiay 4 the equipment zequired to bring the plant to a safe sbutdowucandition on this Safe Sbutdm Equipmentlidt aSEL) is. to the best of my kowledge and belief. crm.rec and urste. (One ormare sigtu of'Systems ar Operatio Engineers)

John G. Connolly / Senioc Enginee JGC 5/11/95 Stephen P. Reichle I Technical Manager SPt fd/11L95 Print or Type Namellitle Signature Date Print or Type NameaIltle Signature DaIU

PAGE NO.

  • SALEM GENERANISTATION - UNIT 1 DOCUMENT NO. 0014)A-D001 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUJTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT I)

TRAIN EQ EQUEPMENT SYSFEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL IDWNOER ELEVATION NOTES REQD SYSTEM SUPPORT UNl STATE CONTROL PWR DRAwINGS STSTEMs LINE 1N0S LOCAL ID ROB COMPONENT NO. LOCATYON EQ F*DJrTON 1 11311s RH ILtP MBX FLOW CONTV 20523, SET. I Ael s OPEN NR 1RS[-IC4)ONV I M OPENCLOSD NB 4415 IEPMp 11 Em, ACTIVE 1 1 111.HIO"ONV 111 H CONy FOR F IRH.l 205232, StT. 1 AuxI Ba OPERABLE IDISIASYA 11H)18 1 045 OPERABLE NR 4416 1LRHI8 XIEIR Pmp Rm ACTIVE 1 8 11RHE EH iPM MIN FLOW MOV 205232. SUT. 1 A-x 1 R OPEN Ni 1 045 OPEN NR 4413 11R*IEMPp Bo PASS.IVE 9 LlRH4 RH RaE PlPsuCer TMOV 205232, ST. I Aux I R OPEN Ni 055 OPEN NR 4411 11 RER* VIVRm PASSIVE 3 1 I1S3J16 5. NO. 11 HOT LEG I*JECrONLINECHECK VLV 2=24,SET. 8 NE N/A CLOSED NIA 1 NE CLOSED N/A 31r, NR PASSIVE 3 I 11W17 ST BORON INJECTION LINE CHECK VALVE 205234. SET. 1 NR N/A CLOSED N/A NM CLOSED N/A 5113 4420 NR PASSV 3 8 113.144 CV CONT BUMP SUCT VALVE, MOV 202834, SMT. 3 Azt B CLOSED N 1 045 1 CLOSED NU 3014 1114 2116 4410A I ICantSump Dr PASIVE 3 8 11L45 CV RBTE"0I Pwt -STOPMOV 205234. SHT. 2 A. I R CLOSED NR 1 084 1 CLOSED NR 3011 1111 2118 12 SI Pmp Rm PASSIVE CERTIFICATION: 17 The information identifying the equipment requiked to b=mg the plant to a 3a sihutdotn coartin on this Safe Shutdown Equipment List (SL) is. to the bet of my Imowledgo dmiec and ataoaate. (one and belief, orm gatn of Sytemsa r Operaian Egineem) gu Joln G.Ceonnolly I SenuiorEngineer Jac 5/1aSS Stehna P. Re l' la/Tehnica MManaer SPR si105 T

Print or ype NameIrhie sip-aa Date Pant or Type Name/Titie Signsatus Date

9 DOCUMENT NO. 0014-98-D001 PAGE NO. SALEM GENERATIOSTATION - UNIT 1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LOCALID EQ FUNCTION LINE NOS ROB COMPONENT NO. LOCATION 3 7 IISW127 SW 1iCCBX SW OUTLE CONTROL VALVE 205242. STI Au I S OPEN N/A ITA92O6C 1 084 8 OPEN N/A 5273 11CCPpRm m PASSIVP 3 7 IISW129 SW i1 CC PMP EM CLE SW CONT V 2051,2. SET a Aux 1 9 CLOSE*I-OPEN NIA ISV601 1 084 8 OPEN N/A 5277 12 Aux Fd Prop R. ACTIVE 3 7 11SW153 SW 11iRH PnMPRM CLE SW CONT V 205242, SHT 3 MxuI S CLOSED N/A LSV596 1 045 8 CLOSEDIOPEN N/A 5277A IIM MP mpBR- ACTIVE 3 8 IISW17 SW SW PN DISCS HDR X-OVER MOV 205242, SET. 1 Ya*d I OPEN

  • R 1 100 OPEN NR 5291 Srat Wtr Bldg PASSIVE 3 8 1 IRW20 SW TO HDS SUP MOV 201242. SET. 1 Yard SR OPEN I1103 (I1) 1 100 CLOSED ICDE 5215 Srvc Wtr Bldg A~ntJ 3 S IISW21 SW DO CLG SW INLE= V 205242, SET. 3 Amx1 R OPEN NR 1 084 OPEN NR

$219 1lDieseIFOSTR.m PASSIVE 3 a I LSW22 SW NUC SDR INLET MOV 205242, SET. 3 PA I R OPEN NR 1 078 OPEN NE

$232 SW Piping Am (3) PASSIVE 3 7 I1SW223 SW it ?CU SW OTLETVIPNL700-IQ 205242. SHT 6 IPA1 NIA OPEN NWA LSVI468 1 078 OPEN N/A 5244 SW Piping Rm (1) PASSIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a sale shutdown condition an this Safe Shutdown Equipment List _SSEL) is. to the best of my knowledge and belief. correct and accurate. (One at mare signature ofSystema at Operations Engineers)

John G. Connally ISeior Eineer JGC 5W115m Stephen P. Reichle / Technical Manager SPE 5/11195 Print or Type NamelTitle Signature Date Psint or Type Nam#oTitle Signature Date

9 SALEM GENERATISTATION - UNIT 1 PAGE NO. DOCUMENT NO. 0014-.*D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER ELEVATION CL ID NUMBER NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 115349 sJ I1SI RHR OUTLrT TO COLD LEG MOV 205254. SET. 3 iPAI R OPEN MA NIA 1 078 18 OPEN NIA 3011A 1IIIA 2113A Meoh Pen Area SO PASSIVE BD Hx 3 7 IISJ50 SJ LOWIWEADSIT-STSTOPV 205284, SET. 3 Cutmnt I NIA CLOSED N/A N/A IVll 1 078 1 CLOSED NIA 3012 3112 2114 Cý at Elevator PASSIVE I a I W54 SJ ACCUM OUTLET VALVE 205234. SET. 4 Cnmnit I SR OPEN 21107(23D) WA 1 078 10 OPEN/CLOSED LADE 21G !Ao1 mulay ACTIVE 3 1 11S 54 NO. 11 COLD LEG INJECTION LINE CHECK 205234, SFT. 4 NR NIA CLOSED NIA VALVE 1 NR CLOSED N/A 3109 NR PASSIVE 3 1 11S064 CV MIN. FLOW LINE CHECK VALV. SEPUMP NO. 205234. SET. 2 Am I N/A CLOSED NIA 11 1 084 1 CLOSED N/A 3047 3147 2149 11 SlPlop Rm PASSIVE 3 1* n5362 Si 100 GPM MINIFLOW LV. 2024. SET. 2 A= I NLA CLOSED N/A 1 084 1 CLOSED N/A 3045 1145 2147 lIsitopEm PASSIVE 3 7 lISWIl0 SW CHCNI.SRSWOUTLETV 205242, SHT.85IPA1I NIA OPEN N/A 1 100 9 OPEN NIA 5342 CH Wte Pmp Area PASSIVE 3 7 11SW122 SW CC HX SW INLET CONTROL VALVE 205242, SETS Aum1 S OPEN/CLOSED N/A SV613 1 084 11 OPEN N/A 6271 11 CC Pmp Rm ACTIVE CERTIFICATION: I ýr The in&hrmai n ta. qojpmt required to bring the p0-t to a ade shutdown onalition on Ibis Safe Shutdown Equ mnt List (SSE) is. to the best of my Imowledge and bele* et and acmumate(One or mine fgsmrme of Systms or Operamions Engineers)

John G. Connelly Senior Engineer JGC 8/11/98 Stephen P. Reichle / Tlehnical Manager SPR 5"/115 Print or Tko Nameflltle Signature Date Print or Typoe Nmetlle Signatux De

PAGE NO. 0 SALEM GENERATI*STATION - UNIT I DOCUMENT NO. 0014-09 8-D001 DATE 5/111/95 USI A-46 PROJECT RE-VISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD S"ATE CONTROL I'WR DRAWINGS SYSTEMS LINE NOS LOCAL ID N ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 IISW58 SW 11FCU SW INLETV 205242, SHT. 6 IPA 1 NIA OPEN N/A IMV622 1 078 OPEN NfA 5236 Mech Pen Area PASSIVE 3 7 11Sw6s SW iFCUSW THRMOTV 205242, SBT. 6 Cnotnt I N/A OpEN NA 1 100 12 OPEN NIA 5240 460V Cut Elec CC pASSIVE 3 7 11SW72 SW 11 CFCUSW OUITLr`VA 205242. SET 6 IPA I N/A OPEN NIA ISV623 1 078 OPEN N/A 5242 Mech Pen Area PASSIVE 3 7 JISW92 SW CH CNDSR SW CONTV 205242. SET. S IPA I S CLOSEDIOPEN N/A ISV593 1 100 OPEN NIA 5340 CH Wtr Pmp Area ACISVE 3 7 1L.W93 SW 11CE CNDSL SW REC V 205242. S-T. 5 IPA I S OPEN N/A 1 100 9 OPEN/ICLOSED N/A 5376 CH Wtr Prop Area ACTIVE 1 7 J2AFnI AF AUX FEED - SG IEM CONTROL V 205236 Aux I NIA OPEN N/A 1FA3967 1 084 OPEN N/A 4018 12 Ax FdPmp Rm PASSIVE 2 7 12AF2I AP AUX FRED - SFGLEVEL CON'ROL V 205236 AMxI S CLOSED N/A 1FA3963 I 084 OPEN N/A 4013 12AuxFdPmpltm ACTIVE I 12BF22 AF 12 SO FW STOP CHECK ISO VALVE (MOV) 205M20.SET. 3 OPA I NIA CLOSED NIA 1 100 CLOSED NWA 4014 Mg Pen Area PASSIVE CERTIFICATION:

The information identifying the equipment -quired to bring t.re plant to a saft shutdown ondition n this Safe Shutlown Equipment List C&SEL) is toothe best of my knowledge and belieft correct and ararete. (One or mor signature ofSystems o*xOperations Engineem) john G. Conn Senior togineer JoC 5/11195 Stephen P. Reisce I Technical Manager SIE ,5/1i15 Print or Type Namelritle Signaturs Date Phnt or Type NameEtle signaturae Date

PAGE NO. P SALEM GENERATI#STATION - UNIT 1 DOCUMENT NO. 0014-08-Do01 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL M NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTS REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LCL ROB COMPONENT NO. LOCATION EQ FUNCTION 3OP 7 11SW24 SW SW SiR BID CONT V 205242. SHT. 1 Yard S OPEN/CLOSED N/A ISV259 1 100 OPENICLOSED N/A 5202 Srm Wtr Bldg ACTIVE 1OP R IISW25 SW 11 SW STR BID OUTLET V 205242, SfEr. 1 Yard NWA OPEN N/A I I0 CLOSED NI/A 5201 SwWt Bldg ACTIVE 3 7 LrSWM05 SI NYC HDR BK REG IVF2PNL740-1A 205242, SET, S IPA I NIA CLOSED N/A 1 078 9 CLOSED t&A 232 SWPipiagRm (3) PiASSVE 7 1I1SW$9 SW IA DO SW INLET TO COOLER 205242, SET. 3 ArmtI S CLOSED N/A ISV0 100 OPEN /A 220 1ADlG Rm ACTIVE 3 7 ILSW40 SW IA D/I CLG SW DIN V 205242, SHT. 3 Aux 1 N/A OPEN NIA ISV69o 200 20 CLOSID NIA 5226 IA D/G Rom ACTIVE 3 7 11SW42 SW iA DG CM SW THROT PNL 740-1Z 205242. SHT. 3 Aux I S OPEN/CLOSED NIA 1 100 OPEN NIA 5229 1A D/U Fan ACTIVE 3 7 IISW49 SW NUCEDRBYP R.GV 205242. S*T. 3 IPAI WA CLOSED N/A 1 078 9 CLOSED NIA 5=3 SW Rmn(3)

Ripng PA5SSvM 3 7 ilSWSI SW CONTYANCOILUNITSWISOL 205242, SIT. 6 IPA 1 N/A OPEN NIA ISVII15 1 078 OPEN N/A 524 MlEchPm Area PASSIVE

ýy CERTIFICATION:

The If a-a identiying the eqwipmeut required to lring ate pla to a saf ahutdowu Codtn 0n this Safe Shutdown Euipmeit Litt $Sm:L) i8, to the be*t f my Iwledge and beae* cmocasdac urate. (One or more signature f System or Overations Enginfer)

John G. Comnly /Senior Engineer JGC 5/11195 Stephen P. Reidble / Tecnicall anager m s/11/,3 P rintTpe Name/Title Signature Date Print or Type Name/TItle Si'nture Date

9 SALEM GENERAT#TATION - UNIT 1 DOCUMENT NO. 0014J-fD'001 PAGE NO.

DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMEN4T STSTE EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE FIV SUPPORTDNIG REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNrT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL D ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 12CC16 CC 12R.1IR HEAT EXCHANGER COMPONENT 205231. SBT. 1 A= I SR CLOSED 11109 (41) 1 COOLING OUTLET VAVLE (MOV) OPEN iBDE 5142 12 RHR Vlv Rm ACTIVE 3 8 12CC3 cc 12-13HEADERX-OVER'VLV 20523L SErT. I A-x I si OPGERICIOSED [1111(61 1 084 OPEN ICDE 5109 12 & 13 CC mp PE m ACTIVE 3 a 12CS2 Cv 12 CS PM DISCH MOV 2D5235 AM3 R CLOSED NR 1 084 1 CLOSED NR 3008 1208 2110 12 Co,.Spray Pip PAssI Em 3 a 12CS36 CV REC. CS STOP VA-MOV 20523S IPA 1 R CLOSED NR 1 078 1 CLOSER 3019 1119 2121 Bit Em Upper Lvl PASSIVE 1 9 12DAI3A DA lIB DIEMEL STARTAIR MOTOR SOL VALVE 205241,SM. I Aux I RE DEENERG 1AADC I 1SV877 100 ENERG lADE IDAZ4 1A DIG Rm ACTIVE ISWGRIAIC 5019 I 8 12DA13B DA 12B DIESEL START AIR MOTOR SOL VALVE 205241, SMT. 2 A= I HE DEENERG IRBDC I lo) ENERG IBDC 5043 1DA=3 1B DJG Rm ACTIVE ISW5RIBIC 1 8 12DAIC DA 13B DIESEL START AIR MOTOR SOL VALVE 205241, SMT.3 Aux 1 ER DEENERG ICCDC 1 100 ENERG ICDE 5067 IDAUS WCDIG Rm ACTIVE 1SWGRICDC 1 8 12DA14A DA 11D DIE-SEL START AIR MOTOR SOL VALVE 205241, SHT. I Au I ER IJEEN'RG 1AADC I LSTloVg 10 ENERG lADE IDAR4 1A DIG *m ACTIVE ISWGLIADC 5021 CERTIFICATION:

The information identifying the equipment required to bring the plant to a earn shudowrn cohdition on this Sara Shutdown Equipmanti lst (SSEL) is, to dAn bol dmy knowledge and befief, correo and arcurate. (One or mbre signature *fSyatcms or Operations Enginoer)

John G. Counolly I Senior Engineer JGC 5/11195 Stephen P. Reic.le I Technical Manager SPR 5/11)95 Print or Type Name/Dde Signature Date Printor Type NnmeJaltme Sipininre Date

PAGE NO. 0 SALEM GENERAAITATION - UNIT 1 DOCUMENT NO. 0014-51D001 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAN EQ EQUPMENT SYSM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNNT ELEVATION NOTES EEQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS$ OALI ROB COMPONENT NO. LOCATION EQ FUNCTION 1 8 12DA14B IDA 12B DIESEL START AIM MOTOR SOL VALVE 205241, SET. 2 Aax 1 BE DEENERG IBBDC 1 100 ENERG IBDE IDA21 IllDIGAISWGRIBDC 8 12DA14C DA ISB DIEELSTAR1' AlR MOTOR SOL VALVE 205241. SPIT. 3 Aux I ER DEENERG ICCDC 1 100 ENERG ICXD 5069 IDAE3 IC IG Rm ACTIVE ISWGR1CDC 1 I 1IDAA DA IADIESEL STARTAIR RCVRINLET CIK 205241. SHT. 1 Ax 1 NIA N/A N/A VALV'E I 100 N/A N/A

.017 iA DIG Rm PASSIVE S I InDSR DA 12B DIESEL START AIR RCVR IDUET CHK ,05241,SET. 2 A= 1 N/A N/A N/A I VALVE 100 NIA N/A 5041 1B DIG Rm PASSIVE I I I2DA6C DA 13B DIESEL START AIR RCVR INLEr CHK 205241, S61T. 3 Aux 1 N/A N/A NIA VALVE 1 100 NIA N/A 5065 IDAE38 lCD/GRm PASSIVE 3 7 12GB3 GB 12 /G BLOWDOWN OUTLET HDR GATE VLV 205225, SET. I Catmnt I N/A OPEN N/A N/A NWA 1 078 19 OPEN/CLOSED NIA 4506 Corat 13 ACTIVE Aiaumulator 3 7 12GR4 GB 12 SfG BLOWDOWN =SOVLV 205225. SETr. 2 IPA I S OPEN NIA IM07 1 078 CLOSED NIA 4504 Mech Pen Area ACTIVE 3 14 12MAC ]5P II5VAC DISTRIBUTION CABINET 211370, SFIT. I A= I S El/ERG IINVICOYC 1 100 ENE]G N/A 8070 1 RELAY RM ACTIVE CERTIFICATION:

The inoemafb o'o ideatufying e equipment required to bing the plant to a saa shutdown casdition en this Sa& Shusilv Equipment List (SSEI is, W the best ormay icamdedge and belie& correct and Aaenorai (One crmore~ntsi afSyvumss OrOPe-tiosia Zopneers)

John G. Coannal" ISenio Engineer JGC 5/1 195 Stephen P. Regirle / Tedincal Manager SER 5/1,95 Print or Type NamerTitle Signature Date Print or Type Noo'eFltle Signsture Date

PAGE NO. 9 SALEM GENERATI*1'ATION - UNIT 1 DOCUMENT NO. 0o14o*-DOO1 DATE 5/11/95 US! A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING RVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED ID NUMBER NUMBER SYSDAW SUPPORT CL ELEVATION NOTES UNIT REQD STATE CONTROL PWR DRAWNMGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FuNCfON 2 7 12MSI0 MS MS PWR RELIEF V 205203. SHT. 2 OPA I S CLOSED NIA 1 100 OPEN N/A 4132 MS Pen Area ACTIVE 20P 7 12MSII MS MS SAPETYVLV 205203, SET. 2 OPA 1 S OFF N/A 1 100 OFF/ON N/A 4130A MS Pen Ara ACTIVE 2OP 7 12MS12 MS MS SAFETY VLV 2052*. SHT. 2 OPA I S OFF N/A 1 100 OFF)ON NIA 4130B MS Pen Area ACTIVE 20P 7 12].153 MS MS SAPETY VLV 205203. SHT. 2 OPA I S OFF N/A 1 100 OFF/ON N/A 4130C MS Pen Area ACTIVE 2OP 7 L2MS14 MS MS SAFEIT VLV 205203, SHM.2 OPA z S OFF NIA 1 100 OFF/ON NIA 4130D MS Pen Area A07M 2OP 7 12MS15 MS MS SAPETY VLV 205103. SHT. 2 OPA 1 S OFF NIA I z0o OFF/O= N/A 4130E MS Pen Area ACTIVE 2 7 12M0167 MS MSISOLV 2052M3. SHT. 2 OPA 1 S OPEN NIA 1 100 CLOSED NIA 4133 MS Pe. Area ACTIVE 2 7 1ZMSEI9 us MS INLET V 3.WAYMOVAIR OPRD STN 205203. SHT. 2 IPA I S CLOSED N/A ISV280 ASSIST VLV 1 100 OPEN NIA 4135 MS Pen Area ACTIVE CERTIFICATION:

The iunjon idendfing tbe equipment required to bring the plant to a safe shutdown conditionen this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and beri4 correct and ccurate. (One or -ore signture of Systecas or Operations Engineers)

John G. Connolly I Senior Egineer JGC 5/11195 Step*hen P. Reicbi / Technical Man acer SPR 5/11/95 Print or Type N-.eitle Signature Date Print or Type Name/fitle Signeture Date

PAGE NO. 9 SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014-OSt-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2.

SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSEMI EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVmE FWR SUPPORTING REQUIRED CL ZDNU30FE NUMBER SYSTEM SUPPORT UNIT ElE.ATION NOTES REQD STATE CONTROL PWR DRAWiWGS SYSTEMS LIE OS LOAMROB COM[*PONENT NO. LOCATION EQ FUNCTION 2 7 12MS171 MS MS ILT V 3WAY MOV AIR OPRD STU 205203. SHT. 2 IPAl S CLOSED I/A ISV281 1 ASSIST VLV 100 OPE*N N/A 4137 MS Pe Area ACTIVE 2 7 12MS1s MS MS STOP BEP V 205203. SHiT. 2 OPA 1 N/A CLOSED M/A ISV581 1 100 CLOSED N/A 4139 MS Pen Area PASSIVE 3 I 12RH12 CV RlE aX BYP ISOL 2022.., ShTT. 2 Aux I N/A CLOSED N/A 8945 1 CLOSED N/A 3017 1117 2119 12EHRPmp *R PASSIVE 2 7 12R 12RIRHX FLOW 00 V 205232. SHT. 2 Aux I S OPEN NR 12RHBICONV 1 045 OPEN/XCOSED NR 4406 12 RHS PaP Em ACZTVE 2 is 12RHIs.CONV R RIP CONVERIER FOR 12RU18 2052a2. SMT. 2 Aux I BE OPERABLE NR 1 045 OPERABLE NR 4407 121H18 12 MIR Prop Rm ACTIVE 2 8 12RE29 RE 12 RHR PMPMlIN FLOW MdV 205232, SET. 2 A- I R OPEN NR 1 045 OPEN NR 4404 12 RHR Prop Rm PASSIVE 2 8 12RHA RE 12 RIm PMe SUCTMOV 2032, Sl.T. 2 AnmI R OPEN NR 1 055 OPEN NR 4402 12 ERIR Vlv Rm pASSJr 3 I 12Sj 106 SJ NO. 12 HOT LEG INJ.ECTION LINE CHEC 205234, SHT. 3 NR NIA CLOSED NIA VALVE I VN CLOSED N/A 3118 AIR PASS.VE CERTIFICATPION:

The infiormahion ideatifyin the iopipment retipijeto blinglht plant to a safa shutdown caoditian on this Safe Shuotdown EFmbment List (SOL)4 is, to Ahe best of my koo.Isdge and be~ief~comneia and aiaexa. (One or -are sitnature of Systems or Operations Engineer*)

Joba G. ConnollyISeir Eagiiz r JUC 5/11/95 Stephen P. Reichle Teehoical Manager SPR 5ILJ95 Print or 'pe Nameflltle signaturse Date Psut ar 7IeNameSzle signauxre Dte

PAGE NO. 0 SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014-98-D'001 DATE 5111195 USI A-46 PROJECT . REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBIER SUPPORT CL ID NUMBER ELEVATION NOTES SYSTEM UNIT 9EQD STATE CONTROL PWiR DRAWINGS SYSTEMS LINE NOS OAI ROB COMPONENT NO. LOCATION EQ FUNCTION 3 I 12SJ17 Si BORON INJECI*ON LINE CHECK VLV 205234. SET. 1 NR N/A CLOSED N/A 1 NR CLOSED N/A 3114 4408 NR PASSIVE 3 8 12SJ44 CV CONT SUMP SUCTVALVE, MOV 205234, SHTr.3 Aox I R CLOSED NR 1 045 1 CLOSED NR 3015 1115 2117 4411A Cont Smop Dra VIv PASSIVE REM 3 8 12SJ45 CV RHR TO CEG SI PunS STOP MOV 205234, S-T. I Ax I R CLOSED NR 1 084 1 CLOSED NR 3053 1153 2155 IlCCVIvRm PASSIVE 3 8 12SJ49 Sj 12 SlRHR OVTLEE TO COLD LEGMOV 205234, ST.3 IPA I R OPEN N/A N/A 1 078 18 OPEN NiA 3012A 1112A 2114A Bit Bin Upsper LvA PASSIVE 3 12SJSO CV LOW HEAD SI TEr STOP V 205234, SHT. 3 Cntmnt I NIA CLOSED N/A ISVI 10 1 078 1 CLOSED N/A 3013 1113 2115 Cor at Elevator PASSIVE 1 a 125.154 58 ACCUSAOUTLET VALVE 205234.*S*T. 4 Cnlm*at I SR OPEN 11137 (21)) NIA 1 078 10 OPEN/CLOSED IBDE 2157 12 Amoumlnator ACTIVE 3 I 12SJ56 SJ NO- 12 COLD LEG INJECTION LINE CHECK 205234, SHT. 4 NR NIA CLOSED NIA VALVE 1 ENR CLOSED NIA 3110 NE PASSIVE 3 1 2SJ84 CV MIN FLOW LINE CHECK VLV, SI PUMPNO_ 12 205214, S*T. 2 Auxl WA CLOSED NIA I 084 1 CLOSED N/A 3048 1148 2150 12 SI Prop Rm PASSIVE CERTIFICATION:

Thei ifmatlon,identifying the equipment requined to bring the plant to a safe ahutdown condition on this Safe Shutdown Equipment Iot MEL) is. to thebeet of ray knowledge and belie& coT"o a=3 a.naute (One or mote signature ofSystems arOpe-ti- Enginees)

John G. CamonlalySeniorEntneer JGC 5/111 Stephen P. eicIe Tedcal Manager SPit 5/11b95 Print or Type NamsTe Signature Daot Print ar Type Name/tle Signstae Date

PAGE NO.9 SALEM GENERATI 9 TATION - UNIT 1 DOCUMENT NO. 0014-0fD001 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORJ* STATE MOTIVE ?"P SUPPORTING REQUIRED CL ID KUMEER NUMBER DRAWINGS SUPPORT ELEVATION NOTES REQD STATE CONTROL PWR SYSTEMS LINE NOS LOCALED ROB COMPONENT NO. LOCATION EQ FUNCTION 3 I 12SJ922 3 1o00GPM MINIFLOWIV 205234, S*IT. 2 Aux I NIA CLOSED NIA 1 084 1 CLOSED N/A 3046 1146 2148 ,SIMPmoplm PASSIVE 3 7 12SWI02 SW CE CNDSR SW OUTLET 205242. ST. 5 IPA 1 N/A OPEN XfA LPA.861 1 100 9 OPEN NIA 5C3 Wtr Pap AreA PASSIVE 3 7 12SW129 SW 12 & 13 CC PhilP RM CLR SW CON? V 205242. SMT. 4 Auc I S CLOSED/OA)N N/IA 1SV603 1 084 14 OPEN NI)A 5350 I Aux Pd PopvRm ACTIVE 3 7 12SW153 SW 12 RHR PUP EM CLR W INlET VALVE 205242, SET. 4 Aux I S CLOSED M/A 25V6,4 I 04G CLOSEDIOPEN NIA 5350A 22 PHR Pmp Rma ACTIVE 3 8 12SW17 SW SW PMP DISCS HDR X-OVER MOV 205242, SffT. 2 Yard it OPEN NR 1 100 OPEN NU 5294 Stec Wtr Bd PASSIVE 3 a V2SW20 SW NUC 10DR SUP MOV 20524, SHT. I Yard S OPEN NR 1 100 OPEN NR 5217 SrvcWtr Bldg PASSIVE 3 12SW21 SW DG CLG SW INLET V 205242, SHT. 3 Au% 1 R OPEN NR 084 OPEN NR 5312 II1DieseIFOST ma PASSIVE 3 8 12SW22 SW NUC HDE INLET MOV 205242, SIT. 3 IPAI R OPEN NIX 1 078 OPEN NR 5313 SW Piping Ihn (4) PASSIVE CERTIFICATION:

The inforantion idenfihing the equipment requited to bring the plant to a u& shutdown- c:nd:iion on this Safe Shutdown Equipment List (SSEL) j.S to the best of My knowledae and belief. corect and accur'at (Oue or more signature of Systems or Operations Engneers)

John G. Connelly ISeor Envginee JGC 5/11),95 Stephen P. Reichle / Teelmicr. Manager SPR 511)5 P r Type Nasmelicle Signature Date Print or Type Nama'e Signature Date

PAGE NO. P SALEM GENERATWNTATION - UNIT 1 DOCUMENT NO. 0014-0tD001 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE MR SUPPORMiNG REQU*R*D CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PW DRAWINGS SYSTEMS LINE NOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 . 12SW223 SW 12 FCU SW OUTLET V PNL700-1IP 2052.42.*ST6 IPA I NIA OPEN N/A ISVuc9 1 078 OPEN N/A 5256 SW Piping ?- (4) PASSIVE SOP 7 12SW24 SW SW STR B/ CONT V 205242. SET. I Yard S OPEN/CLOSED NIA 1SV260 I 105 OPEN/CLOSED NIA 5207 Srvt Wtr Bldg ACTIVE 30P R 12SW25 SW 12 SW STR BID OUTLET V 205242, SHT. 1 Yard N/A OPEN/CLOSED N/A 1 100 CLOSED NIA 5209 Srvr Wtr Bldg ACTIVE 3 7 IZSW305 SW NUC HDR RK RE* IV PNL740.IB 205242. S1r.3 [PA I N/A CLOSED M/A 1 078 13,20 CLOSED N/A 5314 SW Piping Rm (4) ALTIVE 3 7 1SW376 SW 12B NILINLET VALVE 205242. SHT. 4 Aux I S OPEN/CLOSED N/A 1SVI499 1(84 14 OPEN N/A 5346 12 & 13 CC PulpRm ACTIVE 3 7 125W379 SW 128 HX OUTLET VALVE 205242, SHT.4 AoA I S OPEN/CLOSED N/A ITA9264 1 084 14 OPEN N/A S347 12& IICCPmpltm ACTIVE 3 7 12SW380 SW ZAMHX INLET VALVE 205242. SET. 4 AUr I S OPEN/CLOSED NIA 1SV1499 1 034 14 OPEN N/A 5348 12 & 13 CCPmpRnz ACTIVE 3 7 12SW383 SW I2A XHOUTLET VALVE 205242, S-T. 4 Aux I S OEN/C*LOSED W/A ITA"206 1 084 14 OPEN N/A 5347A 12& 13 CC PnpR ACTIVE CERTIFICATION: ý7 The information identi~ying the eqipment required to bring the plant to a safe ahuttDwA condition on this Safe Sbut&own Equipment List (SSEL) is to the best ofmy knowledge and belief ca.e. soI accurate. (Ose or mre signature ofSystem or Operacione Enginrs)

JohaG. Conolly /Senior Engineer JGC 5/11195 Stephen P. Reidhle I Technical Manager SPR 5/11195 Print or Type Noram/Tie Signature Date Print or Type Namen'Ien e Signature Date

PAGE NO.0 SALEM GENERATI TATION - UNIT 1 DOCUMENT NO. 0014-8-DO001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTM EQUiP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTNG REQUIRED CL ID NUMbBER NUMBER SYSTEM SUPPORT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 12SW39 SW 1B DG SW INLET TO COOLER 205242. SHT. 3 Au I S CLOSED NIA 1SV591 1 100 OPEN NIA 5222 1B DIG Rm ACTIVE 3 7 12SW40 SW ID DIGClI SW DRN V 205242, SHT. 3 A. I N/A OPEN NIA ISVS9l 1 0o 20 CLOSED NfA

- 5227 UBDIG Rm ACTIVE 3 7 12SW42 SW 13 DG CLG SW CONTROL PNL 74OL4A 205242. SHT. 3 Awc 1 S OPEN/CLOSED N/A 1 100 OPEN N/A 5* IBDIG Em ACTIVE 3 L2SW49 SW NUC 11DRBYP REG VPNL 740-1B 206242. SMT. 3 IPA 1 NIA CLOSED N/A IPA9224 1 078 13,20 CLOSED NIA 5315 SW Pi'wag Rm (4) ACTIVE 3 7 12SW57 SW CONT FAR COIL UNT SWISOL 205242, SfH.G6 ]PAI N/A OPEN NIA ISVIIIS 1 078 OPEN NtA 6246 Mech Pen Ana PASSIVE 3 7 12SW58 SW 12 CKC SW INLET VA 205242. SET a IPA I N/A OPEN' NfA tSv6z 1 078 OPEN N/A 5248 Meeh Pen Area PASSIVE 3 7 12SWOS SW 12CFCU SW 79ROIT VA 20542, SHT. 6 Cntmant 1 NIA OPEN NIA 1 100 12 OPEN NIA 5252 460V Cot Ele CC PASSWE 3 7 12SW72 SW 12 CFCU SW OUTLET VA 205242. ST* 6s IPA I N/A OPEN N/A ISV6 078 OPEN NIA 5254 Merc Pen Area pASSIVE CERTIFICATION:

The inmormation identifying the equipment required to bring the plant to a sA shutdown coodition on this Safe Shutdown Equipment list CSEL) is, to the best of my knowledge and beliet corect and acurate. (One or more signature ofSystems or Operations Engineera)

John G. Cnolly I Senior Engineer JGC 5n1f/95 Stepken P. Reiehle I Technical Manager SPR 5/W195 Print or Type Name/Rte Sinature Date Print or Type Name/Ttle SignatUre Date

PAGE NO5 @ SALEM GENERAT&STATION - UNIT 1 DOCUMENT NO. 0014-8-D001 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NU3MBER SYSTEM CL I) NUMBER ELEVATION NU R NOTES REQD STATE SUPPORT UNIT CONTROL P"S DRAWINGS SYSTEMS LINE NOS WCAL W ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 IISW92 SW CH CNDSR SW CONT V 205242, SHT. 5 PA I S CLOS/OPEN N/A ISV594 1 100 OPEN N/A 5543 CE1Wt Prop Area ACTIVE 3 7 12SW93 SW 12IC CNDSR SW RECIRC V 205242, SWT. 5 IPAI .S OPEN N/A 1DP9284 1 100 CONT OPEN/CLOSED N/A 5378 CH Wt P.,PmpA*LL ACTIVE 20 131-1 EP I REACTOR PROT SOID STATE PROT TRAIN Aux 1 S ENER. N/A I A OUTPUTTF.Sr PANEL 1I1n C ENER NIA 9044 1 Control Rm ACTIVE 20 132-1 EP i REACTOR PROT SOLID STATE PROT Aux 1 S ENERO N/A IOUTPUJT TEST CAB NO. 132

[22 ENE N/A 9045 1 Control Rm ACTIVE 1 7 LwAYII AF AUX FEED - SIGLEVEL CONTROL V 205236 Aux I N/A OPEN N/A IFA396" 1 084 OPEN NIA 4020 1 AuxaFd Prop Rm PASSIVE 2 7 13AF21 AF AUX FEED - S/G LEVEL CONTROL V 205236 A=s 1 S CLOSED N/A IFA,957 1 084 OPEN N/A 400B 12 Aux Fd Prop Em ACTIVE 3 1 13TF2= AF 13 S1 FW STOP CEC O VALVE (MO'V) 205202. SHT. 3 WPA1 N/A CLOSED NIA I 100 CLOSED N/A 4016 MS Pen Area PASSIVE 5 7 13G13 GB 13 /&GBwWDOWN OUTLET HDR GATE VLV 205225. Sl.i CIhtt I N/A OPEN N/A N/A N/A 1 078 19 OPEN/CLOSED NIA 4510 Cor at Elevator ACTIVE CERTIFICATION: I.r The infoiataiaon identifing the equipment reqmired to bring the plant to a safe ahutdowu cmilition on this Safe Shutdown Equipment List (SSEL) is. to the best of wy knowledge sind belief, correct and ~accuat. (One or muse sitosture of Systems or Operarims Entineers)

John G. Connally /Senior Enzineer J.GC 5/1l1*2 Stephen P. Reirhle / Technical Manager SPR 5/11/95 Print or Type Nam*e'*itle Sigatne Date Print or Type Nameflitle Signatue Date

PAGE NO.# SALEM GENERATIPSTATION - UNIT 1 DOCUMENT NO. 0014-08-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT IT)

TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORMSTATE MOTIVE EWR SUPPORTING REQUIRUD CL ID NURSER SYSTEM SUPPORT ELEVATION NOTES REQDSTATE CONTROL F DRAWINGS SYSTEMS LINE NOS LOCAL ID RQFUNCTION ROR COMPONENT NO. LOCATION 3 7 13GB4 GB 13 SiG SLOWDOWN ISO VLV 205225. SHT. 2 IPAI S OPEN NIA ISV7os 1 078 CLOSED NIA 4508 Mech Pen Area ACTIVE 2 7 13MSIO MS MS PWR RELIEFV 205203,.ST. I IPA 1 S CLOSED NIA 1 100 OPEN N/A 4112 MS Pel Area ACTIVE ZOP 7 13M.II MS MSSAFEMYVLV 205203. SRLT.I EPAI S OFF MIA 1 t0o OFF/ON WJA 4111A MS Pen Area ACTZVE 20? 7 13mM2 WE5 MS SAFETYVLV 205203, SHY. 1 [PA 1 S OFF N/A 1 100 OFF/ON MIA 41113 MS Pen Area ACTI 20P 7 13MS13 MS MS SAFETY VLV 205203, SM. 1 IPA I S OFF N4A 1 100 OFFION MIA 4111C MS Pon Area ACTIVE 20P 7 I13.54 MS MS SAFETY VLV 205203, SHT. 1 IPA 1 S OnF NA 1 100 OFIFON WA 4111D MS PFet Area ACTIVE 20P 7 131S15 MS MS SAFETY VLV 205203. SHT. I EPA1 S OFF N/A 1 100 OFFION NIA 4111E M9 Pen Area ACMVE 2 7 13MS1167 MS MS L101LV 205203, SHT. I IPAI S OPEN NIA I z00 CLOSED NIA 4113 MS Pen Area ACTIE CERTIFICATION:

The injRmatiou iudeot g the eqtipment required to bring the plant to a safe shutdown condition on this Safe Shutd*wn Equipment List (SSEL) is. to the bes: of*ry kw L-,edge and bebef correct and a*rate. (One or more signature of Systemn or Operations Engineers)

John G. Connolly /Senior Engineer JGC 111/95 Stephen P. Reichle / Technical Manager SPt W/31/95 Print or Type Namefitle Signature Date Print or Type Name.I/tle Signature Date

PAGE NO.* SALEM GENERATI*STATION - UNIT 1 DOCUMENT NO. 0014-08.D001 DATE 5111195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL TO NUIMER NUMBER ELEVATION NOTES BEDSTATE SYSTEM SUPPORT UNIT CONTROL I'WR DRAWINGS SYSTEMS LINE NOS LOCAL ID LOCATION EQ FUNCTION ROB COMPONENT NO.

2 7 13)15169 3M MS INLET V S-WAY MOV AIR OPRD STM 205303, SHT. I IPA 1 S CLOSED W/A ISV270 ASSISTVLV 1 100 OPEN N/A 411a NS Pen Area ACTlVE 2 7 13MS1711 uS MS INLET V3-WAY MOV AIR OPRD STM 205203, SHT. I IPAI S CLOSED WA ISV271 ASSIST VLV I z00 OPEN N/A 4117 MS Pen Are. ACTIVE I 1 13M1S8 uS MSSTOPBYPV 205203. SHT- I I'A I NIA CLOSED NIA ISV585 1 Ion CLOSED NIA 4119 NE Pen Area PA.SSIV 3 1 133.*J16 sJ NO. is HOT LEG INJECTION IjNE CHECK 205234, SMT. 3 NR NIA CLOSED NIA 1 VALVE NR CLOSED N/A 3119 NR PASSIVE 3 I 13SJ17 S3 BORON IECTION LINE CHECK VLV 205234. SET. I NE N/A CLOSED N/A 1 NE CLOSED MIA 3I11 4421 NR pESrB I 1aSJ54 sJ ACCUM OUTLET VALVE 205234. SET. 4 Cnutan i SR OPEN I 108 9D) N/A 1 078 t0 OPENICLOSED iCDE 2158 13.A .mulator ACTIVE 3 1 13S.T56 Si NO.13lCOLD LEG INJEC1IMON LE CHECK 205234. SIHT.4 NR N/A CLOSED NWA VALVE I NE CLOSED N/A 3111 NR PASSIVE 3 8 lBW20 SW TG HDR SUP NOV 205242. SHT. 2 Yard SE OPEN 11101 (II) 1 10a CLOSED LADE 5310 Srvc Wtr Bldg ACTIVE CERTIFICATION:

The information idetiffying the equipment requied to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment List (5EL)iz. to the best ofmy Iwuledge and beliet ceorect and acmitate. (One or more sigfntn of Systerms or Operations Engineers)

John 0. Connolly /Seaior Engineer JGC 5/1105 St.ehen P. Raichle I Technical Manager SPIR 5111J.9 Print or Type Nanmeale Signature Date Print or Type Namefitle Signature Date

PAGE NO.

  • SALEM GENERATIITATION - UNIT 1 DOCUMENT NO. 0014-0&DOOIL DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAMN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PwE SUPPORTING REQUIRED CL NUMBER ELEVATION NOTES ID NUMBMR SYSTEM SUPPORT REQI STATE CONTROL PWR UNIT NO D'RAWINGS SYSTEMS LOCALID LIN NOS ROB COMPONENT NO. LOCATION EQ FUNC"ION 3 7 18SW223 SW 13 FCU SW OUTLETV PNL700-lR 205242, SHT s IPA1 N/A OPEN NIA ISVI475 1 078 OPEN N/A 5269 SW Piping Bm (2) PASSIVE 2 7 1S.W24 SW SW SIR B/D COVT V 205242. SHT. I Yard S OPEN/CIOSED N/A ISVZ61 1 100 OPEN/CLOSED N/A 5212 Srvc Wtr Bldg ACTIVE 2 R 1iSW25 SW 13 SW SM B/D OU'IETV 205242, SHT. 1 Yard N/A OPEN NIA 1 100 CLOSED N/A 5214 Sow W* Bldg ACTIVE 3 7 13SW39 SW IC DG SW DI*XLT TO COOLER 205242, ScT. 3 Aux I S CLOSED NA lBV592 1 100 OPEN N/A 5224 C D/O Rw ACTIVE 3 7 13SW40 SW IC D/G CLI SW DEN V 205242 SMT. 3 Anx i N/A OPEN MA LSV592 1 100 20 CLOSED NA 5228 IC DIG Em ACTIVE 3 7 13SW42 SW "1CDG CO SW M 1NL 740-tB 205242, SM.3 Aux I S OPEN/CLOSED N*A 1 100 OPEN N/A 5231 IC 2/GRm ACT7VE 3 7 13SW57 SW CONT FAN COIL UNIT SW ISOL 205142, SET 6 IPA 1 N/A OPEN N/A SVI 117 1 078 OPEN NIA 5253 Mecl% Pen Area PASSIVE 3 7 13SWsS SW 13 FCU SW INLT V 205242, SET 6 IPA i N/A OPEN N/A LWSV62 1 078 OPEN I/A 5260 Mech Pen Ar PASSIVE CERTIFICATION: Iz The information ideanifyig tie equipment requird to bring the Plant to a safe ahutdown condition on this Safe Shutdo Equipment List (SSEL) is. to the best ofmy knowledge and belie, anet and a*urate- (Otte or mare sgte f Systems or Operafions Ennee)

Jom G. Conally/Senir FAgincer JGC 5/1Wl95 Stephen P. Reichle / Tednical MauaW SPR 5/11)9 Print or Type Namnflitle Signature Date Print or Type Name/Title Sigaature Date

DOCUMENT NO. 0014-0O-D001 PAGE NO.@ SALEM GENERAT*STATION - UNIT 1 DATE 5/11V95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SfSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE FWR SUPPORTING- REQUIRED CI, ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL P DRAWINGS SYSTE31S LIKENOS LOCAL ID LOCATION EQ FUNCTION ROB COMPONENT NO.

3 7 13SW65 SW 13 FCU SW TH V 205242, SHT. 6 C'-te~t I NJA OPEN NIA 1 100 12 OPEN N/A 5265 MS Pen A. PASSIVE 3 7 I3SW72 SW 13 FCU SW OUTLET V 203242. SFIT 6 IPA I N/A OPEN N/A ISVm2S I 078 OPEN N/A 8267 Mech Pen Axrea PASSIVE 3 7 13SW92 SW CH CNDSR SW CONTV 205242. SHT. s IPA 1 S CLOSED/OPEN N/A ISV595 1 100 OPEN NIA 8288 CH Wtr Prop Area ACTIVE 3 7 13W93 SW C ONS SW OUTLET VALVE 205242, SHT. 5 IPA I S CLOSED/OPEN NJA I-S59-5 1 100 OPEN N/A 529O CH Wtr PumpArea ACTIVE 1  ? 14AFII AF AUX FEED- S/G LEVEL CONTROL V 205236 Aux I N/A OPEN N/A IFA395 1 084 OPEN N/A 4019 13A.a FdPmp Epm PAnSSVE 2 7 14AF21 AF AUX FEED. SKILEVEL CONTROL V 205236 Aux I S CLOSED NIA 1PA3959 1 084 OPEN NIA 4010 11AuxFdPmpRm ACTIVE 3 1 14BP22 AF 14 SG FW STOP CRECK ISO VALVE (MOV) 205202. SET. 3 OPA z N/A CLOSED/OPEN N/A 1 100 CLOSED NIA 4013 MS Pen Area PASSIVE 3 7 14GB3 GB 14 S/G BLOWDOWN OUTLET HDR GATE VLV 201225. SET. I Cntmnt I N/A OPEN N/A N/A NIA 1 078 19 OPENI/CLOSED N/A 4514 Cor at Elevator ACTIVE CERTIFICATION: Iz The idna~mn identifying the equipment required to bring the plant toa aa*e shutdown condition on this Safe Shutdown Equipment List (SSEL) is. to the begoofmy knowledge and belief, cnectnmd garate. (One or mare ignature of Systems or Operations Engineers)

John 0. Connolly I Senior Engineer JGC 5/11/95 Stephen P. teide I TeInical Manager SPR 5/11195 Print or Type Name/Title Signature Date Print or Type Name/TSe Signature Date

9 PAGE NO. SALEM GENER.ATIOTATION - UNIT 1 DOCUMENT NO. 0014-00rDool DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM RQUIP CMESCIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROLPWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 14GB4 GB 14 S/G SLOWDOWN ISO VLV 205225. SHT. 2 IPA 1 S OPEN N/A 1SV709 I0 D8 CLOSED NIA 4512 Mech Pen Area ACTIVE 1 7 14M510 Us MS PWR RELJEF V 205203ASHY. 2 OPAl S CLOSED N/A I 100 OPEN N/A 4121 MS P'm. Area ACTIVE lop 7 14MSII MS MS SAFETY VLV 205203, SHY. 2 OPAl S OFF NIA 1 1O0 OFF/ON N/A 4120A MS Pen Area ACTIVE loP 7 14142 MS MS SAFETY VLV 205203. SET. 2 OPA I S OFF N/A 1 100 OFF/ON NLA 4120B MS Pen Area ACTIVE lOP 7 14MS13 MS MS SAFETY VLV 205203. SHT. 2 OPA I S OFF N/A 1 zoo OFFION NIA 4120C US Pen Area ACTIVE lOP 7 14WS14 MS MS SAFETY VLV 205203, SHT. 2 OPA I S OFF N/A 1 100 OFF/ON N/A 4120D MS Pen Are ACTIVE lOP 7 14MS15 MS MS SAFETY VLV 205203, SHT. 2 OPA I S OFF NIA 1 100 OFF/ON N/A 4120E MS Pen Ama ACTIVE 1 7 103167 NS MSISOLV 205203, SHT. 2 OPAl S OPEN N/A 1 100 CLOSED N/A 41" MS Pen Area ACTIVE CERTIFICATION:

The in ruiation identfying the equipment required to bring tbe plant to a safe shutdown codiltion on this Safe Shuldown Equipment List (SSEL) is, to the best of my knowledge and belief, correc and accurate. (One or more S2gna*t'e *f Sym.ems or Operations Zgiem.)

JIohn G. Counonly I Senior Engineer JGC 5/11/95 Stephen P. Retechle ITechnical Manager SI'R Wiles9 Prnt -Ty~pe Nnxsm llite Sigature Ilotc Print or Typo Narne/TIide &ignatI'J7 Date

9 DOCUMENT NO. 0014-8-D001 PAGE NO. SALEM GENERATI*STATION - UNIT 1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVEM SUPPORTING REQUIRED CL ID NUMBER NUMBERL ELEVATION NOTES SYSTEM SUPPORT UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID EQ FUNCTION LINE NOS ROB COMPONENT NO. LOCATION 1 7 14S169 MS MS INLET V3- WAYMOV AIR OPED SIM 205203. SHT. 2 IPA I S CLOSEb N/A 1SV284 IASSISTVLV 100 OPEN N/A 4124 MS Pen Area ACTIVE 1 7 141U171 MS MSU I2TV3-WAYMOVAIROPRDSI M 205203, SHT. 2 IPAI S CLOSED N/A ISV285 ASSIST VLV I 100 OPEN N/A 4126 MS Pen Area ACTIVE I I 14MS18 MS M.SSTOP BYP V 205203. SET. 2 OPA I N/A CLOSED NtA 1SV583 1 100 CLOSED N/A 4128 MSPen Area PASSIVE 3 1 145J156 5j NO. 14 HOT LEG INJECTION LINE ECK VLV 205234. SHT. 3 NR N/A CLOSED NIA I NR CLOSED N/A 3120 NE PASSIVE 3 I 14SJ17 Si BORON DNJECTION LINE CHECK VLV 205234, SHT. I NR N/A CLOSED NIA I NR CLOSED NIA 3116 4.410 NR PASSIVE 1 8 14SJ54 ST ACCUM OUTLET VALVE 205234. SRT. 4 Cantnt I SR OPEN 11137 (31)) NIA 1 078 10 OPEN/CLOSED IDDE 2159 14 Aicumulator ACTIVE 3 I 14SJ.56 ST NO. 14 COLD LEG INJECTIONLINE CHECK 205234, SMI. 4 NR NtA CLOSED N/A VALVE 1 NE CLOSED N/A 3112 NR PASSIVE 3 8 14SW20 SW NZUCRDRSUPMOV 205M42, SHT. 2 Yard R OPEN NE 1 100 OPEN NR 5311 Srvc Wtn Bldg PASSIVE CERTIFICATION:

Thei fn oemati idenfying 4

the equipment required to bring the plant to a safe ahutdo-a condition on this Safe Shutdown Equipment List (SSEL) is. to tihe best ofmy knowledge and ief orect and amrate. (One or more signature of Sytems or Operations Engineers)

JoloG. Conoldly ISernorEngineer JGC 3/11/95 Stephen P. Reichle / Technical Manager SM1 5/11195 Printtor Tye NauneIIal Signs~xe, Date Print or Type Namehle Signature Date

PAGE NO.

DATE 5/11/95 9 SALEM GENERATIOTATION . UNIT 1 USI A-46 PROJECT DOCUMENT NO. 0014-098-DO01 REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAMN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPODR7NG REQMU.ED CL ID NUMBER NUMBER SYS7EM SUPPORT UNIT ELEVATION NOTES RRQD STATE CONTROL m DRAWINGS SYSTEMS LINE NOS CALD ROB COMPONENT NO. LOCATION EQ FUNCTION 3 7 14SW223 SW 14 FCU SW OUTLET V PNL70D-IS 205242. SMT. 6 IPA I NIA OPEN N/A ISV1473 1 078 OPEN - N/A 5338 SW Piping Rm (2) PASSIVE 2 7 14SW24 SW SW STR BID CONT V 205242. SET. 2 Yard S OPEN/CLOSED N/A 1 100 OPENICLOSED N/A 5297 Srvc Wtr Bldg ACTIVE 2 R 14SW25 SW 14 SW SMRB/D OUTLET V 2=-242. SHT. 2 Yard NIA OPEN N/A 1 10D CLOSED NIA 5299 SrvWtr BIMd AC7iVE 5 7 14SW57 SW CONT PAN COIL UNIT SW ISOL 205242, SHT. 6 IPA I N/A OPEN N/A LSVI118 1 078 OPEN NIA 5328 Mech Pen Area PASSIVE 3 7 14sws8 SW 14 FCU SW INLET V 205242, SHT. 6 EPAI N/A OPEN NrA 1SV631 1 078 OPEN N/A 530 Mech Pea Area PASSIVE 3 7 14SW95 SW 14 PCU SW TBROTV 285=42,6W.T. 6 O'ntwntl NIA OPEN N/A 1 100 12 OPEN N/A 334 Sairay Area PASSIVE 3 7 14SW72 SW 14 FCU SW OUTLET V 205242. SET. 6 IPA I NIA OPEN NIA LSV632 1 078 OPEN NIA 53,6 Mech Pen Area PASSIVE 3 7 ISSW223 SW 15 FCUSW OUTLET V PNL700-IT 205242. SET. 6 EPAI N/A OPEN NfA ISVI477 1 078 OPEN NIA 5326 SW Piping Rm (2) PASSIVE CERTIFICATION:

The information identiying the equipmentrequired nto6ing the plant to a safe shutdown canuitian on this Safe Shutdown Eqtuiment List (SSEL) is. to the best olmy k]owdedge and belie& o*ze andI uat (Oe or mawe sip mreof Systems or Operantio Engineers)

John G. CnnUy / SenioxEngineer JGC 5/1195 Stephen P. 1e16,1ie / Technical Manager SPR 5/SU95 Print or Type Name/ritle Siga-te Date Print or Type Nameflltle Signature Da

DOCUMENT NO. 0014-*.-D001 PAGE NO. # SALEM GENERATISTATION - UNIT 1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED ID NUMBER ELEVATION NOTES SYSTEM SUPPORT CL REQD STATE CONTROL PWR DRAWINGS UNIT SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

1 7 15SW24 SW SW SIR B/D CONT V 205242, SHT. 2 Yard S OPEN/CLOSED N/A 1SV293 1 100 OPEN/CLOSED NIA 5302 Srwr Wtx Bldg ACTIVE 1 R 15SW25 SW 15 SW STR BID OUTLET V 205242. SHT. 2 Yard N/A OPEN N/A 1 100 CLOSED N/A 534 Se Wtr Bldg ACTIVE 3 7 15SW57 SW CONT FAN COIL UNIT SW ISOL 205242, SHT. 6 IPA I NIA OPEN NIA ISVIl 19 1 078 OPEN N/A 5316 Mah Pen Area PASSIVE 3 7 ISSWS15 SW 15 YUSW INLET V 205242, SET. 6 IPA I N/A OPEN Na IBV634 1 078 OPEN NIA 5318 Mech Pea Ana PASSIVE 3 7 15SW65 Sw i YFCUSW THIIOT V 205242, SHIT. 6 Cn15aI NA OPEN NIA 1 100 12 OPEN NIA 5334 Elevator Passage PASSIVE Area 3 7 15SW72 SW 15 FCU SW OUTLET V 205242, SHY. 6 IPA 1 N/A OPEN N/A ISV635 1 078 OPEN N/A 5324 Mach Pen Area PASSIVE 1 7 16SW24 SW SW STR B/D CONT V 103242. SHY. 2 Yard S OPEN/CLOSED NA 1SV264 1 100 OPENICLOSED N/A 5308 Seve Wtr Bldg ACTIVE I R 16SW25 SW 26 SW S*R BID OUTLET V 205242, SHT. 2 Yard NIA OPEN N/A 1 100 CLOSED N/A 5m Sruc Wtr Bldg ACTIVE CERTIFICATION:

The informion identyig the equipment required to bring the plant to a safe shetdown condition on this Safe Shutdown Equipiment tist (SSEL) is, to the beat ofmy knowledge and beliet creed and accurate. (Oue or mere sinatu-re of Syýtems or Operations Engineers)

John U. Connonly /Senior Engineer JG( 5/11/95 Stephen P. Reirhle i TecLhical Manager SPR 511195 Print or Ty1peName/Title Signature Date Print or Type Nanef'btle Signature Date

PAGE NO.# SALEM GENERAT#STATION - UNIT 1 DOCUMENT NO. 001408-DOO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT IUD TRAIN EQ EQIJ-PMEN SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NOPJM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMB ELEVATION NOTES REQD STATE SYSTEM SUPPORT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALIDR ROB COMPONENT NO. LOCATION EQ FUNCTION 114 LAADC EP 125VDC DISTRIBUTION CABINET 203007 Aux I S ENERG ISWORlADC 1 100 ENEEG N/A 8067 1 RELAY RM ACTIVE 1 14 LADE EP NO 1A28VOC CONTROL BUS 211357. 55T, I Aux I S ENERG 1SWC.RIADE 1 084 ENERG 8017 460/230V Vital ACTIVE 125MW50DC Bat 3 1 1AF5I AF AFBUIMETOALTWTSUPV 205236 A=i2 NIA CLOSED N/A 1 084 3 OPEN NIA 403 CrAa btwn ACTIVE SWGE Rms 3 21 lAFEl AF 1 AUX FEED*S*IRAGE TANK 205=36 Yard S N/A NIA 1 100 N/A N/A 4001 1 RWST Area pA.SSIVE 2 5 LAFE4 AF 11AUXFERD PMP 20236 A- 1 S OFFION N/A RKM-1AID 1 084 ON NIA 4007 11Aux Fd Pmp Rau ACTIVE 2 5 LAM AF 12 AUX FEED PMP 205256 Aux I S OFF/ON N/A BER-1B1l)

I 084 ON N/A 4012 12 Aux Fd Pmp Rm ACTIVE I 5 IAFEG AF 13 AUX FEED PUP 205236 A=e I S ON/OFF N/A IlSE3 1 084 ON N/A 4017 13 Aux PdPmp Rni ACTIVE 2 14 IBBDC EP 125VDC DISTRIBUTION CABINET 20,07 Arx I S ENERlO 1SWGRIBDC 1 100 ENERG N/A Sass1 RELAY RM ACTIVE CERTIFICATION: I-,

The informanon identiying the equipment requi-ed to bring the plant to a safe shutdown coudition n this Safe Shutdown Equipment List (SEL) is. to the best of my knowledge and belief mczz and aeorate- (One rormore signazte [fSystems or Operatius Ensineem)

Johno 0. ConnollylI Senior Engineer .IGC 511L/O5 Stephen P. Reicle I Tu're iml Manager SPR S/11 Print or Type NumefIdte & 6 na-ture Date Print or Type Name/Title Signature Date

PAGE NO. 4 SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014 -ftD001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING RQUIRED NUMBER SYSTEM SUPPORT ELEVATION NOTES REQD STATE CONTROL TM DRAWINGS SYSTEMS UO LOCAL W W LINE NOS LCLI LOXATION EQ FUNCTION ROB COMPONENT NO.

2 14 iBDE EP NO IB 29VDC CONTROL BUS 211357, SHT. I Aux I S ENERG ISWGRIBDE 1 100 ENERG 8936 1iElay Rm ACTIVE 3 21 IBRE16 CC B. A EVAP. CONDENSER 20523*1.SHT. 2 A=mi S NIA N/A 1 100 NIA N/A 5125BA Evap Rm PASSIVE 3 21 IBRE17 CC DISTILLATE COOLER 201231. SHT. 2 Aux I S NIA N/A 1 100 N/A N/A 5126 BA EVap 3 PASSIVE 3 21 IBREIS CC VENT CONDENSER 205231, SHT. 2 Aux I S NIA N/A 1 100 N/A N/A 512"7 BA Ev, Rm PASSIVE I 16 IBTRYLAI.Y EP NO IAi 125VDC BAITERY CHARGER 203007 Aux I SR ENERG ISWGRIAY 1 084 ENERG 8013 460r230V Vital ACTIVE 12WMDC Bat 1 16 1BTRYIA12Y EP NO IAJ 2BVDC BATTERY CHARGER 2113*7, SHT. 1 Aux I SR ENERG ISWGRIAY 1 190 ENEEG 8016 1 Relay Rm ACTIVE 1 15 .BTRYIADC EP NO IA 125VDC BATTERY 203007 Aux I S ENE]G IBTEYIAIUY 1 100 ENERG 8012 125 VDC Bat Rm ACTIVE 1 15 IBTEYLADE EP NO 1A 28VDC BATTERY 211357, SHT. 1 Aux I S ENERG OrBYIAI2Y 1 Ica ENERG 8015 126 VDC Bat Rm ACTIVE

ýY CERTIFICATION:

Tlhe information i&mfyi* g the equipment required to bring tbe plant to a sh szhutdoun couiwmi anthis Safe Shutdown Equipment Li' (SESL) M to tfe best of my knowlede and belief, reelct and acur3e. (One or more signature of Systems or Oprtio- Engneers)

Johu G. C*muoollyl.SeartDiE*ie JGC S/11S5 Stephen P. R [Technical Manager

/eie SPR 5/15 Signature Date Print or Tpe Namene Sgnatra Print or Type NameTirle

PAGE NO* SALEM GENERATOSTATION - U IT 1 DOCUMENT NO. 0014-*8.D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING RVAL NORM STATE MOTIVE FMV SUPPORTING REQUIE CL ID NUMBER NUMBER SYRSEM SUPPORT UINw ELEVATION NOTES REQD STATE CONTROL PWE DRAWINGS SYSTEMS LINE NOS LOCAL U) ROB COMPONENT NO. LOCATION EQ FUNCTION 2 16 IBTRITB10Y FP NO IB1 125VDC BATTERY CHARGER 203007 Aux I SR ENERG ISWGRIBY 1 04 ENERO 9032 460230V Vital ACTIVE 12S/250fDC Bat 2 16 IBTRYlBI4Y EP NO IBI 28VDC BATTER CHARGER 211357. SHT. I Anx I SR ENERG ISWGRIBY 1 100 ENERG 8035 1 Relay Rza ACTIVE 2 15 IBTRYIBDC EP NO LB 125VDC BATrERY 2030O7 Anx I S ENERG IBTRYlB1iY 1 100 ENERG 8031 1B 125VBat Rm ACTIVE (South) 2 15 IBTRTIBDE EP NO IB 28VDC BAITERY 211357, SET. I Anx I S ENERG IBTRYIBI4Y 1 140 ENERG 8034 IB 125V Bat Rm, ACTIVE 3 16 IBTRY1CI2Y EP NO ICI 125VDC BATEY CHARGER 203007 A=i I SR ENERG 1SWGRICY 1 084 ENERG 8061 460V23aVVital ACTIVE 125r250DC Bat 3 15 1BTRYTCDC EP NO WC12VDC BATTERY 203007 Anx 1 S ENERG ISWGRICDC 1 064 ENERG 80m0 C Bat Rim;Vital Bus ACTIVE Area lop 21 iCA-EC.039,A PR AIR ACCUMUIATOR FOR IPR2 20=201, SHT. I Cntnmt I S N/A NIA LSV1199 I 130 N/A MIA 2010 1 Pzr Area PASSIVE 1 21 ICA-EC-0398B PR AMRACCUMULATOR FOR IPRI 205201, ST'. 1 Cntmnt 1 S N/A N/A 1SV1198 1 130 N/A N/A 2005 1P=r Area PASSIVE CERTIFICATION: I ?

Tile Inor-atianidenflYing the eqrdmea +/-equizrdto bting the Pirer tea sade sburtdonwn conffiione an this Saf Shutraown Equipment List (SSEI) is. to the best dfmy knowled~ge and belief, correct and awrseurt. (One or momesignature of Systems or Oeations Enginaeers)

John 0. Connay I Seniar Engineer JGC05/11)5 Stephen P. Reich. / Technial Manager SFR 5/11,5 Print or Type NamefI'ilfe Signature Date Print or Type Name~fle Signaure Dale

PAGE N0Q SALEM GENERAT 9 STATION - UNIT 1 DOCUMENT NO. 0014 -98001 DATE 5111/95 S USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCALID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION lOP 21 ICA-ED-0148A PR AIR ACCUMULATOR FOR IM 205201, SET. I Cntmnt I S N/A N/A LSV1199 1 130 N/A N/A 2009 1 Pzr Area PASSIVE 1 21 1CA-ED-0149B PR AIR ACCUMUL.ATOR FOR IPRI 205201, SErT. I Cutmnt I S N/A N/A ISVI198 1 130 N/A N/A 2104 I P-a Area PASSIVE 1 10 1CAA15-DMOP VH 1 COrIT1LAREAVENT EMER AIR COND SUP 205248. S*T. 2 Aux 1 S CLOSED/OPEN N/A ISV!043 1 FAN 11 OUTLET DMOP 122 15 OPEN N/A 5705 CR A/C Rc ACTIVE lOP I0 ICAA16-DMDP VH I CONTRL AEZA VENT EMER AIR COND SUP 205248, SET. 2 AuxI S CLOSED/OPEN NA ISVI044 FAN 12 OUTLET DMOP 1 122 15 OPEN N/A 5705 CR A/C Rm ACTIVE 1 10 iCAAv7-DMOP VH i CONTRL AREA VENT RISE AIR FLTR INTK 205248. SET. 2 Am 1 S CLOSED W/A ISV695 DISOP 1 122 OPEN N/A 5700 CR A/C R= ACTIVE 1 I ICAA21-DMOP VH I CONTML AREA VENT OFFICES SUP DMOP 205248. SHT. 2 Am I NIA OPEN NIA 1 122 OPEN N/A 5712 Spare & Test Equip PASSIVE ICE 3 21 ]CAEIl CH I ECAC DITrR COOLER 205216. SET. 3 IPAI1WA B N/A I 100 N/A N/A 5408 ICAES CH Wtr Pmp Area PASSIVE 3 21 ICAE5 CH I ECAC LP & HP CYL COOLING 205216, SHT. 3 IPA 1 S N/A NIA 1 110 NIA NIA 5409 CH Wtr Pmp Area PASSIVE CERTIFICATION:

The information identifying the equipment lequired to bring the plant to a sare shutdown condition on this SaE&Shnluwn Equipme~nt List (SIIL is. to the best ormy knowledge and belie. correct and accurate. (One or more signature ofS'rye or Opertioon Eneern)

John 0. Coooly I Senior Engineer JGC 5/11)95 Stephen P. Poichle /Teehnicul Mosam SPR 5111195 T

Print or ye Nametite Signature Date Print or Type Narneflltle Signature Date

PAGE NO5 @ SALEM GENERATSTATION - UNIT 1 DOCUMENT NO. 0014R8EDON1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 21 1CAE'6 CH 1 ECAC*AFTERCOOLER 205216. SET. 3 IPA I S KfA N/A 1 1t0 N/A N/A 5410 CH Wtr P=p Area PASSIVE 1 10 1CBVIO-DMOP VEl 13 CONT VENT FAN COIL UNIT ACCIDENT 205238. SHT. 3 Cut**at I B CLOSED/OPEN N/A ISV922 FLOW D3LOP 1 130 OPEN N/A 5916 IVHEI7 13 CFCU ACTIVE 1 10 ICBVI1.DMOP VII 12 CONT VENT FAN COIL UNIT NORMAL 205238, SET. 2 Cut-nt I B OPEN NIA ISV921 FLOW DMOP 1 130 CLOSED NIA 5911A IVHFE16 12 CFCU ACTIVE 2 10 ICliV12-DMOP Vu 12 CONT VENT PAN COILUNIT NORMAL 205238. SHT. 2 Cutaint I B OPEN N/A 15s"21 FLOW DMOP 1 130 CLOSED N/A 5911B 1VHE16 12 CFCU ACTIVE 1 10 ICBV13-DMP VE 12 CONT VENT FAN COIL UNIT ACCIDENT 205238, SET. 2 Cnbnnt 2 B CLOSEDIOPEN N/A ISV921 FLOW DMOP 1 130 OPEN NIA 5911 1VH916 12 CFCU ACTIVE 1 30 ICBV14-DMOP VEl 12 CONT VENT FAN COIL UNIT DMOP 20S238, SHT. 2 Cautnnt I B CLOSED/OPEN NIA 1SV921 I 130 OPEN N/A 5912 IVOEIG 12 CFOII ACTIVE 1 10 ICBV15-DMOP VR II CONT VENTFANCOILUNITNORMAL 2523&8, SET. 2 Cubn I B OPEN N/A LSV920 FLOW DMOP 1 130 CLOSED NIA 5907A 1WHE15 11 Ch' ACTIVE 2 10 ICBVI6-DMOP VOL 11 CONTVENT FAN COILUNIT NORMAL 205238, SBLT.2 Currant 1 B OPEN N/A L"1920 FLOW DMOP I 13O CLOSED NIA 59071B 11/HEl1 11 CFCU ACTIVE CERTIFICATION:

The informationideutifjing the equipment reqluired to bring the plant to a safe shutdown codition on this Safe Shutdown Equipment List (SSPL) is, t the best of my knowledge and belief. correct and accurate. (One or momzsignature of Systems or Operatincs Engineers)

John G. Counelly ISenior Engineer JGC 5/11)95 Stephen P. Reiblce I Technical Manager SPE 5/1V Print or Type Name/"*ele Signatue Date Print or Type Nnmel'e Signature Date

PAGE NO.@ SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014*d-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 1 10 iCBVI7-DMOP VE i1 CONT VENT FAN COIL UNIT DMOP 205238. SHT. 2 Crumist I B CLOSED/OPEN NI/A 1SV920 1 i1O OPEN N/A 5907 IVHER5 11 CFCU ACTIVE 1 10 ICBVIB-DMOP VIA iI CONT VENT PAN COIL UNIT ACCIDENT 205233, SET. 2 Cuatmi i B CLOSEDJOP*N NIA ISV920 FLOW DMOP 1 130 OPEN NIA 3808 IV-EIS i CFCU ACTIVE 110 ICEVI9-DMOP VII 15 CONT VENT FAN COIL UNIT NORMAL 205238. SET. 2 Cbtnt I B OPEN N/A ISV924 FLOW DMOP I 130 CLOSED N/A 5902A IV1EIS 15 CFCU ACTIVE 2 10 ICBV20-DMOP VH 15 CONT VENT FAN COIL UNIT NORMAL 205238. SHT. 2 Cntnut I B OPEN N/A LSV924 FLOWDMOP 1 130 CLOSED NIA 59MB IVIE19 15 CFCU ACTIVE 1 10 1CBV21.DMOP VH 1,5CONTrVENT FAN COIL UNIT DMOP 205238. SET. 2 Cntmnt I B CLOSED N/A ISV924 1 130 OPEN NIA 5902 IVHE19 15 CFCU ACTIVE I 1 1oBV22-DMOP VH 15 CONT VENT PAN COIL UNIT ACCMDENT 205238. SHT. 2 Cutnot I B CLOSE]) N/A lSV924 PLOW DMOP 1 130 OPEN N/A 590l IVHEI9 is CFCU ACTIVE 2 20 ICBV3-DMOP VIH 14 CONT VENT PAN COIL UNIT NORMAL 205238, SET. 3 Cntbnt I B OPEN M/A ISV9"3 FLOW DMOP 1 130 CLOSED N/A 592ZA 1VIS8 14 CFCU ACTIVE 2 to ICBV4-DMOP VH 14 CONT VENT FAkNCOIL UNIT NORMAL 205238. SET. 3 Cntnnt I B OPEN k/A 1SV923 FLOW DMOP 1 130 CLOSED NIA 5922' IVNE)8 14 CFCU ACTIVE CERTIFICATION:

The inforaonln identifying the equipment required to bring the plant to a safe hutdown conditin on this Safe Shutdowb Equipment List (SSEL) is, to the best a my knowledge amibeief came and accuate. (One a. mcce signatuie u/Syatems or Operatiens Engine"s)

John G. Counnlty I Senior Engineer JGC 5/11095 Stephen P. Raichle J Technicol Manager SPR 511195 Pki:t or T*pe NamellWe Signature Date Print or Type NamueTtle Sigoature Date

PAGE NO* SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014-981D00I DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TIAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE W SUPPORTING REQUIRED CL ID NUMBER NUMBER CONTROL PWR SYSCIEM DRAWINGS SUPPORT UNIT ELEVATION NOTES REQD STATE SYSTEMS LINE NOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION I I0 ICBVDMOP VE 14 CONT VENT FAN COIL UNIT DMOP 205238, SHT. 3 Cntmnat I B CLOSED IVA LSvm 1 130 OPEN NIA 5922 IVHEI8 14 CFC ACTIVE 1 10 1CBV6-DMOP VII 14 CONT VENT FAN COIL UNIT ACCIDENT 205238. smT. 3 Centmnt 1 B CLOSED N/A Lsvsm FLOW GlADE I 130 OPEN NIA 5921 IVHI 15 14 CFCU ACTIVE 1 10 ICBV7-DMOP VE 13 CONT VENT FAN COIL UNIT NORMAL 205238, SMT. 3 Cntrnt 1 B OPEN NIA 1SV922 FLOW DMOP 1 130 CLOSED N/A 5917A IVEE17 13 CFCU ACTIVE 2 10 IMAV-DMOP VH 13 CON'T VENTFAN COIL UNIT NORMAL 2052,8, SHT. 3 Cntmnt I B OPEN N/A ISV"l2

.PLOW DMOP I 130 CLOSED N/A 59187 IVHEI7 13 CFCU ACTIVE 1 10 ICBV9-DMOP VII 13 CONT VENT FAN COIL UNIT DMOP 205238, SET. 3 Cntnunt I B CLOSEDOPEN NLA 1SV922 I ]30 OPEN N/A 5917 1VltIE7 13 CFCU ACT*VE 3 20 lCoc RP I REAM'TO PROTCONTBOL ROOM CONSOLE Aux I S N/4 NLA PANEL 1 122 NA NIA 9000 1 Cntro] Rm PASSIVE 3 8 1CC117 CC RC CC CONTAINmEm ISO DI*ETMOv 20521, SET. 3 IPA I R OPEN NR 1 078 OPEN NR 5119 Mech Pen Area SG PA ED Hx 3 8 ICCl1S CC RCP CC CONTAINMENT ISO JIlXT MOV 205231, SI1T. 3 IPAI R OPEN NR 1 078 OPEN NR 5120 Mach Pen Area SG PASS/VE BD Hx CERTIFICATION:

The information identifying the equipment required to bring Theplant to a afe shrtedown coadition on this Safe Shutdown Equipment List (SSE i%,to Thbebest dmy hkowlege and behat torrect end accurate. (One or more ignatere ofSysttam or Operamans Eagtnees)

John G. Connolly I Senior Engineer JGC 5111/95 Stewhen P. Reiable I Technical Manager STR 5/115 Print or Type Name/Btle siglatrre Date Print or Type Name/IAle Signature Date

PAGE NO. SALEM GENERAT 9 STATION - UNIT 1 DOCUMENT NO. 0014- 0 8-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES* REQD STATE SYSTEM SUPPORT UNIT CONTROL FIVE DRAWINGS SYSTEMS LOCAL ID LINE NOS ROD COMPONENT NO. LOCATION EQ FUNCTION 3 B ICC131 CC RC*P ERM EAR CC CONTAINMENT ISO MOV 205231, SlT. 3 IPA 1 R OPEN NR 1 07a OPEN NE 5122 Mech Pan Ae SO PASSIVE BD Ex 3 8 ICC17 cC cc P SUCT X-OVER V 205231. SET. I Aml I SR OPEN/0C SED 11139 (SE)

I 084 OPEN ZADE 5103 11 CC Pop Rm ACTIVE 3 8 1CC18 CC CC PUM SUCTION X-OVERVLV 205231, SIT. 1 Amx 1 S OPEN/CLOSED I1110 (GE) 1 034 OPEN ICDE 5104 12 & 13 CC Prop Rm ACTIVE 3 9 ICC190 cc RCP THERM BAR CC CONTAINMENT ISO 205231, SET. 3 Citrnt I R OPEN NE OUTLMMOV 1 078 OPEN NR 5121 14 Amno PASSIVE I I ICC195 CC CC M/U CHECK VALVE 205231. SlfT. I A= I N/A N/A N/A 1 122 N/A N/A 5101 1CC Suge Tk Area PASSIVE 3 20 iC02 EP 1 REACTOR PROT CONTROL ROOM CONSOLE Am 1 S NIA N/A PANEL 1 122 N/A NfA 9001 1 Control Rm PASSIVE 1 1 ICC210 CC CC MU CHECK VALVE 205231, SHT. I A- l N/A NIA N/A 1 122 NIA N/A 5102 1CC Surge TI Area PASSIVE 3 20 ICCI EP 1 MN STM & TEB BYPASS CONTROL ROOM AUXI S N/A NIA CONSOLE PANEL 1 122 N/A N/A 9002 1CtrUl Rm PASSIVE CERTIFICATION:

The information identifying the equipment required to bing the plant to a safe shutdown terdition on dais Safe Shutdown Eqipment List (SEL) is. to the best ofmy knowledge and beief, orrectana a*eurate. (One or more signatmr ofSystem or Operations Engineers)

John aC lISenorEngee JGC 5/11/95 Stephen P. D.echle I Tehnial Manaer SPE 5/11 95 Point a=Type Name/itlhe Sivnktre Daze Print or Type Name/Tide Signature Date

PAGE NO. 9 SALEM GENERATIA TATION - UNIT 1 DOCUMENT NO. 0014-fid-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUM3ER NUMBER ELEVATION NOTES SIRTEM SUPPORT1 UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID EQ FUNCTION LINE NOS ROD COMPONENT NO. LOCATION 3 8 ICC30 CC 11EXIOAUXCCFMDRSI'OPV 205231, SHT. I Auxl R OPEN NR 1 084 OPEN NR 5111 SFP Pmp Rat PASSIVE 3 a ICC31 CC 12 HX TO AUX CC HR STOP VLV 205231, Sift. I Amt 1 R OPEN NE 1 084 OPEN NR 5113 SFPP=P Em PASSIVE 3 14 1CCDC EP 125VDC DISTRIBUTION CABINET 203007 A=gI S ENERG ISWGRICDC 1 100 EIERG N/A 6069 1 RELAY RM ACTIVE 3 21 ICCEl CC NO.I CCStRGET 205231 SBT. 1 AUX 1 S OPERABLE N/A I 1=2 OPERABLE N/A 510 1 CC Surge Tk Area PASSIVE 1 5 1C0 CC CC PMPNO. I1 205231, SHT. 1 Amr l S ON/OFF NIA BKR-1A30D 1 084 ON/OFF NIA 5105 12 CCPmp RM ACTIVE 30P 5 ICCOE CC CC PMP NO. 13 203231, SHT. 1 AUx I S ON/OFF N/A BKR-ICIOD 1 084 ON/OFF NIA 5106 12 & 13 CC Pmp Rm ACTIVE 1 5 ICCE4 CC CC Phe NO. 12 205231. SliT. I Aux I S ON/OFF NIA BDR-IBIOD 1 0"4 ON/OFF NLA 5107 12 & 13 CC Pmp*R.* ACTIVE 3 21 iCCE5 CC CCHXlNO.I1 205231,SHT. 1 AmgI S NIA N/A 205242. SET.3 1 084 N/A N/A 5110 11 CC Pmp RM PASSVE CERTIFICATION:

The information identfing the equipment required tobring the plant to a safe shutdown condition on this Safe Shutdown FEuipment ILi (SEL) is, to die best ofmy knowledge and belief, correct and accrate- (One or mare signature ofSyztem or Operatians Engineeem)

John G. Connolly / Senior Engineer JGC 5111(95 Stephen P. Reichle / Technical Manager SPR 5r11(5 Print or Type Na*ndt/ e Signature Date Print or Type Nameitide Signature Date

PAGE NO. 0 SALEM GENERATATATION - UNIT 1 DOCUMENT NO. 0014-0O-D001 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSrEm EQUIP DESCRIPTION DRAWING BUPLDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SySOMR SUPPORT UNIT CONTROL PWR DRAWINGS SYSTIMS LOCAL ID LOCATION EQ FUNCTION LINENOS ROB COMPONENT NO.

3 21 ICCE,6 CC CC X NO. 12A &R 205231, SET. I Auxl S N/A W]A 05242. SHT. 4 1 084 WA NLA 5112 12 & 13 CC Prop Rm PASSIVE 3 14 ICDE EP NO IC 28VDC CONTROL BUS 211357. SWT. I Aux I S EIIERG 1SWGRIADE 1 084 IINERG 8062 46=/230V Vital ACTIVE 125/250DC Rat 3 7 ICH168 CH EMEE AC COIL RET C02T V 205=16, SET. I Aux S CLOSED NIA ISV42G 1 122 OPEN NIA 5427 CR A/C Rm ACTIVE 3 21 CHEI CH I CH WTR EXP T 25216. SHT. I IPA1 S NIA NIA 1 100 N/A NIA 5400 CH Wtx Pmp Area PASSIVE 3 21 iCHIEI2 CH 1EMERG AIR COND COIL 205216, SlIT. 1 IPA I B NIA NIA 1 100 N/A N/A 5419 IVFIl5 CH Wtr PrDo Area PASSIVE 3 5 ICKE17 SW 11CH CNDSR RECIRC PUMP 205242. SHT.5 IPAI SR ON/OFF 11111 (ZA)

I 100 ONIOFF 5380 CH Wtr Pwp Area ACTIVE 3 5 ICBERI SW 22 CH CNDSR RECIRC PUMP 205242, SHT. 5 IPA 1 SR ON/OFF I1112 (ZA) 1 100 OWOFF 5381 CH Wb Prop Area ACTIVE 3 5 ICHE19 SW 1S CH CNDSR RECIRC PUMP 205242. SHT. 5 IPA I SR ON/OFF 11133 (3G)

I 100 ON/OFF 512 CH Wtr Pmp Area ACTIVE CERTIFICATION:

The Jinzin identifying the equipment required to bing the plant to a safa shutdown condition an this Safe Shutdown EquWment List aS=L) is to the best of my Imowledge and belieK aect

- and acurate. (One or more signatue of SYsems or Opleations *nginees)

John G. Co*nlly Senior Engineer JGC 5111195 Stephen P. Reichle I Techial Manager SPR 5Wl95 Print or 'Type Namnefle Signatne Date P'int or Type NzuneThe Signatume Date

PAGE NO.* SALEM GENERAT]STATION - UNIT 1 DOCUMENT NO. 0014-7-D*001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYS"TM EQUIP DESCRITI'ON DRAWING BUILDING EVAL NORM STATE MOTIVE EW SUPPORTING REQUIRED CL EDMI MBER NUMBER ELEVATION NOTES REQD"STATE Sv3TEM SUPPORT UNIO CONTROL PWE DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO.

LOCA31ON EQ FUNCTION I 5 lCBE, CH 11CH WE*PMP 205216. SET. ] IPA.I SR ON/OFF I1Z11 c" I lee ON 5403 CH Wtr Prp Area ACTIVE 2 5 3IW[E CH 12 C WTaRPMP 205216, SMT. I IPAl SR ON/OFF 1112(2 )

1 100 ON 5404 CH Wtr Prep Area ACTVE I II ICHE' CH I11CH LRR 205216. SM. 1 IPA I S N/A N/A 1 100 WIA N/A 5407 CH Wtr Prep Area PASSIVE 1 12 ICT.-COMP CR u1 CHILLER COMPRE3SSOR 205216. SET. 8 IPA 1 B ONOFF NIA BKR-IA13 I IC1ETr*X 100 ON MIA 5407A ICRST CH W&Pp Area ACTIVE 2 11 1BE8 CH 12 CHE.LER 205216. SET.1 IPA 1 S N/A N/A SI00 NIA NIA 5406 CH Wtr Pmp Area PASSVE 2 12 ICHES-COMP CR 12 CEIM RCONPRIESOR 205216, SIT. 8 IPA I B ONJOFV N/A MR-iB1iX I ICHE-TEX 100 ON MIA ISV594 S406A ICHES CH Wtr Prp Area ACTIVE SOP I1 WClow CH 13 CHMFE 205216. SRT. I IPA1 S N/A NIA lOO NIA MIA 3405 CH Wtr Prop Area 30P 12 ICHE9-COMP CH 13 CIELLER C0302SSR 205216, SET. 8 IPA I B ON/OFF NIA BER-ICISX I 1CHE!-MTX 10 ON N/A 5405A ICHE9 CE Wtr Prop Area ACTIVE CERTIFICATION:

The infemaion identiying tlhe eqWPipet eqnired to bring the plant oa safe auhtdnow conditon on this Safe Shutclom Fquipwnt e List SEL) is, to the best

  • nho.kdge
  • r and belief. corerct and accurate. (Ono ormore signature of Sysaten o, Operations Engineers)

JohnG. Connlly I Senior Engineer JGC s/11/95 Steph*e P. Reaijle /TecnimManager SPR S/1119 Print or Type NaneTtle Signature Date PlintrType Namelrtil* Sicaatare Date

PAGE NO.9 SALEM GENERATI 9 STATION - UNIT 1 DOCUMENT NO. 0014-t8-D001 DATE 5/11V95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUYMBER SYSTEM SUPPORT ELEVATION NOTES UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LIKE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ*FNCTLON 3 1 ICS31 CV RWIT TO EDUCTORS STOP V 205M35 Anx I N/A CLOSED N/A 1 084 1 CLOSED NIA M 1106 o6 2108 1 Spray Additive Tk PASSIVE

- I ICS35 CV CS PMP FLOW TEST STOP V 205235 A= 1 NIA CLOSED N/A 1 084 1 CLOSED N/A 304 1144 2146 I Spray Additive Tk PASSIVE Em 3 5 lCSEI CV CONTA.InoENT SPRAY PFUP. NO. 12 205235 Aux I S OFF NR 1 084 7 OFF NE I105A 2107A 3005A Ia Cout Spray Pzoi PASSIVE Rm 3 5 ICSE2 CV CONTAINMENT SPRAYPUMP, NO. 12 205235 Ada I S OFF NR 1 084 7 OFF NR 2105B 2107"B 300 II Cont Spray P*np PASSIVE Rm 3 7 ICV114 RCS ReCp SEAL WTR BYP SMTP V 205228, SHT. a Cntznnt A S OPEN NIA NIA ISV442 1 078 18 CLOSED N/A 3128 Car at Elevator ACTIVE 3 a ICV316 CV RCP SEAL WR RET BDR STOP MOV 205228, S.T. 2 IPA 1 R OPEN NE 1 078 1 OPEN NE 3M42 1142 2144 Meoh Pen Area SG PASSIVE BDHa 2 1 ICV130 CV RCP SEAL WTR TO VCTV 205228, SHT. 2 Aux I N/A OPEN N/A 1 094 2 CLOSED N/A 3035 1135 2137 Seal Wtr HK Viv Rm ACTIVE 2 0 1CVJ39 CV CHG PUPS RECIRC STOP MOV 205228. SHT. 2 Aux I R OPEN NR I 084 2 OPEN Ni 3032 1132 2134 Seal Wtz Hx Vlv Rm PASSIVE CERTIFICATION:

The inhormatiwe identifying the equipment required to bring the plant to a eafe shutdown condition on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belie co, treand amunte. (One ar more uigriature f Systems or Operatioas Engineers)

John G. Connoly/Senior Engineer JGC 6111/95 Stephen P. Reichle I Technical Manager SPR 5/11M95 Print or Type Nameftitle Signature Date Print or Type NameTitle Signature Date

PAGE NO.* SALEM GENERATSTATION - UNIT I DOCUMENT NO- 0014-98-Doo1 DATE 5/11/95 USI A-46 PROJECT REVSION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIP'MENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMhBER NUMBEER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS YSThMS LINE NOS LOCAL.1ID ROB COMPONENT NO. LOCATION EQ FUNCTION 2 8 ICV140 CV CEG PMPS RECIRC SOP MOV 2=298. SF1T. 2 Aux i R OPEN NE 1 084 2 OPEN NE 3033 1133 2135 Seal Wtr Hx VL Rm PASSIVE 3 1 ICV174 CV BA BLENDER BYP V 205=22, SHT. I Aux I NIA CLOSED NfA 1 100 1 CLOSED VIA 3022 1122 2124 RmByBAXFPmps PASSIVE 3 I 1CV184 CV BA BLENDER- RWSTV 205228, SIT. I Aux I N/A CLOSED N/A 1 100 1 CLOSED NfA 3050 1100 2152 BAXEF Pp$ Aaea PASSIVE 2 1 1CV197 CV SEAL WIN HX TO 011G PMP S*ICT 205228, SHT. I Aux 1 N/A CLOSED N/A 30D 2 OPEN N/A 3036 1136 2138 EmByBAXFPap* ACTIVE 1 7 ICV2 CV LETDOWN LINE ISOLATION VALVE 205228, SET. 2 Ctmnt I S OPEN N/A N/A LSV489 1 078 CLOSED NIA 3125 Regen H* ER- ACTIVE 3 I ICV273 CV NO. 13 LOOP CHARGING PATH CHECK VALVE 205228. SHT. 2 NR N/A CLOSED N/A 1 NiR CLOSED N/A 3124 NRl PASSIVE 2 7 ICV217 CV LTDWN LINE ISOL VALVE 2052M8. *5T. 2 Cntmnt I S OPEN NIA NWA ISV490 1 078 CLOSED N/A 3126 Regeu Hx Rm ACT/W 1 7 1CV278 CV EX LTDWD HE INLET V 205228. SHT. 2 C-tmnt I N/A CLOSED NIA NIA IS--

1 078 CLOSED NIA 3t22 4425 13 Acum PASSIVE CERTIFICATION:

lie mnormation ideutifying the eqipmentrequized to bling the plant to asafe shutdown condition on t3i6Sde Shnut* EquipmentList (S= is, tothelpead y knovedge awlbelef ome an acere.(Oise oron,. aignakn-e ofSystems er OPeratio- nsusnoems)

John G. Connaly I Senior Engineer JGC 5/11/95 Stephen P. ReNhle I Technical Manager SPE 51115 Print or Type Nane~f2tle Signature Date Prnn aType Name/itle Signature Date

PAGE NO* SALEM GENERAlSTATION - UNIT 1 DOCUMENT NO. 001498-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQNPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVR PWR SUPPORTING REQUIRED, NUMB3ER ELEVATION NOTES SYSTEM SUPPORT REQD STATE CONTROL PWR DRAWINGS SYSTEMS UNIT LINE NOS LOCAL WD ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 ICV284 "V ECP SEAL WTRRET HDR STOP MOV 205228. SHT. 3 Cobantt R OPEN NE 1 078 1 OPEN NR 3041 1141 2143 Cauat Mevart PA 1 8 ICV40 CV VCT OUTLET SOP MOV 205228. SHT. I Aux I SR OPEN 11110 (4A)

S100 1 CLOSED ICDE 3023 1123 2125 Rm By BA XF Pmps ACTIVE 2 8 1CV41 CV VCT OUTLET STOP MOV 205228. SHT. 1 A-n I SR OPEN 11109 (TA) 1 100 2 CLOSED 1BDE 3024 1124 2126 Em]ByBARTPmps ACTIVE 2 7 ICV55 Cv CENT CH0 PMP P1.0W CONPV 20228=. MT. 2 Aux I S OPENICLOSED N/A LFD,317 1 084 2 OPEN NfA 3037 1137 2139 Chrg Pop Vlv Alley ACTIVE 2 18 ICV55-CONV CV P CONVERER FOR IC55 205228, SET. 2 Aux 1 B OPERABLE N/A IFD5316 1 084 4 OPERABLE N/A 1137B 2139B 3037B 216.1 ChEg Pryp V1vAlley ACTIVE 1 8 lOSV6 CV CIG HDR STOP MOV 205228, SHT. 2 IPA I SR OPEN 11100 (SR) 1 078 1 CLOSED IDE 3039 1139 2141 Meda Pen Area SG ACTIVE BD Hx 2 8 ICV69 CV CHG HDR STOP MOV 205228, SHT. 2 IPA I SR OPEN M110(4A) 1 078 2 CLOSED ICDE S040 1140 2142 ltch Pen A. SG ACTIVE BDHX 3 1CV7G CV AUxIJLIARY SPRAY L.EO CHECK VALVE 205228. GUT. 2 Nl NLA CLOSED NIA 1 N CLOSED NIA 3106 NR PASSIVE

.,y CERTIFICATION:

The inhrmaioan idenkiing the equipment equired to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment list (SSEL) is to the best omy knowledge and belief eonmc and accurate- (One or m signature of Sytevm or Operations nginees)

John G. ConnallyI Senlio Engineer JGC 5.'1195 Stevhen P. Reichle / Tedaical Managerr S MIM95 Print or Type Nametntle Signature Date Print or Type Name/the Signature Date

9 PAGE NO. SALEM GENERATIQSTATION - UNIT 1 DOCUMENT NO. 0014-09 8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAM EQ EQUIPMENT SYSTEM EQUIP DESCRIITMON DRAWING BUILDING EVAL NORM STATE MOTIVEPWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES RSQD STATE ONEOL m RANSYSTEM SUPPORT U/NIT CONTOL W~tDRAWINGS sysilam 1XAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 1 ]CM Cv NO. 18 LOOP CHARGING PATE( CHECK VALVE 205228, SRT. 2 NR NIA OPEN NIA I NR OPEN MA 3123 442 NR PASSIVE 3 I 1CV80 CV NO. 14 LOOP CHG. LINE CHECK VLV 205228, SfT. 2 NE MIA ClOs 31/A I NR CLOSED N/A 3127 4409 NR PASSIVE 3 21 ICVEIO CC SEAL WATER HX 205231, SH-. 2 Aux I S NIA NIA 1 084 NIA NfA 5134 Seal Wer IHxRm PASSIVE 2 21* ImEI CV SEAL WTR HE NO. 1 205228, SHT. 2 Ax I S OPERA13LE N/A 1 084 2 OPERABLE N/A 3034 1134 2136 Seal Wtr H Vlv Rm PASSIVE s 21 ICVE17 CC LETDOWNEX 205231. SHT. 2 Axx 1 S NIA NIA 1 084 N/A NWA 5133 LTD Hi Rm PASSIVE 2 5 ICVE20 CV II CHG PMP. CENTRIFUGAL 205228, SRT. 2 Aux 1 S OFF)ON N/A 1CUVEI,CCW 1 084 2 ON NIA BER*-09D 3031 1131 2133 11Chig PtmP R ACTIVE 20P 5 ICVE21 CV 12 CEG PTMP,CENTRIFUGAL 205228, SHT. 2 Aux i S OFF/ON N/A 1CVEGo,CCW 084 2 ON NIA BEE-iD 1

3038 1138 2140 12 Chz. PrnoIpm ACTIVE 1 5 ICVE22 CV CHARGING PUMP. RECIPROcATING 205228, SHT. 2 Aux 1 S ON/OFF NIA ER-IAYAX I 0"4 I ON NIA 302S 1126 2128 5135 13 Chrg PmpItsm ACTIVE CERTIFICATION:

The zinaformati identifing the eowpment require4 to bring the plant to a safe shuttwu conditon an this Safe Shutdawn Equipment m list (S= is to the best of my Imowledg and bad cme and accaeate. (One or mnae signatue vfSysteas or Operationa Engineers)

Jobn G. Couonaly I/Senior Engineer JaC 5/11/95 Stepben P. Roicule I Tedlnic1l Manalgr SPR 5113195 Print orType Nmeitle Signature Date Print or Type NaueMltle signature Date

PAGE NO.C SALEM GENERA*STATION - UNIT 1 DOCUMENT NO. 0014- 9 78-DOO1 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRUKN EQ EQUIPMENT SYSTEM EQUIPDESCRIFTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ED NUJMBER NUMBER ELEVATION NOTFS I1EQD STATE SYSTEM SUPPORT UNIT CONTROL PWB DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONEAT NO. LOCATION EQ FUN-InON 3 21 1CvIF3 CC EXCESS LErDOWN ER 205231, SlIT. 3 Cntmt I S NI/A NIA 1 078 N/A NIA 5118 Regea Hx Rm PASSIVE 3 21 ICVE31 SW 1i CBRG PMP Il CLR 205242. SEr. 4 Aux I B N/A NIA 1 084 WA NIA 5357A ICVEm 21 Chm lPmp Rm PASSIVE 3 21 iCVE32 SW 12 CEG PUP LO CLR 205242. SHT. 3 Aux 1 B N/A N/A 1 084 N/A NIA 5284Ai ICVE21 12ChPop Rm PASSIVE a 21 1CVE42 SW 12 CRG PMP GER OIL CLB 205242, SHT. 3 Aux I B MIA NfA 1 084 N/A NfA 5284A ICVE21 L2Chxg Prop Rm PASSIVE 3 21 ICVE43 SW II CEG PAPW EAR OIL-LR 205242, SHT. 4 Awx 1 B NIA NIA 1 084 N/A NIA S357B ICVE20 11 Chg Prop Em PASSIVE 1 0 ICVFA4 CV SUCTION STABILIUZE FOR ICVE22 205228, SffT. 2 Ani I B OPERABLE MIA 1 084 1 OPERABLE NIA 3025 1125 2127 ICVE22 13 CmgT Pmp Rm ACTIVE 1 0 ICVE45 CV PULSATION DAMPENER 205228, SRT. 2 Aux I B OPERABLE N/A 1 084 1 OPERABLE N/A 3027 1127 2129 ICVET 13 CMrgPmpr m ACTIVE 1 7 IDA24A DA IA DG LUBE OIL TEMP REG VA 205241, SET. I Aux I B O1'EN/CLOSED N/iA 1 100 OPEN/CLOSED N/A 5032 IDAK4 IA D/G Rm ACTIVE CERTIFICATION:

The information Wentifying the equipmlet required tn bring the plant to a sale #hntdown conditio on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief. m-rect and accurste. (One o more signature af Systems o Operations Enginees)

JohunG. CoznnollylISenior Fkwmeer JGC . 5/11195 Stephen P. mele I TechnmicaMNanger SPE W/ N/S Paint or Type Nam e/ride Signat- Date Print of Type Name*tle Sign. Date

PAGE NO5 @ SALEM GENERAASTATI1ON - UNIT 1 DOCUMENT NO. 0014-*8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT IU TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVEPWR SUPPORTING REQUaRED CL ID NUMBER NUMBER SYSTEM SUPPORT UmNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEM L12NRNOB R/~OB COMPONENT NO. LOCATION EQ PUNCTION 2 7 IDAZ4B DA IB DGLUBEOILTEMP MEG VA 205241, SHT. 2 Auxl B OPEN/ICLOSED N/A I 1O OPEN*CLOSED MIA 5056 DAE23 1B DIG R ACTIVE 1 I1DA24C DA iC DG LUBEOILTEMP REG VA 20524L SHT. 3 Aux I B OPENJCLOSED NIA I ]Do OPENICLOSED N/A 5080 1DAE38 IC D/G Rm ACTIVE 1 I IDA36A DA 1A DG LUSE OIL HEATER DISCH.CHX VLV 205241. SHT. 1 Aux I NIA N/A N/A 1 1G0 NIA N/A 5030 IA DIG Rm PASSVE 1 I IDA3UB DA 1B DG LUBE OIL HEATER DISCH.CHK VLV 205241. SHT. 2 Aux1 NWA NfA NWA 1 100 NIA N/A so0U lB D/G Rm PASSIVE I IDA36C DA 1ICDG LUBE OIL FEATER DTSCH.CHK VLV 205241, SHT. 3 A=x 1 WA NIA N/A 1 100 NtA N/A 5078 IC D/G Rm PASSVE I IDA42A DA IA DG JlKT rTEMP REG VA 0MZ41,SET. I Amx1 B OPEN/CLOSED NIA 1 I00 OPENICLOSED XA 5026 IDA.A LAD/ GRm ACTIVE 1 1 1DA49B DA lBDGJTWTRTEMPGVA 205241, SET. 2 Aux I B OPEMIVWOSED N/A 1* 100 OPEN/CLOSED NIA 5050 1DAE23 IB D/a Rm ACTIVE 1 IDA49C DA IC DG JXT WTR TEMP REG VA 20524L SET. 3 Anxi B OPEN/CLOSED X/A 1 100 OPEN/CLOSE N/A 5074 IDAE3$ IC DIG RE ACTIVE CERTIFICATION:

The i i n ideantbla the equipment required to bring the plant to a safe shutdown candition on this Safe Shutdown Fquipmemt List (SSEL) is. to the best of my knowledge end bel~ief,eafedend am sia. (One ormore signature of Systems o Opex nsEngineerý)

John G. Connally Seniar Engineer JCC 511S5 Stephen P. Reichle /Techdial Manater SPR 5/1n/95 Print or Type NameTitle Signature Date Primor Type Nane/Te Signature Dabe

PAGE NO.S SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014-S8-DON1 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES SYSTEM SUPPORT UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 1 21 IDAEI DA 1ADG LUBE OIL CLR 205241, SErT. I Aux I B N/A NIA 205242, SET. 3 1 100 NfA NIA 5033 IDAE4 IA DiG Rm PASSIVE 1 0 IDAE14 DA EXRAUSTrSILENCER- IADI)ESEL 205241. SHT. 1 A=i I S N/A NIA 1 122 N/A NIA 5023 IA DG Rm PASSIVE 1 0 IDAE15 DA EXPANSION TANK - IA DIESEL 205241, SHT. 1 Aux I S N/A NIA 1 122 N/A N/A 5024 iA DIG R PASSIVE 1 21 1DAE2 DA IB DG LUBE OIL CLR 205241. SHT. 2 AuxI B NfA NIA 205242. SET.W I Ion N/A N/A 5057 IDAE23 IB DIG Rm PASSIVE 2 17 IDAR23 EP NO. 1BDIESEL GENERATOR 203002 Aus 1 SR OFF NIA 1 100 ON LSWGRIBDC 1BBDC.

IBDC 8020 IB DrG Rm ACTIVE 9020 1BDE 2 17 IDAE23-EXC EP NO. II DIESEL GENERATOR EXCITE 203002 Ai= 1 BR OFF IDAE23 203002 1DA323 1 100 ON 1BBDC 21 1DAE23 IB D/G Rm ACTIVE 1 0 IDAE24 DA EXHAUSP SILENCER - IB DIESEL 205241, SHT. 2 Aim I S N/A N/A S122 N/A NIA WT 12 D/G Fzh Fan PASSIVE Em/IB Day Tk 1 21 IDAE2S DA 12A DELSTART AIR RCVR 205241, SET. 2 Aim 1 S N/A NIA I log NIA NIA 5030 11i1V Rm PASSIE CERTIFICATION:

The information identifying the equipment required to bing the plaut to a anfe abutdown conditin on this Safe Shtdown Equipment List (SSEL) is, to the best of my knowledge and belie conrect and acrate. (One or momeaignalure of Sytems or Ope.atimm Engineera)

John G. Conanoly I Senior Engineer JGC 5/11/95 Stephen P. Re/hie I Technical Manager SPR 5/ILOS Print or Type Name/tle Signat-- Date Pzint* Type Nazoaihle Signature Date

PAGE NO.@1 SALEM GENERATJTATION - UNIT 1 DOCUMENT NO. 00140 6-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNNS UNT A ELEVATION NOTES REQD STATE CONTROL W DRAWINGS UNE NOS LOCAL II)

ROB COMPONENT NO. LOCATION EQ FUNCTION 1 21 IDAE26 DA 12] DIESEL STATAIRTRAMR 205241. SE'T. 2 Aux I S N/A NIA 1 too NIA N(A 5042 IB DIG Rm PSIVE 1 21 IDAE3 DA IC DG LUBE OIL CLR 205241, SHT. 3 Anx 1 B NIA N/A 205242, ST. 3 1 100 NIA NIA 5081 IDAM3 IC DIG Rm PASSIVE 1 21 IDAE33 DA EXPANSION TANK - 1 DIESEL 205241. SHT.2 Aux I S N/A N/A 1 122 N/A N/A 5148 11 D/G Rm PASSIVE 3 17 ,DAE3 EP NO. IC DIESELGNERATOR 203002 Aux I SR OFF NIA

.I t00 ON ISWGRICIC I06 C DfG Rm ACTIVE ICC7IC ID 3 17 1DAE38-EXC EP NO. 1C DIESEL GENERATOR EXCITER 20300 Aux I BR OFF IDAE38 203002 1DA338 1 100 ON ICCDC 43 iDAE38 IC D/G Rm ACTIVE 1 21 IDAE39 DA 13A DIESEL START AIR *CVR 205241. SHT. 3 AumI S N/A NMA 1 100 N/A WA 500 iC D)GRm PASIVE 1 1 IDAE4 EP NO. iA DIEp L GENERATOR 203002 AMz I SR OFF N/A 1 100 ON ISWGREDC IAADC 8000 IADGRm ACTIVE LADE 8m LADE 1 17 lDAE4-EXC EP NO. IA DIESEL GENERATOR EXCrTER 20002 Aim I BR OFF 1DAE4 203002 1DAE4 1 100 ON IAADC 1 1DAE4 IA DIG Rm ACTIVE CERTIFICATION:

The irsformnaouimidentiDbisgthe eqmnPme/A required to brinig likeplaratl a sale shudaowii condition. on this Safe Shutdoiwn Eqespeot List (SSE1) is. to the best of my Iriowtrd~

and belief, mirect .iid accurate. (One or zmaresignature ofSysterss or Operatios iEnginecr)

John G. ConwflyI Senicr Eigieer JGC 5111/95 Stephen P. Raichde / TechnicalMana*er SPR 5/11/95 Print or Type Naosedte Signature Date Print or Type Nmoe/*itle Signature Date

PAGE NO. 9 SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014-98-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQ HRED NUMBER SYSTEM SUPPORT CL 1) NUMBER ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS UMEO LINE NOS LOCAL ID ROD COMPONENT NO. LOCATION EQ FUNCTION 1 21 IDA40 IDA 13 DI*SEL START AIR RCVR 205241. SHT. 3 Aux I S N/A NIA 1 100 N/A N/A 5066 IC DIG RIM PASSIVE 1 0 1DAE47 DA EXHAUST SILENCER - IC DIESEL 205241.Sit.3 Acx 1 S NIA N/A 1 122 NIA N/A 5071 13 DIG Exist Fan PASSIVE Im/IC Day Taik 1 21 IDAE_. DA EXPANSION TANK - iC DIESEL 20,5241. SIL. 3 AMx I S N/A N/A 1 122 NIA NIA 5072 13 D/G Exhst Fan PASSIVE Rm/IC Day Tnk 1 21 IDAE5 HA JIADIESELSTAR"AIRECVR 205241, SET. 1 Aux 1 S N/A N/A 1 10D N/A N/A 5012 1A D/G Rm PA 1 21 1DIAE8 DA IA DG JET WTREHX 205241, SHT. 1 Aux 1 B NIA NIA 205242. SHT. 3 1 100 NIA NIA 5027 IDAFA IA DIG Rm PASSIVE 1 21 IDAES9 DA 1B DGO JT Wrt HX 205241, SFIT.2 A= I B N/A NIA 205242, SHT. 3 1I00 N/A N/A 5051 IDAE23 1B D/G Erm PASSIVE 1 21 IDAE6 DA l DIESEL*START AIR RCVR 205241. SHT. I A- I S N/A NIA I 109 NIA NIA 5018 1ADIG Em PASSIVE 1 21 HDAF60 DA XCDG JKT WTK BX 205241. SHT. 3 Atu 1 B N/A NIA 205242, SHr. 3 1 100 N/A NIA 5075 IDAE35 IC D/G Rm PASSIVE CERTIFICATION:

'I1e information identi~ing the equipment required to brng the plant to a safe shutlowu condition on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belieE, co-acr and *cuate. (One or more signatre of Systems r Operations Engineers)

John G. Connolly I Senior Engineer Joe 5411M35 Stephen P. Itei.hle / Technical Manager SPR 5/11/95 Signature Date Print orType Namelltlb Signature Date Print or 7ype NamelTitle

PAGE NOO SALEM GENERAATSTATION - UNIT 1 DOCUMENT NO. 0014-178-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWDIN BUILDING EVAL NORM STATE MOTIVE P" SUPPORTING REQUIXED UNIT CL ID NUMBER NUMBER SUPPORT ELEVATION NOTES REQD STATE CONTROL R SYSTEM DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO- LOCATION EQ FUNCTION 1 21 IDAEG1 DA IA D JXTWIR AFTERCOOLER 205241. SMT. 1 An= I a N/A NIA I 100 N/A MA 5sEA DiG =Rm PASSTVE I S IDAE62 DA JACEET WATER PUMP . (ENGINE DRIVEN) IA DIESEL 205241. SHT. 1 Aux I B OFF NIA 1 D00 ON N/A 502S IDAE4 IA DIG Rm ACTIVE 1 21 IDAE63 DA IADGJETWTRAFTERCOOLERHEATER 205241. SHT. I A= 1 hI N/A NIA I 100 N/A N/A 5029 IDAE4 IA D/G Ram PASSIVE I 0 IDAEO DA NO. 1 START AIRMOTOR. IA DIESEL GEN 205241. SET. I Aux 1 B CLOSED NIA S100 OPEN NIA 5020 IDAE4 IA IVGRm ACTIVE I 0 IDAE6I DA NO. 2STARTAI1MMOTOR- IADIESEL GEN 201241. SHT. I Anx I B CLOED N/A 1 100 OPEN WA Sal1e IDAE4 IA DIG Sm RnACTA 1 0 IDAE67 DA NO. 3 START AIR MOTOR- 1A DIESEL GEN 20,241iST. 1 Aux 1 R CLOSED N/A 1 100 OPEN NIA 5014 IDAE4 IA DIGEMn ACTIVE 1 0 IDAEG& DA NO. 4 START AIR MOTOR - IA DIESEL GEN 205241, SHT. I Auxt E CLOSED N/A 1 100 OPEN NIA 5022 IDAE. 1A DIG Rm ACTIVE 1 0 IDAE69 DA IA DG LUBE OIL FILTER 205241, Sfr. I A= I B N/A N/A 1 100 NIA NIA 5031 IA D/0 Rm PASSIVE CERTIFICATION:

The inrormeliot identifying the equc ment required to bring the plant to a safe shutdown condi/trn on this Sae Shutdown Equipment List (SSEL) is, to the besrtafnyknowledge and bellef. ri4,ne* and acorare. (One or mare signattre ofSystems orOpe-deons Engineers)

John G. ConnollylfSenior En&=ee SC 5/11/I5 Stephen P. Reirle I Teemiral Manager SPit 5/11/5 Print orI~'pe Name~ilte, Signture Date Friat oxType Namc1"ftle Siqsature Daft

PAGE NO.* SALEM GENERATh16TATION - UNIT 1 DOCUMENT NO. 0014-O -DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER SYSTEM SUPPORT CL ID NUMBER ELEVATION NOTES REQD STATE CONTROL FWR DRAWINGS SYSTEMS LINE NOS LOCAL1) ROB COMPONENT NO. LOCATION EQ FUNCTION 1 0 IDAE73 DA IA DG LUBE OIL DUPLEX STRAINER 205241. SHT. I Aux I B OPERABLE N/A 1 100 OPERABLE N/A 5034 1DAF4 IA DIG Elm PASSIVE 1 21 IDA-E74 DA IB DG JEKTVIR AFTEECOOLER 205241, SET. 2 Ax I B N/A N/A 1 100 NIA NIA 5052 IDAE23 IB DIG Ron PASSIVE 1 5 1DAE75 DA JACKETEWATER PUMP (ENGINE DRIVEN) - 1B 205241.,SL1T. 2 Aux 1 B OFF N/A DIESEL 1 100 ON N/A 5049 IDAE23 1B DIG Um ACTIVE 1 21 IDAE76 DA IB DG JKT WTR AFTERCOOLER REATER 205241. SET. 2 Aux 1 B N/A N/A 1 100 N/A NIA 5053 IDAE23 1B DIG Rm PASSIVE 1 0 IDAE78 DA NO. 1 START AIR MOTOR - IB DIESY-EL GEN 205241, SET. 2 Aux I B CLOSED NIA 1 1O OPEN N/A 5044 1DAE23 1B DIG [an ACTIVE 1 0 1DAE79 DA NO. 2 START AIR MOTOR l1B DIESEL GE.N 205241. SHT. 2 Aux I B CLOSED N/A 1 100 OPEN N/A 5040 IDAE23 LBDIG Pmn ACTIVE 1 0 IDAE80 DA NO. 3 START AIR MOTOR - IB DIESEL GEN 203241. SHT. 2 Aux I B CLOSE]D N/A 1 I00 OPEN NIA 5038 1DAE23 IB DIG Rm ACTIVE 1 0 1DAESI DA NO. 4 START AIR MOTOR IB DIESEL GEN 20524L SHT. 2 Aux I B CLOSED N/A 1 100 OPEN N/A 5046 1DAE23 IB D/G Rm ACTIVE CERTIFICATION: ii 3r The information idrenfying the equipment required tn bring the plant to a safe shutdown oonditen on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief, corret sandsccurate. (One or more signaure of Systems or OperationsEngineers)

John G. Connolly / Senior Engineer JGC 5/11/95 Stephen P. Reiehle I Techmical Manager SPR 6/15.55 Print or Type Name/Tile Signature Date Print or Type Namefl'le Signature Date

PAGE NO.O SALEM GENERATI STATION - UNIT 1 DOCUMENT NO. 0014-98-1)01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS0 LOCALI ROB COMPONENT NO. LOCATION EQ FUNCTION 1 0 IDAEB2 DA 1BDO LUBE O1. FILTER 205241, MST. 2 Aux I B N/A N/A 1 100 N/A N/A 5955 tDAE23 IB DIG Ri PASSIVE 1 0 1DAE86 DA IB DG LUBE OIL DUPLEX STRAINER 205241, SHT. 2 Aux I B NIA N/A 1 100 N/A N/A 5058 IDAE23 II DiG Rm PASSIVE 1 21 1DAE87 DA ICDGJKTWTRAFTERCOOLER 205241, SHT.3 Aux I B NIA NIA 1 100 N/A N/A 507C6 IDAF-9 IC DIG Rum PASSIVE 1 5 IDAEI8 DA JACKET WATER PUMP (ENGINE DRIVEN) - IC 205241, SHT. 3 Anx 1 B OFF N/A DIESEL 1 100 ON N/A 5072 1DAE38 1CD/G m ACTEVE 1 21 IDAE89 DA IC DG JMT WTR nIX AFTERCOOLER HEATER 205241. SHT. 3 Au. I B NIA NIA 1 200 NIA NIA 507"; IDAE38 ICDIGRm PA 1 0 IDAE91 DA NO. I START AIR MOTOR- IC DIESEL GEN 205241, SET. 3 Aux I B CLOSED N/A 1 100 OPEN N/A 5068 1DAE38 IC D/G Rum ACTIVE 1 0 IDAE92 DA NO. 2 START AIR MOTOR -IC DIESEL GEN 205241, SET. 3 AuxI B CLOSED N/A 1 100 OPEN N/A 5064 D.AE38 ICD/G Rm ACTIVE 1 0 IDAE93 DA NO. 3 START AIR MOTOR - IC DIESEL GEN' 205241, SET. 3 Au" I H CLOSED N/A 1 100 OPEN N/A 5062 IDAR38 IC D/G Rm, ACTIVE CERTIFICATION:

The information identifying the eq.pme.nt required to brln the plant to a safe shutdawn condition on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and be.lie, correct and accurate. (One oxmore signature of Systims or Operatons Engineers)

John G. Connot I/Senior Engineer JGC 5/11195 Stephen P. Reiche /Techniml Manager SPR 5/Il/Ps Print or Type Name/Title Signature Date Print or Type Namsatflitle Signature Date

PAGE NO5* SALEM GENERAT 0 STATION - UNIT 1 DOCUMENT NO. 0014- 9 18.DOOI DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID I4UMBER NUMBER SYSOD INE SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE Nos LOCAL ID LOCATION ROB COMPONENT NO. EQ FUNCTION 1 0 IDAEE4 DA NO. 4 START AIR MOTOR - IC DIESEL GEN 205241, SET. 3 Aux I B CLOSED N/A 1 100 OPEN NIA 5070 IDAE3- 2CD,'GRm ACTIVE I 0 iDAE95 DA IC DGLUBE OIL, FILTER 205241, SRT. 3 Aux I B NIA NIA 1 100 NIA NJA 5079 IDA-38 ICDIG Rm PASSIVE 1 0 IDAE99 DA I C DG LUBE OIL DLPLEX SITANER 205241, SHT. 3 Aux I B NIA NIA 1 100 NIA N/A 5082 IDAE38 IC D/G Rm PASSIVE 2 14 IDDC EP 125IVDC DISTRIBUTION CABINET 203007 Aux 1 S ENERG ISWGRIBDC 1 084 ENERG NfA 8071 4601230V Vital ACTIVE 1251250DC Bat 2 14 IDDE EP NO ID 28VDC CONTROL BUS 211357, SHT. I Anx 1 S ENERO ISWGRIBDE 1 100 ENERG 8037 1 Relay Rm ACTIVE 3 R IDF35 DF 11/12 DUF STOR TK-X-CONN V 205249, SHT. 2 Aux I NIA CLOSED N/A 1 084 3 CLOSED/OPEN NWA 5002 11 DIF X Pp Em ACIVE 1 21 IDFEi DF NO. 11 DIESEL FUEL OIL STORAGE TANK 205249. SHT. 2 Anx 1 S NA N/A 1 084 NIA N/A 5000 11 Diesel POST Em PASSIVE 2 5 IDFEI0 DF NO. 12 DIESEL FUEL OIL TRANSFER PUMP 205249, SET. 2 Aux 1 SR OFF 11105(23))

1 084 OFFION IBBDC IAADC 12DIF X Prp Rm ACTIVE iCCOC 5004 ICCDC CERTIFICATION:

The information identifying the equipment requirtd to bring the plaat to a safe shutdown condition an this Safe Shutdawn Equipmenet List (SSEL) is, to the best of a*y knowledge and belief. -er-ctand accurate. (One or more signature of Systos or Operations Engineers)

John G. Connolly / Senior Engineer JGC 511W5 Stephen P. Reichle I Technical Manager SPR 5/115 Print or Type Nazne/itle Signatuu Date Print or Type Name/Tidle Siguatnes Date

PAGE NO5 SALEM GENERATOSTATION - UNIT 1 9 DOCUMENT NO. 0014-0 78-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUI'PMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCALID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 2 21 IDFE2 DF NO. 12 DIESEL FUEL OIL STORAGE TANK 2D5249. SHT. 2 A=n I S NIA NIA 1 084 N/A NIA 5003 12 Diesel FOST R- PASSIVE 3 21 1DFE3 DF NO. IA DIESEL FUEL OIL DAY TANK 205249. SHT. 2 AnxI S NIA N/A II0o NIA NMA 5005 IA DJO ER. PASSIVE 3 5 IDFE30 DF LAFUEL OIL (ENGINE DRIVEN) BOOSTER 205249. SET. 2 A-n I B OFF NIA PUMP 1 100 ON NIA B006 LDAE4 IA D/G Rm ACTIVE 3 5 IDFE3I DF 11 FUEL OIL (ENGINE DRIVEN) ROOSTER 205249. SET. 2 Aux 1 B OFF NIA PLRIP 1 100 ON N/A 5008 1DAE23 IB DIG Rm ACTIVE 3 5 iDFE32 DF 1C FUEL OIL (ENGINE DRIVEN) BOOSTER 205249, SHT. 2 A=n I B OFF N/A I 100 ON N/A 5010 1DAE38 IC DIG Rm AT'IVE 3 21 IDFE4 DF NO. IB DIESEL FUEL OIL DAY TANK 2D5249. SHT. 2 Anx 1 S N/A N/A I 122 N/A N/A 5001 IB DIG Rin pP.a-,1c 3 21 IDFES DF NO. IC DIESEL FUEL OIL DAY TANK 205249, SET. 2 AuxI S NIA N/A I 122 N/A NIA 5009 13 DIG Exlhst Fan PASSIVE Rm/lC Day Tnk 1 5 IDFEM DF NO. 11 DIESELFUEL OIL TRANSFER PUMP 205249, SlT. 2 Aux I SR OFF 11104 (21) 1 084 OFI/ON 1AADC 5001 11 DIF X Pmp Rm ACTIVE IBBDC ICCDE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shLtdwnv condition oa this Safe Shutdown Equipment List ISEL) is, to the best of mnyIowledge ancd belief, correct and arrrate. (One or more signature of Sysus or Operations Engineers)

John G. Connolly / Senior Engineer JGC 5/1LJ95 Stephen P. Reichle / Technical Manager SPR 5/1 1/95 Print or Type NamelTitle Signature Date Print or Type Name/litle Signature Date

PAGE NOO SALEM GENERA STATION - UNIT 1 DOCUMENT NO. 0014- 9 78-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES SYSTE3 SUPPORT UNIT REQD STATE CONTROL 'WR DRAWINGS SYSTEKS LOCAL ID EQ FUNCTION LINE NOS ROB COMPONENT NO. LOCATION 1 14 IDISIASYA EP NO IA VITAL INSTRUMENT BUS (IIS1V) 211370, SHT. I Anx I S FNERG INV3IAB 1 100 ENERG 8019 1 Relay ERm ACTIVE 2 14 IDISIBlIYA EP NO BDVITALINSTRUMENT BUS (115V) 211370, SET. i Anx I S ENERG lINViBIIYB 1 10O ENERG 8042 1 Relay Rm ACTIVE 2 14 IDISIBSYA EP NO lB VITAL INSTRUMENT BUS (I1 V) 21137D, SHT. 1 Ax= S ENERG IINVIBSYE 1 1O0 ENERG 8041 1 Relay Roo ACTIVE 3 14 IDISICSYA EP NO 1C VITAL INSTRUMENT BUS (I15V) 211370. SIT. 1 A- I S ENERG IINVICSYB 1 100 ENERG 8064 I Relay RPt ACTIVE 2 18 IFA.3957 AF CONTROLLER FOR 13AF21 205236 Aux 1 BR OPERABLE IDISIA5YA 13AP21 1 084 OPERABLE lADE 4043 205-1 12 Aux Fd Prop Rm. ACTIVE 2 18 JFA3959 AF CONTROL.LER FOR 14AP21 205236 Aux 1 BR OPERABLE IDISIASYA 14AP21 1 084 OPERABLE lADE 4042 207.1 .2Aux Fd Prop Ron ACTIVE 2 18 IPA3961 AF CONTROLLER FOR IlAF2I 205236 A-n I BR OPERABLE IDMIBSYA IlArL21 1 084 OPERABLE 1BDE 4041 207-1 12 Aux Fd Pop E, ACTIVE 2 1i IFA3963 AF CONTROLLER FOR I2AF21 205236 Aux I BR OPERABLE LMIS1B5YA 12AF21 1 084 OPERABLE 17DE 4044 206-1 12 Aux Fd Prop Bm. ACTIVE

  • Y CERTIFICATION:

The information identiying the equipment reqixed to bring the plant to a safe shutlod condition on this SafeShutdown EqOupment List 03SEL) is, to the best of my knowledge and belief, correct and. arorate. (One or more signature of Syst~re or Operations unrineers)

John G. Connholly / Semor Engineer JOC 5111)95 Stephen P. MeichleITechnical Manager SPR 51I1/95 Print orT-ype Name/flde Signatuee Date Print orType Namerfitle Signaamue Date

PAGE NO.O SALEM GENERA STATION - UNIT 1 DOCUMENT NO. 0014-08-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DIAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LIE NOS CAL I LOCATION ROB COM'PONEFT NO. EQ FUNCrION 3 18 IFA39G4 MS CONTROLLER FOR IMS53 205203, SET. 1 Aux 1 R OPERABLE LDIS1C5YA 15MS53 1 084 OPERABLE ICOE 4102B 207-1 12 Aux Rd Pmp Rm ACTIVE I is IFA3965 AF CONTROLLIE FOR 14AFII 205236 Aux I R NIA NR 14AFII 1 084 NIA NR 4038 207-1 12 Aux

=PdnPmpRm PASSIVE 1 18 IFA3966 AF CONTROLLER FOR I3AFI1 205236 Au 1 NIA NR 13AFII 1 084 NfA NR 4039 207-1 12 AumFd Prop Rm PASSIVE I 18 IFA39%7 AF CONTROLLER FOR 12AFII 205236 A"u 1 R NIA NiR 12AFl1 1 084 N/A NR 4040 207-1 12 A=nPcdPrap Em PA&3VE 1 18 IFA3%68 AF CONTROLLER FOR 11AFI11 20523G Aux 1 R NIA N'R I IAFII 1 084 N/A NR 4037 207-1 12 Aux Fd Prop Rm PASSIVE 2 18 lF"D5317 CV FLOW SIGN-.AL TO ICVT,5-CONTV 205223, S.ET. 2 Aux I BR OPERABLE 1DDE 1 122 4 OPERABLE 1137C 2139C 3037C ICC2 1 Control Rm ACTIVE 2 18 IBC1286 CV AIR BOOSTER FOR ICV55 205228, SBT. 2 Aux 1 B OPERABLE NIA 20568. SHT. 1 ICV55-CONV 1 084 4 OPERABLE 1/A 220008. SNT 1 1137A 21".A 30371A 216.1 Cbxg Plop Vlv Alley ACTIVE I 16 LINVIA5YB EP NO 1AVITALINSTRUIMENT INVERTER 211370, SST'. 1 Aux I SR ENERG ISWGRIAY 1 100 ENERG ISWGRIADC 8018 1Relay ROm ACTIVE CERTIFICATION: .7 The information idendfýtyg the equipment required to brng the plant to a safe shutdown condition Onthis Safe Shutdown Equipment List MSEL) is, Io the best of my knowledge and beief. cormect and aoruxate. (One or more signature of Systems or Ope.e ion. Engineers)

John G. Connolly I Senior Engineer JGC 5111/95 Stephen P. Reihhle I Technical Maage.r SPR 5s11/95 Print or Type Namefeitle Sigaatum Date Prtin or Type NaamefTtle Signaaure Date

PAGE NO.9 SALEM GENERAT ISTATION 9

- UNIT 1 DOCUMENT NO. 0014- 1 8-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SISTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED ID NUMBER NUMBER ELEVrATION NOTES RF.QO STATE SYSTEM SUPPORT CL coNTROL I~R bDRAWINGS SYSTEMS UNIT LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

2 16 IINV1BIIYB EP NO ID VITAL INSTRUMENT INVERTER 211370. SHT. 1 Aux 1 SR ENRRG ISWGRIBY 1 100 ENERG 1SWGRIBDC 8039 1 Relay Bin ACTIVE 2 16 IINVIBSYB EP NO IB VITAL IJNSTRUMENTP ]VERTER 211370, SHT. I Aux I SR ENERG ISWGRiBY 1 100 ENERG ISWGRIBDC 8038 1 Relay Biu ACTIVE 3 16 i1NVIC5YB EP NO C VITAL INSTRUMENT INVERTER 211370, SHT. 1 Aux 1 SR ENERG ISWGRICY 1 I00 ENERG ISWGRICDC 8063 1Relay Ron ACTIVE 3 is IINVIC6YC EP NO 11 & 12 STATION ESSENTIAL CONTOL 211370,.SHT. I A" I SR ENERG ISWGRICY INVERTER 1 100 ENERG ISWGRICDC 8040 1 Relay Rzo ACTIVFE 1 18 IIP5739 RB CONTROLLER FOR IPSI 205201, SHT_ 1 N R NIA NR IPSI I NR N/A NR 4419 NR PASSIVE 1 18 1IP5741 RH CONTROLLER FOR IPS3 205201, S*IT. 1 NR R NIA NE IPS3 NER NIA NE 4424 NR PASSIVE 1 18 1LA2670 AF 1APST LEVEL TRANSM37MR 205236 Yard N/A OPERABLE NIA ILA2705 1 100 OPERABLE NIA 4005 1 RWST Area ACTIVE 1 18 Lk.27,05 AF I AFS LEVEL INDICATOR 205236 Aux 1 R OPERABLE IDIS1C6YA 1LA2670 1 122 OPERABLE 12 MAC 4006 1 Control Brn ACTIVE CERTIFICATION:

The information identifying the equipment equired to bring the plant to a safe 3hutdoa' condition on this Safe Shutdomn Equipmeat List (SSEL) is. to the beht of my knowledge and belief. correct ad ao-urate. (One or oroe signature of Systems or Operations Engineers)

John G. Conuolly/SeniorEngineer JGc 5111195 Stepben P. Reicle / Technoical Manager SPR 5/11ns Print or Type Nameflltle Signature Date Print or Type NajeMitle Signature Date

PAGE NO@ SALEM GENERAT*STATION - UNIT 1 DOCUMENT NO. 0014- 9 8-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION UNIT NOTES SYSTEM SUPPORT REQD STATE CONTROL FWR, DRAWINGS SYSTEM4S LINE NOS LOCALM LOCATION ROB COMPONENT NO. EQ FUNCTION 1 18 IL3459A PS PRESSURIZER LEVEL, CIL 1 205201. SHM. I Aux 1 BR OPERABLE 1DLSIA5YA ILT459 S122 OPERABLE 3201 ICC2 1 Control Rm ACIVE 2 18 ILI460A PS PRESSURIZER LEVEL, CH. 2 205201. SHT. I Aux I BR OPERABLE IDISIBSYA ILT460 1 122 OPERABLE 3203 ICC2 1 Control Rm ACTIVE 20P 18 IL1461 PS PRESSUBE LEVEL, CH. 4 205201, SHT. I Aurx1 BR OPERABLE IDISIC5YA ILT461 1 122 OPERABLE 3205 1CC2 1 Control Rm ACTIVE 2 18 lL157T BF STM GEN i iLEVEL INDICATOR NR) 205202, SHT. 3 Aux I BE OPERABLE IDISBIBYA ILT517 1 122 OPERABLE 4313 ICC2 I Control Rm ACTIVE 20P 1i I1513 BF STM GEN I I LEVEL INDICATOR (NEt) 205202. SHr. 3 Aux 1 BR OPERABLE IDISICSYA ILTSI8 1 122 OPERABLE 4321 ICC2 1 Control ,za ACTIVE 20P 18 112519 EF STM GEN 11 LEVELINDICATOR (NM) 205202. SHT. 3 A=m I BR OPERABLE IDLS1BSYA 1LT-.19 1 122 OPERABLE 4329 ICC2 I Control Rw ACTIVE 2 18 11527 BF STM GEN 12 LEVEL INDICATOR (NR) 205202, SHT. 3 Aux 1 BE OPERABLE IDISIBIYOA LLT527 1 122 OPERABLE 4315 ICC2 I Control Rm ACTIVE 20P 18 122528 BF SIM GEN 12rEVEL LVDICATOR (NR) 205202, SHT. 3 A:rý I BR OPERABLE IDISICSYA 1LT528 1 122 OPERABLE 4323 1CC2 I Control RM ACTIVE CERTIFICATION:

The inforWaton identifYig the eqtlpmentrequired to bring the plant to a safe shutdown eundition on this Safe Ssutdown Equipment List (SSML) is. to the best of my knowledge and helief, correct and acurate (COe or momesignature ofSystems or Operations Engineers)

John G. Connolly /Senior Engineer JGC 5/11/95 Stephen P, Reichle / Technical Manager SFR 511195 Pint or Type Naneltle Signature Date Print or Type Nanmeirde Sinature Date

PAGE NO.* SALEM GENERATIOSTATION - UNIT I DOCUMENT NO. 0014-0*8-DO 0 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS UNIT LINE NOS LOCAL I'D ROB COMPONENT NO. LOCATION EQ FUN4CTION 20P is8 i1529 RF SIM GEN 12 LEVEL INDICATOR (NR) 205202, SEIT. 3 Aux 1 BR OPERABLE IDISLA1YA iLT529 1 122 OPERABLE 4331 ICC2 I Control Rm ACTIVE 1 18 IU537 BF STM GEN 13LEVEL INDICATOR (NR) 205202. SFT. 3 Aux I BR OPERABLE IDISI:B11YA 1LT537 1 122 OPERABLE 4317 ICC2 I Control Rm ACTIVE 20F 18 .U38 BF STM GEN 13LEVEL INDICATOR (NM) 205202, SliT. 3 Aux I BR OPERABLE IDISIC5YA ILT538 1 122 OPERABLE 4325 ICC2 I Control Rm ACTIVE lop 18 I11539 BF STM GEN 13 LEVEL INDICATOR (NR) 205202, SET. 3 Aux 1 BR OPERABLE IDLSIASYA ILT539 1 122 OPERABLE 4333 ICC2 I Control Rm ACTIVE I 18 I11547 BF STM GEN 14LEVEL INDICATOR (NR) 205202, SHT. 3 Anx I BR OPERABLE IDIS1O11YA ILT547 1 122 OPERABLE 4319 ICC2 I Control Rm ACTIVE lOP is 11U4s BF STM GEN 14 LEVEL INDICATOR (NR) 205202, SET. 3 Aux 1 BR OPERABLE IDISICSYA ILT548 1 12-, OPERABLE 432? ICC2 I Control Rm ACTIVE lop 18 I1549 BF "STMGEN 14LEVEL INDICATOR (NR) 205202. SET. 3 Aux I BR OPERABLE 1DISIB5YA ILT49 1 122 OPERABLE 4335 ICC2 I Control Em ACTIVE I 18 I1628A CC LEVEL INDICATOR - NO. 1 CC SURGE TANK 205231, SET. I Awe i BR OPERABLE IDISIC5YA ILT628A 1 122 OPERABLE 5138 ICCi I Control Rm ACTIVE CERTIFICATION:

The information idengti the equipment required to bring the plant to a safe shutdown conditon Onthis Safe Shutdo-n Equipment List (SSEL) is, to the best ofmy knowledge aod behee correct and anurate. (One or more signatu.o ofSystems or Operations Engineers)

John G. Connolly I Senior Engineer JGC 5i11195 Stephen P- Reihle I Techznical Manager SPR s5 1/95 Print or Type Name/Title Sig;atere Date Print or Type Name.Title Signature Date

PAGE NO 9 SALEM GENERATI 9 STATION - UNIT 1 DOCUMENT NO. 0014- 078-DO019 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER CONTROL PWR SYSTEM DRWIG SUPPORT UNIT ELEVATION NOTES REQD STATE SYSTEMS LINE NOS LOCAL[D ROB COMPONENT NO. LOCATION EQ FUNCTION 2 18 ILlG28C CC LEVEL IN'DICATOR- NO. I CC SURGETANK 205231,SHT. I A=n 1 BR OPERABLE lDISIBIIYA 1LT6z8B 1 122 OPERABLE 5140 ICCI 1 Contrnl R- ACTIVE 1 18 1L1920 CV RWSTIEVEL INDICATOR 205234. SIT. I Anx 1 Bit OPERABLE IDISIB11YA ILTS20 122 1 OPERLABLE 3002 1102 2104 ICCi I Conrul Rm ACTIVE 2 is 11,1921 CV RWST LEVEL INDICATOR 205234, SliT. I Aux 1 BR OPERABLE IDIS1BSYA 1LT921 1 122 2 OPERABLE 3004 1104 2106 ICCI I Control Em ACTIVE 2 0 1LL6229 CH SIOT GLASS - 1 CU WTRM PZ 205216, SMT. 1 IPA 1 B OPERABLE NIA NONE I Izo OPERABLE N/A 5400A ICHEI CH Wtr Prop Area ACTIVE 1 18 ILT459 PS LEVELTRANSM3ITTER FOR Lr45.C 205201,SHT. I Cerantn I B OPERABLE NIA NIA 100 OPERABLE N/A NONE 1

3202 335-1 ElevatorPrasage ACTIVE Area 2 18 1LT460 PS LEVEL TRANSM1TrER FOR LI460A 205201, SET. I Cntznt I B OPERABLE NIA 1 100 OPERABLE N/A 3204 335-1 Elevator Passage ACTIVE Area 20P 18 ILT461 PS LEVEL TRANIS2rMT R POE L1461 205201, SET. I CunInt 1 B OPERABLE NIA 1 100 OPERABLE N/A 3206 335-1 Elevator Passage ACTIVE Arca 2 18 ILTSI? BF LEVEL TEANS197MTr FOR LI517 205202, SET. 3 Catoent I B OPERABLE N/A 1 130 OPERABLE N/A 4314 444-IA 11 SIG Area ACTIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a afe shutdown condiciou on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belief, lorrect and accurate. (One or more signature of Syotems or Operations Engineers)

John G. Connally / Seaio Engineer JGC 5/11/95 Stephen P. Boichloe

/ Technical Manager SPR 5/11.95 Print or Type Name/Title Signature Date Print or Type Name/ritle Signature Date

PAGE NO@ SALEM GENERATO STATION - UNIT I DOCUMENT NO. 0014-.078-D)01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES- EEQD STATE SYSTEM SUPPORT UNIT CONTROL PIVE DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 2OP 18 1ILT518 BF LEVEL TRANSM'ITTER FOR LI518 205202. SFT. 3 Cnent I B OPERABLE NIA 1 130 OPERABLE N/A 4322 444-13 11 S/G Area ACTIVE 20P 19 ELTSI5 BF LEVEL TRANSMITTrR FOR I.ns 205202. SIT. 3 Cnmant 1 B OPERABLE N/A 1 130 OPERABLE NIA 4330 444-1C i iS/O Area ACTIVE 2 18 2LT527 BF LEVEL TRANSMITTEE FOR LI527 205202, SHT. 3 Cotmot I B OPERABLE NIA 1 130 OPERABLE N/A 4316 444-IF 12 S/G Area ACTIVE 2OP 18 1LT528 BF LEVEL TRANSMITTER FOR 12528 205202, SET. 3 Cotmft I B OPERABLE N/A 1 130 OPERABLE NIA 4324 444-I 12 S/G Area ACTIVE 2OP 18 ILT529 BF LEVEL TRANS.ITI'EE FOR LI529 205202, SHT. 3 Cntera I B OPERABLE N/A 0130 OPERABLE N/A 4332 444-1D 12 S/0 Area ACTIVE I 1 LT537 BF LEVEL TRANSlArPEE FOR 1I537 205202. SHT. 3 Cegmet I B OPERABLE NIA 1 130 OPERABLE NIA 4318 444-1G 13 SIG Area ACTIVE 2OP 18 1LT538 BF LEVEL TANSMITTER FOR LI538 205202. SHT. 3 Cnont 1 B OPERABLE NIA 1 130 OPERABLE N/A 4326 444-1H 13 SIG Area ACTIVE lOP 18 ILT539 BF LEVEL TRANSMITTER FOR 11539 205202, SHT. 3 Catrant I B OPERABLE N/A I 130 OPERABLE NIA 4334 -Ij 13SIG Area ACTIVE CERTIFICATION: 4 The information idegtifying the equipment required to bring the plant to a safe shutdown c0diti2u on thas Safe Shutdawn Equipment List CSEL) is, to the best ofmy knowledge and belief, c*rrctd ana nurate. (One or more siguahbe of Systems or Operations Engineers)

John G. Connolly I Senior Engineer JGC 5/11n5 Stephen P. Reictwe / ToelonicaI Manager SPR 5/11195 Pit or Type NanM~tle Signature Date Print or Type Name/['tle Signature Date

PAGE NO* SALEM GENERAIS STATION - UNIT 1 DOCUMENT NO. 0014-8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LMN NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 1 18 ILT547 BF LEVEL TRANEMITTER FOR L1547 205202. SHT. 3 Cntmt 1 B OPERABLE NIA 1 130 OPERABLE N/A 4320 444-IM 14 SG Ara ACTIVE lop 18 ILT548 BF LEVEL TRANSMITTER FOR LI54 205202. SlIT. 3 Cnrmtut 1 B OPERABLE N/A 1 130 OPERABLE N/A 4328 444-1I 14 SIG Area ACTIVE lop 18 lLT549 BF LEVEL TRANr!TER FOR 1U549 205202, SHT. 3 Cntrnt 1 B OPERABLE NIA 1 130 OPERABLE NIA 4336 444-1K 14 S/G Area ACTIVE 1 18 1LT628A Cc LEVEL TRANSMITTER NO. I CC SURGE TANK 205231, SHT. 1 A- 1 B OPERABLE N/A 1 122 OPERABLE NIA 5139 401-1 1 CC Surge Tnk ACTIVE Area 2 18 1IT462B cc LEVELTRANSMrTER NO. 1 CC SURGE TANK 305231, SET. I AnI I B OPERABLE NIA 1 122 OPERABLE N/A 5141 401-1 1 CC Surge "nk ACTIVE Area 1 18 LLT920 CV LEVEL TRANŽ TI'TM FOR L1920 205234, SHT. 1 Yard B OPERABLE NIA 1 100 1 OPERABLE NIA 3003 1103 2105 378-1 Fire Pmp/Fresh ACTIVE Water House 2 18 ILT921 CV LEVEL TRAN1SITITER FOR L1921 205234, S*T. 1 Yard B OPERARLE, NIA 1 100 2 OPERABLE N/A 3005 1105 2107 378-1 Fire Pmp/Fresl ACTIVE Water House 3 7 1M5132 MS 13 AF PMP STARTSTOP V 205203. SHT. 1 Aux I S CLOSED N/A 1SV509 1 084 OPEN NIA 4100 13 Aux Fd Pmp Rm ACTIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdown cmndition on th is Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belief, correct and accurate. (One or more signatuxe of Systemw or Operatons Engineers)

John 0. Connolly / Senior Engineer JigC 5/1119 Stephen P. Reichle / Technial Manager SPR 5/1195 Feint or Type Namefttle Sigriatue Date Print or Type Namxefitle Signat-oe Date

PAGE NO* SALEM GENERATI STATION - UNIT 1 DOCUMENT NO. 0014- 9 8-D001 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUiM NUMBER CONTROL P`Wr. SYSTEU SUPPORT CL ID NUMBER ELEVATION NOTES REQD STATE DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 IM552 MS 13 AF pMP TURB TRIP VALVE (V) 205203, SET. 1 Auxl BR OPEN/CLOSED NE 1 094 OPEN NE 4 *8 IAFES 1i3A xFdPmp Em ACTI"VE 3 7 1MS53 MS 13AF PMF TURB GOV 205203, SHr. I Aux I S OPENICLOSED N/A IFA3964 1 084 OPEN/CLOSED N/A 4102 13 Aux Fd PropRm ACTIVE 3 5 IMSE3 MS 13 AF PM1PTURB 205203. SHT. I Aux I B ON/OFF NIA 1 084 ONIOFF N/A 4102A IAFE 13 A=x Fd Pmrp Er ACTIVE 1 18 IPD9859 PR PRESSURE SWITCH FOR ISV1IS9 205203. SHT. I Cntmt 1 S N/A NIA 211310 1 130 NIA N/A 2105C 1PLz Area ACTIVE lOp 18 IPD9860 PR PRESSURE SWITCH FOR ISVI199 205201. SET. I Cstmnt I S N/A N/A 211310 1 130 N/A N/A 2105D I Pzr Area ACTIVE 1 is IPI455A PS PESSURIZERPRESSURE, CIL 1 205201, SHT. I Aux I BR OPERABLE IDISLASYA IPT455 1 122 OPERABLE 2201 ICC2 I Control Rm ACTIVE 2 is IPI45G PS PRESSURIZER PRESSURE, CH.2 205201. SET. I Aax i BR OPERABLE IDISIBSYA IPT456 1 122 OPERABLE 2203 1CC2 1 Control Em ACTIVE lOP is IP1457 PS PRESSURIZER PRESSURE. CH. 3 205201. SET. I Aux I BE OPERABLE IDISIC5YA 1.r457 1 122 OPERABLE 2205 ICC2 1 Control Ron ACTIVE CERTIFICATION:

The information ideniffyinc the equipment required to bring the plant to a safe Shutdown condition on this Safe Shutdowen Equipmenot Lit (SSEL) is, to the bost of my knowledge and belief. correct and accurate. (One or more sipnature of'Systemos or Operations Engineers)

John G. Connolly I Senior Engineer JOC 5111/95 Stephen P. Reichle / Technical Manager SPR 5/11/95 Print or Type Name/Title Signarure Date Print or Type Narerl'itle Sigature Date

PAGE NO* SALEM GENERAT STATION - UNIT 1 DOCUMENT NO. 0014- 9 8-DOOI DATE 5/1 1/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TIRAN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALM ROD COMPONENT NO. LOCATION EQ FUNCTION 2OP 18 1P1474A PS tIRESSURIZERPRESSURE. CH. 4 205201. SHT. I As I BER OPERABLE 1DIS1BtlYA IPT474 1 122 OPERABLE 2207 ICC2 I Control Em ACTIVE lop 18 IP1514A MS PRESSURE INmiCATOR, MS LOOP 11 205203, SEIT. 1 Aux t BR OPERABLE IDISIA5YA IPT14 1 122 OPERABLE 4144 ICC2 1 Centrol Rm ACTIVE 2 18 1PISA MS PRESSURE INDICATOR. MS LOOP I1 205203. SET. I Aux I BR OPERABLE 1DISIBSYA IPTSI5 1 122 OPERABLE 4146 ICC2 I Contreo Rm ACTIVE 1 18 IPI516A MS PRESSURE INDICATOR. MS LOOP 11 205203. SHT. I A. I BR OPERABLE 1DISIB11YA LrrS16 1 122 OPERABLE 4142 1CC2 1 Control Rm ACTIVE 2OP 18 1PI524A MS PRESSURE INDICATOR, MS LOOP 12 205203, SHT 2 A- 1 BR OPERABLE 1DISLA5YA IPT524 1 122 OPERABLE 4162 ICC2 I Contrao Em ACTIVE 2 18 1P1525A MS PRESSURE INDICATOR, MS LOOP 12 205203, SHT. 2 Aux i BR OPERABLE IDISIBSYA tIMT26 1 122 OPERABLE 4164 ICC2 I Control Rm ACTIVE 1 18 IP1526A MS PRSSURE INDICATOR, MS LOOP 12 205203, SHT. 2 Auxl BR OPERABLE IDISiC5YA lIPT526 1 122 OPERABLE 4160 ICC2 1 Control Rm ACTIVE lOp is 1P1534A MS PRESSURE INDICATOR, MS LOOP 13 205203, SET. I Aux I BR OPERABLE 1DISIASYA IPT534 1 122 OPERABLE 4150 ICC2 I Control Rm ACTIVE CERTIFICATION:

The infoarmaion identif-ing the equipment required to bring the plant too sAsi Shutdowu condiio on this Safe Shutadao Equipme= t List (SSML) is, to the best of my knowledge and belief, correct and accurate. (One or more signature ef Systems or Operations Engineers)

Joh~nC. Connolly I Senior Engineer JGC 51n185 Stephen P. Belee / Techmical Manager SPR Wi!11/95 Print or Type Name)itle Silnatue Date Pxint or Type NamenTite Signature Date

PAGE No* SALEM GENERAtW STATION - UNIT 1 DOCUMENT NO. 0014-978-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPM]ENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIFMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM SPATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT ELEVAT7ON** NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS UNIT LINE NOS LOLD ROB COMPONENT NO. LOCATION EQ FUNCTION 2 18 I'1-535A MS PRESSURE INDICATOR, MS LOOP 13 205203. SET. I Aux 1 BR OPERABLE 1DISlB5YA PT`535 1 122 OPERABLE 4152 ICC2 I vlont-zem AE 1 18 1PI536A MS PRESSURE INDICATOR, MS LOOP 13 205203M.MIT.1 Aut I BR OPERABLE IDISICSYA 1PT536 1 122 OPERABLE 4148 ICC2 1 Control Em ACTIVE 1OP 18 1I11544A MS PRESSURE INDICATOR, MS LOOP 14 205203, SHT. 2 Aux I BR OPERABLE IDISIAJIYA 1PT544 1 122 OPERABLE 4156 lCC2 I Cootr-l Rm ACTIVE7F 2 18 IP1545A MS PRESSURE INDICATOR, MS LOOP 14 205203, SET- 2 Aux I BR OPERABLE 1DISIBSYA IPTS4*

1 122 OPERABLE 4158 ICC2 1 Control Rm ACTIVE 1 18 UPL546A MS PRESSURE INDICATOR, MS LOOP 14 205203, SE(T-2 AiM L BR OPERABLE IDIS IBIYA IPT"4a 1 122 OPERABLE 4154 ICC2 I Contol rm ACTIVE 1 20 11NLli828 EP IA DIG GENERATOR CONTROL PANEL AixI S ENRG NIA 1 GCP-LA 100 ENEEG NIA 9065 ADIG ControlRm ACTIVE 1 20 I'?NL 11829 EP 1ADIG ENGINE CONTROL PANEL Aux I S ENE-G N/A 1 ECP. IA 100 ENERG NIA 9062 IA DIJGConmu Rm ACTIVE 2 20 IPNL11830 EP IB Di, GENERATOR CONTROL PANEL AuX I S ENERG NIA 1 GCP-.B 100 ENERG N/A 9066 IB DIG Control Rm ACTIVE CERTIFJ CATION:

The nft*irmation itlein ing the equipment required to bring die plant to a *fe shutdown conditibo on this Safe Sbhtdown Equipmen. List (SSEL) is- to the best vfimy.xowmlead and belief, arr-ect nd arolte. (One or mare signatbre of Systems or Operatioos EigtieeiS)

John G. Co*onlly/ Senior Engineer JGC 5111195 Stephen F. Reichle I Technical Manager SPR 5/I1/$5 Print or Type Nanieflitle Signoture Date Print or 7yrps Nanielftle Signature Date

PAGE NO 9 SALEM GENERAT 9 STATION - UNIT 1 DOCUMENT NO. 0014-00078-DO01 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMNER CL IDNUMBER ELEVATION NOTES SYSTEM SUPPORT UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPOVENT NO. LOCATION EQ FUNCTION 2 20 IPNLI 1831 EP 1B DIG ENGINE CONTROL PANEL Aux I S ENERG NIA I ECP-1B 100 NERG NIA 9063 II DIG Contanl Em ACTIVE 3 20 IPNLI1832 EP IC D/IGENERATOR CONTROL PANEL Aux I S ENERG NIA I GCP-1C 100 ENERG N/A 9067 IC DIG Cantrol Rm ACTIVE 3 20 IPNLI 1333 EP iC DIG ENGINE CONTROL PANEL Au I S ENE RG N/A 1 ECP-iC 100 ENERG N/A 9064 IC D/G Control Rm ACTIVE 20 IPNLI1834 EP IA DIG 230V CONTROL CENTER AUX PANEL Aux I S ENERG NIA 1 100 -NERG N/A 9041 IA DIG Cntro Bldg ACTIV 20 IPNLI1835 EP ID DIG 230V CONTROL CENTER AUX PANEL Aux I S ENERG NfA 1 100 ENERG NIA 9042 111DIG Cord wBldg ACTIVE 20 1.PNL11836 EF IC DIG 230v CONTROL CE AUX PANEL Aux I S ENEEG N/A 1 100 VIERG NIA 9043 1C D/G Control Bldg ACTIVE 3 7 iPRI PR PZR PWR OP OFE V 205201, SHM. I Curnnt I NIA CLOSED NIA 1SV759 I 130 CLOSED NIA 3]04 1 PmrArea PASSIVE I IPRI PR PZR PWR OP RELIEF V 205201, SUT. 1 Cotmnt I S CLOSED N/A 1SV759 1 130 OPEN/CLOSED N/A 2002 3104A I P=r Arem ACTIVE CERTIFICATION:

The information identif.ing the equipment required to bring the plant to a safe shutdown condition on this Safe Shutdon-n Equipment List (SSEL) is, to the best of my knowledge and belief. corect and amcorate. (One or more sgnature of Systems or Operatios Engineers)

John G- Connoaly/Senor Engineer JGC 5/11/95 Stephen P. Reicrhe I Technical Manager SPR 5/11/95 Print or Type NamefTitle Signature Date Porit or Type Na&riTte Signature Date

PAGE NO* SALEM GENERATQ STATION - UNIT I DOCUMENT NO- 0014 9 78-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE pWR SUPPORTING REQUDIED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

20P I IPR0 FR PZRSPRAY VLOOP SEALDR V 205201, SWT. I Cuntt I NIA CLOSED NIA 1 130 CLOSED N/A 2015 1 Par Area PASSIVE 3 7 IFR14 PR PRT DRN V 205201, SHT. 1 Cnt2t I NIA CLOSED N/A ISV424 1 078 CLOSED N/A 2022 1 PRT Area PASSIVE 3 7 iPR2 PR PZOtPWR OP RELIEF V 205201, SHT. I Cntant I N/A CLOSED NIA ISV760 1 130 CLOSED N/A 3105 1 Pxr Area PASSIVE lOP 7 IPR2 PR PZR PWR OP RELIEF V 20520 1, SHT. I Cntmat I S CLOSED N/A ISV760 1 130 OPEN/CLOSED N/A 2007 1 Pr-Area ACTIVE 3 1 1FR23 PR PZR SPRAY V LOOP SEAL DR V PRT 205201, SHT. 1 Cutmnt 1 N/A CLOSED N/A 1 130 CLOSED N/A 2017 1 PI= Area PASSIV 3 1 iPR25 PR CONT ISO CHK VLV, RV PATH TO PRT 205201, SHT. I NA NIA CLOSED N/A I NR CLOSED N/A 2018 NR PASSIVE 3 7 IPR3 PR PRESSURIZER RELIEF VALVE 20520 1, SET. I Cntmnt i S CLOSED NIA 1 130 CLOSED N/A 3101 1 P-r Area PASSIVE 2 7 IPR3 PR PRESSURIZER BELIEF VALVE 205201, SH'T. I Curtant 1 S CLOSED NIA 1 130 OPFN/CLOSED NIA 2012 1 P-r Arca ACTIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdowrn condition on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge Mndbelief. correct and acurate. (One or mare sirnture of Systems or Operation Enginerer)

John G. ConnoI~y I Senior Eugincer JGC 511/195 Stephen P. Reichle / Techmical Manager SPR 5/111/95 Date Print or Type Name/litle Si.gnature Date Print arType Name/Tile Signature

PAGE NO.@ SALEM GENERATOSTATION - UNIT 1 DOCUMENT NO. 0014-8-D'001 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMEINT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNE S C ELEVATION NOTES REQD STATE CONTROL WR DRAWINGS SYSMS LINE NOS LCLI LOCATION EQ FUNCTION ROB COMPONENT NO.

3 I IPR30 PR VLV STEM LEAKOFFS TO PRT CXK VLV 205201. SET. 1 NI NA CLOSED N/A I NR CLOSED N/A 2019 NA PASSIVE 3 7 1PR4 PR PRESSURIZER RELIEF VALVE 205201. SHT. I Cantmt I S CLOSED NIA 1 130 CLOSED N/A 2102 1 Pzr Area PASSIVE 2OP 7 IPR4 PR PRESSURIZER RELIEF VALVE 205201. SET. 1 Cntmnet I S CLOSED NIA 1 130 OPEN/CLOSED N/A 2014 1 Psr Area ACTIVE 3 7 IPR5 PR PRESSURIZER RELIEF VALVE 205201, SET. 1 Cntmnt 1 S CLOSED N/A 1 130 CLOSED NIA 3103 1 Pzr Area PASSIVE 20P 7 IPR5 PR PRESSURIZE. RELIEF VALVE 205201. SET. I Cntmt 1 S CLOSED WA 1 130 OPENICLOSED NIA 2016 1 Per Area ACTIVE 1 8 IFER PR PZR PWR OP R1 STOPMOV 205201, SiT. 1 Cntmat I SE OPEN 11107 (11) 1 130 5 OPEN/CLOSED 1ADE 2001 1 Prr Area ACTIVE 0op 8 IPR7 FR Pz PWR OP RELIEF STOP MOV 205201. SHT. I Cntmnt I SE OPEN 1I137(4E) 1 130 6 OPENICLOSED IBDE 2006 1 Pu Area ACTIVE 2 1 IPRS PR PZRSPRAYVLOOP SEALDR V 205201,SHT. I Cta..t 1 NIA CLOSED NIA I 130 CLOSED NIA 2031 1 Pzr Area pASSIVE CERTIFICATION: -ff The information ident.fying the equipment required to bring the plant to a safe shutdown condition on this Safe Shuldown Equipment List (SSEL) is, to the best of my knowledge and belief, correct and accurate. (One or more signature of Systems or Operations Engineers)

John G. Connolly I Senior Engineer JGC 5/111/95 Stephen P. Reich]e /Technical Manager SPR ,/11/95 Print or Type NamelTitle Signature Date Print or Type NamenTitle Signature Date

PAGE NO*. SALEM GENERA* STATION - UNIT 1 DOCUMENT NO. 0014-#8DO01 DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NIUM33ER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 20P I IPR9 PR PZR SPRAY V LOOP SEAL DR V 205201, SFIT. 1 Cntmnt I N/A CLOSED NIA 1 130 CLOSED N/A 2013 1P=r Area PASSIVE 1 7 IPSI RH PER SPRAY V 205201, SHT. I Cntmnt i N/A CLOSED NIA 12P5739 1 130 CLOSED N/A 4418 1 P= Area PASSVE 1 7 IPS3 AR PZR SPRAY V 20520 1. SRT. 1 Cntmnt 1 N/A CLOSED N/A 1IP5741 1 130 CLOSED N/A 4423 1 Pzr Area PASSIVE I 18 IPT455 PS PRESSURE TRANSMITTER FOR PI455A 205201, SHT. I Cntnnt I B OPERABLE NIA 1 100 OPERABLE N/A 2202 335-1 Elevttor Pasmage ACTIVE Area 2 18 IPT456 PS PRESSURE TRANSMITTER FOR PI456 205201. SET. 1 Cntrant i B OPERABLE N/A 4 - 100 OPERABLE N/A NONE 2204 335-1 Elevator Passage ACTIVE Area lop 18 IPT457 PS PRESSURE TRANS!uTIRr FOR P1457 205201. SRT.1 Cntnmt 1 B OPERABLE N/A P1457 1 too OPERABLE NIA 2206 335-1 Elevator Passage ACTIVE Area 20P 18 IPT474 PS PRESSURE TRANSMITTER FOR P1474A 205201, SOT. 1 Cuntmnt I B OPERABLE NIA P1474A 1 100 OPERABLE NIA 2208 335-1 Elevator Passage ACTIVE lop 18 IPT514 lS PRESSURE MA1sMT EMS LOOp 11 205203, SHT. I IPA 1 B OPERABLE N/A 1PI514A 1 100 OPERABLE N/A 4143 635-L.A MS Pen Area ACTIVE CERTIFICATION:

The in-forr-ion identifying the equipment req3ir-d to bring the plant to a safe shutdovw condition on this Safe ShutD*nw Eqripment List MEL) is%to the best i my knowledge and belief, correct and accurate. (One or momesigmature of Systems or Operarous Engiueers)

John G. Connolly / Senior Engineer JGC 5111195 Stephen P. Reihle / Tecbmical Manager SPR 5/11/95 Print oa Type Name/Title Sigoatres Date Print or Type Name/title Signature Date

PAGE NO09 SALEM GENERATOSTATION - UNIT 1 DOCUMENT NO. 0014-08..DO01 DATE 5111195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMER ELEVATION NOTES UNrr IIEQD STATE SYSTEM SUPPORT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO.

LOCATION EQ FUNCTION 2 18 IPTS15 MS PRESSURE TRANSMRITTER MS LOOP 11 205203, SET. IPA 1 B OPERABLE N/A IPISISA I 100 OPERABLE NIA 4145 686-IA MS Pen Area ACTIVE 1 18 lPTS16 NMS PRESSURE TRANSMITIER. MS LOOP 11 205203. SET. 1 IPA I B OPERABLE N/A IFISIMA 1 100 OPERABLE NIA 4141 684-IA MS Pen Area ACTIVE 20P 18 1PT524 MS PRESSURE TRANSMITISR -MS LOOP 12 205203, SHT. 2 OPA l B OPERABLE NIA 1PI524A 1100 OPERABLE N/A 4161 685-1B MS Pen Area ACTIVE 2 18 IP'S25 MS PRESSURE TRANdSMITER -MS LOOP 12 205203. SHT. 2 OPAi B OPERABLE NIA IPI526A 1 100 OPERABLE N/A 4163 686-11 MS Pen Area ACTIVE 1 18 1PT526 MS PRESSURE TRANSMITR - MS LOOP 12 205203, SlIT. 2 OPA 1 B OPERABLE N/A 1P152GA 1 100 OPERABLE N/A 4159 684-IB MS Pen Area ACTIVE lop 18 1PTS34 MS PRESSURE TRANSITE, MS LOOP 13 205203, SET. 1 IPA I B OPERABLE N/A 1PL534A 1 100 OPERABLE N/A 4149 685-IC MS Pen Are. ACTIVE 2 11 1PT535 MS PRESSURE TRAMS)TTER, MS LOOP 13 205203. SHT. I IPA I B OPERABLE NIA IPI535A 1 100 OPERABLE NIA 4151 686.1C MS Pen Ares ACTIVE I 18 1FT536 MS PRESSURE TRANS!MITTER. .MS LOOP 13 205203. SET. I IPA 1 B OPERABLE N/A 1PI536A 1 100 OPERABLE NIA 4147 684-IC MS Pen Area ACTYVE CERTIFICATION:

The information idcntifying the equipment required to bring the plant to a safe shutdown noditionan this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belief, correct and accurate. (One or more signature of Systema or Operations Engineers)

John G. Connally/Senior Engineer J-C 5/11)95 Stephen P. Reichle I Technical Manager SPR 5/11/95 Print or Type Namedfitle Signature Date Print or Type Nam tfl'tle Signature Date

PAGE NOO SALEM GENERAIOSTATION - UNIT 1 DOCUMENT NO. 0014-018-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SU1PPORTING REQUIRED CL W NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL FE DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION loP 8 Ir544 MS PRESSUBR TRANSMI1TIR - MS LOOP 14 205203, SMT. 2 OPA I B OPERABLE Nfh. 1P1544A 100 OPErP-ABLE N/A 4155 G95.ID MS Pen Area ACTIVE 2 18 1PT545 MS PRESSURE TRANSM3TrER - MS LOOP 14 205203, SET. 2 OPA 1 B OPERABLE NIA IPI545A 1 100 OPERABLE N/A 4157 686-ID MS Pen Area ACTIVE I 18 iPTs46 MS PRESSURE TRANSMITTER - MS LOOP 14 205203. SHT. 2 OPA 1 B OPERABLE N/A IPI"48A 1 100 OPERABLE N/A 4153 684-iD MS Pen Area ACTIVE 20 I1ll EP 14KV iC*DD, I1CSD & 12CSD BKIl FAILPROT Aux S ENERG X/A RELAY RACK iRi i rANEL 1 100 ENERG N/A 9046 1 Relay Rm ACTIVE 20 1124 EP 1 4KV VITAL BUS IBDD, 1BSI & 12BSD BER AMx I S ENERG NIA FAIL PROT RELAY RACK 1 100 ENERG N/A 9047 1 Relay m ACTIVE 20 1R8 EP 1 4KV LADD,IUASD & 12ASD BER FAIL PROT Atux 1 S ENERG NIA RELAY RACK IR8 (PANEL)

I f0 ENERG N/A 9048 1 Relay Rm ACTIVE 3 I IRC40 REACT HEAD VENT SOLENOID VALVE 205201, SHT. I Cnmmnt 1 R CLOSED NR OR 1 130 CLOSED NR 3107 13 SIG Ara PASSIVE 3 5 IRO42 REACT FMAD VENT SOLENOID VALVE 205201, ST1'. CtmnIt I R CLOSED NB OR I 13D CLOSED NR 3108 13 SIG Area PASSIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a *afe shutdown condition on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief, correct and acmurate (One or more oeatWu-,e ofSystems or Operations Engineers)

John G. Coonoiy / Senior En&-e~r JC-C 511 /95 Stephen P. Reilile I Technic2I Manager SPE 51fl95 Print or Type Nameflde Signature Dare Print or Type Name/Title Signature Date

PAGE NO.@ SALEM GENERATMSTATION - UNIT 1 DOCUMENT NO. 0014.8-D901 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQITRED CL ID NUBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROLPWR DRAWINGS SYSTEMS L NO LOCALID LOCATION EQ FUNCTION ROB COMPONENT NO.

1 NIA IRCEI0-11 RC PER IITRS. BACK-UP GROUP 1 203003 NR N/A OFFION ISWGRICX 480V BUS FET NO. IC I GROUP 11 NR ON/OFF ISWGRICDC BME-lC23X NR ACTIVE 1COR 2102 1 N/A IRCE-lI2 RC PZR HIlE, BACK-UP GROUP 2 203003 NR NIA OFFION ISWGRIAX 480V VITAL BUS IA I GROUP 12 NER ONOFF ISWGRIADC NiR ACTIVE LADE 2102 3 21 IRCEZI PR PZR BLIEFTANKNO 1 205201. ET.I Cnant I S N/A NIA 1 078 N/A N/A 2020 1 PET Area PASSE 3 8 IRHI RH RHR COMMON SUCT MOV 205232. SET. 2 Cnat- I R CLOSED NR 1 078 CLOSED NR 3121 13 S/G. RCP & PZR PASSIVE Supports 3 8 1RHI RH PIam COMMON SUCT MOV 205232, SHT. 2 Cntmnt I SR CLOSED 1137 (4A) 1 078 CLOSED/OPEN IBDE 44DO 13 S/G. RCP & PZR ACTIVE Surpp-fts 3 8 iNH RH ERR COMMON SUCT MOV 205232. SHT. 2 Cntmnt I SR CLOSED 1]107 (4A) 1 078 CLOSED/OPEN LADE 4401 Cor at Elevatoy ACTIVE 3 8 IRE96 RH ROT LEG ISOLMOV 205232. SET. 1 Cntmnt I R CLOSED NR 1 0118 CLOSED NR 4417 Car at 13 PASSIVE Aafmmnlator 3 5 1RHEI RR I1 RtfR PMP 205232, SHT. I Ax I S OFF NR 1 045 7 OFF NR I rigA 2121A 3019A II RE Porp,Rm PASSIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shu tdron coodition on this Safe Sh utdown Equipmee t List (SSEL) is. to the best of my knowledge and belief, correct and acmxrate. (One or more signature of Systems or Operations Engineers)

John G. Connolly I Senior Engineex JGC 51115 Stephen P. Reichle / Technical Manager SPR 5/II/95 Print or Type Nameetfle Signatore Date Print or Type Name/Tile Signature Date

PAGE NO51 SALEM GENERATOSTATION - UNIT 1 DOCUMENT NO. 0014-06-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUrPPORT EI.SATTON NOTES REQD STATE CONTROL PWR DRAWINGS UNIT SYSTrEMS LINE NOS LA ROB COMPONENT NO. LOCATION EQ FUNCTION 1 5 1RHESI SB I1 RIS PMP 205232, SHT. 1 Aux 1 S OFF NA RKR-tA7D 1 045 OFF/ON NIA 4412 11RER ProppRm ACTIVE 3 5 IKVl2 R1H 12 ERR PMd 205232. SF1'. 2 Aux I S OFF NR 1 045 7 OFF NR 111C 2121C 3019C 12 ERRR.Pmp Rm PASSIVE 2 5 IRI3E2 RB 12 RER PMP 205232. SHIT. 2 Aux 1 S OFF NIA 1E3-I17D, 1 045 OFF/ON NIA 4403 12 RER Prop Rm ACTIVE 3 21 1RHE3 CC NO. 11 HR HX 205231, SHT. 1 Aux I S NIA NIA 1 045 NIA NIA 5137 11 SR Rx m PASSIVE 3 21 IRE[3 SB In RIR IX 205232, SHT. I AUxI S N/A NIA 1 045 7 NWA N/A IlIISB 2121B 3019B 10 RRH I-XRm PASSIE 1 21 IREE3 RIE II BRIIEX 205232, SRT. I A=Ie1 S NWA NIA I 045 NIA N/A 4414 11RHR Hx Im PASSIVE 3 21 IR11.4 CC NO. 12RH EX 2053 1, SET. I Aux I S NIA N/A 1 045 N/A NIA 5136 4405 12 RER ExRa PASSIVE 3 21 IR1_E4 RS 12 5Fl3X 205232. SM. 1 A=Il S NWA N/A 1 045 7 NIA NIA 1Ig1D 2121D 3019D 12 R BY ORm PASSIVE CERTIFICATION:

knowledge The informeatien identifying the equipment required to bring the plant to a safe ahut&os condition on this Safe Shutdown Equipiment List (SSEL) is. to the best ofray and belief. corre-t and accurate. (One or more signaturo ofSystems or Operations Eagineers)

John G. Connolly / Senior Engineer JGC 3/11/95 Stephen P. Reichle / Tchnical Maoaager SPR 5i1/95 Print or Type Name/Title Signature Date Pzict or Type Nme/itle Siguature Date

PAGE NO.

  • SALEM GENERATI*STATION - UNIT 1 DOCUMENT NO. 0014-#8-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES SYSTEM SUPPORT UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL M ROB COMPONENT NO. LOCATION EQ FUNCTION 20 IRP1 EP i REACTOR PROPTCONTROL ROOM STATUS Aa I S ENMRG NZA PANEL 1 122 ENERG N/A 9117A I Control Rm ACTIVE 20 IRP2 EP I REACTOR PROT CONTROL ROOM Aux 1 S ENERG N/A RECORDER PANEL 1 122 ENEEG N/A 9049 1 West Elevatar ACTIVE 20 IRP4 EP I REACTOR PROT CONTROLROO0M Aux I NIA ENERG N/A RECORDER PANEL I 122 21 WENG N/A 9127, Cmotl Em ACTIVE 3 i lSF36 CV RWPF OUTLET V TO XFR CANAL 205233 IPA I NWA CLOSED NIA 1 078 1 CLOSED N/A 3010 1110 211.2 MwIlPe.n Are PASSIVE 3 I ISP37 SF RWPP TO SF? DM 201233 Aux I N/A CLOSED N/A 1 100 CLOSED N/A I I0SB 21105 SO0B Ion ExO.hRz11DM pASSIV Alley 3 I tSF38 CV SF" DM OUTLET VLV TO RW?? 205233 Aux I NIA CLOSED N/A 1 100 1 CLOSED NIA 3009 1109 2111 Ion Exch Rm/DM PASSIVE 3 1 1SF74 SF REFUELING CANAL DRAIN LINE CRE VLV 205233 N/R N/A CLOSED N/A I NIB CLOSED NIA S108A2II0A 3008A N/R PASSIVE 3 21 1SFEL2 CC SPENT FUEL PITHX 20523I. SHT. 2 AuxlI S N/A N/A 1 084 N/A NIA 5114 Main Corridor PASSIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a aofe shutdown condition on this Safe Shutdown Equipment LiWt(SSEL) is. to the beat of my knowledge and belief, correct and anurate. (One or more signature ofSystemus or Operationn Engineers)

John G. Cozonely )Senior Eonieer JOC 5111105 Stephen P. ReirIle I Tedcmieal Manager SPE 5/21%5 Print or Type Nameflitle Signature Date Print or Type Nameflitle Signature Date

PAGE NO.@ SALEM GENERA STATION - UNIT 1 DOCUMENT NO. 0014- 9 8-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM1 STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNTr CONTROL PWR DRAWINGS SYSTEMS LIEENOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 1 8 ISJI CV RWST TO CHG MIPS STOP MOV 205234. SEIT. I A=o I SR CLOSED 11110 (TA) 1 084 1 OPEN ICDE 3020 1120 21L22 W/M Tk &Prp Rn ACTIVE 3 8 1SJ12 Cv BTr 0UTlET MOV 205234, SHT. 1 IPA I R CLOSED NR 1 078 1 CLOSED NR 3029 1129 2131 Bitl.n LowewLvi PASSIVE 3 8 I1JI3 CV BIT*1o(rLETMOV 205234. SRT. I IPA I R CLO= NR 1 078 1 CLOSED NR 3030 1130 2132 Bit RPnLower Lv PASSIVE 2 8 1SJ2 CV RWST TO CHG PMYS SMOP MOV 205234, SET. 1 A- 1 SR CLOSED 01109 (IA) 1 084 2 OPEN IEDE 3021 1121 2123 W&MTk & Pmp Rxn ACTIVE 3 21 ISJSE CV REFUEL WTR STORAGE TANK HX NO 1 205234. SHT. 1 Aux 1 S NIA N/A 1 064 1 NIA N/A 3043 1143 2145 PompRM PASSIVE 3 5 ISJE100 SW 11 SJ PMP LUBE OIL CLR 205242. SHT. 4 Aux 1 B N/A N/A 1 084 NIA N/A 5354 1qJE2 11 SI Prop Rm PASSIVE 3 5 ISJEI01 SW 12 SJ PMP LURE OIL CLR 205242. SLT. 3 Aux I B N/A N/A 1 084 NIA N/A 5287 lSJrF 12 SI Prop lmn PASSIVE 3 5 ISJE2 SW I I SAFETY INJECTION PUMP 205234, SET. 2 Aux I S N/A N/A 1 084 22 NIA N/A 5354A 11 SI Prop Rom PASSIVE CERTIFICATION: kx The inofrmation identifying the eqoipment required to bring the plant to a safe shutdown *ndition ca tbis Safe Shutdown Eq*ument.Lit (SSEL) i3. to the hest ofmy knowledge and belief. correct and accurate. (One or more signature of Systems or Operations Engineers)

John G. Connolly I Senior Engineer JGC 5111/95 StephenP. IReiclle I Tachmial Manager SPR 511119s Print or Type Name/Title Signature Date Print or Type Nameftilo Signature Date

PAGE NO.19 SALEM GENERATI 9 STATION - UNIT 1 DOCUMENT NO. 0014-.8-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWv SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTrROL PR DRAWINGS SYSTEMS LINE NOS LOCAL ID LOCATION ROB COMPONENT NO. EQ FUNCTION 3 5 ISJE3 SW 12 SAFETY INJECTION PUMP 205234 SET. 2 Aux 1 S NIA NIA 1 084 22 N/A N/A 5287A 12 SI Prop Rm PASSIVE 3 21 ISJE4 CV BORON INJECTION TANK NO. 1 205234, SET. I IPA I S NIA N/A 1 078 1 NIA N/A 3028 1128 2130 Bit Rm Loer LvI PASSIVE 3 21 1SJES CV Refueling Water Storage Tank 205234. SHT. I Yard S N/A NIA 1 100 1 NIA NIA 3001 1101 2103 1 RWST Ar.a PASSIVE 2 8 1SV1043 VII SV FOR ICAAIS-DMOP 205248, SHT. 2 Autx I BR DENRG/ENRG 11131 (3D) ICAA15-DMOP 1 122 ENERG ISV703 5706 724.D I CcRA/C Rm ACTIVE lop 8 1SVI044 VI SVFOR ICAAI6-DMOP 205248, SiTý 2 Amr 1 ER DEN5RG/ENRG 11133 (41) 1VHEM 1 122 ENERG 5709 724-E 1 CR A.C Rm, ACTIVE 1 8 1SV1045 VH SV FOR IVHE28 253321. SHT. 2 Aim 1 BR DEENERG 11104 (3G) 1VHE28 1 100 ENERG 5011 726-IA A DG Control Rm ACTIVE 1 8 ISVI046 VII SV FOR zVBH15 205321. 55?. 2 A=n1 E DEENERG 11104 (2G) 1VME25 I 10O 17 ENERG

,X01 IAD/G Em ACTIVE 1 8 1SV1047 VH SVFORiVE*M2S 205321,SET. 2 AnxI BR DEENERG 11105 (3G) IV1ES 1 100 ENEEG 5809 726-IC I1 DI/ Control Rm ACTIVE CERTIFICATION:

The information idenfitfing the eqoipment required to bring the plant to 2 safe shutdown condition on thi Safe Shutdown Equipment List (SSEL) is. to the beat of toy kmowledge and belief. correct and acru-ate. (One or more signature of Systems or Operotioen. Eogineers)

Johln G. Connolly / Senior Engeer JGC 5/sims Stephen P. Rekible I Technical Mauagr SPR 5/11s95 Poet or Type Namethle Signature Date Print or Type Name/Title Signature Date

PAGE NO.* SALEM GENERAT1OTATION - UNIT 1 DOCUMENT NO. OR14-S-DON1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENTr SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCA ED ROB COMPONENT NO. LOCATION EQ FUNCTION 1 8 ISVIO48 VH SV FOR 1VHE26 205321, SHT. 2 Aux I BR DEENERG 11105 (2G) IVEEm 1 100 ENERG 5803 726-ID IB DIG Rm ACTIVE 1 8 ISVIO49 VI SV FOR IVHE3o 205321, SHT. 2 Aux I BR DEENERG 11106(3G) IVEEE30 1 10o ENERG 5807 726-IB IC DIG Comtrol Rm ACTIVE 1 8 ISVI050 Vy SV FOR 1VH-E27 205321. SHT. 2 Arx 1 BR DEENFG 11106 (2G) IVHE27 1 10o ENERG 5805 726-1F IC DIG Rm ACTIVE 3 8 ISVII0 CV SV FOR 12SJ50 205234, SHT. 3 NR R DEENERG NE 12SJ50 1 NR 1 DEENERG NR 3013A 1113A 2115A NR PASSIVE 3 8 ISVIIl CV SV FOR I ISJS5 205234, ST. 3 NR R DEENERG NR IISJS0 1 NR 1 DEENERG NR 3012A 1112A 2114A NR PASSIVE 3 8 ISVills SW SVFORAO IISW57 205242, SM.6 IPA I R ENERO IAADC 115W37 1 078 ENERG 5235 827--LA Mech Penet Area ACTIVE 3 8 ISVI 116 Sw SV FOR AO 12SW57 205242, SHT. 6 IPA 1 R F-NEG LHBDC 12SW57 1 078 ENERG 5247 827-I Mech Penel Aea ACTIVE SG BIaG Nea 3 8 ISVI117 SW SV FOR AO 13SW57 205242, SHT. 6 IPA R ENER(O ICCDC 13SW57 1 100 ENERG 5259 827-,D NBD Area ACTIVE CERTIFICATION:

The information identifying to bringthe plant to asah srhutdown condition on this Safe Sbutdon Equipment List (SSEL) is. to the best of my knowledge the equipment required and belief,correct and aturate. (One or more signaotoe efSystes or Operations Engineers)

John G. Connolly fSenior Engineer JGC V2IMS Stephen P. Reirhle / Tirechnial Managea SPR &I V95 Print orType Namef'*le Signature Date Print orType Natuefre Sign.tm.e Date

.-.. W

9 PAGE NO. SALEM GENERATI#STATION - UNIT 1 DOCUMENT NO. 0014-076-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ED NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTPS REQD STATE CONTROL PWR DRAWINGS LOCAL ID LINE NOS ROB COMPONENTS NO. LOCATION EQ FUNCTION 3 8 ISVI 118 SW SV FOR AO 14SW57 205242, SHT. 6 IPA 1 R ENERG IBBDC 14SW57 1 078 ENERG 5329 827-lC Mech Penet Area ACTIVE SG Blow Dn Hx 3 8 ISVIl19 SW SV FOR AO 15SW57 205242. ST.6 IPA I R ENE-G 1CCDC 1*57 1 100 ENERG 5317 827-lE SIG BjD Area ACTIVE I a ISVII98 PR PORVACCUM OUTLET SOL VLV 205201S SHlT I Catont I SR DEENERG LAADC 211310-B-9508 IPD9859 1 130 DENRG/ENRG 2105A I Par Area ACTIVE lOP 8 ISV1199 PR PORVACCUM OUTL'ErTSOL VLV 205201, SHT 1 Cbtmnt I SR DEEN-EG IBBDC 211310-B-9508 IPD986M 1 130 DENRGIENRG 210533 I Per Area ACTIVE 3 8 ISVI468 SW SVIFORAO ILSW223 205242, SHT. 6 IPA 1 R ENERG 1AADC 11SW223 1 078 ENERO 5245 827-IA Mech Peanet Area ACTrVE 3 8 ISV1470 SW SV FOR AO 12SW223 205242. SHT. 6 IPA I R ENERG IBBDC 12SW223 1 078 ENERG 5257 827-IB Mech Penet Area ACTIVE SO Blow Dn Hx 3 8 1SV3473 SW SV FOR AO 14SW223 205242. SHT. 6 IPA I R ENERG IBEDC 14SW223 1 078 ENERG 5339 827-IC MeCh Penet Area ACTIVE SG Blow Do Hx 3 8 1SV1475 SW SV FOR AO 13SW223 205242, SlT 6 IPA I R ENERG ICCDC i3SW223 I Oo ENERG 5270 827- ID S/G BID Area ACTPIVE CERTIFICATION:

The information identfying the equipment required to hzing the plant to a safe shutdown condition on this Safe Shutdown Equipment List (S'EL) i to the best olmy knowledge and belief. correct and accurate. (One or more signature of Syo3tms or Operations Rogineem)

John G. Connolly ISenior Engineer JGC 5f11/95 Stephen P. Reirble / Technicsl Manager SPR 5/II195 Print or Type Name/ritle Signature Date Print or Type Name/ritle Signature Date

PAGE NO.* SALEM GENERATIh TATION - UNIT 1 DOCUMENT NO. 0014-#8-DOO0 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES R1EQD STATE DSAWINGS SUPPORT UNIT CONTROL PWR SYSTEMS LOC Ii LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 9 ISV1477 SW SVFOR AO 15SW223 205242. S*.T 6 EPA 1 R ENEEG 1CCDC 15SW223 1 100 ENERG 5327 827-IE SIG BID Area ACTIVE 3 8 1SV1499 SW SVFOR AD 12SW376 205242, SHT. 4 Aix 1 R DENRG/ENRG NR 12SW376 1 SV FOR AO 12SW380 084 DEENEEG N 12SW3g0 5349 835-IB 12 CC Hx*Rm ACTIVE 30P 8 1SV259 SW SV FOR SW STR B/D CONT V 205242, SRT. I Yard R ENEGGDE.NG 11103(IG) ISWE7 1 100 ENRG/DENRG 5204 979-IA Srv Wtr Bldg ACTIVE 3OP B ISV260 SW SV FOR SW STR BID CONT V 205242. SHT. I Yard R ENRGIDENRG 11103(2G) 1SWES 1 100 ENRGIDENRG 5208 979-IB Srv Wr Oldg ACTIVE 2 8 1SV261 SW SV FOR SW SIR BID CONT V 205242, SMT. I Yard R ENRGADFNEG 11126 (1O) 1SWE9 1 100 ENRGIDENRG 5213 979-IC Srvc Wtr Bld ACTIVE 2 $ ISV262 SW SV FOR AO 14SW24 205242. SRT. 2 Yard R ENEGIDENRG 11102 (IG) ISWEI0 1 100 ENRG/DENRG 5298 979-ID Sk, Wtr Bldg ACTIVE 1 8 1SV263 SW SV FORAO 15SW24 205242.ST. 2 Yard R ENRG/DENRG 21101 (1G) 1SWEII I10o KNRG/DENRCG 5303 979-LE Srvc Wtr Bklg ACTIVE 1 1V264 SW SV FORA0 16SW24 205242, SET. 2 Yard R ENRG/DENRG 1101 (2G) ISWE12 I 10o ENEGIDENRG 5307 979-IF Srw Wtr ldg ACTIVE CERTIFICATION:

The information identifing the equipment required to hbidogthe plzat tI a safe sn*utdown condition on this Safe Shutdoýn Eqvipment List CSEL) is, to the best of my knowledge and belief corxect and a*urate (One or more signature of Systems or Operations Enneemr)

John G. Connolly (Senir i JSC 5/11 ,91 Stephna P. Reidile / Technical Manager SPR S 1195 Phint or Typo Nameofltle Signature Date Print orType NaiMeritle Signature Date

PAGE NO.* SALEM GENERATSTATION - UNIT 1 DOCUMENT NO. 0014-*&-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWE SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LCLI LOCATION EQ FUNCTION ROn COMPONENT NO.

1 8 1SV270 MS SV FOR AO 13MS169 205203. SHT. 1 IPA I R DEENERG ICCDC 1S3MS169 1 I00 ENERG IDDE 4116 MS Peo Area ACTIVE 1 8 lSV271 MS SVFOR AO 13M5171 205203. SHT. 1 IPA 1 R DEENERG IDDC 13MS171 1 100 ENERG IDDE 4118 MS Pen Area ACT'M I 8 1SV274 MS SVFORAO 11.MS169 205203, SHT. 1 IPA I R DEENERG 1CCDC I1MS169 1 10D ENERG ICDE 4107 MS Pen Area ACTIVE 1 a 1SV275 MS SVFOR AO 1IIS171 2015203, SHT. 1 IPA I R DEENIERG IDDC ]IMSITI 1 100 ENERG ICDE 4109 MS Pen Area ACTIVE 2 8 1SV280 MS SV FOR AO 12MS169 205203. SHT. 2 OPA i R DEENERG 1CCDC 12MS169 1 700 ENERG ICDE 4136 MS Pen Area ACTIVE 2 8 ISV281 MS SV FOR AO 12MS171 205203. SET. 2 OPA I R DEENERG IDDC 12MS111 1 100 ENE2 G ICDE 4138 MS Pen Area 1 8 1SV284 MS SVFORAO 14MB169 205203, SET. 2 OPA I R DEENEG ICCDC 14MS369 I 100 ENERG IDDE 4125 MS Pen Area ACTIVE I a ISV2B5 MS SV FOR AO 14MS171 205203. SHT. 2 OPAl R DEENERG IDDC 14M5171 1 100 ENERG 1DDE 4127 MS Pen Area ACTIVE CERTIFICATION:

The ionformation identifying the equipmea t required to bring the plant to a sofe shutdown condition on this Sare Shutdown Equipment List (SSEL) is, to the best of my knowledge and belief, correct and arcurate. (Oe or more ignature of Systems or Operations Engineers)

John G. Connolly Senior Engineer JGC 5111135 Stephen P. Reichle I Tecltaical Manager SPR 5111/95 Print or Type N-aeltile Signature Date Print or Type Name/Title Signature Date

PAGE NO.9 SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014-0 8-D001 DATE 511195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAW*NG BUILDING EVAL NORM STATE MOTIVE PWB SUPPORTING REQUDKED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWI DRAWINGS SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

3 8 1SV424 PR SV FOR IPRI4 205202. SET. 1 NR R DEENERG NR 1 NR DEE'ERG NR 2023 NR PASSIVE 3 8 1SV426 CII SV FOR AO 1CE168 205216. SET. 1 Aux I R ENFRG NER 1CH18 1 122 DERNERG NR 5426 CR AC Rom ACTrVE 3 8 1SV442 CV SV FOR ICV114 205228. SITr. 3 Cntmot I BR ENERG NR 1 078 DEENERG NE 3129 Coreodtor at 13 ACTIVE Arccsnalato'r 1 8 1SV489 CV SV FOR 1CV2 205228, SET. 2 Cntrant I BR ENERG NR 1 078 DEENERG NE 3125A WkTy at#14 ACTIVE Arcumtola=o 2 8 ISV490 CV SV FOR ICV277 205228. SET. 2 Cntmnt 1 BR ENERG NR 1 078 DEENERG NR 3126A Wiey at014 ACTIVE Accnuulator 1 8 ISV50 CV SV FOR ICV278 205228, SIET. 2 NE R DEENERG NE 1 NR DEENERG NR 3122A NR PASSIVE 3 8 15V809 MS SV FORAO 1.S32 205203, SlIT. I Aux 1 R ENEG NR 1MS132 1 084 DEENERG NR IM052 4101 13A=x Fd Prop Rm ACTIVE 2 8 ISV58i MS SVFORAO 12MS18 2052013,S-T. 2 OPA I R DEENERG NR 12I5S18 1 I00 DEENERG NR 4140 MS Pem Area PASSIVE CERTIFICATION:

The inaormation identifying the equipment required to bring the plant to a safe shutdoa condition on this Safe Sbutdou a Equipment List (SSEL) is, to the best of my knosledge and belief, correct and acurate. (One or more mgnature of Systems or Operations Engineers)

John G. Connolly I/nior Engineer JGC 5111/95 Stephen P. IReichle I Technijnl Monnnger SITR NI1/9 Signaturm Date Print or Type Name/Title Signature Date Print or Type NameTitle

PAGE NO. SALEM GENERAT 4 STATION - UNIT 1 DOCUMENT NO. 0014-08-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE 5MOTIVE PWR SUPPORTING REQUIRED CL EDNUM1BER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWVR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 1 8 ISV583 MS SVFOR AO 14MS18 205203, SHIT.2 OPA i R DEENERG NR 14MS18 1 100 DEENERG Ni 4129 MS Pen Area PASSIRVE 1 8 ISV585 MS SV FOR AO 13MS18 205203, SET. I IPA I R DEENERG NR 13MS18 1 100 DEENERG NRT 4120 SPen Area PASSIVE 1 8 1SV587 MS SVFORAO IILMS*1 205203, SET. 1 IPA 1 R DEENERG NER lmS18 1 100 DEENERG Ni 4111 MS Pen Area PASSIVE 3 8 ISV590 SW SV FORAO 1ISW39 & 1SW40 205242, SEIT. 3 Anx I DR ENERG NR IL 1 100 DEENERG NR 1 1SW40 5221 11SW39 Lt DIG Rm ACTIVE 3 8 ISV591 SW SV FOR AD 12SW39 & 12SW40 205242, SET. 3 Aux 1 BER ENEG NR 12SWI39 1 100 DEENERG NE 12SW40 5223 12SW39 1B D/G Rm ACTIVE 3 8 1SV592 SW SV FOR AO 13SW39 & 13SW40 205242, SHT. 3 Aux I BE ENERG NR 13SW39 100 DEENERG NlR 13W40 1

5225 13SW39 IC DIG Rm ACTIVE 3 8 1SV593 SW SV FOR AO 11SW92 205242. SHT. 5 IPA I R DEN'RG/ENRG ISWGR1AX 1CHE7 1 10o ENERG ISWGR1ADC 5341 Ch Wtr Prop Area ACTIVE 3 8 ISV594 SW SV FORAO 12SW92 205242, SMT. 6 IPA i R DENRO/ENRO ISWGRIBX ICHE8 1 100 ENERO ISWGRIBDC 5344 C Wtr PompArea ACTIVE CERTIFICATION:

The inforoation identifing the equipment requiied to bIning the plant to a safe shutdown condition on this Safe Shutdown Equipment List CSSEL) is. to the best of my knowledge mndbelief, correct and aocu.ate. (One o more signature of Systems or Operations Engineers)

John G. Connolly i Senior Eugineer JGC 5/11V95 Stephen P. Reichle I Technical Manager SPR slim Print or Type NameTitde Signature Date Print or Type NaineJ*te Signature Date

PAGE NO* SALEM GENERATIW6TATION - UNIT 1 DOCUMENT NO. 0014-*ijs-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER CONTROL PWR~ SYSTEM DRAWINGS SUIPPORT UNE L L ELEVATION NOTES REQD STATE SYSTEMS LIKE NOS LCLI LOCATION EQ FUNCTION ROB COMPONENT NO.

3 8 1SV595 SW SV FOR AO 13SW92 205242, SET. 5 IPA 1 R DEN.G/ENRG 1SWGR1CX ICEE9 SV FORAO 13SW93 1 100 ENERG ISWGR1CDC 5289 C Wr PmpAeA ACTIVE 3 8 ISV596 SW SVFORAO ISISW13 205242, SHT3 Azx I BR ENERG 11131(2J) 1VHE31 1 045 8 ENRGIDEN'G 5277B 101-1 11RE Rm&Inst ACTIVE Ratk 101 3 a ISV601 SW SVFOR AO 11SW129 205242, SET 3 Aux 1 BR ENRGIDENEG NR IVIE33 1 084 DEENERG NR 5278 207-1 12 AuexFd Prop Rzm ACTIVE 3 8 iSV602 SW SV FOR AO ISW137 205242. SET3 Aux I BR ENRGIDENRG NE IVHE36 1 084 DEENERG NR 5275 205-1 12 Aux Fd Pmp R- ACTIVE 3 8 15V603 SW SV FOR AO 12SW129 205242, SilT. 4 Aux 1 BR ENRGIDENRG NR IVE34 1 054 DEENLERG N 5351 206-1 12 Awe Fd Prop Ram ACTIVE 3 8 1SV604 SW SV FOR AO 12SW153 205242, SHT. 4 Aux 1 BR ENERG 11132 (2J) IVEI32 1 045 ENRG/DENRG 5350B 102-1 Insfruzment Rack ACTIVE 102 3 8 1SVG05 SW SV FOR AO 1SWI85 205242, SHT. 4 Aux 1 R DEEqERG NR 1SW185 1 084 DEENERG NR 5357 ChrgPmp Vlv Alley PASSIVE 3 8 ISV606 SW SVFORAO ISWI91 205242, S*T. 4 Aux 1 BR ENRG/DENRG NR IVBE37 1 084 DEENERD NR 5359 229-LB Chrg Pnrp VIv Alley ACTIVE CERTIFICATION:

The information ide=4if~,ng the equipment required to bring the plant to a safe shnt*lown condition amthis Safe Shutdown Equipment List (SSEL) is, to tde best of my knowledge and belief. correct and accurate. (One or more signature ofSystems or Operations Engineers)

John G. Conmolly I ienior Engineer JGC 5/11/95 Stephen P. Reicble / Techbial Manager SPR 5L1g95 Signature Date Print or Type Namartltie Sigmatae Date Print or "ýpe Nameeltle

PAGE No0 SALEM GENERA STATION - UNIT 1 DOCUMENT NO. 0014-.8-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTRM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWB DRAWINGS SYSTEMS LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION a 89 15V607 SW SVFOR AO ISWIS9 205242, SHT. 3 A=n 1 R DEENERG NR ISW1M 1 084 DERNERG NR 5285 Chrg Pm., Vlv Alley PASSIVE 3 8 ISVG08 SW SV FOR AO ISW205 205242. SET. 3 Aux I R ENRG/DENRG NR 1VVE38 I 084 DEENERG NR 5282 Chrc Pmp VIv Alley ACTIVE 3 8 ISV610 SW SV FORAO 1SW213 205242, SET. 4 Aux I BR 3"NRCJDENRG NR IVHE39 1 084 DEENERG NE 5363 229-lA Chrg Prop Viv Aney ACTIVE a 8 1SV613 SW SV FORAO 11SW122 205242. ST 3 Aux 1 BR DENERGMENG NR IISW122 1 084 DEENERG NR 5272 203-1 11 CC Plop 1zo ACTIVE 3 B 1SV"22 SW SV FOR AO I ISW58 205242, SIT. 6 IPA I R DEENRERG NRt ISW58 1 078 DEENERG NR 5237, Mech Penet Area PASSIVE 3 8 1SV623 SW SV FOR AO ISW-72 205242, SHT. 6 IPA 1 R DEENERG NE 2lSW72 1 078 DEENERG NR 5243 Meo Penet .Ana PASSIVE 3 8 L-V625 SW SV FOR AO 12SW58 205242, SHT. 6 IPA I R DEENERG NE 12SW8B 1 078 DEENERG NR 5249 Merh Penet Area PASSIVE SG Blow Dn Ex 3 8 1SV626 SW SV FOR AO 12SW72 205242, SET. 6 IPA I R DEENERG NR 12SW72 1 078 DEENEEG NE 5255 Mech Penet Area PASSIVE SG Blow Dn Hx CERTIFICATION:

The information identifyin g the equipment required to bring the plant to a safe 3hutldown condition on this Safe Shutdown Equipment List (SSEL) is. to the beat of my knowledge and belief. correct aud ac-urate. (One or more signature orSystema or Operations Engineers)

Jabl G. Connolly fSeniar Engineer JGC 5/11]295 Stephen P. RachlTe]heelMnager SPR 51/Z/95 Print or Type Name/Title Signature Date Print or Type Nam eTile Sigeatore Date

PAGE NOO SALEM GENERA* STATION - UNIT 1 DOCUMENT NO. 0014-#8-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DEAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NFU.BER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UN=T CONTROL I'WR DRAWINGS SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROD COMPONENT NO.

3 8 ISV628 SW SV FOR AO 135W58 205242. SHT. 6 IPA I R DEENERG NR 13SW58 1 100 DEENEEG NR 5261 S/G B/D Area P.ASSIVE 3 8 ISV629 SW SV FOR AO i3SW72 205242, 5IT 6 IPA 1 R DEENERG NR 13SW72 I 100 DEF-NERG NE 5268 S/O M/D Area PASSIVE 3 8 ISV631 SW SVFOR A0 14SW58 205242, SHT. 6 IPA 1 R DEENERG NE 14SW58 1 078 DEENERG NR 5331 Mech Penet Area PASSIVE SG BSic Do 13X 3 8 ISV632 SW SV FOR AO 14SW72 205242. SET. 6 IPA I R DEENERG NR 14SW72 1 078 DEENERG NR 5337 Mech Penet Azea PASSIVE SG Blow D Ex 3 8 1-V634 SW SV FOR AO 15SW58 205242. SE'l. 6 IPA 1 R DENES G NR 155W58 1 100 DEENEEG NR 5319 S/G B/D Area PASSIVE 3 8 1SV635 SW SV FOR AO 15SW72 205242. SHT. 6 IPA 1 R DEENERG NR 15SW72 1 100 DEENEG NR 5325 SIG BID Area PASSIVE 1 8 15V695 VII SV FOR ICAAI7-DMOP 205248. SliT. 2 Au= 1 BR ENEEG NR iCAAi7-DMOP 122 DEENERG NR ISVT03 1

5701 407-1 I CR A/C Ri ACTIVE 3 8 1SV706 GB SVFORAO IGB4 205225, SHT. 2 IPA 1 BR ENERG NR 1I 1o DEEKERG NR 4501 325-1 STM GEN BID ACTIVE AREA CERTIFICATION:

The information idectifying the equipment required to bring the plant to a safe butdsown cruditioi on this Safe Shutdown Equipment List (SSEL) is, to the be3 cf my lo1.Iedge and belief. co-rrect end a-rater (One or moee signature of Systeni or Operations Engineers)

John 0. Connolly / Senior Engiveer JGC 8/I /915 Stephen P. Reioldo I Technical Manager SPR 5111J96 Print or Type Name/title Signature Date Print or Type Name/title Signature Date

PAGE NO. 9 SALEM GENERATINSTATION - UNIT 1 DOCUMENT NO. 0014-0O8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTE31 EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER ELEVATION NOTES CL ID NUMBER REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 8 1V707 GB S' FOR AG 12GB4 205225, SET. 2 IPA 1 BR ENERG NR 1 100 DEENERG NR 4505 325-1 STM GEN B/D ACTIVE AREA 3 8 1SV708 GB SV FOR AO 13GB4 205225. SHT. 2 IPA I RR ENERG NR 1 100 DEENERG NR 4509 325-1 STM GEN BID ACTIVE AREA 3 8 ISV709 GB SV FOR AO 14GB4 205225, SHT. 2 IPA I BR ENERG NR 1 100 DEENERG NR 4513 325-1 STM GEN BID ACTIVE AREA 1 8 i1SV59 PR SV FOR IP~l 205201, SHT. I Catmat t BR DEENERG LAADC 1CA-ED-0148B 130 ENRGDENEG lADE A-EC-0398B 1

2003 iPRI 1Pzr Area ACTIVE 1 8 ISV759 PR SV FOR IPRI 205201, SET. I Currat I BR DEENERG NE ICA-ED-0148B 10 DEENERG NR ICA-E"398B I

3104B IPRI I Pt Are2 PASSIVE lop 8 is1V60 PR SVFOR IPR2 205201, SET. I Cnbent I BR DEENERG IBBDC 1CA-ED-0148A 130 ENRG/DENMG IBDE ICA-EC-0398A 1

2008 IPR2 I Pzr Are ACFIVE lop 8 LSV760 PR SV FOR IPR2 205201, SIfT. I Cntmnt i R DEENERG NR 1 130 DEENERG NR 3105B I P- Area PASSIVE 1 8 ISV920 VH SVFOR jCBVIS-DMOP 203238, SET. 2 Cntsnt I BR ENERG NR IVEIE15 SVFOR ICBV17-DMOP 1 1-30 DETNERG NR 5909 440- LA II CFCU ACTIVE CERTIFI CATION: 4 The information ide thig the equipment required to brng the plant to a safe shutdown cendition on this Safe Shutdown Equipment list (SSEL) is, to the best of my knowledge and behlef. correct and acurate. (One or more signatmu ef Systems ar Opera-tiOs Engineers)

John G. Coanolly I Senior Engineer JGC 5111/95 Stephen P. RBaleI/Technical Marager SPR ./11/95 Print or Type Nameffitlc Signature Date Print = Type Name/E1de Signat-e Date

PAGE NO.@ SALEM GENERATI STATION - UNIT 1 DOCUMENT NO. 0014#8-DOl1 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUBI-ER NUMBER SYSTEM SUJPPORET UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS LOCAL ED LINE NOS ROB COMPONENT NO. LOCATION RQFUNCTION I a ISV921 VII SVFOE iCBVI3.DMOP 205238, SET. 2 Ontamt I BR RNERG NR 1VREIG 1 SV FOR ICBV14-DMOP 330 DE-ENEEG NR 5913 440-IB 12 CPCU ACTIVE 1 8 1SV922 VH SV FOR ICBV9-DMOP 205238, SHT. 3 Ontmat I BR RI/ERG NR 1VBE[7 1 SV FOR ICBVIO-DMOP 130 DEENERF-O NE 5918 440-IC 13 CFCU ACTIVE 1 8 15V923 VH SV FOR ICBVG-DMOP 205238, S=IT. 3 Cetmt I BR FBERG NR 1VHEI8 1130 SV FOR 1CBVS-DMOP DEENEERG 521 5923 44a1.D 14 CFCU ACTIVE 1 8 ISV924 VEI SV FOR 1CBV22-DMOP 205238, SH.T 2 Cntmnt 1 BR ENERG NER IVH19 SV FOR 3CB'V21-DMOP I 130 DEENERG NR 5903 440-IE 15 CFCU ACTIVE 3 7 15W137 SW AP P1*P M CLR SW CONT V 205242, SET 3 Aon I S CLOSEDIOPEN N/A ISV602 1 084 8 OPEN N/A 5274 12 Aux Fd Pop Rm ACTIVE 3 7 ISW185 SW CHG PMP LO CLR SW CONT V 205242. SET. 4 Aere 1 N/A OPEN NA 3SV5O5 1 084 OPEN NIA 5356 Che Peep Viv Alley PASSIVE 3 7 ISWI91 SW CHG PMP RM CLR SW CONT V 205242. SHT. 4 Au.1 S CLOSED/OPEN N/A 1SV606 1 084 OPEN N/A 5358 Chrg Prop VIv Alley ACTIVE 3 7 ISWI99 SW 32 CHGPMPLO CLR CONT VALVE 205242. SHT. 3 Auei 1 N/A OPEN NIA 1SV607 1 084 OPEN N/A 5284 Cbxg Prop Vlv Alley PASSIVE CERTIFICATION:

The information identifying th e equipment required to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment ist (SSEL) is. to the best of my knowledge and belief, coeerrt and accurate. (One or momefdgntnre ofSystems or Operations Engineee*)

John G. Connolly / Senior Engineer JC 5111/95 Stephbn P. Relcle JTechnical Manager SPR 5111195 Print or Type Nameftlide Signasuce Date Print or Type Namefi'tle Signature Date

PAGE NO 9 SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014-78-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMEN"T SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PVR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LCLI ROB COMPONENT NO. LOCATION EQ FVCTnON 3 7 1SV205 SW CHG PMP ROOM CLE SW II/LBT V 205242, SET. 3 A= 1 S CLOSED/OPEN N/A 1SVC6I 1 O84 OPEN NtA 5251 Chr Prop Vl Alley ACTIVE 3 7 1SW213 SW,¥ CHGPPERMCLRSWCONTV 205242.,SHT. 4 A-1l S CLOSED/IOPEN* N/A ISV610 1 084 OPEN N/A 5362 Chrg Prop Vlv Alley ACTIVE 3 a ISIV26 SW TG HDR INET= MOV 205242. SHT. I Yard SR OPEN 1112G(2n 1 100 CLOSED IBDE 5216 Sr Wtr Bldg ACTIVE 30P I ISW306 SW S.W. PUMP RECIRC ISOLVLV 205242, SET. I Yard N/A OPEN N/A 1 100 4 CLOSED N/A 5292 Srvc Wtr BRif ACTIVE 3 7 ISW308 SW RECIRC CONTROL V pNL740-2GG 205242, SET. 1 Yard S OPEN N/A 1 100 9 CLOSED N/A 5293 Srw Wtr Bldg ACTIVE 301, 6 ISWEl SW I I SERVICE WATER PUMP 205242, SHT. 1 Yard S ONIOFF NIA BItR-lC3D 1 110 ON N/A 5200 Sc Wtr Bldg ACTIVE 2 0 1SWEI0 SW 14 SW PUP1'DISCE STRAIE 205242, SET. 2 Yard S OPERABLE N/A S100 OPERABLE N/A 5256 Srvc Wtr Bldg PASSIVE 2 0 1SWEl0.MTRY SW I4SWSTRAIlNERTI,. 207903 Yard BR OFF 11102 (IG) 1 100 OFFION 5320 ISWE1O Src Wtr Bldg ACTIVE CERTIFICATION:

Th infaormation ideuffying the equipment requim to bring the plant w a e shutd condition en thisSde Shutdew Equipment list (SSEL) to the best f my kuwledge and belief. correct and azuorata. (One er mere signeture or Systoms or Operations Engineers)

John G. CoannIly I Senior Engineer J-C /111195 Stephen P. Rei./e I Tecduical Manager SPR 5/11)95 Print or Type NamemTtle Signatuxe Date Printor Type Nameflile Signature Date

PAGE NO SALEM GENERAT STATION - UNIT 1 DOCUMENT NO. 00149781-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING LVAL NORM STATE MOTIVE PWR SUPPORTING R3QUIRED CL ID NUMBER NUMBER ELEVATION NOTES KEQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 1 0 ISWEII SW 15SW PNEPDISCH STRAINR 205242. SET. 2 Yard S OPERABLE N/A 1 100 OPERABLE N/A 5303 Srvc Wtr Bldg PASSIVE 1 0 lSWEII-MTRY SW 1S SWD ITAINER MTR 207902 Yard BR OFF 11101(IG) 1 100 OFF/ON 5369 ISWEiI Sr Wtr Bldg ACTIVE 1 0 ISVVE12 SW IGSW PWPDISCHSTRAINER 205242, SHT. 2 Yard S OPERABLE NIA 1 100 OPERABLE NIA 5309 Srvc Wtr Bldg PASSIVE 1 0 1SWEI2-1TRY SW 16SWS*RAINERT*fR 207902 Yard BR OFF 11101 (IG) 1 100 OFFION 5370 ISWE 12 Srvc WtI Bldg ACTIVE 3 10 LSW'13 SW I1 B1IR PMP jOBCLR 205242, SET. 3 Aux I S N/A N/A 1 045 N/A NIA 5286 13 RHR Prop Rm PASSIVE 3 10 ISWEI4 SW 12 CHRG 'b ERM CLR 205242. SF1.3 Anx I S N/.A N/A 1 084 NIA NIA 5283 12 Chrg Prop Rm PASSIVE 3 ID ISWE15 SW I ICONT SPRAY P3P RM CLR 205242, SHT. 3 AuxI S NIA N/A 3 084 N/A N/A 5280 11 Cont Spray Prop PASSIVE Rm 3 10 1SWEIS SW I ICC PM1P JIM CLR 205242, SHT. 3 A= I S NIA N/A ABV 1 084 NIA N/A 5279 11 CCPop RM P.ASIVE CERTIFICATION:

The infarmation idectifyinggthe equipment required to bring the plant to a safe shutown condition on t&.3Safe Shtdown Equipment List (SSEL) i3, to the best of ry knowledge and belief, correct and accurate. (One or more signature of Systems or Operations Engineers)

John G. Connolly ISenior Engineer JGC 5/iSI 5 Stophnn P. Reichle I Technical Manaer SPR 5/111s9 Print or Type Nazoe/Title Signature Date Print er Type Name/tite Signature Date

DOCUMENT NO. 001* 8D001 PAGE NA SALEM GENERAS STATION - UNIT 1 DATE 5f11f95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD SPATE SYSTEM SUPPORT tINrr CONTROL PWE DRAWINCS SYSTEMS LOCAL ID LINE NOS ROD COMPONENT NO. LOCATION EQ FUNCTION 3 10 1SWE17 SW 11 & 12AFPMP RM CLR 205242, S1ET3 ArtI S NIA N/A ABV 1 084 8 N/A N/A 5276 12 AuxFd Prp Em PASSIVE 3 21 ISWEIO SW 12 & .3 CC PIMPRM*CLR 205242, SECT. 4 Auxl S NIA N/A 1 084 NIA N/A 5352 12 Aux Fd Prop Rm PASSIVE 3 1t 1SWE19 SW 12 RHR PUP EM CM 205242, SET. 4 Aux I S N/A N/A 1 045 N/A N/A 5353 12 RHI Prop Rm PASSIVE 30P 6 ISWE2 SW 12 SERVICE WATER PUMP 205242. SEIT.1 Yard S ON1OFF NIA BRR-IC8D 1 100 ON N/A 5205 Srv Wtr Bldg ACTIVE 3 21 1SWE20 SW 31 CR*,0fPUP EM CLIR 205242, SEIT. 4 AM. I B NfA NWA 1 084 NIA NIA 5360 1VBEHSI 11 CM Prop Rm PASSIVE 3 ,5 ISWE2I SW ISJ PIA RP CLR 205242. SI1T. 4 Awal S NIA NIA 1 084 N/A NIA 5355 11 SI Prp Rm PASSIVE 3 10 ISWE22 SW IZCONTSP.RAY PMPRMCL 205242. SUT. 4 Aux I S N/A N/A 1 004 NIA N/A 5361 12 Cant Spray Pmp PASSIVE Rm 3 21 ISWE23 SW 13 CERG 10nP RM CLR 205242. SHT. 4 Aux I B NIA N/A 1 084 N/A N/A 5364 IVHF39 13 ChOg Pmp *m PASSIVE CERTIFICATION:

The information identifying threequipment required to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment List (SSEL) is, to the best ofmy knowledge and belief. corret and accurate. (One or more sigatare ofSystems or Operations Engineers)

John 0. Connolly/ Senior Engineer JGc S/11651 Stepien P. Rvichle I Teconical Manager SPR 5/IMSn Print or Type NamelTitle Signatire Date Print or Type NameTitle SignatuMe Date

PAGE NO.9 SALEM GENERATI STATION - UNIT 1 DOCUMENT NO. 0014-0 9 18-DOO1 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIP*MFNT SYSTEM EQUIP DESCR1IPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES SYSTEM SUPPORT UNIT EEQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 9 ISWF24 sW 11 FCU 205242, SHT. 6 Cntwmt 1 S N/A N/A 1 130 NIA N/A 5238 11 CFCU PASSIVE 3 9 ISWE25 SW 12 FCU 205242. SHT. 6 CntmnlI S N/A NIA 1 130 N/A N/A 5250 12 CFCU PAS=

3 9 ISWF26 SW 13 FCU 205242, SHT. 6 Cntmnt 1 S NIA N/A 1 130 N/A N/A 5263 13 CFCU PASSIVE 3 9 1SWE27 SW 14 CFCU 205242, SET. 6 Cotmnt 1 S N/A N/A 1 130 NIA N/A 5332 14 CFCU pASSIVE 3 9 ISWE28 sW 15 CFCU 205242, S*T. 6 Cnmnt 1 S NIA N/A 1 130 N/A N/A 5320 15 CFCU PASSIVE 3 10 ISWE29 SW 1i FCU MOTOR COOLER 205242, _HT r Cntmtt I B NIA NIA 1 10 N/A NIA 5239 IVBE15 11 CFCU PASSIVE 2 6 ISWE3 SW 13 SERVICE WATER PUMP 205242, SHT. I Yaud S ON/OFF NIA BKR-IB3D 1 100 ON N/A 5210 Sm Wtr Bldg ACTIVE 3 10 ISWE30 SW 12 FCU MOTOR COOLER 205242. SHT. 6 Cinot 1 B N/A N/A 1 130 NIA NIA 5251 1VREIG 12 CFCC PASSIVE CERTIFICATION:

The information identifying the equip ment requirea to bring the plant to a safe ahuotown condition an this Safe Shutdown Equipment List (SSEL) i* to the best of my knowledge and belier, corect and acer-ate. (One or more signa.rme dSystems or Operatona Eogineeo)

Jo.om G. Conjooly I Senior Engineer JGC 511*$95 Steephen P. Rei,:le YTeclhnical Manager SPR 51/2LM5 Print or Type Nameflitle Signature Date Print r Type NaxmeTitle Signature Date

PAGE NO5 9 SALEM GENERAS STATION - UNIT I DOCUMENT NO. 0014-09 78-Doo1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DFSCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NTMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LO CAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 10 ISWE31 SW 13 FCU MOTOR COOLER 205242, SHT. 6 CnntL I B N/A N/A

] 130 N/A N/A 5264 IVH-,17 13 CFCU pASSTVE 3 10 ISWE32 SW 14 CFCU MOTOR COOLER 205242, SHT. 6 Cnlnnt 1 11 N/A NIA 1 130 N/A N/A 5333 IVIIEIS 14 CFCU PA.SSIVE 3 10 ISWE33 SW 15 CFCU MOTOR COOLER 205242, SET. G Catmut i B N/A N/A 1 130 NLA NIA 5321 lVHIE19 is CFCU PASSIVE 2 6 1SWE4 SW 14 SW PMP 205242, SHT. 2 Yard S ON/OFF N/A BKR. IBED 1 100 ON NIA M5 Sr Wtr Bldg ACTIVE 30P 0 ISWE42-MTRY SW 11 TRAVELING WTR SCREEN MTR 207905 Yard R OFF 11103 (1A) 1 100 OFF/ON 5371 Szrrc wtr Bldg ACTMVE 30P 0 1SWE43-MTRY SW 12 TRAVELING WTR SCREEN 1TR 207905 Yard i OFF 11103 (2A) 1- 100 OFF/ON 5372 Svc Wte Bldg ACTIVE 2 0 1SWE44-MTRY SW 13 TRAVYELING WTR SCREEN MTR 207904 Yard R OFF 11L26 (1A) 1 100 OFFION 5r73 Savc Wtr Bldg ACTrVE 2 0 1SWE45-MTRY SW 14 TR,4VEL ING WTR SCREEN MTR 207903 Yard R OFF 11102 (WA) 1 100 01FION 5374 Sr~c Wtr Bldg ACITVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a sale shutdown condition on this Safe Shutdown Equipment List (SSEL) is, to the best ofmy knowledge and beef. correct and accurrate. (Ono or more nignonure of Systems or Operations Engineers)

John G. Connolly / Senior Engineer JGC 5/11/95 Stephen P. Reichle / Technical Manager SPIZ 5/11195 Print or Type NamefTitle Sigoatnre Date Print or Type Namef'itle Signature Date

PAGE N01/ SALEM GENERATING STATION - UNIT 1 0

DOCUMENT NO. 0014-00078-DO01 DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MNOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

1 0 ISWE4r-MTRY SW 15 TRAVELING WTR SCREEN MTR 207902 Yazd R OFF 11101 (IA) 1 100 OFFRON 53715 Sr,- Vtr Bldg ACTIVE 1 0 1SWE47-MTKY SW 16 TRAVELING WTR SCREEN MTR 207902 Yard R OFF 11101 (ZA) 1 100 OFFRON 5376 Src Wtr Bldg ACTIVE 1 6 ISw1E5 SW tsSW P11P 205242, SHT. 2 Yard S ON/OFF NIA BKR- IA3D I 100 ON N/A 5300 Stwc Wtr Bldg ACTIVE 1 6 1SWE6 SW 16SW PMP 205242, SHT. 2 Yard S ON/OFF NIA BKR.IASD 1 150 ON NIA 5305 SrC Wt, Bldg ACTIVE 30P 0 ISWE7 SW 1I SW PMP DIS CH STRAINER 205242, ST. I Yard S OPERABLE N/A I100 OPERABLE NIA 1201 Sor* Wtr Bldg PASSIVE 30P 0 ISWE7-MTRY SW I ISW STRAE MTR 207905 Yard BR OFF 11103 (IG) 1 100 OFFION 1105 ISWE7 Srvc Wtr Bldg ACTIVE 3OP a 1SWE8 SW 12 SW PMP DISCH STRAINER 205242, SET. 1 Yard S OPERABLE N/A 1100 OPERABLE N/A 5206 Sr". Wtr Bldg PASSIVE 30P 0 1SWE&-NTRY SW 12 SW STRAINER MTR 207905 Yard BR OFF 11103 (2G)

I IO OFF/ON 5316 1SWE8 Srvc Wtr Bldg ACTIVE CERTIFICATION:

The informanon ide"df.ing the equipment required to bring the plant to a sfe shutdowa condition on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief. correct and accurate. (One or more signature ofSystema or Operaiows Engineers)

John G. Connol]v / Senior Engineer JGC 5/11195 Stephen P. Rericle / Technical Manager SPR 5111/95 Print or Type Namne/Itle Signatare Date Phint or Type Namej1Itle Signature Date

PAGE NO. - SALEM GENERAT1*STATION - UNIT 1 DOCUMENT NO. 0014-08-DO01 DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUJTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUTPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELIVATION NOTES KEQD STATE CONTROL PWR DRAWINGS SYSTE31S LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 2 0 ISWE9 SW 13 SW PPDISCH STRAINER 205242. SHT_ I Yard S OPERABLE NIA SI00 OPERABLE NIA 5211 Sroc Wnr Bldg PASSIVE 2 0 ISWE9.-,MRY SW 13 SW STRAINER MTR 207904 Yard BR OFF 11126 (IG) 1 I0G OFFION 5367 15WE9 Srvc WIr Bldg ACTV 1 3 1SWGRIAD EP NO Uk 4160V VITAL BUS 203002 Aux I S ENEEG IDAE4 BKR-IADD 1 064 ENERO 81 44VVital RV Btj & ACTIVE Bat Rm 1 2 ISWGRIADC EP NO L4-IIVDC BUS 203007 Au- I S ENFRO IBTRYtAlOY I 084 ENEEG 8011 460)230V Vital ACTIVE 1?5/250DC Bat 1 14 ISWGRIADE EP NO 1A 28VDC BUS 211357, SET. 1 Aux I S ENERG IBTRYIAI27 1 too ENEE0 8014 1 Relay Rm ACTIVE 1 2 ISWGRiAX El NO LA460V VITAL BUS 601231 A-x I S ENERG IXFRIA4DAX 1 084 ENERG 8004 4600230V Vital ACTIVE 1251250DC Bat 1 2 ISV/GEIAY El' NO LA230V VITAL BUS 601241 A-a 1 S ENERG IXFRiA4DBY 1 084 ENEMG 8005 4601230V Vital ACTIVE 125250DC Bat 2 3 ISWGRIBD EP NO lB 4160V VITAL BUS 203002 A"x I S ENERG IDAE23 BER-IBDD 1 44 ENERO 8021 4 KV Vital Bus & ACTIVE Bat Rm CERTIFICATION:

no in forantion identifying the equipment required to bring the plant t a safe shutdown condition on this Safe Sh utd**n Equipment List (SSEL) is, to the bont of my knowledge nod belief, correct and aCCurate. (One or morn Signature of Systems or Operations Engineers)

John G. Connoly /Senior Enginee JGC 5/11195 Stephen P. Reicle I Technical MMaager SPR 5/11,195 Print or Type NamefTitle Signature Date Print or Type Namen'*itIe Signature Date

PAGE NO.* SALEM GENERAASTATION - UNIT 1 DOCUMNENT NO. 0014* t 8-D0O1 DATE 511/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT IAST (SSEL)

SORTIED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE FWR SUPPORTING REQUDMED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PV] DRAVNGS SYSTFMS LLNE NOS LOCAL ROB COMPONENT NO. LOCATION EQ FUNCTION 2 2 ISWGRIBDC EP NO IB i2sVDC BUS 203007 Aux I S ,NERG IBTRY1BIOY 1 084 ENERG 8030 460230V Vital ACTIVE 1251250DC Bat 2 14 ISWGRIBDE EP NO L1 28VDC BUS 211357, SLIT. I Aux I S ENERG IBTRYIBI4Y 1 100 ENERG 8033 1 Relay lb ACTIVE 2 2 ISWGRIBX EP NO 1B 460V VITrAL BUS 601232 Aux 1 S ENERG I 'RIB4DAX 1 084 E.XERG 460Ir23VVItal 125f250DC ACTIVE Bat 2 2 ISWGRIBY EP NO It 230V VITAL BUS 601242 Aux 1 S ENERG IXFRIB4DBY 1 084 EERG 0025 4601230V 1251250DCVItal ACTIVE But 3 2 ISWGRIC9X EP NO IC 460V VITAL BUS EXTENSION G01233 A-m 1 S PN'ERG ISWGRICX BER-IC9X 1 064 ENERG 351 4 KV Vital Bus &

Bat ACTIVE Rm 3 3 LSWGRICD ET NO IC4160V VITAL BUS 203002 A=m I S ENERG 1DAE38 BER-ICDD 1 084 ENERG 047 4 KV Vital Bus &

BatRm ACTIVE 3 2 iSWGRICDC EP NO IC 125VDC BUS 203007 Aux I s ENERG LBIITYICI2y 1 084 ENEEG 0059 4601230VVital 125125ODC ACTIVE Bat 3 2 ISWGRICX EP NO IC 460V VITAL BUS 601233 Aux 1 9 ENERG IXYIC4DAX 1 084 ENERG 0}50 4801430V Vi*il 125/250DC ACTIVE Bat CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment List (SSEL) is, to the best of ny knowledge andbelief, correct and accurate. (One or more signature of Systems or Operations Raineers)

John G. Connolly I Senior Engeee JGC 5/11J95 Stephen P. ,eicble I Technical Manager SPR 5111195 Print or Type Namealltle Signatore Date Pcint or Type Nameeitle Signature Date

PAGE NO.' SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014- 8-D001 DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED Cl EDNUMBER NUMBER CONTROL PWR SYSTEM SUPPORT UNTT ELEVATION NOTES RFQD STATE DRAWINGS SYSTEM4S LINE NOS LOCAL ED LOCATION *Q FUNCTION ROB COMPONENT NO.

3 2 iSWGRICY EP NO IC 230V VITALBtS 601243 Aux I S ENERG IXFR1C4DBY 1 084 ENERG 8052 4601230V Vital ACTIVE 125&250DC Bat 1 2 1SWGRIEPX EP NO. LEP 480V PRESSURIZER MTR BUS 601238 IPA 1 S ENERG ISWGRIAX BKR-lA14X I (BACK-UP GROUP 2) 079 E-NERG 8066 4601230VV1 401l ACTIVE 125a250DC Bat 3 14 ISWGRIGTX EP NO. IGP480VI'RESSUIZER HTR BUS 601239 IPAI S RNERG ISWGRICSX BKR-IC2aX I (BACK-UP GROUP 1) 078 XNERG 8065 A ccB. C East Valves ACTIVE 2 18 ITAI4 RC TEMPERATURE INDICATOR, LOOP 11 205201. SIT. 2 A-s I BR OPERABLE IDISIASYA ITE413A 1 W OPFERABLE 1TE413B 4301 IRP4 1 Control RM ACTIVE 2 18 ITAI6 RC TEMPERATURE INDICATOR. LOOP 12 205201. SLIT. 3 Aux I BR OPERABLE IDISIATYA ITE423A 1 122 OPERABLE 1r 23B 4304 1RP4 1Control Rm ACTIVE 1 15 ITA36 RC TEM2PRATURE INDICATOR. LOOP 13 205201. SMT. 2 AmxI BR OPERABLE IDISICSYA ITE433A 1 122 OPERABLE 1TE43B 4307 IRP4 1 Cont*ol R*n ACTIVE 1 18 IT.A38 RC TEMPERATURE INDICATOR. LOOP 14 205201, SMT. 3 Aux I BR OPERABLE 1DISICSYA 1TE_43A 1 122 OPERABLE ITE443B 4310 IR4 I Control Rm ACTIVE 1 18 ITE413A RC TEMPERATURE ELEMENT, RCS LOOP 11 HOT 205201. SHT. 2 Cutnot 1 S OPERABLE N/A LEG 1 078 OPERABLE NIA 4202 11SIG&EtCP ACTIVE Supports CERTIFICATION:

The information identifying the equipment equired to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment List aSEL) is, to the best oimy knowledge and belief, correct and acrurste. (One or more signature ofSystexri or Operations Enginee0)

John G. Connolly I Senior Engineer JGC 5W1115 Stephen P. Reickle / Technica Manager SPR 5/1105 Prait or Type NXmeltle Signature Date Print or Type NameoTitle Signature Date

PAGE NO.* SALEM GENERASWSTATION - UNIT 1 DOCUMENT NO. 0014--DOOl1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTMSs LOCAL D LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO-I 18 ITE413B RC TEMPERATURE FJ.EENT. RCS LOOP 11 205201, SIlT. 2 Cntont 1 S OPERABLE NIA COLD LEG 1 078 OPERABLE N/A 4303 11 S/G &RCP ACTIVE Supports 2 18 ]TE4IEA RC TEMPERATURE ELEMENT, RCS LOOP 12 HOT 205201, SLT. 3 Ctnant I S OPERABLE N/A 1 078 OPERABLE NfA 4305 12 S/G & ReCP ACTIVE Supports 2 t8 ITE423B RC TEMPERATURE ELEMENT, RCS LOOP 12 205201, SHT. 3 Cotmnat 1 S OPERABLE N/A COLD LEG 1 078 OPERABLE NIA 4306 12 S/G & RCP ACTIVE Supports 1 Is ITE433A RC TEM'PERATURE ELEMENT, RCS LOOP 13 HOT 20520 1. SHT. 2 Cntmnt I S OPERABLE N/A LEG 1 078 OPERABLE N/A 4308 13 S/G & RCP ACTIVE Supports 1 18 ITE433B RE TEMPERATURE ELEMENT. RCS LOOP 13 205201. SLT_ 2 Catrant 1 S OPERABLE NIA COLD LEG 1 078 OPERABLE NIA 4309 13 S/G &RCP ACTIVE Supports 2 18 1TE443A RC TEMPERATURE ELEMENT. RCS LOOP 14 HOT 205201, SET. 3 COnnmat1 S OPERABLE N/A LEG 1 078 OPERABLE N/A 4311 14 S/G & RCP ACTIVE Suppor-s 2 18 iTE443B ReC TEMPERATURE ELEMENT, RCS LOOP 14 205201, SIT. 3 Ctnumt I S OPERABLE NIA COLD LEG 1 078 OPERABLE N/A 4312 14 S/G &RCP ACTIVE Supports 20 ITRCC EP I C.ABLNIET RFT-AY ROOM TERMINAL RACK Aux I S ENEEG N/A ITRCC 1 10.0 ENERG N/A 9050 I Reay Rm. ACTIVE CERTIFICATION:

The information identifying the equipmentsequired tobring the plantto a safe shutdown condition on tis Safe Shbtdsow Equipment List (SSEL) is to the best of my knowledge ad belief, correct and accurate. (One or more signature of Systems or Operaiaons Engineers)

John G. Connolly (Sanior Engineer JGC 5/1 1M95 Stephen P. Raicle / Technical Mnager SR 5/11)95 Signature Date Printor Type Name/itle Signatre Date Print or Type Name./tle

PAGE NO.9 SALEM GENERATIISTATION - UNIT 1 DOCUMENT NO. 0014-0#8-D001 DATE 5/11195 USI A46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMFNT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER NE ELEVATION SYSTEM SUPPORT UNIT NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 20 ITRDD) EP 11-14 MN STM & TP3 BY PASS STY VHYD A-n I S EdERG N/A 2 PMP OVRD BLYTERM RACK 100 ENrERG N/A 9051 1 Relay E- ACTIVE 1 9 IVEI15 VH 11 CFCU FAN 205238. SrT. 2 Cntmat i S OFF/ON NIA 1 130 ON NIA 5905 11 CFCU ACTIVE 1 9 IVRIE15-,b.X VI I I CFCU MTR 205238. SIT. 2 Cntmat i B OFJ/ON lSWGRJAX BIrR-IA2X 1 130 ON 5909 IVIEI5 II CFCU ACTIVE 1 9 1VREIO V13 12 CFCU FAN 205238. SET. 2 Cntmnt 1 S OFFION N/A 1 130 ON N/A 5910 12 CFCU ACTIVE 1 9 IVFEEiIr-ITRX VII 12 CFCU MTE 205238. SET. 2 Cnrzt 1 B OFF/ON ISWGR1BX BER-B.2X 1 130 ON 5914 IVHEIO 12CFCU ACTIVE 1 9 IVEIE7 VH 3ICFCU FAN 205238, SET. 3 Cntmnt 1 S OFFI/ON N/A 1 130 ON N/A 5925 13 CFCU ACTIVE 1 9 11,VEI7-MTRX VII 13 CFCU2OIYS 205238, SET. 3 COatnt I B OFFION ISWGRlCX BmKP-C2X 1 230 ON 5919 IVHE17 13 CFCU ACTIVE 1 9 IVFS VE 14 CFCU FAN 205238. STlT. 3 Cataont 1 S OFF/ON N/A 1 130 ON NIA 5920 14 CFCU ACTIVE CERTIFICATION:

The infromation identifying the equipment requirod to bring the plant to a safe shutdown condition on his Safe Shutdown Equipment List (SSEL) is, to the beet of my knowledge and belief, correct and nocurate. (One or more signature of Systems or Operations Engineers)

JIohn G. Connelly f Senior Engineer JGC 5/111f95 Stephen P. Reichle / Technical Manager SPR 5/11*

Prinotor Type Nomctl~ltl Signature Date Print or Type Name/Title Signature Date

PAGE NO, SALEM GENERATIOSTATION - UNIT I DOCUMENT NO. 0014-*8-Doo1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL UD NUMBER NUMIBER ELEVATION NOTES SYSTEM SUPPORT UNIT REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ED LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

1 9 IVHBEI-MTRX VH 14 CFCU MTR 205238. ST*. 3 Cntmnt I B OFF/ON 1SWGRIBX BEJ.-1B6X 1 110 ON 5924 1VIE19 14 CFCU ACTIVE 1 9 IVHE*S VX 15 CFCU FAN 205238. SHT. 2 Cntnnt I S OFF/ON NIA 1 130 ON N/A 5900 15 CFCU ACTIVE 1 9 IVHE19.MTRX VHi 15 CFCU mTE 205238. SHT. 2 Cntmnt 1 B OFF/ON 1SWGRICX BKR-1CGX 1 130 ON 5904 IVSE 9 15 CFC-U ACTIVE I I IVEE200 VH 1EMEEG AIR FILTRATION UNIT 205248, SHT. 2 Aux 1 NIA OPERABLE N/A 1 122 OPERABLE N/A 5702 CH A/C Oni PASSIVE 1 9 IVUE2M VH 11 D/G ARAEA MWFAN 205321, SHT. 2 A=xl SR OFF f1104 (2G) 1 122 ON 5800 11D/G Exh Fn ACTIVE Ie/IA Day Tk 1 9 IV-II6 VH 12 D/G AREA EXH FAN 205321,SRiT.2 A-n 1 SR OFF I1105(2G) 1 122 ON 5802 12 D/G Rah Fan ACTIVE enx/1BDay Tk 1 9 1VHE27 VH 13 D/G AREA EXH FAN 205321. S*T. 2 Aux I SR OFF 112 (2G) 1 122 ON 5804 13 DIG EXh Fa ACTIVE Rm/1C Day Tk 1 9 IVHE2S VH ii DIESEL CONTROL AREA EXR FAN 205321, SHT. 2 Aux I SE OFF 11104 (3G) 1 122 ON 5810 I1 D/G Exh Fn ACTIVE R=1nADay Tk CERTIFICATION: t The informntion identifying the equipment required to bring the plan to a safe shutdown condition an this Safe Shutdown Equipment List (SSEL) is, to the best of roy knowledge and belief, correct and accurate- (One or moe signature of Systems or Operationns Engineers)

John G. Coanoolly /Senior Engineer JGC 5/11/95 Stephen P. Reilnle / TechniixnclMnage SPR 5/1)95 Print en Type Name/TMtle Signature Date Print or Type Nane/Tifle Signatom' Date

PAGE NO* SALEM GENERAT 9 STATION - UNIT 1 DOCUMENT NO. 0014-*8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPM*ENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEMd SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCALID LINE NOS ROB COMPONrENT NO. LOCATION EQ FUNCTrON 1 9 iVtIE29 VE 12 DIESEL CONTROL AREA EM FAN 205321. SET. 2 Aux I S1 OFF 11105 (3G) 1 122 ON 5808 12 DIG Eah Fan ACTIVE mt/1B DayrTk 1 9 IVEEE30 NiT 13 DIESEL CONTROL AREA EXH FAN 205321. SEIT.2 Anx I SR OFF 11106 M3G) 1 122 ON 13 DIG Exh Fan ACTIVE 5EmIC Day Tk 1 I1 IV;IE31 Vil 11 RHE P1UVEM Cl1 205237, SET. 3 Aux I SR OFF 11131 (2J.)

1 045 OFF/ON 5713 P ATIVE 1 10 IVIEM315 VI I CONTRL AREA VENT EMER AIR FLTR 205248. SET. 2 Aux I S N/A N/A I122 COOLING COIL N/A N/A 5703 CR A/C Ro PASSEE 1 10 IV11E32 VE 12 1RM.PIp RM CLR 205237, SMT. 3 A-1 SR OFF 11132 (2,3) 1 045 OFF/ON 5714 12 _RR I'mp RE ACTIVE 1 9 1VRE33 VII 11 CC PMP RM CLR FAN UNIT 205237, SMT. 3 Aux]I SR OFF/ON 11133 (0D) 1TD7552 1 084 ON moo 13 Aux Fd P-an Rm ACTIVE 1 9 1VRE34 VH 12 & 13 CC PIM RM CLR FAN UNIT 205237, SHT. 3 AuxI SR OFF/ON 11132 (2D) ITD7575 084 ON ITD7545 1

5501 12 Aux Fd Prop Rm ACTIVE 1 9 IVHE36 VII 11 & 12 AUX FEED WTR PMP RM CL FAN 205237, SET. 3 Aux1 SR OFF/ON 11131 (2D) 1TD7551 UNIT 10OD75654 1 084 ON 55212 Aun Pd Prop Ens ACTIVE CERTIFICATION:

The inornmation identifying the eguipmnat required to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment list (SSEL) is. to the best or my knowledge and belief. correct and accurate. (One or more signature of Systems or Operations Engineers)

John 0. Connolly I Senior Engimeez JGC 5111195 Stephen P. Rerhle / Technical ManageM SPR 5/11U95 Print or Type Name!Title Signamtae Date Print or Type Namerritle Signature Date

PAGE NO*@ SALEM GENERAT0oTATION - UNIT I DOCUMENT NO. 0014-#,o-D001 DATE 5111195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER ELEVATION SUPPORT CL ID NUMBER NOTES SYSTEM UNIT BEQD STATE CONTROL 1Wt DRAWINGS SYSTEMS LINENOS LOCAL lID ROB COMPONENT NO. LOCATION EQ FUNCTION 1 9 1VRE37 VS 11 CHRO PMP EM CLIZFAN UNIT 205237. SET- 3 Aux I SR OFFION 11132 (IG) ITD7547 1 084 ON 5503 11 Chrg Pmp Rm ACTIVE 1 9 lVHE38 VS 12 ClNG PEMPRM CIL FAN UNIT 205237, SlT. 3 Au 1 SR OFFION 11133 (IG) 1TD7554 1 084 ON 5504 12 Chx Prop Rm ACTIVE 1 9 iVIE9 VH 13 CURG PUP RM CLR FAN UNIT 205237. SHT. 3 Aux I SR OFFION 11131 (IG) zTD75so 1 084 ON 5505 13 Chrg Prop Em ACTIVE 1 9 IVEE64 VS 11 EMSEEGAICSOP FAN 205248, SHT. 2 A/tx I SR OFF/ON 11131(3D)

S12"2 ON 5704 C- A/C Rm ACTIVE lop 9 IVEE65 VE 12 EMERG A/C SEP FAN 205248, SRT. 2 Au 1 SR OFF/ON 11133 (4E) 1 122 ON 5707 CR A/C Em ACTIVE 1 10 IVEM-838 VI I CONTEL AREA VENT SWGR RM SUP FAN 205248. SET. I IPA I S N/A N/A ICAVI-DMOP FILTER ENCLOSURE N/A N/A ICAV2EDMOP IA2DO 1 100 5600 CH Wtr Prop Area pASSVE 3 21 IWGEI4 CC WASTE EVAP CONDENSER 205231. SET. 2 Ajnx 1 S NIA NIA I 100 N/A NIA 5230 Waste Evap Rm PASSIVE 3 21 IWGEI7 CC WASTE EVAP VENT GAS CLR 205231, SMT. 2 Aux I S N/A NIA 1 100 N/A NIA 5128 1 Cone Fite Rm PASSIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdowv condition an this Safe Shutdown Equipment List (SSEL) is, to the best odmy knowledge and belieL correct and asourate. (One or more .ignaýta of Sym, or Operations Rngineem)

Joha G. Connolly I Senior Engineer JGC 5/11/95 Stephen P. Reidhle I Technical Manager SPR 6/11195 Print or Type NamefTitle Signature Date Print orType Name/Title Signature Date

PAGE NO@ SALEM GENERAT*STATION. - UNIT 1 DOCUMENT NO. 0014-,8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED 3Y EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUM3BER NUMBER SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 3 5 IWGE2 CC NO. I1 WASTE GAS COMPRESSOR HX 205231. SHT. 2 Aux I S N/A NIA 1 054 NIA NIA 5131 I1 Waste Gas PASSIVE Cmpsr Ron a 21 IWGE22 CC WASIE EVAP SUB CLR 205231, SHT. 2 A- I S N/A N/A 1 100 N/A N/A 5129 Waste Evap,m pnASSIVE 3 5 IWGE3 CC NO. 12 WASTE GAS COMPRESSOR EX 205231. SET. 2 Aux I S NIA NIA 1 064 NIA NIA 5132 12 Waste Gas PASSIVE COnpr Ro 3 I IWL222 Cv RCDT TO RWST 205239, ET. 3 IPA I N/A CLOSED N/A 1 078 1 CLOSED N/A 3049 114S 2151 Me& Pen Axes SG PASSIVE BD Ba 3 1 JWR81 PR 1PRI WTRTO PRT, CONT C VLV 205201, SHT. 1 NIt NIA CLOSED N/A I NR CLOSED N/A 2021 NR PASSIVE 1 18 1X465521 N/I ISOLATED SOURCE RANGE INDICATOR - 601526 Aux 1 Rt OPERABLE IDISIC5TA I CHANNEL"C" 122 OPERABLE 1302 1 Control Rm ACTME 1 18 IXAG5531 NI ISOLATED POWER RANGE INDICATOR. 601526 Aux I R OPERABLE IDIS.C5YA CHANNEL C" 1 122 OPERABLE 1301 1 Control Ran ACTIVE 2 18 IXA65561 NI ISOLATED SOURCE RANGE INDICATOR - 601526 A=. I R OPERABLE IDISIBI1YA CHANNEL "I 1 122 OPERABLE 1308 1 Control Rm ACTIVE CERTIFICATION:

The infonration identifying the equipment required to bring the plant to a safe shubtdov condition an this Safe Shutdown Equipment List (SSFL) i, to the beat of my k)oorledge and belie corrrect and accra'te. (One orm ore sigeaue cf Systes Operations Engineem)

John G. Cosnolly / Senior Engineer JGC Sn LY15 Stephen F. Rechice I Technical Aanager SPR 5V95 Point or Tne NamenTitle Signature Date Print or Type NamenoItl Signature Date

PAGE NOt0 SALEM GENERA* STATION - UNIT 1 DOCUMENT NO. 0014-0078-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPbEENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION 2 18 IXA655TI NI ISOLATED POWER RANGE INDICATOR- 601626 Aux 1 R OPERABLE IDISIBI YA CHARNEL -D-1 122 OPERABLE 1304 1 Control Ra ACTIVE 1 18 IXA6560 NI NEUTRON FLUX DETECTOR - CHANNEL -C- 601526 Cntmnt 1 N/A OPERABLE 612178,601002 IXAB583I 1 081 OPERABLE IXA65521 1300 ACTIVE 2 18 IXA6561 NI NEUTRON FLUX DETECTOR - CHANNEL -D- 601526 Cnmnnt I NIA OPERABLE 612178 IXA65571 081 OPERABLE 601002 LXA65M 1

1303 ACTIVE 1 4 IXFR1A4DAX EP TRANSFORMER TO NO. IA 460V VITAL BUS 203003 Aux 1 S ENERG ISWGRIAD ISWGRIAD-IA4D ISWGRIAX 1 084 ENERG S02 4601O30V Vital ACTIVE 125I250DC Bat 1 4 1XFRIA4DBY EP TRANSFOEMER TO NO. LA230V VITAL BUS 203003 Aix 2 S ENERG ISWGRlAD 1SWGRIAD-IA4D ISWGEIAY 1 084 ENERG 8003 4o,-0230V Vtal ACTIVE 125r250DC Bat 2 4 IXFRIB4DAX EP TRA*FORMER TO NNO.1B 460V VITAL BUS 203003 Aux I S ENERG 1SWGRlBD ISWGRIBD-lB4D ISWGR1BX 1 084 ENERG 8022 460/230V Vital ACTIVE 12ir2-0DC Bat 2 4 IXVRLB4DBY EP TRANSFORMER TO NO. 1B 230V VITAL BUS 203003 Aux I S ENEG 1SWGRIBD ISWGRIBD.IB4D ISWGRIBY 084 ENERG 8023 4601230V Vital ACTIVE 1251250DC Bat 3 4 1XFRIC4DAX EP TRANSFORMER TO NO. IC 460V VITAL BUS 203003 Aux I S ENERG 1SWGRICD ISWGRICD-IC4D 1SVGR1CX 1 084 ENERG 6048 4601230V Vital ACTIVE 125/25ODC Bat 1z CERTIFICATION:

The infocmation identifying the equipment required to bring the plant to a safe shutdown codition on this Safe Shutdown Equipment List (SSEL) is, to the best of my knowledge and belief. eorret and acourate. (One or mome signature of Systems or Ope2ion3 Engineers)

John G. Counolly / Senior Engineer JGC 5/11/95 Stephen P. Remchle (Technical Manager SPR 5/11/95 Print or-Type Name/*tle Signature Date Print or Type Nameflitle Signabure Date

PAGE NO. 9 SALEM GENERATIOSTATION - UNIT I DOCUMENT NO. 0014-98-D01 DATE 5/111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCHXPTtON DRAWLNG BUILDING EVAL NORM STATE MOTIVE PW SUPPORTfNG REQUIRED CL ID NIJMBER NUMIER SYSIMM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PW DRAWINGS SYSTEMs LINE NOS CALED ROB COMPONENT NO. LOCATION EQ FUNCTION 3 4 IXFRIC4DBY EP TRANSFORMER TO NO. IC 230V VITAL BIS 203003 Auaxl S ENERG ISWGRICD ISWGR1CD-.C4D ISWGRICY 1 084, ENEEG 8"s 4 KV Vital Bus & ACTIVE Bat Rm 18 203-1 CC i CC IBAT EXCHANGER INSTRUMENT Aux 1 S ENERG N/A 1 PANEL 084 ENERG N/A 5272A 11CC Bo Rm ACTIVE 20 205-1 EP 11 AUX FEEDWATER PANEL 205 Aux 1 S ENERG N/A 1 084 ENERG N/A 9052 12 Aux Fd Pmp RFa ACTIVE 20 206-1 EP 12 AUX FEEDWATER PANEL 20G Aux I S ENERG N/A 1 084 ENERG N/A 9053 12 Aux Fd Prop Rio ACTIVE 1 20 207-1 AP 13 AUX FEEDWATER PANEL Aux I S NIA N/A 1 084 NIA N/A 9039 12 Aux Fd Prop Rm PASSIVE 2 20 216-1 CV iCVC CHG PMPS FL & PR LqST PANEL .AaccI S N/A N/A 1 084 NIA N/A 9003 Chrg Prop Vlv AlJey PA 20 229-1A SW SW CHERGPUMP RM COOLER FLOW Aux 1 S ENERG NIA S084 INSTRUMENT PANEL ENERO N/A 5393A Chrg Pmp Vlv Alley ACTIVE 20 229-IB SW SW CE[RG PUMP RM COOLER FLOW Aux I S ENERG N/A IISTRUMPfIEJ PANEL 5 094 RPEoRG NAA 5359A Chrg Prop VivA.*ey ACTIVE CERTIFICATION:

The informalton identifying the equipment rmqaired to bring the plant to anafe siutdow codndition on this Safe Shutdown EqulpmentList (SSEL) is. to the best oftay knowledge and belief, correct and accurate. (One or more signature orSys*ems or Operations Engiueers)

John G. Connolly ISenior Engineer JGC 5f111/95 Stephen P. Relchde I Technical Manager SPR 5/11/95 Print or Type Nanwelftle Signature Date Print or Type Namefritle Signatore Date

PAGE NO.@ SALEM GENERATOSTATION - UNIT 1 DOCUMENT NO. 0014-0 28-D001 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUlMBER ELEVATION NOTES REQD SYSTEM SUMPORT UN3T STATE CONTROL PR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 18 230-1 VH 1 AUX BLDG VENT SWGR EM INST PANEL Aux 1 S N/A N/A 1 084 N/A N/A S004 460/230V Vital PA,*'VE 125=250DC Bat 20 32-1 EP 1REACT PROT SOLID STATE PROT Aux 1 S ENERO NIA 1 1rINTERFACE CAB NO. 32 122 ENERG N/A 9054 1 Control Rm ACTIVE 18 325-1 EP I1 STM GEN DRN & BLDWN STM GE-4 IPA I N/A NIA N/A 110 BLDWN TE PANEL oo 31 N/A N/A 9119 Sto GenBID A- PASSIVE 3 20 335-1 PR I REACT COOL PER PROTECTION PANEL Cnatnt I S NIA N/A 1 100 N/A N/A 9005 Ele-atox Passage PASSIVE Area 20 37.1 EP I REACT PROT SOLID STATE PROT TRAIN B Aux 1 S ENERG NIA OUTPUTr CAB NO. 31 1 1 22 ENERG N/A 9055 1 Control lIes ACTIVE 3 20 378-1 Si I SAFETY INJ RWST 230V AC. 1KW PANEL Yard S N/A N/A 1 100 NA N/A 9006 Fire Pmp/Fresh PASSIVE Water Hne 2 20 373-1 SJ 1 SAFETY INJ RWST 230V AC, IKW PANEL Yard S N/A N/A 1 100 N/A N/A 9007 1 RWST Area PASSIVE 20 38-1 EP i REACT PROT SO.1 STATE PROT TRAIN B Aux 1 S ENERG N/A INTERFACE CAB NO. 38 1 122 ENERO N/A 91)36 I Control S~m ACTIVE CERTIFICATION: ly The informatiaa identifying the eeuipment requixd to bring the plant to a safe shutdown cnnditioa on this Safe Shutdown. Equipment list (SSEL) is. to the best ofmy knowledge and belief. corect and accurate. (One or more signature of Systems or Operations Engineers)

John G. Connolly / Senior Engineer JGC 5112."95 Stepben P. Reir/ I /Technical Manager SPR 5/11/95 Print or Type NameflUle Signature Date Print or Type Name/Title Signature Oate

PAGE NO.. SALEM GENERAT*STATION - UNIT I DOCUMENT NO. 0014-0 9 8-DOOI DATE 5111195 1USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING D)UILDING EVA]- NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL CO ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCALED ROB COMPONE.NT NO. LOCATION EQ FUN07YON 1 20 401-1 CC I CC SURGE TNK LVL INST PNL Arm 1 S N/A N/A 12*12 N/A N.A 9008 1 CC Si61g Týk PASSIVE Area 1 20 407-1 VE I CONTRL AREA VEN CONT RM AC CONT PNL Aux I S KIA N/A 1 122 NIA NIA 9009 CR A/C Rm PASSIwVE 1 18 440-LA VH I1 CNTMNT VENT FCU DAMPER CONTRL PNL Cutomt I S NIA N/A 1 130 NIA NIA 9010 11 CFCU PASSIVE I 1s 440-1B VI 12 CNTMWT VENT FCU DAMPER CONTRL PNL Cutmnt 1 S N/A NIA 1 130 N/A NIA 9011 12 CFCU PASSWE I is 440.1C V11 13 CNTINT VENT FCU DAMPER CONTRL PNL Catnmt I S NIA N/A 1 130 NIA N/A 9012 13 CFCU PASSIVE I 18 440-ID VII 14 CNTMBNT VENT FCU DAMPER CONTRL PNL Catnmt I S NIA NIA 1 130 NMA NfA 9013 14 CFCLr PASSIVE 1 18 440.1E VH 15 C JT VENT FCU DAMPER CONTRL PNL Cntmnt i S NIA NIA 1 130 N/A NIA 9014 1sCFCU PASSIVE 2 18 444-IA AF II S/G FEED & cOND PNL NARROW RANGE I CntmitI S N/A N/A 1 130 N/A NIA 9015 11S/G Area PASSIVE CERTIFICATION:

Ile information identifying the equipment required to bing the plant to a sofe shutdown conudition on this Safe Slhtd*wn Equipment Lin (SSEL) is. to the best of my ,mowIedge and belief. corr.ct and accurate. (One or more signature f Systems or Operans Engine*rs)

John G. Connolly I Senior Engineer JGC 5/11/%5 Srephe, P. R*eicbe J Tedninll Manager SPR 5/1sli5 Print or Type Name..itle Signature Date Print or Type Name/Tile Signatore Date

PAGE NOB SALEM GENERAT STATION - UNIT 1 DOCUMENT NO. 0014#8-DO01 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL 11 NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 20P 18 444- 1B AF 11SIG FEED & COND PNL NARROW RANGE 2 Cnta-t 1 S N/A NIA 1 130 NfA N/A 9016 SIG Aren PA.SSIVE 20P 18 444-IC AF I I S/G FEED &COND PNL NARROW RANGE 3 Cntont I S N/A N/A 1 130 NIA N/A 9017 IISG Area pAS.rVE 20P 18 444-ID AF 12S/G FEED & COND PNL NARROW RANGE i C-tamnt I S N/A NIA 1 130 N/A NIA 901a 12 S/G Area PASSIVE 20P 18 444-IE AF 12 SIG FEED & COND PNL NARROW RANGE 2 Cntmat 1 S NIA NIA 1 130 N/A N/A 9019 12S/G Area PASSIVE 2 18 444-1IF AF 12 S/G IEED & COND PNL NARROW RANGE 3 Cotnet 1 S NWA N/A 1 130 N/A NIA 9020 12S/G Axre PASSIVE 1 18 444-1G AF 13 S/G FEED &COND PNL NARROW RANGE i Cotmnt I S NIA N/A 1 130 N/A NIA 9021 13 S/G Area PASSIVE 20P 18 444-IH AF 13 S/G FEED &COND PNL NARROWILANGE 2 Ct.nt i S NIA NIA 1 130 NIA N/A 9022 13 S/GArea PASSIVE lOP 18 444-IJ AF 13 SIG FEED & COND PNL NARROW RANGE 3 C-tanmt L S NIA N/A 1 130 W/A N/A 9023 13 S/G Area PASSIVE CERTIFICATION:

The infornation identifying the equipment required to briag theplant to a safe shutdown condition on this Safe Shutdown Eqaipment List ISSEL) s. to the best af ny knowledge and belief, correct end accurate. (One or mor signature of Sy.stems or Operations Eugineeeo)

John G. Connolly /Senior Engineer JGC 51/11/95 Stephen P. Reichle I Technical Manager SPR 5/11)95 Print or Type Nama/Tifle Signature Date Print or Type Naree/Title Sigaatore Date

PAGE NO. 95 SALEM GENERATIPSTATION - UNIT 1 DOCUMENT NO. 0014-00078-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (S-SEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUM]BER ELEVATION NOTES E

REQDSTATE SYSTEM SUPPORT CONTROL FW1 DRAWINGS SYSTEMS IJINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION lop 18 444-4% AF 14 S/G FEED & COND PNL NARROW RANGE I Cntmnt 1 S NIA NIA 1 130 N/A N/A 9024 14 SIG Area PASSIVE lOP 18 444.il, AR 14 S/G FEED &-COND FNL NARROW RANGE 2 Cutmvt I S NIA N/A 130 NJA N/A 9025 14 S/G PASSIVAe 1 18 444-1M AF 14 S/G FP*- & COND PNL NARROW RANGE 3 Contant I S N/A N/A 1 130 NIA N/A 9026 14 S/G Are. PASSIVE 20 58-1 EP 1 CABINET AUX RELAY RACK Anx 1 S ENERG NJA 1 122 ENERG NIA 0057 1 Control Rm ACTIVE 20 59-1 EP I CABINET AUX RELAY RACK Aux I S ENERG NIA I12 ENFG NIA 9058 1 Control Rm ACTIVE 1 20 684-1A MS IIMN STM & TRB BY PASS STM GEN PRIMS IPA1 S NIA N/A I CONTRL PNL 10/) N/A N/A 9028 MS Pen Area PASSIVE 1 20 684-11 MS 12 MN STM & mTB BY PASS SIM GEN PRESS OPAl S NIA N/A S100 CONTRL PNL N/A .N/A 9027 MS Pen A-ea PASSIVE OP 20 G84-IC MS 13 MN SWl & TRB BY PASS STM GEN PRESS IPA 1 S N/A N/A 1 CONTRLYWI 100 N/A N/A 9029 MS PeanArea P A SSIV CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdown oendition en this Safe Shutdown Equipment List (SSEL)is, to the best of my knowledge and belief, correct and accurate. (One or more signatve ofSystems or Operations Engineers)

John 13. Conoally / Seior Eogiee JGC 5111/95 Stephen P. Reichle I Technical Manager SPR 5/11)95 Printor7"ype NameiMtle SiKnature Date Print or Type Namerfitle Signature Date

PAGE NO.* SALEM GENERATOSTATION - UNIT 1 DOCUMENT NO. 0014*-8DOOI DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT CL ID NUMBER CONTROL DRAWINGS SYSTEMS UNIT LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION lop 20 684-ID MS 14 MN SIM & TRB BY PASS STM GEN PRESS OPA 1 S N/A NIA CO3JTRL PNL~

1 100 NIA NIA 9030 MS Pen Area PASSI-9 1 20 685-1A MS 11MN STM & TRB BYPASS STM GEN IPAI S N/A N/A OUTLET HEAD PRESS CONTRL PNL 1 100 N/A NIA 9031 MS Pen Area PASSIVE 2 20 6&5-LB MS 12 MN STM &TRB BY PASS STM GEN OPAl S NWA N/A 1 OUTLET HEAD PRESS CONTRL PNL 100 N/A NWA 9032 MS Pen Area PASSIVE 20P 20 685-iC MS 13 MN STM &TRB BYPASS STM GEN IPA1 S NIA NIA 1 OUTLET HEAD PRESS CONTRL PNL 100 N/A N/A 9033 MS Pea Area PASSIVE lOP 20 685-ID MS 14 MN STM & TRB BYPASS $Th GEN OPAl S NIA NIA OUTLET HEAD PRESS CONTRL PNL 100 N/A N/A 9034 MS Pen Area PASSIVE 1 20 686-IA MS I1MN SIM & TRB BY FASS STM GEN STM IPAl S N/A NIA 1 OUTLET HEAD PRESS CONTRL PNL 100 N/A N/A 9033 MS Pen Area PASSIVE 2 20 616-IB MS 12 MN STM &TRB BY PASS SM GEN STM OPAl S N/A NIA OUTLET READ PH0 CONTRA NNLA 9036 MS Pen Area PASSIVE 20P 20 GRG-IC MS I3 MN STM & TRB BYPASS SIM GEN SIM IPAI S NIA N/A OUTLET HEAD PRESS CONTR. PNL 1 I00 NfA N/A 9037 MS Pen Area PASSIVE CERTIFICATION:

The information iden*ifying the equipment required to hbing the plant to a eafe shutdo condition on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief correct and accurate. (One or more signatroe of System or Operations Engineers)

John G. Connolly ) Senior Engineer JGC 5/11195 Stephen P. Rdxhe ,Techniml Managrr SPR 5('1595 Print or Type Nameitle Sigasture Date Print or Type NameTnde Signature Date

PAGE N*7 SALEM GENERA* STATION - UNIT I DOCUMENT NO. 0014 0 18-DOO1 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN 9Q EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LQCATION EQ FUNCTION lOp to 686-ID MS 14 MN STM & TUB BY PASS STM GEN STM OPA I S NIA M/A OUTLET HEAD PRESS CONTRLPNL 1 109} N/A NIA 9038 MS Pen Area PASSIVE 18 724-ID EP I1ICONTROLAREA VENT EMERGSUPPLY Anx 1 N/A M/A N/A 1 FAN INSTRUMENT PANEL 122 21 A NA 9120 CR A/C Rm PASSIVE 18 724-IE EP 12 CONTROL AREA VENT EMERG SUPPLY Aux 1 S N/A N/A 1 FAN INSTRUMENT PANEL 122 N/A N/A 9121 CR AICRm PASSIVE 18 726- lA EP I AUX BLDG VENTDFSL GEN VENT DMpR Aux I S N/A N/A CONTROL INSTRUMENT PANEL 1 100 N/A N/A 9122 IA DiG Rm PASSIVE 18 726,IC EP I AUX BLDG VENT DIESEL GEN VENT DMPR Aux I S N/A N/A 1 CONTROL INSTRUMENT PANEL 100 N/A N/A 9123 IB DIG Rm PASSIVE 18 726-1D EP i AUX BLDG VENT DIESL GEN VENT DMPR Aux 2 S N/A N/A 1 CONTROL INSTRII4ENT PANEL 100 N/A N/A 9124 IB DIG Rm PASSIVE is 726-1E EP I AUX BLDG VENT DIESEL GEN VENT DMPR Aux 1 S N/A N/A CONTROL INSTRUMENT PANEL 10I0 N/A N/A 9125 IC D/G Rm PASSIVE 18 726-IF EP 1AL BLDG VENT DIESEL GEN VENT DMPR Aux I S NIA N/A CONTROL INSTRUMENT PANEL 910 N/A N/A 9126 lC D/G RmPnt CERTIFICATION: I tý The information identifying the equoment required to beingthe plant to a safe shntdown contion on this SafeShutdown Equipment List (SSE is.tothebmt fmsy kowledge and belieI, correct and accurate. (One or momesignature ofSystems or OPexztioms Engineers)

John G. Connolly I Senior Engineer JGC 5/111 A Stephen P. Reide I Technical Manager SPR 5/11/95 Print or Type NameTitle Signature Date Print or Type Name./Tite Signature Datp

PAGE NOO SALEM GENERAT S6TATION - UNIT I DOCUMENT NO. 0014-0 --D01 DATE 511/195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NT.MBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

18 827-IA P I ISW FCU. INSTRUMENT PANEL IPA I S NIA NIA 1 078 NIA NIA 9128 Koch Pen Area PASSIVE 18 827-1B EP 12 SW FCU INSTRUMENT PANEL IPA I S N/A N/A 1 078 NA N/A 9129 S/G B/DB PASSMx 18 827-IC EP 14 SW FCUfSrRUMENT PANEL IPA I S N/A N/A 1 078 N/A NIA 9130 S/G B/D Hx PASSE 18 827-ID EP 13 SW FCU INSTRUMENT PANEL IPAI S N/A N/A 1 078 N/A N/A 9131 Bit RB Upper Lvi PASSIVE is 827-IE EP 15 SW FCUINSIRUMENT ANEL IPA I S NIA NfA 1 078 N/A MA 9132 Bit Rm Upper LvW PASSIVE is 835-1B EP 12AI12B SRVC WTR CON? COOLING PANEL A=x 1 S NA N/A 1 084 N/A N/A 9133 12 CC RK Rm PASSIVE 18 979-4A EP 1I SW SIAINER PANEL Yard S N/A N/A 1 100 N/A N/A 9334 Srvc Wtr Dldr PASSIVE 18 979-IB EP 12 SW STRAINER PANEL Yard S NIA NIA 1 10D NIA NJA 9135 SrvmWtB1g PASSIVE CERTIFICATION:

The informaion identifying the equipment reaixied to bring the plant ta a safe shutdowi ondition on thi3 Safe Shutdxon Eqodpmeint List (SSEL) in, ta the best of my knowlcdge and belief. correc and accarate. (One ae more signaturv of Stas or Oporationn Eaginesra)

John 0.Connolly /Senior Enpneer JGC 51L95 Stephen P. Reichle /Technical Manager SPR 5/11/95 Print or Type Nane/Title Sicuatae Date Print r Type Name!litle Signature Date

PAGE NOS SALEM GENERA* STATION - UNIT 1 DOCUMENT NO. 0014-,8-D001 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PIWR SUPPORTING REQUIRED CL ID NUJMBER NUMBER SYSTEM SUPPORT VATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 18 979-IC EP 13SWSIRAINERPANEL Yao, S NIA NIA 1 100 NIA N/A 9136 Srvt Wtr Bldg PASSIVE 18 979-ID EP 14 SW STRAINER PANEL Yard S N/A NIA S100 NfA N/A 9137 Srvt Wtr Bldg PASSIVE 18 979.-E EP 15 SW STRANER PANEL Yard S NIA N/A 1 100 N/A NIA 9138 Srvt Wtx Bldg PASSIVE 18 979-IF EP 16 SW STRAINER PANEL Yard S NIA N/A 1 1o0 N/A N/A 9139 Src Wtr Bldg pASSIVE 1 2 BKR.ILASD EP BREAKER FROM NORMAL STATION POWER 203002 Aux I BR CLOSED IXFRI ISD 1 TO 4160V NO. IA VITAL BUS 064 CLOSED-/OPEN L1SWGR IAflC 8200 ISWGRIAD 4KV -Vtal Bus& ACTIVE LADE Bat ROa 2 2 BKR-I IBSD EP BREAKER FROM NORMAL STATION POWER 203002 Anx I BR CLOSED LXFRI1SD TO 4161W NO. lB VITAL BUS 1 064 CLOSED/OPEN 1SWGRIBDC 8109 ISWGRIBD 4 V /Vital Bus & ACTIVE IBDE Bat Em 3 2 BER-lC.SD EP BREAKER FEORMNORMAL STATION POWER 203002 A=x1 BR CLOSED IXFiRIESD TO 4160V NO. 1CYITAL BUS I 064 CLOSED/OPEN ISWGRICDC SI19 ISWORBCD 4KV Vital Bus & ACTIV lODE Bat Rm 1 2 BKR- lZASD EP BREAKER FROM NORMAL STATION POWER 203002 A=- 1 BR CLOSED 1JXEI25D 1 TO 4160V NO. IA VITAL BUS 064 CLOSED/OPEN ]SWOIILAD)C s108 ISWGR1AD 4 EV Vital Bus & ACTIVE lAfE Bat Rm CERTIFICATION:

The inform ation idenft-ifng the equipment required to bring the plant to a safe shutdown cmrdition on this SafOe Shutdown EquiPument List (SEL) is, to the best of my laowledge and belief, maned md.acuoute. (One or mere signature ofSystesss so Operations Egineers)

John G. Connolly / Senior Engineer JGC 5/! 1/95 Stephen P. Raicble / Tecldnial Manager SIR 5s11/is Print or Type Name/rile Signature Date Print or Type NamefIale Signatur Date

PAGE NO.9 SALEM GENERATISTATION - UNIT 1 DOCUMENT NO. 0014- 918-DOOI DATE 5111/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID)

TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE FWOR SUPPORTING REQUIRED CL ID NUPMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR 3RAWINGS SYSTEMS LINE NOS LOCAL ED ROB COMPONENT NO. LOCATION EQ FUNCTION 2 2 BIKR-12BS.)D E BRAEAER FROM NORMAL STATION POWER 203002 Ausc 1 BR CLOSED 1XFR12SD 1

TO 4160V NO. 1BVITAL BUS 084 CLOSED/OPEN OSWGRIBIIC 4 KV Vital Bus & ACTIVE iBDE 8118 ISWGRIBD Bat Ra 3 2 BKR-12CSD EF BREAKER FROM NORMAL STATION POWER 203002 Aux I BR CLOSED XIF2SD TO 4161WVNO. OC VITALBUS 1 064 CLOSED/OPEN ISWGRICDC ISWGRICD 4 KV Vital Bu & ACTIVE 8126 Bat Rm 1 2 BER-TAIOD EP BREAKER TO 11 COIMPONENT COOLING PM? 203002 Au= I BR CLOSED/OPEN 1SWGR1AD 1(CCF2) 064 CLOSED/OPEN 1SWGRLADC 4 KV Vital Bus& ACTIVE LADE 8107 1SWGRlAD Bat It.

1 2 BER-IAI3X EP BREAKER TO 1l CHILLER COWRESSOR 601231 Aux 1 BR CLOSEDiOPEN ISWGRIAX I 084 CLOSED ISWGRIADC 8129 ISWGRLAX 46/230V Vital ACTIVE 125r250DC Bat 1 2 BKR-LA14X EP BRFAKERTO 1EP 480VPRESS!JRIZERHEATER 601231 Aux I BR OP/CLOSED 1SWGRIAX I BUS 084 CLOSED/OPEN ISWGRIADC ISWGRIAX 460 V V-tal ACTIVE 8130 125r250DC Bat 1 2 BEK-lAID EP BREAKER TO 11 AUX FEED PMP (LAFFM) 203002 Aux I DR OPENJCLOSED 1SWGRIAD 1 04 CLOSED ISWGRIADC ISWGRLAD 4 "V V'WalBus & ACTIVE 8101 Bat Ra 1 2 BKR-IA2X EP BREAKER TO 11CONTAINRJNT FAN (IVEEIS) 601231 A=x 1 BR OPENICLOSED ISWGR1AX L 084 CLOSED lADE 8127 1SWGRIAX 460/230V Vital ACTIVE 12W250DC Bat 1 2 BEE-tARTD EP, BREAKER TO 15 SERVICE WATER PUP (ISWES) 203002 Aux I BR CLOSED/OPEN ISWIGkAD 1 064 CLOSED ISWGRIADC 4 KV Vital Bus & ACTIVE 1ADE 8102 ISWGRIAD Bat Ron CERTIFICATION:

The information identifying the equipment required to bring the plant to a Safe ahutdown condition on this Safe Sbutdown Equipment List (SSEL) is, to the best of my knovwledge and belief, correct atd nomrate. (One or mote signature of Systemis or Operations Engineers)

John G. Connolly I Senior Egineer JGC 5/111/95 Stephen P. oichl /Technical Manager SE 5/121/95 Signature Date Printia Type Name/itlae Signature Date Print or Type Name/Title

PAGE NO* SALEM GENERA* STATION - UNIT I DOCUMENT NO. 0014-9 78-Dool DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUW'ED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINENOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUNCTION 2 B'R-IA4D EP BREAKER TO TRASFOWRMERS 1XFRlA4OAX 203012 Am%1 BR CILOSED 1SWGR1AD AND iXFRLA4DBY 1 064 CLOSED ISWGRIADC 1SWGRLAD 4 KVV Vtal Bus & ACTIVE ADE 8103 B2t RM 1 2 BKt.1ATD EP BREAKER TO 11 RER PMP (IHE ) 2=300,2 Aux I BR OPEN ISWGRLAI) 1 064 OPENICLOSED 1SWGRLADC IS WGRIAD 4 KV Vital Bus & ACTIVE LADE 8105 Bat Rm 1 2 BZRLIA7X EP BREAKER TO 13 CHARGING PIP (ICVE22) 601231 Aux I BR CLOSED/OPEN ]SWGRIAX I 084 CLOSED 1SWGR1ADC ISWGRIAX 460d23V Vital ACTIVE 1ADE 8128 12,5025DC Eat 1 2 BKR-IASD EP BREAKER TO 16 SERVICE WATER PIP (lSWM6) 203002 Aux 1 BR CLOSED/OPEN iSWGRIAD 1 064 CLOSED ISWGRLADC 1SWGRIAD 4XKV i IB& ACITVE LADE 8106 Bat Rm 1 2 BKR-iADD EP BRRAKER FROM iA DIESEL GENERATOR 203002 Aux I BE OPEN WDAE4 (IDAY-GNAD) 1 064 CLOSED 1SWGRIADC ISWGRIAD 4 EV Vital Bu3 & ACTIVE JADE 8104 Bat R*o 2 2 BER-IBlOD ED BREAKERTO 12 COMPONENT COOLING PMP 203002 A=m 1 RR CLOSED/OPEN ISWGRtBD (ICCE4) 1 064 CLOSED/OPEN ISWGRIBDC ISWGRIBD 4 KV Vital Bus & ACTIVE IBDE 8117 Bat Rm 2 2 BRI-1I13x EP BEAKER TO 12 CHILLER COMPRESSOR 601232 Aux 1 BR CLOSED/OPEN ISWGRIBX

(]CH38-MTRUX)

( 084 CLOSED ISWGRBIIC 8135 ISWGRLIX 461-/30V Vital ACTIVE 125/250DC Bat 2 2 BER.iBID EP BREAKER TO 12 AUX FEED PMP (LAFE) 203002 A=m1 BR OPEN/CLOSED 1SWGRiBD 1 064 CLOSED zSWGRiBDC ISWGRIBD 4 KV Vital Bus & ACTIVE MDE 8s10 Bat Bin CERTIFICATION:

The information identifying the equipment required to bring the plant to a wfe ahutdown condition on this Safe Shutdown Equipment List (SSEL) is. to the best of aoy knowledge and btlie'. correct and aocurate. (One or mare-gnature of System r Operatioa.3Engiee)

Johzt G. Conoally I Senior Engimee, JGC 5/1 195 Stephen P, Reichle / Pedjita] danater sTE 6/1 i98 Print or Type Namef~itle Signature Date Printeor Type Namertllte Signatore, Date

PAGE NO. 0 SALEM GENERA TATION - UNIT I DOCUMENT NO. 0014- 9 8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUIL.,D1ING EVAL NORM STATE MOTTVE FwR SUPPORTING REQU.RED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTELS LINE NOS LOCALI[D ROB COMPONENT NO. LOCATION EQ FUNCTION 2 2 BKR-IB2X EP BREASERTO 12 CONTAiNMENT FAN (IVREU1) 601232 Aux I BR OPEN/CLOSED 1SWGRiBX 1 084 CLOSED iBDE 8132 ISWGRIBX 460/230V Vital ACTIVE 1251250DC Bat 2 2 BKR.IB3D EP BREAKERTO 13 SERVICE WATER PMP (ISWE3) 203002 Aux 1 BR CLOSED/OPEN 1SWGRIBD 1 064 CLOSED ISWGRIBDC ISWGRIBD 4 KV Vital Bus & ACTIVE 1505 8111 Bat Rm 2 2 BKR.IB4D EP BREAKER TO TRANSFORMERS IXFR1B4DAX 203002 Aix I BR CLOSED ISWGRIBD AND IXFRIB4DBY I 064 CLOSED ISWGRIBDC ISWGRI.BD 4 EV Vital Bus & ACTIVE IBDE 8112 Bat Roo 2 2 BKR-iBfX Ep BREAKERTO 14 CONTAINMENTFAN (IVEEII) 601232 Aux I BR OPENICLOSED ISWGRIBX 1 084 CLOSED 1BDE 8133 ISWGRIBX 460l.30V Vital ACTIVE 125'250DC Bat 2 2 BERB7-0D EP BREAKE TO 12 1 PMPU (IRlHE2) 203002 Aux 1 BR OPEN ISWGRIBD 1 064 OPENICLOSED ISWGRIBDC ISWGR1BD 4 KVVilta] Bus & ACTIVE IBDE 8114 BatRm 2 2 BKR-IBSD EP BREAKERTO 14 SERVICE WATER PM? (ISWE4) 203002 Aux I BR CLO.STDfOPEN ISWGUIBD 1 064 CLOS-D ISWGRIDDC 811a 1SWGRIBD 4 KV Vital Bus & ACTIVE IBDE Bat Rai 2 2 BKR-IBOD EP BREAKER TO 11 CHARGING P.MP 0 CYBIO) 203002 Aux I BR OPEN/CLOSED ISWGRIBD 1 064 CLOSED ISWGRLODC 8116 ISWGR1BD 4 KV Vital Bus & ACTIVE innE Bat Rm 2 2 BKR-1BDD EP BREAKER FROM 1BDIESEL GENERATOR 203002 Aux 1 BR OPEN IDAE23 I (IDAE2-GENIBD) 064 CLOSED ISWGRIBDC 8113 ISWGRIBD 4 KV Vital Bus & ACTVE IBIvE Bat KIn CERTIFICATION:

The information identiying the equipment required to bring the plant to a safe shutTOwn muditius on this Safe Shutdown Equipment List (SSEL) iz, to the best of my knowledge and belIef, correet and ao-urete. (One or more signatu.e ufSyste=n or Operations Engineer)

John G. Coinnlly I Senior Engineer JGC 5111195 Stephen P. Re;Il / Technical Manager SFR 5/11195 Print or Type Nametritle Signature Date Print or Type Nameritle Signature Date

PAGE NO.* SALEM GENERATI 9 STATION - UNIT 1 DOCUMENT NO. 0014-0 9 8-D001 DATE 5111195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD SPATE CONTROL ]?WR DRAWINGS SYSTEMS LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 3 2 BKR-ICIOD EP BREAKER TO 13 COMPONENT COOLING PMP 203002 A-x I BR CLOSED/OPEN ISWGRlCD (ICtCE3)

I 064 CLOSED*/OPEN ISWGRICDC ISWGRWICD 4 KV Vital Bus& ACTIVE ICDE 8125 Bat Rm 3 2 BE2R-IC13X EP BREAKER TO 13 CHILLER COMPRESSOR 601233 Aux I BR CLOSED/OPEN ISWGRICX 1 T'2C 084 CLOSED ISWGRICDC 8139 ISWGRICX 460/1230V Vital ACTIVE`

125/z5ODC Bat 3 1 BKR-IC23X EF BREAKER TO 1GP 480V PRESSURIZER BEATER 601233 Aux 1 BR OPEN/CLOSED 1SWGRlC9X BUS 1 084 CLOSED/OPEN 1SWGRlCDC 3SWGRt1C9X 460/230V Vital ACTIVE iCD9 8141 1251250DC Bat 3 2 BKR-IC2X EP BRREAKER TO 13 CONTAINMEIT PAN (1VEIE17) 60123 Aux I BR OPENICLOSED 1SWGRICX 1 084 CLOSED 1CDE 8136 1SWGRICX I01230VVital ACTIVE I251250DC Bat 3 2 BKR-IC3D EP BREAKER TO 11 SERVICE WATER PMP (ISWELI 203002 Aux I BR CLOSED/OPEN ISWGRICD 1 064 CLOSED iSWGRiCDC ISWGRICD 4KV *Ital Bea& ACTIVE ICDE 8120 Bat Rm 3 2 BKR-1C4D EP BREAKER TO TRANSFORMERS 1XFR1C4DAX 203002 Aux I BR CLOSED ISWGRICD AND 1XRIC4DBY 1 064 CLOSED ISWGRICDC ISWGRICO 4 K'V tal Bus & ACTIVE ICDE 8121 Bat Rm 3 2 BER-IC6X EP BREAKER TO 15 CONTAINMENT FAN (IVHEI9) 601233 Aux 1 BR OPEN/CLOSED ISWGRICX 1 084 CLOSED ICDE 8137 LSWGR1CX 46=3230V Vital ACTIVE 1250DC Bat 3 2 BKR-1C8D EP BREAKER TO 12 SERVICE WATER PM? (ISWE2) 203002 Ax 1 BR CLOSED/OPEN ISWGR1CD 1 064 CLOSED ISWGR1CDC ISWGR1CD 4 KV Vital Bus & ACTIVE lODE 8123 Bat Rm CERTIFICATION:

The information identifying the equipment required to bring the plant to a able shutdown condition on this Safe Shutdown Equipment List (S&L) is. to the best of my knowledge and belief correct ind accurate. (One or more iguature of Systems or Operations Entineera)

John G. Connolly / Senior Engineer JGC 5111/95 Stephen P. Reihle i Technical Manager SPR 5/11/95 Prnt or Type Nanef/itle Sigature Date Print or Type Namel.tle Signab-re Date

PAGE NO.@ SALEM GENERAT STATION - UNIT I DOCUMENT NO. 0014- 9 8-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER SYSTEM SUPPORT CL ID NUMBER ELEVATION NOTES CONTROL PWR DRAWINGS UNIT REQD STATE SYSTEMS LOCALID LOCATION EQ FUNCTION LINE NOS ROB COMPONENT NO.

3 2 BER-IC9D EP BREAE TO 12 CIJARGING PUP (ICVE21) 203002 Au= I BR OPEN/CLOSED ISWGRICD 1 064 CLOSED 1SWGRICDC 4 KV Vital Baus& ACTIVE ICDE 8124 ISWGRICD Bat Rm 3 2 BKR-lC9X EP BREARERTO IC460VVITALBUSEXTENSION 601233 A= I BR CLOSED ISWGRICX I084 (ISWGRIC9X) CLOSED 8138 1SWGRICX 460/230V Vital ACTIVE 125/250DC Bat 3 2 BKR.ICDD EP BREAKER FROM IC DIESEL GENERATOR 203002 Aux I BR OPEN ISWGRICD I (IDAE38-GENICD) 064 CLOSED ISWGR1CDX 4 EV Vital Bus & ACTIVE ICDE 8122 ISWGR1CD BatRm 1 20 EC-LA EP EXCITER CABINET - IA Aux 1 S ENERG NIA 1 100 ENERO N/A 9059 IA DIG m ACTIVE 2 20 EC-IB EP EXCITER CABINET- 1B Am 1 S ENERG N/A 1 100 Fl/ERG NfA 9060 IB D/G R. ACTIVE 3 20 EC-IC EP EXCITER CABINET - IC A- 1 S ENEORG NZA 1 100 ENERG NIA 9061 IC D/G Om ACTIVE 1 1 11101 EP NO ILASERV WTR INTAKE 230V VITAL 207902 Yard S ENERG ISWGRIAY CONTROL CENTER 1 100 ENERG N/A 8054 Srzc Wtr Bldg ACTIVE 2 1 11102 EP NO IB2 SERV WTRfINTAKE 230V VITAL 207903 Yard S ENERG 1SWGRIBY CONTROL CENTER 1 100 EN'ERG N/A 8045 Srvc Wtr Blde ACTIVE CERTIFICATION:

The information idetfg the equipment required to In/ng the plant to a safe shmrtdwn moditaou on this Safe Shtntd Equipment List MSEL) is. to the best ofm yknaledg snd belief, corred and aroate. (One or more o igrnabtre olSystems or Operatons Ehgineers)

John G. Cononlly J Senior Eogineer JGC 511195 Stephen P- Reiche / Technial Manager SPR 5/11/95 Print or Type Na*msettle Signature Date Pr/at or Type Nameffitle Signature Date

9 PAGE NO. SALEM GENERATIOSTATION - UNIT 1 DOCUMENT NO. 0014-0 9 8-DO01 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT I)

TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES REQD STATE SYSTEM SUPPORT UNIT CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FUINCTION 3 1 11103 EP NO IC SERV WTR INTARE 230V VITAL 207005 Yard S ENERG I.WGRICY CONTROL CENTER 1 100 ENERG N/A 8OS3Sr* Wt Bldg ACTIVE 1 1 11104 EP NO LADIESEL GENERATOR 230V VITAL 207907 Aux I S ENERG ISWGRIAY CONTROL CENTER 10 ENERG NJA 7 l~~AY~iDA 0 N-RNA 808 1A DIE Control Aea AIVE 2 1 11105 EP NO 1B DIESEL GENERATOR 230V VITAL 207908 A=x I S ENERG ISWGRIBY CONTROL CENTER I IBYIDA 100 ENERG NIA 8044 1B DIG Central Area ACTIVE 3 1 11096 E NO IC DIESEL GENERATOR 23DV VITAL 207909 Aux 1 S ENERG 1SWGR1CY 1IC*IDA CONTROL CENTER 100 ES"ERG N/A 8055 IC DIG Control Area ACTIVE I 1 11107 EP NO IAEAST VALVES & MISC. 230V VITAL 207931 IPA I S ENERG ISWGRIAT CONTROL CENTER I IAT'2EP 078 ES/ERG NIA 8009 A. B. C East Valves ACTIVE CC 3 1 11108 NP No IC EAST VALVES & MISC. 230V VITAL 207933 IPA I S ENERG ISWGRXCY 1 I CTIE? CONTROL CENTER 078 ENERG N/A 8057 A, B. C Eat Valv ACTIVE CC 2 1 11109 EP NO 1JBWEST VALVES & MISC. 230V VITAL 207911 Aux 1 S ENERG ISWGRIMY CONTROL CENTER 1 084 ENERG NIA g029 Elec Conte Center ACTIVE 3 1 11110 Er NO iC WEST VALVES & MISC. 230V VITAL 2D7912 Aux I S ENERG ISWGRICY CONTROL CENTER 1 1CY2AX 084 PERo EN N/A 8058 12 Aux Fd Prop Bra ACTIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdown condton on this Safe Shuftonm Equipment List (SSEL) is, to the best of my knvwledge and belief, correc and accrate- (One or more sdgnature of System.5 or Operations Engineers)

John G Connolly / Senior Engineer JGC 5/11195 Step*hen P. Reithie / Technical Manager SPR s1WI)95 Pxint or Type Namefl'o Sfigature Date Print or Type NamelTitle Signature Date

9 0

PAGE N06 SALEM GENERAIG STATION - UNIT 1 DOCUMENT NO. 0014-00078-DO01 DATE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE FWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL

  • DKDAWINGS SYSTEMS LINE NOS LOCAL ID ROB COMPONENT NO. LOCATION EQ FIINCTION 1 1 11111 E NO IA AIR COND 23oV VrrAL CONTROL 207914 A=I S ENERG ISWGRIAY CENTER 1 122 ENERG N/A 8006 CREAC Rn= ACTIVE 2 1 11112 EP NO IB AIR COND 230V VITAL CONTROL 207915 Aux 1 S ENEIRG 1SWGRIBY CENTER IIBY3AX 122 ENERG N/A 8027 Aux Bldg Sup Vent ACTIVE 2 1 11126 EP NO t11 SERV WTR INTAKE 230V VITAL 207904 Yard S ENERG ISWGRIBY CONTROL CENTER 1 100 ENERG N/A 8043 Src Wnr Bldg ACT7VE 1 1 11131 EF NO IA VENTILATION 230V VITAL CONTROL 207935 IPA 1 S ENERG ISWGRIAY CENER I 1AYLEP 100 ENERG NIA S007 CH Wtr Pmrp Area ACTIVE 2 1 11132 EP NO IB VENTILATION 23DV VITAL CONTROL 207936 IPA 1 S ENERG ISWGRI3CY 1 IBYlEP 100 ENEG N/A 8026 CH Wtr Pmp Area ACTIVE 3 1 11133 EP NO IC VENTILATION 230V VITAL CONTROL 207937 [PA I S ENERG 1SWGR1CY CENTER 1 ICYIEP 100 ENERG N/A 8D56 CBH Wt Prop Area ACTIVE 1 1 11136 EP NO IA WEST VALVES & MISC. 230V VITAL 207910 Aux I S ENERG ISWGRIAY COMTROL CENTER 1 084 ENERG N/A 8010 Cor at Anx Fd Prep ACTIVE Area 2 1 11137 EP NO 1B EAST VALVES & MISC. 230V VITAL 207932 IPA 1 S ENERG ISWGRIBY CONTROL CENTER 1 MBY2EP 078 EN.RG N/A 8028 A,B. C East Valves ACTIVE cc CERTIFICATION:

The inforztntion ideutifyinl the equipment required to bring the plant to a safe shutdown condiion on this Safe Shutdown Equipment Lisr (SSEL) is. to the best ofmy knowledge and belie. carredandsodaorat, (One or more signature of Sytewms or Operatios Enghneera)

John G Con.noly JSenior Engneer JGC slims95 Stemhen P. Reichle ITechnical Manager SPR 5/11-15 Print or Type Namet&i*le Signature Date Print or Type Naxoefltle Sigoatnoe Date

9 0

PAGE NO SALEM GENERATr STATION - UNIT 1 DOCUMENT NO. 0014-00078-DO01 DATfE 5/11195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PwR DRAWINGS SYSTEMS LINE NOS LOCALID LOCATION PQ FUNCTION ROB COMPONENT NO.

3 21 PANEL 309-1 CC UNIT a SAMPLE COOLERS FOR M R.X 205231, SET. 2 Aux I N/A N/A N/A COOLANT AND STM GENS I PNL 309-1 113 23 N/A NIA 5115 Primary Sys Sample PASSIVE Rm 3 21 PANEL 309-2 CC UNIT 2 SAMPLE COOLERS FOR PZ. RX 20523 1. SET. 2 Aux I N/A N/A NIA COOLANT AND STM GENS 1 PNL 309-2 113 23 N/A N/A 5116 Primary Sys Sample PASSIVE Rm 3 21 PANEL 312 CC UNITS i & 2 SA.MPLE COOLERS FOR STEAM 205231. SET- 2 Aw I N/A TVA N/A GENERATORS I ML 312 113 23 W/A N/A 511" Primary Sys Sample PASSIVE R.

20 RC11-3 EP 11 AUX CONTROL SYSTEM RELAY CABINET Aim 1 S ENERG N/A RCII-5 1 100 ENERG NIA 9068 1 Relay R. ACTrVE 20 RC1l-4 EP II AUX CONTROL SYSTEM RELAY CABINET AiuxI S ENERG NfA RCII-4 1 100 ENERG N/A 9069 1 Relay Rm ACIIVE 20 RC1I-5 EP 11 AUX CONITROL SYSTEM RELAY CABINET Anxl S ENERG N/A RCII-5 1 100 ENERG NIA 9070 1 Relay Rr. ACTIVE 20 RCI 1-6 EP 11AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG NIA RCI I-6 1 100 ENERG NIA 9071 1 Relay Rio ACTIVR 20 RC1i-7 EP 11 AUX CONTROL SYSTEM RELAY CABINET A- I S ENEEG N/A 1 RCll-7 100 ENERG N/A 9D72 I Relay Rio ACTIVE CERTIFICATION:

The informaiOn identifying the equipment required to bring the plant to a safe shutdown condition an this Safe Shutdown Equipment iszt (SSEL)is, to the best of my knowledge and belief, correct and accurate. (One or more ojgnature ufSysolma or Operations Engineers)

John G- CAmnally I Senior Engineer JC_ 5/11J90 Stephen P. Reidde I krehieal Manager SPR 8/1 ImS Print or Type Nameritle Signature Date Print or Type Name/Tbre Signature Date

PAGE NOB SALEM GENERAT STATON - UNIT 1 DOCUMENT NO. 0014 0 /8-D001 DATE 5111195 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED NUMBER ELEVATION NOTES SYSTEM CL ED NUMBER SUPPORT UNET REQD STATE CONTROL PWR DDRAWINGS SYSTEMS LINE NOS LCLE ROB COMPONENT NO. LOCATION EQ FUNCTION 20 RC12-S EP 22 AUX CONTROL SYSTEM RELAY CA*=N' Aux 3 S ENERG NIA RC12-3 1 100 ENERG N/A 9073 1 Relay Rm ACTIVE 20 RC 12-4 EP 12 AUX CONTROL SYSIEM RELAY CABRINT Aux 1 S ENERG N/A RC12-4 1 100 ENERG N/A 9074 1 Relay Em ACTMVE 20 RCI2-6 EP 12 AUX CONTROL SYSTEM RELAY CABINET Aux 1 S ENERG N/A RC12-5 1 1zo ENEG NA 9075 1 Relay Rm ACTIVE 20 RC 12-6 EP 12 AUX CONTROL SYSTEM RELAY CABINET Aux 1 S ENERG N/A RCI2-6 1 100 ENERG N/A 9076 1 Relay Eon ACTIVE 20 RC12-1' EP 12 AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG N/A RC12-7 1 100 ENERG N/A 9077 1Relay Em ACTIVE 20 RC13-3 EP 13 AUX CONTROL SYSTEM RELAY CABINET Aux 1 S ENERG N/A RCI3-3 1 100 ENERG N/A 9078 1Belay R. AC-TIVE 20 RCI3-4 EP 13 AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG NIA RC1I3-4 1 100 ENERG N/A 9079 1 Relay Rm ACTIVE 20 RCI3-5 EP 13 AUX CONTROL SYSTEM RELAY CABINET A- I S ENERG N/A RC13-5 1 100 ENERG N/A 9080 1 Relay Rm ACTIVE CERTIFICATION:

The inforonatian identifyiog the equipment required to bring itheplant to a safe shutdown condition on this Safe Shutdown Equipment List (SSEL) is. to the best of my knowledge and belief. correct and ac-ur'te, (One ox momesinature of Syst-s or Operaions Engineers)

John G. Connolly / Senior Engioeer JGC /I1i195 Stephen P. Reicloe I Technical Manager SPR 51 1195 Print or Type Namefmide Signature Date Print or Type NameThtle Signature Date

PAGE N009 SALEM GENERAt STATION - UNIT 1 DOCUMENT NO. 0014-9078-DOO1 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIfPENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SYSTEM SUPPORT UNIT ELEVATION NOTES REQD STATE CONTROL PWR DRAWINGS SYSTEMS LINE NOS LOCAL ED ROD COMPONENT NO. LOCATION EQ FUNCTION 20 RC13-9 EP 13 AUX CONTROL SYSTEM RELAY CABINET Auz 1 S ENEEG N/A RCl3-G 1 100 ENERG N/A 9081 1 Relay RM ACTIVE 20 RCI3-7 El' 13 AUX CONTROL SYS`BTM RELAY CABINET A= I S ENERG NIA RC13-7 1 Ina ENERG NIA 9082 1 Relay Rm ACTIVE 20 RCi4-3 EP 14 AUX CONTROL SYSTEM RELAY CABIN*T A=n I S ENERG NIA RC14-3 1 100 ENERG N/A 9013 1 Belay R. ACTIVE 20 RC14-5 EP 14 AUX CONTROL SYSTEM RELAY CABINET A-n I S ENERG N!A RC14-5 1 100 ENERG NfA 9084 1 Relay Rn ACTIVE 20 RCI4"- EP 14 AUX CONTROL SYSTEM RELAY CABINET A=n I S ENERG NIA RC14-6 1 100 ENERG N/A 9085 1 Relay Rm ACTIVE 20 RC14-7 El 14 AUX CONTROL SYSTEM RELAY CABINET Am I S ENERG N/A RCI4-7 1 100 ENERG N/A 9091 1 Rel27 m ACTIVE 20 RC15-3 EP 15 AUX CONTROL SYSTEM RELAY CABINET A= I S ENREG NJA RCI5-3 1 100 ENERG NIA 9087 1 Relay Em ACTIVE 20 RCI5-4 EP 15 AUX CONTROL SYSTEM MELAYCABINET Anx 1 S E-,ERG NIA RC15-4 1 100 ENERG NIA 9088 1Relay Rm ACTIVE CERTIFICATION:

The information identifying the equipment required to bring the plant to a safe shutdown mndiioon en this Safe Shutdown Equipment List (SSEL) is, to the best ofmy knowledge and belieL correct and a-srate. (One or more signatre of Systems or Oprations Engineers)

John 0. Connally /Senior Engineer JGC 5/11195 Stephen P. Reichbe I Technical Manager SPR 5/11193 Print or Type Name/Title Signature Date Prn or Type Name,'ifile Signatare Date

9 9 PAGE NO.51 SALEM GENERA STATION - UNIT I DOCUMENT NO. 0014- 078-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER ELEVATION NOTES S*ISTEM SUPPORT UNIT REQD STATE CONTROL PWIV DRAWINGS SYSTEMS LIKENOS LOCALID ROB COMPONENT NO. LOCATION EQ FUNCTION 20 RC15-6 EP 15 AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG NIA RC15-6 1 100 ENERG N/A 9089 I Relay Rm ACTIVE 20 RC15-7 EP 1S AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG N/A RCt5-7 1 100 ENERG NIA 9090 1 Relay Rn ACTIVE 20 RC16-5 EP 16 AUX CONTROL SYSTEM RELAY CABINET Anx I S FN'ERG N/A RCG1-5 1 100 RNERG N/A 9091 1Relay Ras ACTrAVE 20 RCi-6 EP 16AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG NIA RC16-6 1 100 ENERG NIA 9092 Re.lay Rm ACTIVE 20 BC 16-7 EP 16 AUX CONTROL SYSTEM RELAY CABINET Awx l S ENERG N/A RC16-7 1 100 ENERG NA 9093 1 Relay Rra ACTIVE 20 RC17-7 EP 17 AUX CONTROL SYSTEM RELAY CABINET Aux 1 N/A ENERG N/A RC17-7 1 100 ENERG N/A 9091A I Relay Ro ACTIVE 20 RC18-4 EP 18 AUX CONTROL SYSTEM RELAY CABINET A=e 1 S ENERG N/A RCl&4 1 IO ENERG NIA 9094 1 Relay __ ACTTVE 20 RCI8.5 EP 18 AUX CONTROL SYSTEM RELAY CABINET Aux I S ENERG NIA RCI$-5 1 100 ENERG N/A 9095 a Relay Rm ACTIVE CERTIFICATION:

The intormaton identifying the equipment required to bnng the plant to a saWeshutdown rondition on this Safe Shutdown Equipment List (SSEL) is. to the best army knowledge and belief. correct and accrate. (One or more sgnare oflSystems or Operations Enginoros)

John G. Connolly / Senior Enginepr JGC 5I/l/95 Stephen P. Reicihle I Techxical Manager SPR 5/1 1J95 Print or Type Namefsitle Signature Daoe Print or Type Namef'itle Signature Date

PAGE NO* SALEM GENERAT* STATION - UNIT 1 DOCUMENT NO. 0014-#78-DOOI DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQU`IPMENT ID TRAIN EQ EQUIPMENT SYSTEM EQUIP DESCRIPTION DRAWING BUILDING EVAL NORM STATE MOTIVE PWR SUPPORTING REQUIRED CL ID NUMBER NUMBER SUPPORT UNIT ELEVATION NOTES REQD STATE SYSTEM CONTROL PWR DRAWINGS SYSTEMS LOCAL ID LINE NOS ROB COMPONENT NO. LOCATION EQ FUNCTION 20 RC18-6 EP 18 AUX CONTROL SYSTEM RELAY CABINET Aux 1 S ENERG NWA RC18-e 1 100 ENERG N/A 9096 1Relay Ru ACITVE 1 20 SEC-IA EP S.AFEGUARDS EMERGENCY CABINET- IA 205802 Aux I S EMERG NR 1 100 ENERG NR 9097 1 Relay EM ACTIVE 1 20 SEC-IB EP SAFEGU.ARDSEMERGENCYCABINET- iB 205802 AuMx S ENERG NR 1 100 ENERG NE 9098 1 R*lay Rm ACTIVE 1 20 SEC-IC EP SAFEGUARDS EMEEGENCY CABINET- iC 205802 Ans I S ENMEG NR 1 100 E-NEOG N 9099 1 Relay Rm ACTIVE CERTIFICATION:

The information identifying the equpmroat required to bring the plant to a safe shutdown condition on this Safe Shutdown Equipment List (SSEL) is, othe best of my knowledge and helsof, vr~ectian ac-os-ole_ (One or more signature of Sys*ms or Operations Engineers)

John G. Connolly I Senior Engioeer JGC 5/11195 Stephen P. Reirhle I Technical Manager SPR 5/11J5 Print or Type Namefl'tle Signature Date Print or Type Namefritle Signature Date

PAGE NO.0 SALEM GENERATI*'PATION - UNIT 1 DOCUMENT NO. 0014-.-D001 DATE 5/11/95 USI A-46 PROJECT REVISION 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

SORTED BY EQUIPMENT ID TRAXN EQ EQU]PMENT SYSTEM EQUIP DESCRIPTION DRAWING BUTLDING EVAL NOR.M STATE MOTIVE PW SUPPORTING REQUIRED CL ID.NUMBER ELEVATION NOTES SUPPORT UNIT REQDSTATE CONTROL PwR DSlAWsN SYSTEMs LI1,M NOS LCIDROB COMPONEN4T NO. LOCATION EQ FUNCTION NOTES:

1. This component should be designated Train 2 for Reactor Pressure Control.
2. This component should be designated Train 20P for Reactor Pressure Control.
3. This valve will need to be manually opened if required.
4. Component needs to be able to bleed air from 1CV55 so that it can fail open if the valves control signal andlor air supply is lost.
5. Valve may need to be dosed if IPRI sticks open.
6. Valve may need to be closed if 1PR2 sticks open.
7. Component required for Pressure Boundary only.
8. Valve operates normally until tanks bleed down then fails open.
9. Pneumatically controlled valve.
10. Valve Locked Out.
11. Fails As-Is. Can be manually operated if necessary.
12. Valve is physically open 30% when CFCU is at low speed and is 100% open when CFCU is at high speed.
13. Valve fails open on loss of air. Valve can be manually closed if necessary to reduce the amount of divergent flow.
14. Fails As-Is on loss of air.
15. Damper will have to be manually opened on loss of control air.
16. No backup valve identified to compensate for a single failure. Line isolates leakoff from No. 1 Seal on all four RCP's.
17. SV mounted on wall locally.
18. These valves are "Key-Locked" open in the Control Room.
19. Valve is manually closed if necessary to isolate SIG blowdown line.
20. Walkdowns determined that these components are no longer installed in the field.
21. Component contains SV which has been determined to be rugged by SIT. No. walkdown required.
22. SEWS was prepared for lube oil cooler 1SJE100 and 1SJE101 instead of for ISJE2 and 1SJE3.
23. Seismic Review Team (SRT) determined that the component is not required per GIP criteria.

CERTIFICATION:  :

The inaformation idendfying the equipment required to bring the plant to a safe sbutdn-wn condition on this Safe Shuatdoe-Equipmaent List (SSEL) is, to the best of my knoawledge and beliet cosseatAnda.corte. (One or more signataervof Systems or Opersatios Engieers)

John G. Connofly / Senior Engineer JGO 5/2M Stephen P. Reichle / TeduticalhfManager SPR 6/111155 Print or Type Natefldte signotre Date Print ar TypeNoaafeitle Signature Date

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-01 1549 Project No. 12800-217 Rev. 1 Seismic Walkdown Report ATTACHMENT 1B - SALEM UNIT 1 "BASE LIST 2", COMPONENTS ASSOCIATED WITH SPENT FUEL POOL

Attachment 1B - Salem Unit 1- Base List 2 - Components Associated With Spent Fuel Pool Functional location Catalog (Tag Number) Description profile SEISMIC CLASS S1460-1BX1AX14X 12 SFP PP NU-BKR Seismic Class 1 (I)

S1CC -1CC206 SFP HX CC VENT NU-VLV Seismic Class 1 (I)

S1CC -1CC243 SFP HX CC INLET DRN NU-VLV Seismic Class 1 (I)

S 1CC -1CC32 SFP HX CC INLET VALVE NU-VLV Seismic Class 1 (I)

S1CC -1CC33 SFP HX CC DRN NU-VLV Seismic Class 1 (I)

S 1CC -1CC34 1 CC SFP HX OUTLET RELIEF VLV NU-SRV Seismic Class 1 (I)

S 1CC -1CC35 SFP HX CC FLOW TAP NU-RTVL Seismic Class 1 (I)

SlCC -1CC36 SFP HX CC FLOW TAP NU-RTVL Seismic Class 1 (I) 51CC -1CC37 SFP HX CC FLOW CONTROL VALVE NU-VLV Seismic Class 1 (I)

S1CC -1 CC38 SFP HX CC OUTLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -11 SF2 SFP PMP PRESS TAP NU-RTVL Seismic Class 1 (I)

SlSF -11 SF3 SFP PUMP VENT NU-VLV Seismic Class 1 (I)

S1SF -11 SF4 SFP PUMP DRN NU-VLV Seismic Class 1 (I)

S1SF-11SF5 SFP PMP PRESS TAP NU-RTVL Seismic Class 1 (I)

SlSF -1 1SF67 SFP PUMP INLET VALVE NU-VLV Seismic Class 1 (I)

SlSF -11 SF68 SFP PUMP OUTLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -1 lSF72 SFP PMP PURGE V NU-VLV Seismic Class 1 (I)

SlSF -12SF2 SFP PMP PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -12SF3 SFP PUMP VENT NU-VLV Seismic Class 1 (I)

S1SF -12SF4 SFP PUMP DRN NU-VLV Seismic Class 1 (I)

SlSF -12SF5 SFP PMP PRESS TAP NU-RTVL Seismic Class 1 (I)

SlSF -12SF67 SFP PUMP INLET VALVE NU-VLV Seismic Class 1 (I)

SlSF -12SF68 SFP PUMP OUTLET VALVE NU-VLV Seismic Class 1 (I)

S1 SF -12SF72 SFP PMP PURGE V NU-VLV Seismic Class 1 (I)

Si SF -1 F2088 1 SPNT FUEL CLG WATER PMP DISCHARGE FL 0 NU-ORIFI Seismic Class 1 (I)

SiSF -1 FE656 1 SPNT FUEL CLG PIT WATER OUTLET FL ORIF NU-ORIFI Seismic Class 1 (I)

S1SF -1 F1656 1 SPNT FUEL CLG PIT WATER OUTLET FL LOCA NU-IND Seismic Class 1 (I)

S1SF -1 FL2087 1 SPNT FUEL CLG PMP DISCHARGE FL LOCAL I NU-IND Seismic Class 1 (I)

SlSF -1PEN66 1 SPNT FUEL CLG REFUEL CAVITY OUT TO REF NU-PENM Seismic Class 1 (I)

S1 SF -1 P1652 11 SPNT FUEL CLG PIT PMP DISCH PR LOCAL NU-IND Seismic Class 1 (I)

SlSF -1 P1654 1 SPNT FUEL PIT FILTER OUTLET NU-IND Seismic Class 1 (I)

S1SF -1 P1655 1 SPNT FUEL PIT FILTER INLET NU-IND Seismic Class 1 (I)

S1SF -1 P1657 11 SPNT FUEL CLG PIT PMP SUCTION PR LOCA NU-IND Seismic Class 1 (I)

SlSF -1 P1672 1 REFUELING WTR PURIFICATION PMP SUCTION NU-IND Seismic Class 1 (I)

SiSF -1P1674A 1 SPNT FUEL CLG WATER PURIFICATION FILTE NU-IND Seismic Class 1 (I)

SiSF -1PI674B 1 SPNT FUEL CLG WATER PURIFICATION FILTE NU-IND Seismic Class 1 (I)

SiSF -1 P1675 12 SPNT FUEL CLG PIT PMP DISCHARGE PR LO NU-IND Seismic Class 1 (I)

S1SF -1 P1676 12 SPNT FUEL CLG PIT PMP SUCTION PR LOCA NU-IND Seismic Class 1 (I)

S1SF -1PL6396 1 SPNT FUEL CLG PIT REFUELING WATER PR L NU-IND Seismic Class 1 (I)

S1SF -1S55B 1 SPNT FUEL CLG 1S55B SPENT FUEL COOLING NU-PIPE Seismic Class 1 (I)

S1SF -1S55C 1 SPNT FUEL CLG 1S55C SPENT FUEL COOLING NU-PIPE Seismic Class 1 (I)

S1SF -1SF10 SFP DM INLET SAMP V NU-RTVL Seismic Class 1 (I)

SlSF -1SF108 SPT FUEL CLG CROSS TIE ISO VALVE NU-VLV Seismic Class 1 (I)

SiSF -1SF109 SPT FUEL CRS TIE RTN LN ISOL VALVE NU-VLV Seismic Class 1 (I)

SlSF -1SF11 SFP DM INLET VALVE NU-VLV Seismic Class 1 (I)

SiSF -1SF110 SPT FUEL CLG CRS TIE RTN LN DR NU-VLV Seismic Class 1 (I)

S1SF-1SF111 SPT FUEL CLG CRS TIE DRN VLV NU-VLV Seismic Class 1 (I)

P. 1

Attachment 1B - Salem Unit 1- Base List 2 - Components Associated With Spent Fuel Pool Functional location Catalog (Tag Number) Description profile SEISMIC CLASS S1SF -1SF1 12 SPT FUEL CLG CROSS TIE VENT V NU-VLV Seismic Class 1 (I)

S1SF -1SF113 1&2 SPT FUEL CLG CRS TIE VENT NU-VLV Seismic Class 1 (I)

S1SF -1SF12 SFP DM OUTLET VALVE TO SFP NU-VLV Seismic Class 1 (I)

S1SF -1SF13 SFP FILT INLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF14 SFP FILT PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1SF15 SFP FILT VENT NU-VLV Seismic Class 1 (I)

S1SF -1SF16 SFP FILT DRN NU-VLV Seismic Class 1 (I)

S1SF -1SF17 SFP FILT PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1SF18 SFP FILTER OUTLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF19 SFP DM FLOW TAP NU-RTVL Seismic Class 1 (I)

S1SF -1SF20 SFP DM FLOW TAP NU-RTVL Seismic Class 1 (I)

SISF -1SF22 RWPP SUCT V FUEL X-FER CANAL NU-VLV Seismic Class 1 (I)

S1SF -1 SF25 RWPP DR V NU-VLV Seismic Class 1 (I)

S1SF -1 SF27 1 SPNT FUEL CLG REFUEL WTR PURIF PMP DIS NU-CKVL Seismic Class 1 (I)

S1SF -1 SF28 RWPP PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1 SF29 RWPP DISCH VALVE NU-VLV Seismic Class 1 (I)

S1SF -1 SF30 RWPF VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF31 RWPF DRN NU-VLV Seismic Class 1 (I)

S1SF -1 SF32 RW RET PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1SF33 RW RET SAMP V NU-RTVL Seismic Class 1 (I)

S1SF -1SF34 1 SPNT FUEL CLG REFUEL WTR PURIFICATION NU-CKVL Seismic Class 1 (I)

S1SF -1SF35 RWPF OUTLET VALVE TO RWST NU-VLV Seismic Class 1 (I)

S1SF -1SF36 RWPF OUTLET V TO XFR CANAL NU-VLV Seismic Class 1 (I)

S1SF -1SF37 RWPP TO SFP DM NU-VLV Seismic Class 1 (I)

S1SF -1 SF38 SFP DM OUTLET VALVE TO RWPF NU-VLV Seismic Class 1 (I)

S1SF -1SF39 SFP DEMIN BYPASS VALVE NU-VLV Seismic Class 1 (I)

S1SF -1 SF40 SFP DM RESIN FILL V NU-VLV Seismic Class 1 (I)

S1SF -1 SF41 SFP DM BKFLSH OUTLET V NU-VLV Seismic Class 1 (I)

S1SF -1SF42 SFP DM RESIN DR V NU-VLV Seismic Class 1 (I)

S1SF -1SF43 SFP DM DR V NU-VLV Seismic Class 1 (I)

S1SF -1SF44 SFP DM PRI WTR VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF58 DM M/U VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF59 SFP FILT OUTLET SAMP VALVE NU-RTVL Seismic Class 1 (I)

S1SF -1SF6 SF CLG TO HUT NU-VLV Seismic Class 1 (I)

S1SF -1SF60 RWPP DM FLOW TAP NU-RTVL Seismic Class 1 (I)

S1SF -1 SF61 RWPP DM FLOW TAP NU-RTVL Seismic Class 1 (I)

S1SF -1 SF64 SFP HX VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF65 SF XFR POOL FILL V NU-VLV Seismic Class 1 (I)

S1SF -1 SF69 RWPP PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1 SF71 SFP FILL V TO HUT NU-VLV Seismic Class 1 (I)

S1SF -1SF73 FROM REF CANAL TEST CONN NU-VLV Seismic Class 1 (I)

S1SF -1 SF74 1 SPNT FUEL CLG REFUEL WTR PURIF PMP INL NU-CKVL Seismic Class 1 (I)

SISF -1SF75 RWPP DISCH PRESS TAP NU-RTVL Seismic Class 1 (I)

S1SF -1SF76 TO REF CANAL TEST CONN NU-VLV Seismic Class 1 (I)

S1SF -1 SF77 REF CANAL SUCT DRN NU-VLV Seismic Class 1 (I)

S1SF -1SF78 REF CANAL SUCT DR V NU-VLV Seismic Class 1 (I)

S1SF -1SF8 SFP HX DRN NU-VLV Seismic Class 1 (I)

P. 2

Attachment 1B - Salem Unit 1- Base List 2 - Components Associated With Spent Fuel Pool Functional location Catalog (Tag Number) Description profile SEISMIC CLASS S1SF -1SF80 RWPF INLET DR V NU-VLV Seismic Class 1 (I)

S1SF -1 SF81 SFP DM BKFLSH VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF82 SFP DM INLET VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF83 SFP FILT INLET DR V NU-VLV Seismic Class 1 (I)

S1SF -1 SF84 SFP PMPS INLET DR V NU-VLV Seismic Class 1 (I)

S1SF -1SF85 SFP PMPS INLET VENT NU-VLV Seismic Class 1 (I)

S1SF -1SF86 SFP INLET VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF87 RWPP TO SF DM DR V NU-VLV Seismic Class 1 (I)

S1SF -1SF89 REF CANAL SUCT VENT NU-VLV Seismic Class 1 (I)

S1SF -1SF9 SFP HX OUTLET VLV NU-VLV Seismic Class 1 (I)

S1SF -1SF90 REF CANAL SUCT VENT NU-VLV Seismic Class 1 (I)

S1SF -1SF900 SF HEAT EXCH INLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF901 SF HEAT EXCH OUTLET VALVE NU-VLV Seismic Class 1 (I)

S1SF -1SF91 SFP FILT OUTLET DR V NU-VLV Seismic Class 1 (I)

S1SF -1 SF93 RWPP TO SF DM VENT NU-VLV Seismic Class 1 (I)

S1SF -1 SF94 SFP PMP TO SF DM DR V NU-VLV Seismic Class 1 (I)

S1SF -1SFE1 1 SPNT FUEL CLG REFUEL WTR PURIF PMP NU-PMP Seismic Class 1 (I)

S1SF -1SFE12 1 SPNT FUEL CLG PIT HT EXCHG NU-1HX Seismic Class 1 (I)

S1SF -1SFE17 UNIT 1 SPENT FUEL PIT NU-MISCM Seismic Class 1 (I)

S1SF -1SFE2 1 SPNT FUEL CLG PIT DEMINERALIZER NU-IX Seismic Class 1 (I)

S1SF -1SFE3 1 SPNT FUEL CLG REFUEL WTR PURIF FLTR NU-STRM Seismic Class 1 (I)

S1SF -1SFE4 1 SPNT FUEL CLG PIT FILTER NU-STRM Seismic Class 1 (I)

S1SF -1SFE5 11 SPNT FUEL CLG PMP NU-PMP Seismic Class 1 (I)

S1SF -1SFE5-MTRX 11 SPENT FUEL PIT PMP MTR NU-MTRE Seismic Class 1 (I)

S1SF -1SFE6 12 SPNT FUEL CLG PMP NU-PMP Seismic Class 1 (I)

S1SF -1SFE6-MTRX 12 SPENT FUEL PIT PMP MTR NU-MTRE Seismic Class 1 (I)

S1SF -1SW13732 11 SPNT FUEL CLG FUEL PIT PMP LOCAL CTL NU-SW Seismic Class 1 (I)

S1SF -1SW13733 12 SPNT FUEL CLG FUEL PIT PMP LOCAL CTL NU-SW Seismic Class 1 (I)

S1SF -1T1653 1 SPNT FUEL CLG PIT HEAT EXCHANGER TM LO NU-IND Seismic Class 1 (I)

S1SJ -1SJ319 RWST TST CON (SFP EMER FD CON) NU-VLV Seismic Class 1 (I)

P. 3

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-0 11549 Project No. 12800-217 Rev. 2 Seismic Walkdown Report ATTACHMENT 2 - SEISMIC WALKDOWN EQUIPMENT LIST (SWEL)

Report No. SL-011549 Salem Unit 1 - Seismic Walkdown Equipment List (SWEL)

Rev. 3 (Sorted by EQ. Class)

Risk Anchored to Risk Safety New or IPEEE Concrete or Notes No AWB # Comp. ID System EQ. Class Component Description Bldg. Elev. Room Significant Function Replaced Enhanced Structure (Y/NINA) (Y=IlN=O) 1 S1-01 1SWE7 SW 0 11 SW PMP Disch Strainer SWIS 90 SWIS Bay 1 3,4 1Nerif.

2 S1-05 1LL6229 CH 0 Sight Glass-1 CH WTR Exp Tank IPA 1 100 CH WTR Pmp 1,2,3,4,5 0 Area 3 Sl-07 11DA6C DA 0 13A Diesel Start Air RCVR Inlet CHK 1-07 11DA6C DA 0 C DG Rm 12,3,4,5 0 1C DG Lube Oil Heater Disch CHK S $1-07 1DA36C DA 0 VLV100 1C DVG Rm 1,2,3,4.5 Y 0 5 S1-07 1DA49C DA 0 1C DG JKT WTR TEMP REG VLV Aux1 100 1C D/G Rm 1,2,3,4,5 Y 0 6 S1-07 1DAE91 DA 0 No. 1 Start Air Motor-iC Diesel Gen Aux 1 100 1C D/G Rm 1,2,3,4,5 Y 0 7 S1-07 1DAE95 DA 0 1C DG Lube Oil Filter Aux 1 100 1C D/G Rm 1,2,3,4,5 Y 0 8 S1-08 1CVE45 CV 0 Pulsation Dampener Aux 1 84 13 Chrg Pmp

___1,2,3,Rm 9 SI-09 11RH18-CONV RH 0 E/P CONV For 11RH18 Aux 1 45 11 RHR Pmp Rm 3,4 1 Ion Exch 1, 1 10 S1-22 1SF37 SF 0 RWPP - SF DM Aux 1 100 Rm/DM Alle, 0 (1) 11 S1-24 1CV174 CV 0 BA Blender Byp V Aux 1 100 Rm by BA XF 1,3 0 Pmps 12 Sl-31 1SWE46-MTRY SW 0 15 Traveling WTR Screen MTR SWIS 133 SRV Wtr Bldg Y 3,4 Y 1 13 Sl-39 1VHE19-MTRX VH 0 15 CFCU MTR Cont'nt 1 130 15CFCU 5 1 Defer to RFO SR2 14 S1-40 11SJ64 CV 0 11 SI PMP Min Flow Check VLV Aux 1 84 11 SI Pmp Rm 3.4 0 15 S1-46 ISF74 SF 0 1 SPNT FUEL CLG REFUEL CANAL Aux 1 84 Main Cordor 3,4 0 (1) 1 $16 S S7 0______TO PURIF PM 16 S1-28 14GB3 GB 0 14 S/G Blowdown Outlet HDR Gate Cont'nt 1 78 Cor at Elevator 5 0 Defer to RFO VLV 17 S1-04 11133 EP 1 No.1C Ventilation 230V Vital Control 1 100 CH WTR Pmp 1.2.3.4.5 PA Area 1.2,3,4,5

_ 1 Center No. 1C Serv WTR Intake 230V Vital 18 $1-30 11103 EP 1 Control Center SWIS 100 Srvc Wtr Bldg 3,4 1 Defer to RFO 460/230 Vital 19 S1-15 1SWGR1CY EP 2 No. 1C 230V Vital Bus Aux 1 84

~ ~~~~~~125/250DC

/201,2,3,4,5 Bat Y 123451 1 Dfrt to RFO Defer F I

20 51-15 BKR-1C2X EP 2 Breaker to 13 Containment Fan Aux 1 84 460/230 Vital 5 0 Defer to RFO (1VHE17) 125/250DC Bat 21 S1-36 1SWGRlCgX EP 2 No. 1C 460V Vital Bus Extension Aux 1 64 41,2,3,4,5 Nerif. Defer to RFO R2 1,2__4. ________ Deferto ____

& Bat Rm 22 Sl-36 BKR1C10D EP 2 Breaker to 13 component cooling Aux 1 64 4 KV Vital Bus 3.4 1 Defer to RFO pump I1CCEA) &Bat Rm R3 23 S1-36 1SWGR1CD EP 3 No. 1C 4160V Vital Bus Aux 1 64 4KV Vital Bus Y 1,2,3,4,5 1 Defer to RFO 1&Bat Rm 25 S1-15 lXFR1C4DBY EP 4 Transformer to No. 1C 230V Vital Bus Aux1 84 460/230 Vital Y 1,2,3,4,5 1 Defer to RFO 1SWGR1CY 125/250DC Bat P1

Report No. SL-011549 Salem Unit I - Seismic Walkdown Equipment List (SWEL)

Rev. 2 (Sorted by EQ. Class)

Risk Risk Safety New or IPEEE Anchored Concrete orto No AWB # Comp. ID System EQ. Class Component Description Bldg. Elev. Room Significant Function Replaced Enhanced Structure Notes (Y/N/NA)(Y=I/N=0) 24 S1'15 21XFR1C4DAX 1RCD

$15 I EP P 4 Transformer 1SWGRlCX to No. 1C 460V Vital Bus Aux 1 84 460/230 125/250DCVitalBat 1,2,3,4,5 1 DefertoRFO 26 S1-04 1CHE19 SW 5 13 CH CNDSR Recirc Pump IPA 1 100 CH WTR Pmp 1,2,3,4,5 1 I IArea 27 S1-04 lCHE5 CH 5 11 Chiller Water PMP IPA 1 100 CH WTR Pmp 1,2,3,4,5 1 Area 28 S1-07 1DFE32 DF 5 1C Fuel Oil (Engine Driven) Booster Aux 1 100 1C D/G Rm Y 1,2,3,4.5 0 Pump 29 S1-08 1CVE22 CV 5 CHG PMP Centrifugal Aux 1 84 13 Chrg Pmp 1,2,3,4 1Nerif.

Rm 30 Sl-10 1MSE3 MS 5 13 AF PMP TURB Aux 1 84 13Aux Fd 2.4 1Neif.

Pump Rm 31 S1-11 1AFE5 AF 5 12 Aux Feed Pump Aux 1 84 12Aux Fd Y 2,4 1Nerif.

Pump Rm 32 S1-16 1CCE2 CC 5 CC Pump No. 11 Aux 1 84 11 CCPmpRm Y 3.4 lNerif.

33 S1-40 1SJE2 SJ 5 11 Safety Injection Pump Aux 1 84 11 SI Pmp Rm Y 3,4 1Nerif.

34 S1-01 1SWE1 SW 6 11 Service Water Pump SWIS 90 SWIS Bay 1 Y 3,4 Y 1Nerif.

35 S1-01 1SWE2 SW 6 12 Service Water Pump SWIS 90 SWIS Bay 1 Y 3,4 Y 1Nerif.

36 S1-01 1SW308 SW 7 SW HDR Press Contr Reg Valve SWIS 90 SWIS Bay 1 3,4 0 37 S1-03 14GB4 GB 7 14 S/G Blowdown ISO VLV IPA 1 78 Mech Pen Area Y 5 0 38 S1-04 13SW102 SW 7 OH CNDSR SW Outlet VLV IPA 1 100 CH WTR Pmp JArea 1,2,3,4,5 Y 0 39 SI-04 13SW92 SW 7 OH CNDSR SW Control VLV IPA 1 100 CH WTR Pmp Area 1,2,3,4,5 Y 0 40 S1-09 11RH18 RH 7 RHR HX Flow CONT VLV Aux 1 45 11 Rm RHR Pmp 3,4 0 41 Sl-10 11AF11 AF 7 Aux Feed-S/G Level Control Valve Aux 1 84 13Aux Ed 2,4 0 Pump Rm 42 S1-16 11SW127 SW 7 11 CC HX SW Outlet Control VLV Aux 1 84 11 CC Pmp Rm 3,4 0 43 S1-27 14MS18 MS 7 MS Stop Bypass VLV OPA 1 100 MS Pen Area 2 0 44 S1-29 ICV114 RC 7 RCP Seal BYPASS Stop VLV Cont'nt 1 78 Cor at Elevator 3. 0 Defer to RFO 45 S1-33 1CV55 CV 7 Cent CHG PMP FCV Aux 1 84 Chrg Pmp VIv Alley Y 1,2,3,4 0 46 S1-48 12MS10 MS 7 MS Power Relief VLV OPA 1 100 MS Pen Area 2 0 47 S1-Ol 11SW17 SW 8 SW PMP Disch HDR X-Over MOV SWIS 90 SWIS Bay 1 3.4 Y 0 48 S1-01 12SW20 SW 8 NUC HDR SUP MOV SWIS 90 SWIS Bay 1 3,4 Y 0 P2

Report No. SL-011549 Salem Unit 1 - Seismic Walkdown Equipment List (SWEL)

Rev. 2 (Sorted by EQ. Class)

Risk Anchored to Risk Safety New or IPEEE Concrete or No AWB # Comp. ID System EQ. Class Component Description Bldg. Elev. Room Significant Function Replaced Enhanced Structure Notes (YININA) (Y=1/N=0) 49 SI-01 1SV260 SW 8 SV for SW STR BID Cont VLV SWIS 90 SWIS Bay 1 3,4 Y 0 50 Sl-06 11SW22 SW 8 NUC HDR Inlet VLV IPA 1 78 SW Piping Rm 3,4 Y 0 51 S1-07 11DA14C DA 8 1C Diesel Start Air Motor Sol Valve Aux 1 100 1C DIG Rm 1,2,3,4.5 Y 0 52 S1-09 11RH29 RH 8 RHR PMP Min Flow VLV Aux 1 45 11 RHR Pmp 3,4 0 Rm 53 l~3Aux Fd240 53 Sl-10 1MS52 MS 8 13 AF PMP TURB Trip VLV Aux 1 841 1um24 Rm Pump 0 54 S1-16 11CC3 CC 8 11-13 Header X-Over VLV Aux 1 84 11 CC Pmp Rm 3.4 0 55 S1-24 1CV4O CV 8 VCT Outlet Stop VLV Aux 1 100 Rm Propsby BA XF 1.2.3,4 1erif.

56 S1-26 13BF22 AF_______ 8 11 SG FW Stop Check ISO Valve MOV) IPA 1 100 MS Pen Area 2 0 57 ~~~~Coridorat 13 0 Dfrt F 57 S1-28 1SV442 CV 8 SVfor 1CV114 Cont'nt 1 78 Ccmlor at_13_3 Accumulator 0 Defer to RFO 58 S1-41 11CS2 CV 8 11 CS PMP MOT OP Discg VLV Aux 1 84 1mContSpray 3 0 59 S1-42 11SJ54 SJ 8 ACCUM Outlet Valve Cont'nt 1 78 11 Accumulator 3 0 Defer to RFO 60 S1-50 1SV709 GB 8 SV For AO 14GB4 IPA 1 100 Stm Gen BID 1 Area 61 S1-20 1VHE27 VH 9 1C DIG Area Supply Fan Aux 1 122 1C DIG Rm Y 1,2,3,4,5 1Nerif.

62 S1-12 1CBV18-DMOP VH 10 11 Cont Vent Fan Coil Unit Accident Flow DMOP Cont'nt 1 130 11 CFCU 5 1Nerif. Defer to RFO R2 63 S1-04 1CHE7 CH 11 11 Chiller IPA 1 100 CH WTR Pmp Y 1,2,3,4,5 1 Area 64 SI-04 1CHE9 CH ________11 13 Chiller

___________________ IPA 1

____ 100 CHWTRPmp Area Y 1,2,3,4,5 1 1CHE7-COMP CHE7-MTRX CH 12 11 Chiller Compressor PA 1 100 CH AreaWTR Pmp Y 1,2,3,4,5 Y 0 66 Sl-04 1CHE9-COMP CH WTR Pmp Y 1,2,3,4,5 0 1CHE9-MTRX CH 12 13 Chiller Compressor PA 1 100 Area 67 S1-18 1DIS1C5YA EP 14 No. 1C Vital Instrument Bus (115V) Aux 1 100 1 Relay Rm Y 1,2,3,4,5 1 Defer to RFO 68 S1-21 1BTRY1ADC EP 15 No.lA 125VDC Battery Aux 1 100 125VDC Bat Y 1,2,3,4,5 1 69 S1-18 1INV1C5YB EP 16 No.IC Vital Instrument Inverter Aux 1 100 1 Relay Rm 1,2,3,4,5 Nerif. Defer to RFO 460/230 Vital R2 70 S1-34 1BTRY1C12Y EP 16 No. 1C1 125VDC Battery Charger Aux 1 84 125/250DC Bat Y 1,2.3,4,5 1Nerif. Defer to RFO 71 S1-07 1DAE38 EP 17 No.IC Diesel Generator Aux 1 100 1C DIG Rm Y 1,2,3,4,5 INerif.

72 S1-13 1L1460A PS 18 Pressurizer Level CH 2 Aux 1 122 1 Control Room 2,3,4 0 73 S1-13 1L1921 CV 18 RWST Level Indicator Aux 1 122 1 Control Room Y 3,4 0 74 Sl-13 1P1525A MS 18 Pressure Indicator MS Loop 12 Aux 1 122 1 Control Room Y 2,4 0 P3

Report No. SL-011549 Salem Unit I - Seismic Waikdown Equipment List (SWEL)

Rev. 2 (Sorted by EQ. Class)

Anchored to Risk Safety New or IPEEE Concrete or No AWB # Comp. ID System EQ. Class Component Description Bldg. Elev. Room Significant Function Replaced Enhanced Structure Notes (YININA) (Y=I/N=0) 75 Sl-13 iXA65561 NI 18 Isolated Source Range Indicator- Aux 1 122 1 Control Room Y 1 Y 0 7$1-13 1XA6556 NI 18 Channel "D" AuI 1221Control Room 1 76 S1-19b 1LT628A CC 18 Level Transmitter No. 1 CC Surge TK Aux 1 122 Supply Fan 3.4 0 Area 77 S1-37 1PT524 MS 18 Pressure Transmitter-MS Loop 12 OPA 1 100 MS Pen Area 2,4 Y 0 78 S1-43 1LA2670 AF 18 1AFST Level Transmitter Yard 100 1 RWST Area 2,4 Y 1 79 S1-13 1TA14 RC 19 Temperature Indicator Loop 11 Aux 1 122 1 Control Room 1,2,3,4 Y 0 80 S1-02 230-1 VH 20 1 AUX Bldg Vent SWGR Rm Inst Aux 1 84 460/230 Vital 1,2,3,4,5 1Nedf.

Panel, 125/250DC Bat

'11 RHR Pmp 81 S1-09 101-1 EP 20 11 RHR Instrument Panel Aux 1 45 Rm 3,4 1 82 $1-11 206-1 EP 20 12 AUX Feedwater Panel Aux 1 84 12AuxId Y 2,4 1 Pump Rm 83 Sl-18 1TRCC EP 20 1 Cabinet Relay Room Terminal Rack Aux 1 100 1 Relay Rm 1,2,3,4,5 1 1TRCC 84 Sl-19 724-1 E VH 20 12 Control Area Vent Emerg Supply Aux 1 122 1 CR A/C Rm 1,2,3,4,5 1Nerif.

84_$-19_24-1 V 20 Fan Instrument Panel 85 S1-19b 401-1 CC 20 1 CC Surge TKI LVL INST PNL Aux 1 122 Supply Fan Area 3.4 1Nerif.

lC D/G Control 86 S1-32 1PNL11832 EP 20 1C DIG Generator Control Panel Aux 1 100 mY 1,2,3,4,5 1 Defer to RFO 87 S-37 686-1B MS 20 12 MN STM & TRB By Pass STM 7_$1-37_686-1B

_MS 20 GEN Outlet Head Press Control Panel OPA 1 100 MS Pen Area 2,4 1Nerf.

1 REACT COOL PZR Protection Co~t1 10 Elevator 88 Sl-38 335-1 PR 20 Cont'nt 1 100 2,3,4 1 Defer to RFO Panel IPassage Area 89 S1-04 ICAE6 CH 21 1 ECAC Aftercooler IPA 1 100 CH WTR Pmp 2,3,4,5 0 Area 90 S1-12 1SWE24 SW 21 11 FCU Cont'nt 1 130 11 CFCU 3,4 iNerif. Defer to RFO 91 S1-12 1SWE29 SW 21 11 FCU Motor Cooler Cont'nt 1 130 11 CFCU 3,4 1Nerif. Defer to RFO R2 92 S1-16 1CCE5 CC 21 CC HX No 11 Aux 1 84 11 CC Pmp Rm Y 3.4 1Nerif.

93 S1-19b 1CCE1 CC 21 No. 1 CC Surge Tank Aux 1 122 Supplya Y 3.4 Nerif.

Area ______

94 S1-20 IDAE48 DA 21 Expansion Tank-lC Diesel Aux 1 122 1C DIG Rm 1,2,3,4,5 INerif.

95 S1-20 iDFE5 DF 21 NO. 1C Diesel Fuel Oil Day Tank Aux 1 122 IC DIG Rm Y 1,2,3,4,5 1Nerif.

96 S1-23 1DFE2 DF 21 No. 12 Diesel Fuel Oil Storage Tank Aux 1 84 12 Diesel FOST Y 1,2,3,4,5 1Nerif.

97 S1-25 1SJE1 CV 21 Refuel WTR Storage Tank HX No. 1 Aux 1 64 Pmp Rm 3,4 1 98 $1-44 1RCE11 PR 21 PZR Relief Tank No. 1 Cont'nt 1 78 1 PRT Area 2,3,4,5 1 Defer to RFO 99 SI-47 1SFE12 SF 21 1 SPNT FUEL CLG PIT HT EXCHG Aux 1 84 Main Corridor Y 3,4 iNerif. (1)

Notes: 1. SWEL 2 component P4

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-0 11549 Project No. 12800-217 Rev. 1 Seismic Walkdown Report ATTACHMENT 4 - SEISMIC WALKDOWN ENGINEER CERTIFICATIONS

- - ~-=-- ~- -

r~i SQUG

=I 4ý MQ 4. )~

T-prtu tratr

0. Jorf cut ~K4

!i ff~is is torx &grlifgtllat N

Arnt Tstum

§Qju(6 alkkbown 'crgenitnq K))

arnb §eismir (Training Toursp (I

N-elb §-ept-ember 14-19, sf 9 6 9 c~;:$~

Neil P. Smith. Commonwealth Edison U, SQUG Chairman V David A. Freed. MPR Associates Robert P. Kassawara. EPRI

/ SQUG Training Coordinator SQUG Program Manager

))Ij1 (f

aIfIr2i Certificateof Completion Alex Coologeorgen Training: on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 27, 2012 lfo44c4aoiRo Date Robert K.Kassawara EPRI Manager, Structural Reliability & Integrity

111 ELECTRICPOWE RESEARCH INSTITUTE Certificateof Completion John Skomorucha Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 21, 2012 Date Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

ELECTRI CO E Certificateof Completion

.Jeffrey Puskar Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 21, 2012 0f0,,44d4 Date Robert K. Kassawara EPRI Manager, Structural Reliability & Integrity

- ~ZZ. Or -~ -

  • -- ~ **-** ..:K. ~.;K-:. *:KK:- *:K::. *::. H k* E iOX' CER~TKIFICYATE OAcHVMET HAS, COMPLETED THE Q WAL..DOW .. WE, AND SMiSMiC EVALUATTIO TRA'INiNGCOURSE.

DECEMBER 104-1-4 001 .7 .....

W(,

rsc-lu-ýý,--

1_00-7W A /~A ___

-F . .. ..

Richard G. StarckU, MIR Associates John NC Richard§, Duke Enrgy" SQUG Training Coordinator SQUG Chairan=

Robert P. Kmasswira, EPRI SQUG Program Manager .... . .

l.s..... _ I

  • l

Salem Nuclear Generating Station Unit 1 S&L Report No. SL-0 11549 Project No. 12800-217 Rev. 1 Seismic Walkdown Report ATTACHMENT 5 - CHECKLIST FOR PEER REVIEW OF SSC SELECTION

Sheet I of 2 Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL). in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to addrcss those findings. Additional space is provided at the end of this checklist for documenting other comments.

I. Were the five safety functions adequately represented in the SWEL I selection? YZ NEI

2. Does SWEL I include an appropriate representation of items having the fbllowing sample selection attributes:
a. Various types of systems? YZ NEI
b. Major new and replacement equipment? YM NEI
c. Various types of equipment?

All classes of equipment were included in the SWEL except for Class 13. SGS does not have any Seismic Category I equipment in this equipment class.

d. Various environments? YN NEl
e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YN NEI Per "PSEGResponse to Generic Letter 88-20, Supplement 4, Individual Plant Examination for External Events (IPEEE)for Severe Accedent Vulnerabilities, Salem NuclearGenerating Station, Docket Nos. 50.272 and 50-311 ",Section 7, no plant improvements involving equipment were required at SGS. Therefore, no IPEEE enhanced equipment was included in the SWEL.

Sheet 2 of 2 Peer Review Checklist for SWEL,

f. Were risk insights co~sidered in theddevelopment.of SWEL I? YZ NO
3. For SWEL 2:
a. Were spent fuel P0ool related items.consileredAnd ifapplieabl6. inelud il Y9 NO

' :WEL 2?

b. Was an appropriate justification docum'ented for.spent fuel pooi r lated itrnt not YE NL included in SWEL 2?
4. Pro'vide any otlei cnmmentsirelated to .tie peer.review of theSWELs.
5. Have all: pee review c ommelits been adequately addrensed in tdi final SWEL? YZ NO.

Peer Rev.iewer #1: Bnwan Morgan: " I--Date &.tL//2 Peer Reviewer #2; Javad:Moslemian * , ] -. . Date: hi V .