Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23249A2666 September 2023Attachment 2: Salem Pavan Input File
ML23249A2676 September 2023Attachment 3: Salem Pavan Output File
ML23249A2636 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019
LR-N23-0050, Attachment 5: Hope Creek Pavan Output File6 September 2023Attachment 5: Hope Creek Pavan Output File
ML23249A2686 September 2023Attachment 4: Hope Creek Pavan Input File
ML23249A2646 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020
ML23249A2656 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021
ML17335A11825 January 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi AccidentUnanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
ML17046A29630 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-1130 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-330 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3Design basis earthquake
Earthquake
ML17046A30730 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)
ML17046A31130 January 2017Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3Design basis earthquake
Earthquake
LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal30 December 2016Flood Hazards Mitigating Strategies Assessment (MSA) Report SubmittalHigh winds
Ultimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16102A27711 March 2016Submittal of Annual Incidental Take Report
ML15238B70410 September 2015Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML15243A44710 September 2015Master Report - Tables 1 and 2
ML15030A28222 September 2014Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation
ML15030A30122 September 2014Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results
ML15030A30022 September 2014Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results
ML15030A29922 September 2014Table 06B, Groundwater Analytical Results for Well AC
ML15030A29822 September 2014Table 06A, Groundwater Tritium Analytical Results for Well AC
ML15030A29622 September 2014Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014)
ML15030A29522 September 2014Table 04, Groundwater Measurements and Elevations - First Quarter 2014
ML15030A29422 September 2014Table 03, Effluent Data Tritium Activity
ML15030A28422 September 2014Table 02, Sample Collection Schedule - First & Second Quarter 2014
ML15030A28322 September 2014Table 01, Well Construction Details
ML15030A28122 September 2014Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation
ML15030A28022 September 2014Figure 14, Historic Tritium Recovered Through Well Field Operation
ML15030A27622 September 2014Figure 11, Station Wind Summary - Q1 2014
ML15030A27522 September 2014Figure 10, Precipitation Measurements
ML15030A25122 September 2014Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E'
ML15030A25022 September 2014Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D'
ML15030A24922 September 2014Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C'
ML15030A24822 September 2014Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B'
ML15030A24722 September 2014Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A'
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-14928 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
ML13052A68228 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
ML12284A4274 October 2012PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4
LR-N12-0027, Submittal of RCS Dei Graphs Report2 March 2012Submittal of RCS Dei Graphs Report
ML1030002023 May 20101R20 NRC Items of Interest Punchlist
ML10298037021 April 2010Graphs of Salem - Unit 2 Ffdp Exam
ML10300020020 April 2010Document: Nbu Weld Joint Notice #80101382, Salem Unit 1
ML10300019611 April 2010Document Schedule: Subject: Buried AFW Pipe Schedule
LR-N09-0103, Submittal of 2008 Summary of Revised Regulatory Commitments5 May 2009Submittal of 2008 Summary of Revised Regulatory Commitments
ML0805605394 March 2008Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
LR-N07-0150, Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C0127 June 2007Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld