Issue date | Title | Topic | |
---|---|---|---|
ML23249A266 | 6 September 2023 | Attachment 2: Salem Pavan Input File | |
ML23249A267 | 6 September 2023 | Attachment 3: Salem Pavan Output File | |
ML23249A263 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 | |
LR-N23-0050, Attachment 5: Hope Creek Pavan Output File | 6 September 2023 | Attachment 5: Hope Creek Pavan Output File | |
ML23249A268 | 6 September 2023 | Attachment 4: Hope Creek Pavan Input File | |
ML23249A264 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 | |
ML23249A265 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 | |
ML17335A118 | 25 January 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident | Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
ML17046A296 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 | Design basis earthquake Earthquake |
ML17046A307 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) | |
ML17046A311 | 30 January 2017 | Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 | Design basis earthquake Earthquake |
LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal | 30 December 2016 | Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal | High winds Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16102A277 | 11 March 2016 | Submittal of Annual Incidental Take Report | |
ML15238B704 | 10 September 2015 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML15243A447 | 10 September 2015 | Master Report - Tables 1 and 2 | |
ML15030A282 | 22 September 2014 | Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation | |
ML15030A301 | 22 September 2014 | Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results | |
ML15030A300 | 22 September 2014 | Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results | |
ML15030A299 | 22 September 2014 | Table 06B, Groundwater Analytical Results for Well AC | |
ML15030A298 | 22 September 2014 | Table 06A, Groundwater Tritium Analytical Results for Well AC | |
ML15030A296 | 22 September 2014 | Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) | |
ML15030A295 | 22 September 2014 | Table 04, Groundwater Measurements and Elevations - First Quarter 2014 | |
ML15030A294 | 22 September 2014 | Table 03, Effluent Data Tritium Activity | |
ML15030A284 | 22 September 2014 | Table 02, Sample Collection Schedule - First & Second Quarter 2014 | |
ML15030A283 | 22 September 2014 | Table 01, Well Construction Details | |
ML15030A281 | 22 September 2014 | Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation | |
ML15030A280 | 22 September 2014 | Figure 14, Historic Tritium Recovered Through Well Field Operation | |
ML15030A276 | 22 September 2014 | Figure 11, Station Wind Summary - Q1 2014 | |
ML15030A275 | 22 September 2014 | Figure 10, Precipitation Measurements | |
ML15030A251 | 22 September 2014 | Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' | |
ML15030A250 | 22 September 2014 | Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' | |
ML15030A249 | 22 September 2014 | Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' | |
ML15030A248 | 22 September 2014 | Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' | |
ML15030A247 | 22 September 2014 | Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
ML13052A682 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
ML12284A427 | 4 October 2012 | PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 | |
LR-N12-0027, Submittal of RCS Dei Graphs Report | 2 March 2012 | Submittal of RCS Dei Graphs Report | |
ML103000202 | 3 May 2010 | 1R20 NRC Items of Interest Punchlist | |
ML102980370 | 21 April 2010 | Graphs of Salem - Unit 2 Ffdp Exam | |
ML103000200 | 20 April 2010 | Document: Nbu Weld Joint Notice #80101382, Salem Unit 1 | |
ML103000196 | 11 April 2010 | Document Schedule: Subject: Buried AFW Pipe Schedule | |
LR-N09-0103, Submittal of 2008 Summary of Revised Regulatory Commitments | 5 May 2009 | Submittal of 2008 Summary of Revised Regulatory Commitments | |
ML080560539 | 4 March 2008 | Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
LR-N07-0150, Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 | 27 June 2007 | Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 | Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |