Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23249A2626 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021)
LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature7 August 2022License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and TemperatureShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Exemption Request
Pressure Boundary Leakage
LR-N21-0004, U.S Additional Protocol for Salem, Unit 131 January 2021U.S Additional Protocol for Salem, Unit 1
LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report6 December 2020License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits ReportAnticipated operational occurrence
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
B.5.b Mitigating Strategies
Exemption Request
Pressure Boundary Leakage
ML20274A07625 September 2020PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 ConsultationNJPDES
Biofouling
Weak link
LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology24 April 2020License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break MethodologyGrab sample
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Surveillance Frequency Control Program
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Through-Wall Leak
ML20121A1333 March 2020Biological Opinion 2019 Annual Incidental Take Report
LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 201926 November 2019Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019Loop seal
ML19029B01729 January 2019Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design
ML18337A32430 January 2018Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018
ML18337A32530 January 2018Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018
ML18337A32630 January 2018Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2)
ML16280A52331 August 2016Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation ReviewMission time
Hydrostatic
Earthquake
ML15030A30122 September 2014Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results
ML15030A16322 September 2014Remedial Action Progress Report First Quarter 2014Boric Acid
Offsite Dose Calculation Manual
Hydrostatic
Met Tower
Annual Radioactive Effluent Release Report
ML15030A24222 September 2014Appendix a, Mass Flux Calculations
ML15030A24322 September 2014Figure 1, Site Location Map
ML15030A24422 September 2014Figure 2, Station Layout Map
ML15030A24522 September 2014Figure 3, Salem Generating Station Layout Map
ML15030A24622 September 2014Figure 4, Station Shallow Groundwater Elevation Contours - February 2014
ML15030A24822 September 2014Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B'
ML15030A30022 September 2014Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results
ML15030A29922 September 2014Table 06B, Groundwater Analytical Results for Well AC
ML15030A29822 September 2014Table 06A, Groundwater Tritium Analytical Results for Well AC
ML15030A29622 September 2014Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014)
ML15030A29522 September 2014Table 04, Groundwater Measurements and Elevations - First Quarter 2014
ML15030A29422 September 2014Table 03, Effluent Data Tritium Activity
ML15030A28422 September 2014Table 02, Sample Collection Schedule - First & Second Quarter 2014
ML15030A28322 September 2014Table 01, Well Construction Details
ML15030A28222 September 2014Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation
ML15030A28122 September 2014Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation
ML15030A28022 September 2014Figure 14, Historic Tritium Recovered Through Well Field Operation
ML15030A24722 September 2014Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A'
ML15030A24922 September 2014Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C'
ML15030A25022 September 2014Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D'
ML15030A25122 September 2014Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E'
ML15030A27522 September 2014Figure 10, Precipitation Measurements
ML15030A27622 September 2014Figure 11, Station Wind Summary - Q1 2014
ML15030A27922 September 2014Figure 13, Tritium Isoconcentration Map - March 2014
ML14010A34313 January 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Salem Generating Station, Units 1 and 2, TAC Nos.: MF0868 and MF0869Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Frazil ice
Earthquake
GOTHIC
LR-N13-0172, Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic20 December 2013Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicSafe Shutdown
Unanalyzed Condition
Loop seal
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
LR-N13-0122, Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19)9 May 2013Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19)Nondestructive Examination
LR-N13-0020, SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated Plan25 February 2013SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated PlanHigh Radiation Area
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G30 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 530 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
ML13052A67730 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
ML13052A67830 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
ML13052A67930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N