Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23249A262 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) | |
LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | 7 August 2022 | License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Exemption Request Pressure Boundary Leakage |
LR-N21-0004, U.S Additional Protocol for Salem, Unit 1 | 31 January 2021 | U.S Additional Protocol for Salem, Unit 1 | |
LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report | 6 December 2020 | License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report | Anticipated operational occurrence Hydrostatic Incorporated by reference Pressure and Temperature Limits Report B.5.b Mitigating Strategies Exemption Request Pressure Boundary Leakage |
ML20274A076 | 25 September 2020 | PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation | NJPDES Biofouling Weak link |
LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | 24 April 2020 | License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | Grab sample Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Surveillance Frequency Control Program Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Through-Wall Leak |
ML20121A133 | 3 March 2020 | Biological Opinion 2019 Annual Incidental Take Report | |
LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 | 26 November 2019 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 | Loop seal |
ML19029B017 | 29 January 2019 | Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design | |
ML18337A324 | 30 January 2018 | Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 | |
ML18337A325 | 30 January 2018 | Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 | |
ML18337A326 | 30 January 2018 | Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) | |
ML16280A523 | 31 August 2016 | Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review | Mission time Hydrostatic Earthquake |
ML15030A301 | 22 September 2014 | Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results | |
ML15030A163 | 22 September 2014 | Remedial Action Progress Report First Quarter 2014 | Boric Acid Offsite Dose Calculation Manual Hydrostatic Met Tower Annual Radioactive Effluent Release Report |
ML15030A242 | 22 September 2014 | Appendix a, Mass Flux Calculations | |
ML15030A243 | 22 September 2014 | Figure 1, Site Location Map | |
ML15030A244 | 22 September 2014 | Figure 2, Station Layout Map | |
ML15030A245 | 22 September 2014 | Figure 3, Salem Generating Station Layout Map | |
ML15030A246 | 22 September 2014 | Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 | |
ML15030A248 | 22 September 2014 | Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' | |
ML15030A300 | 22 September 2014 | Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results | |
ML15030A299 | 22 September 2014 | Table 06B, Groundwater Analytical Results for Well AC | |
ML15030A298 | 22 September 2014 | Table 06A, Groundwater Tritium Analytical Results for Well AC | |
ML15030A296 | 22 September 2014 | Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) | |
ML15030A295 | 22 September 2014 | Table 04, Groundwater Measurements and Elevations - First Quarter 2014 | |
ML15030A294 | 22 September 2014 | Table 03, Effluent Data Tritium Activity | |
ML15030A284 | 22 September 2014 | Table 02, Sample Collection Schedule - First & Second Quarter 2014 | |
ML15030A283 | 22 September 2014 | Table 01, Well Construction Details | |
ML15030A282 | 22 September 2014 | Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation | |
ML15030A281 | 22 September 2014 | Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation | |
ML15030A280 | 22 September 2014 | Figure 14, Historic Tritium Recovered Through Well Field Operation | |
ML15030A247 | 22 September 2014 | Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' | |
ML15030A249 | 22 September 2014 | Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' | |
ML15030A250 | 22 September 2014 | Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' | |
ML15030A251 | 22 September 2014 | Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' | |
ML15030A275 | 22 September 2014 | Figure 10, Precipitation Measurements | |
ML15030A276 | 22 September 2014 | Figure 11, Station Wind Summary - Q1 2014 | |
ML15030A279 | 22 September 2014 | Figure 13, Tritium Isoconcentration Map - March 2014 | |
ML14010A343 | 13 January 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Salem Generating Station, Units 1 and 2, TAC Nos.: MF0868 and MF0869 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Severe Accident Management Guideline Frazil ice Earthquake GOTHIC |
LR-N13-0172, Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | 20 December 2013 | Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | Safe Shutdown Unanalyzed Condition Loop seal Safe Shutdown Earthquake Design basis earthquake Earthquake |
LR-N13-0122, Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19) | 9 May 2013 | Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19) | Nondestructive Examination |
LR-N13-0020, SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated Plan | 25 February 2013 | SL-011677, Rev 3, Reliable Spent Fuel Pool Instrumentation Overall Integrated Plan | High Radiation Area FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | |
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | 30 November 2012 | Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | |
ML13052A677 | 30 November 2012 | Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | |
ML13052A678 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | |
ML13052A679 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N |