ML16344A303
ML16344A303 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16344A303 (202) | |
Text
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-1 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1a INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1b INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1c INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1d INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1e INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1f INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1g INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1h INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1i INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1j INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1k INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-1l INTENTIONALLY DELETED (DRN 03-2060, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT PRESSURE HOT LEG BREAK - 19.24 FT 2 PEAK CONTAINMENT PRESSURE FIGURE 6.2-1m
Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT VAPOR AND SUMP TEMPERATURE HOT LEG BREAK - 19.24 FT 2 FIGURE 6.2-1n WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 03-2060, R14)
FIGURE 6.2-1o NOT USED
(DRN 03-2060, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT PRESSURE DISCHARGE LEG BREAK - 9.82 FT 2 PEAK CONT. PRESSURE AT 24 HOURS FIGURE 6.2-1p Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT VAPOR AND SUMP TEMPERATURE DISCHARGE LEG BREAK - 9.82 FT 2 FIGURE 6.2-1q
Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT PRESSURE MSLB HOT ZERO POWER ONE MAIN STEAM ISOLATION VALVE FAILURE FIGURE 6.2-1r Revision 307 (07/13)Waterford Steam Electric Station #3 CONTAINMENT TEMPERATURE MSLB HOT FULL POWER EQ CASE ONE MAIN STEAM ISOLATION VALE FAILURE FIGURE 6.2-1s WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-2 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-3 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-4 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-4a INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-5 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-6 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 03-2060, R14)
FIGURE 6.2-6a INTENTIONALLY DELETED (DRN 03-2060, R14)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7a INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7b INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7c INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7d INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7e INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-7f INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-8a INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-8b INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-8c INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-9 INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-10a INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-10b INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-10c INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 304 (06/10)
(EC-706, R304)
FIGURE 6.2-12b INTENTIONALLY DELETED (EC-706, R304)
Revision 304 (06/10)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station PRESSURE DIFFERENTIAL ACROSS CONTAINMENT VESSEL FOLLOWING INADVERTENT SPRAY ACTUATION FIGURE 6.2-13 SH. 1 OF 2 Revision 304 (06/10)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station PRESSURE DIFFERENTIAL ACROSS SHIELD BUILDING FOLLOWING INADVERTENT SPRAY ACTUATION FIGURE 6.2-13 SH. 2 OF 2
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-13c INTENTIONALLY DELETED.(DRN 01-230)
WSES-FSAR-UNIT-3 Revision 12 (10/02)(DRN 01-230)
FIGURE 6.2-13d INTENTIONALLY DELETED.(DRN 01-230)
050001000015000200002500030000050100150200250300CONTAINMENT TEMPERATURE, DEG FHEAT REMOVAL CAPACITY, BTU/SEC
Revision 302 (12/08)Waterford Steam Electric Station #3 1.0 X DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG FAN COOLER HEAT REMOVAL CAPACITY Figure 6.2-30A
Revision 307 (07/13)Waterford Steam Electric Station #3 WATERFORD 3 - 1.0 X DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG EFFECTIVE SPRAY AND SPILLAGE TO CONTAINMENT Figure 6.2-30B
Revision 302 (12/08)Waterford Steam Electric Station #3 1.0 x DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG CONDENSING HEAT TRANSFER COEFFICIENT FOR STATIC HEAT SINKS Figure 6.2-30c WSES-FSAR-UNIT-3Revision 10 (10/99)FIGURE 6.2-30A1 INTENTIONALLY DELETED
Revision 307 (07/13)Waterford Steam Electric Station #3 WATERFORD 3 1.0 X DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG MINIMUM CONTAINMENT PRESSURE Figure 6.2-31A
Revision 307 (07/13)Waterford Steam Electric Station #3 WATERFORD 3 1.0 X DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CONTAINMENT TEMPERATURE Figure 6.2-31B
Revision 307 (07/13)Waterford Steam Electric Station #3 WATERFORD 3 1.0 X DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG SUMP TEMPERATURE Figure 6.2-31C
WSES-FSAR-UNIT-3Revision 11 (05/01)(DRN 01-417)Figure 6.2-35 has been incorporated by reference in accordance with NEI 98-03.Figure information can be found in Drawing G-163.(DRN 01-417)
WSES-FSAR-UNIT-3 Revision 14-B (06/06)(DRN 06-326, R14-B)Figure 6.2-38 has been incorporated by reference in accordance with NEI 98-03.
Figure information can be found in Drawing G-854. (DRN 06-326, R14-B)
(EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station COMBUSTIBLE GAS CONTROL SYSTEM HYDROGEN RECOMBINER SUBSYSTEM SCHEMATIC FLOW DIAGRAM FIGURE 6.2-53 (EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)
Waterford Steam Electric Station #3 POST-LOCA HYDROGEN AS A FUNCTION OF TIME FIGURE 6.2-54
(EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station ZINC CORROSION RATE FOLLOWING A LOCA FIGURE 6.2-55 (EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station ALUMINUM CORROSION RATE FOLLOWING A LOCA FIGURE 6.2-55a (EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station ASSUMED HYDROGEN GENERATION RATE DUE TO PAINT FOLLOWING A LOCA FIGURE 6.2-55b (EC-6494, R302)
NOTE: With the implementation of Waterford 3 Operating License Amendment No. 192, Elimination of Design Basis Hydrogen Release and Requirements for Hydrogen Recombiners, the information concerning hydrogen generation and the description and design evaluation of the Hydrogen Recombiner portions of the Combustible Gas Control System is historical in nature and is not required to be updated. (EC-6494, R302)
Revision 302 (12/08)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station LONG-TERM CONTAINMENT TEMP. TRANSIENT USED IN POST-LOCA HYDROGEN GENERATION ANALYSIS FIGURE 6.2-55c