ML17264A683
ML17264A683 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 09/13/1996 |
From: | ROCHESTER GAS & ELECTRIC CORP. |
To: | |
Shared Package | |
ML17264A682 | List: |
References | |
NUDOCS 9610100113 | |
Download: ML17264A683 (228) | |
Text
ROCHESTER GASANDELECTRICCORPORATION 89EASTAVENUE,ROCHESTER, NY14649NUCLEARREGULATORY COMMISSION INSERVICE INSPECTION REPORTFORTHETHIRDINTERVAL(1990-1999)SECONDPERIOD,FOURTHOUTAGE(1996)ATR.E.GINNANUCLEARPOWERPLANTREVISION0SEPTEMBER 13,19969610100113 960930,'DRADOCK05000244QPDR
R.E.GINNANUCLEARPOWERPLANTNUCLEARREGULATORY COMMISSION INSERVICE INSPECTION REPORTTHIRDINTERVAL(1990-1999)SECONDPERIOD,FOURTHOUTAGE(1996)OWNERSDATASHEETDate:13September, 1996Owner:Rochester GasandElectricCorporation 89EastAvenueRochester, NewYork14649PlantLocationandUnitNo.:~~R.E.GinnaNuclearPowerPlantUnitOne1503LakeRoadOntario,NewYork14519Commercial 0eratinDate:Suly1970AlicableCode:ASMESectionXI,1986Edition,NoAddenda I
R.E.GINNANUCLEARPOWERPLANTInserviceInspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)TABLEOFCONTENTSIntroduction andSynopsisSummaryofWorkAccomplished Class1Components Class2Components Class3Components HighEnergyComponents DesignBreakWeldExaminations Consequential BreakWeldExaminations Component SupportExaminations SteamGenerators SystemPressureTestingHydrostatic TestingLeakageTestingSectionXI,ServiceInducedRejectable Components
-ExpandedExaminations SnubbersVisualExaminations Functional TestingSeismicSupportProgramErosion/Corrosion (Minwall)
ProgramAttachment IAttachment IIAttachment IIIISIProgramExamination SummaryRepair,Replacement
&,Modification ProgramSummaryErosion/Corrosion (Minwall)
ProgramSummary
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)INTRODUCTION ANDSYNOPSIS:
Inservice Inspection (ISI)activities for1996wereperformed oncomponents withinClass1,2,3,HighEnergyPiping,SteamGenerator Tubes,SeismicSupportsandSnubbers.
ISIexaminations wereconcluded onJuly2,1996.Examination methodsincludedVisual(VT),LiquidPenetrant (PT),MagneticParticle(MT),Ultrasonic (UT),Radiographic (RT),andEddyCurrent(ET).Functional Testing(FT)andSystemPressureTestswerealsoperformed.
Erosion/Corrosion examinations werealsoperformed duringthistime.Personnel involvedincludedRGAELaboratory andInspection
- Services, SonicSystemsIncorporated, MasterLeeServicesCorporation, ABBCombustion Engineering Corporation, GinnaStationQualityControlandtheGinnaStationResults/Test Group.Additional SupportPersonnel includedindividuals fromthefollowirig departments:
GinnaStationInsulators, Maintenance, Electricians, PipeFitters,HealthPhysics,TurbineMaintenance, RG8'cEGeneralMaintenance andtheMechanical Engineering GroupoftheNuclearEngineering ServicesDepartment.
ASMESECTIONXISUMMARYOFWORKACCOMPLISHED:
Uponconclusion ofthe1996Outage,61.7%ofASMESectionXICoderequiredexaminations fortheThirdIntervalISIProgramhasbeencompleted.
Adetailedcomponent summaryofalloutageISIactivities withtheirassociated resultscanbefoundwithin"Attachment I".CLASS1COMPONENTS:
Atotalof46ASME,Augmented orOwnerElectedcomponents wereexamined.
Theexaminations forthesecomponents consisted of19VT's,18PT's,8MT's,17UT'sand4RT's.Atotalof66examinations wereperformed onClass1Components.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)CLASS1COMPONENTS:
Cont.Class1examinations wereperformed onthefollowing items/systems and/orplantlines/component:
Item/SstemDescritionPlantLine/ComonentCVCS-Charging System:2C-CHS-2502 2A-CHS-2501 2-CHS-2501 2H-CHS-2501 CVCS-Letdown System:HighPressureSafetyInjection System:Pressurizer System:ReactorCoolantPumpA:ReactorCoolantPumpB:ReactorCoolantSystem:2B-CH4-2501 10A-SI2-2501-B 10-RC8-2501 PRCOlA(Studs)PRC01B(Bolts)29-RC-2501-A2A-RCO-2501-A 2B-RCO-2501-B 2C-RC0-2501-B ResidualHeatRemovalSystem:10A-AC7-2501-A 10A-AC7-2501-BSteamGenerator ASteamGenerator BEMS01A(Items)EMS01B(Items)
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)CLASS2COMPONENTS:
Atotalof109ASMEorOwnerElectedComponents wereexamined.
Theexaminations forthesecomponents consisted of42VT's,26PT's,35MT's,11RT's,and28UT'sforatotalof142examinations.
Class2examinations wereperformed onthefollowing items/systemsand/orplantlines/components:
Item/SstemDescritionPlantLine/ComonentCVCS-Charging System:2D-CH5-2501 8A-CH-25028B-CH-25028C-CH-2502Feedwater System:18A-FW-900-1A 18B-FW-900-1B 14A-FW-900-1A 14B-FW-900-1B HighPressureSafetyInjection System:2T-SI-2501 2U-SI-2501 3A-SI-1501 3C-SI-1501 4D-SI-1501 4E-SI-1501 8E-SI-301 8G-SI-301 4-SI-3014A-SI-301 Mainsteam System:30A-MS-600-1A 30B-MS-600-1B ResidualHeatRemovalSystem:6C-AC-601 6K-AC-151
R.E.GINNANUCLEARPO%ERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)CLASS2COMPONENTS:
Cont.Item/SstemDescritionPlantLine/ComonentSteamGenerator AEMS01A(Items)SteamGenerator BEMS01B(Items)ServiceWaterSystem:6G-SW-125 8B-SW-125 8F-SW-125 8J-SW-1258N-SW-125 CLASS3COMPONENTS:
Atotalof12ASMEorOwnerElectedComponents wereexaminedutilizing theVTvisualexamination method.Examinations wereperformed onthefollowing items/systemsand/orplantlines/components:
Item/SstemDescritionPlantLine~ICAuxiliary CoolingSystem:Auxiliary Feedwater System:EACOIB(Integral Attachments
&Supports) 3A-FW7-900-1A 3A-FW7-900-1B 3J-FW7-900-1 3K-FW7-900-1 DieselGenerator System:5C-DG-B R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)HIGHENERGYCOMPONENTS:
Five(5)Augmented orOwnerElecteditemsassociated withtheHighEnergyProgramwereexaminedduringthe1996Outage.Theexaminations fortheseitemsconsisted of3VT's,3MT'sand1UTforatotalof7examinations.
HighEnergycomponent examinations wereperformed onthefollowing items/systemsand/orplantlines:Item/SstemDescrition,PlantLineFeedwater System:Mainsteam System:14A-FW-900-1 24B-MS-600-1A STEAMGENERATOR TUBING:EddyCurrentASMEandOwnerElectedExaminations wereperformed ontubesinthe"A"and'B"SteamGenerators.
Thefollowing EddyCurrentexaminations wereperformed.
1.Preservice (Baseline) examinations.
2.OpenGenerator Tubes,BobbinCoil,100%FullLength.3.OpenGenerator Tubes,Peripheral Tubes.SteamGenerator EddyCurrentExamination detailsaredocumented intheRochester Gas8'cElectric1996SteamGenerator EddyCurrentFinalReport.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)SYSTEMPRESSURETESTS:LeakaeTestinAtotaloffive(5)ASMELeakageExaminations wereperformed.
Leakagetestsperformed includedone(1)Class1,ReactorCoolantSystem(PT-7)examination andfour(4)Class2or3examinations.
ASMESectionXIReuiredComonentsServiceInducedReectable-ExandedExaminations:
TherewerenoASMESectionXIrequiredcomponents thatwereclassified as"ServiceInducedRejectable" thatneededCodeexpandedexaminations.
SNUBBERPROGRAM:VisualExaminations:
Atotalof149Snubbercomponent supportswereexamined.
TheseAugmented examinations wereperformed tosatisfyGinnaStationSnubberProgramcommitment.
'nubbervisualexaminations wereperformed onthefollowing items/systemsand/orplantlines:Item/SstemDescritionPlantLineSteamGenerator "A":SteamGenerator "B":Auxiliary Feedwater PumpDischarge-Intermediate BuildingLines:3K-FW7-900-1 3A-FW7-900-1A 3J-FW7-900-1 3B-FW-900-1B3A-FW7-900-1B 3A-FW-900-1A'B-FW
-900-1A l,i "R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)SNUBBERPROGRAM:Cont.VisualExaminations:
Item/SstemDescritionPlantLineTurbineDrivenAuxiliary Feedwater PumpSuctionLine:SteamGenerator B,BlowdownLine:Auxiliary CoolingLines:4A-CD-150-1C 2C-MS-600-1B 4S-AC6-152 3E-AC6-152 4T-AC6-152 2-IN.LetdownLines:2A-CH4-2501 2H-CH-6012A-CH4-151 2-IN.ChargingLine:2G-CH5-2502 2-IN.Alternate ChargingLine:2F-CHS-2501 CVCSReliefLine:2E-CH-601 ReactorCoolantPump"1B"SealWaterLine:2H-CHS-2501 ReactorCoolantPump"1A"SealWaterLine:2P-CH-2501 Feedwater Loop"A"&"B"Lines:14A-FW-900-1A 14A-FW-900-1 14B-FW-900-1B 14B-FW-900-1
~~
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)SNUBBERPROGRAM:Cont.VisualExaminations:
Item/SstemDescritionPlantLineMainSteamLines:30A-MS-600-1A 30B-MS-600-1B 6A-MS-600-1A 6B-MS-600-1A 6B-MS-600-1B 6A-MS-600-1 6B-MS-600-1 SafetyInjection Lines:10A-SI2-2501-A 10A-SI2-2501-B 10-SI-1518J-SI-1514-SI-301ResidualHeatRemovalLines:10-AC-60110A-AC7-2501-B 10A-AC7-2501-A 10D-AC-60110E-AC-60110G-AC-60110GG-AC-1518B-AC-6016-AC-6016D-AC-6016K-AC-151ServiceWaterLines:10B-SWO-125-1 8A-SWO-125-1 8L-SW-125 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)SNUBBERPROGRAM:Cont.VisualExaminations:
Item/SstemDescritionPlantLineStandbyAuxiliary Feedwater Lines:3C-FW-902S-1A 3C-FW-902S-1B Pressurizer ReliefLines:6AP-RC-6026BP-RC-6023BP-RC-6023B-RC8-2501 3A-RC8-2501 Seal,WaterReturnLines:2X-CH-2501 Functional Testin:Atotaloftwenty-one (21)snubberswereFunctionally Tested(FT)duringthe1996outage.Fromthetwenty(20)snubbersthatwereoriginally scheduled, fourteen(14)weremechanical snubbersandsix(6)werehydraulic snubbers.
Duetosnubberfailure,anexpansion wasperformed thatconsisted ofone(1)additional snubberthatwasFunctionally Tested.SnubberFunctional Tests(FT)wereperformed onthefollowing supports.
Mechanical Snubbers.
CVU-131FWU-18FWU-23RHU-109MSU-58MSU-57MSU-18(South)
MSU-19(South)
MSU-72HdraulicSnubbers:
FWU-42MSU-19(North)
.AFU-227RHU-123MSU-22AFU-224PS-6N616AFU-208SGA-8Note:(*)=ExpandedSnubberFunctional TestAFU-226(*)
AFU-229 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)SEISMICSUPPORTPROGRAM:Atotalofseven(7)Augmented orOwnerElectedSeismicSupportswereinspected utilizing thevisual(VT)examination technique.
SeismicSupportexaminations wereperformed onthefollowing items/systems and/orplantlines:Item/SstemDescritionCVCS-Letdown System:HighPressureSafetyInjection:
Mainsteam System:PlantLine3-RC-6012H-SI-902 6B-MS-600-1A 6C-MS-600-1B 6D-MS-600-1B BlowdownSystem:2E-BD-600-1A 2E-BD-600-1B EROSION/CORROSION MINWALLPROGRAM:Atotalof98itemswereexaminedduringthe1996Outage.Thebreakdown ofthistotalisasfollows:ComonentTePipesElbowsReducersTeesTAHITI453912210 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)EROSION/CORROSION MINWALLPROGRAM:Cont.Component thickness measurements wereperformed onthefollowing systems:DWG.NO.SYSTEMM-12AM-12BM-15BM-19M-21M-22M-75M-81M-84M-85M-88DM-91M-92M-99M-100M-103MSR1A&,1B2NDPASSTOSAHEATERANDCONDENSER MSR2A&,2B2NDPASSTO5BHEATERANDCONDENSER MSR1B4THPASSTOSAHEATER1A,2A,&3AL.P.HEATERDRAINSTOCONDENSER STEAMEXT.TOPRESEP.TANKB&4BL.P.HEATERSTEAMEXT.TOPRESEP.TANKAEc4AL.P.HEATERSTEAMEXTRACTION TO5A8c5BHEATERSFEEDWATER DISCHARGE (TURBINEBUILDING)
FEEDWATER TOS/G1A(CONTAINMENT)
FEEDWATER TOS/G.1B(CONTAINMENT)
S/GBLOWDOWNTOFLASHTANK(TURBINEBUILDING)
FEEDWATER CLEANUP(CV-19)MAINFEEDWATER PUMPRECIRCULATION GLANDSTEAMCONDENSER TOTURB.GEN.&GOV.MAINGLANDSTEAMTOTURB.GEN.&GOV.ENDSF.W.HTR.DRAINSYS.FROMH.DPUMPSTOH.T.TANK R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)Thestatements madeinthisreportandattachments arecorrectandtheexaminations andcorrective measurestakenconformtotheRulesoftheASMECode,SectionXI.preparedBy;~.//3/PdFrankA.KlepackiDateISIEngineerApprovedy:MichaelJ.SaoritoDateManager,Laboratory andInspection
- Services, Technical Performance andFieldInspections
>/~/~<Certificate ofInservice InsectionI,theundersigned, holdingavalidcommission issuedbytheNationalBoardofBoilerandPressureVesselInspections andtheStateorProvinceofNewYorkandemployedbyTheHartfordSteamBoilerInsectionandInsurance Comanhaveinspected and/orverifiedthecomponents described withintl~sreportandassociated Attachments duringthestatedreporting timeframe,andstatetothebestofmyknowledge andbelief,theOwnerhasperformed examination andcorrective measuresdescribed inthisReportinaccordance withtherequirements oftheASMECode,SectionXI.Furthermore, neithertheInspector norhisemployershallbeliableinanymannerforanypersonalinjuryorpropertydamageoralossofanykindarisingfromorconnected withthisinspection.
ReviewedBy:+~~~i8Wl~~s/za+esANII'sSignature Date12 FORMNIS-1OWNER'SREPORTFORINSERVZCE INSPECTIONS AsreuiredbvtheProvisions oftheASMECodeRulesl.OwnerRochester Gas6ElectricCor.89EastAve.Rochester N.Y.14649(NanteandAddressofQuitter)2.PlantR.E.GinnaNuclearPowerPlant1503LakeRoadOntarioNY145193.PlantUnit5.Conunercial ServiceDateJul19707.Components Inspected (NameandAddressofPlant)4.(hvnerCertificate ofAuthorization (ifrequired) 6.NationalBoardNumberforUnitN/AN/AComponent orAppurtenance hfanufacturer orInstaller Manufacturer orInstaller SerialNo.StateorProvinceNo.NationalBoardNo.(*)SEE"ATTACHMENT I"FORAPPLICABLE INFORMATION Note:Supplemental siteetsinformoflists,sketches, orArawings maybeused,provided(1) sizeis8-1/2in.xIIin.,(2)inforntatlon initemsItluou8It6onthisreportisincludedoneachsheet,and(3)eachsheetisnumberedandthcnumberofsheetsisrecordedatthctopofthisform.(12/86)Thisform(E0029)maybcobtainedfromtheOrderD~,AShIE,22LawDrive,Box2300,Fairfield, NJ07007-2300 0
FORMNIS-1(Back)8.Exainination Dates11/27/95to7/02/969.hlspection Intervalfrom1990to199910.ApplicableEditionsofScctionXI 1986AddendaNo11.AbstractofExaminations, Includealistofexaminations andastatement concerning statusofworkrequiredforcurrentinterval.
(*)12.AbstractofConditions Noted.(*)13.AbstractofCorrective MeasuresRecoiiunended andTaken.(*)XI.IVcccttifythatstatements madeinthisreportarccorrectandtheexaminations andcorrective measurestakenconformtotherulesoftheASMECode,SectionCertiTicate ofAuthorization No.(ifapplicable)
N/AExpiration DateN/ADate13Semember1996SignedRochester GaBAFlectricCnmtionGNtterISIEngineerCERTIFICATE OFINSERVICE INSPECTION I,Ibeundesigned, holdingavsgdconunisdon issndbytbcNalionstBoardofBoilerandPrestooVesselInspcdora andtheStateorProvinceof~Zgdtandonptoy dbya'.c~ofahaveinspected thecomponents described inthisOhhltei's ReportduringtheperioddfaMtoandstatethattothcbestofmyhlowledge andbelief,thcOhvncrllasperfomled examinations andtakencorrective measuresdescribed inthisOhvnei'sReportinaccordance withtheinspection planandasrequiredbytheASMECode,SectionXl.Bysigningthiscertificate ncithcrthcInspector norhisemployermakesanywarranty, expressed orimplied,concenling theexaminations andcorrective measuresdescribed inthisGhvner'sRcport.Furthemiore, neitherthehlspector norhisemployershallbcliableinanymannerforanypersonalinjuryorpropertydamageoralossofanykindarisingfromorconnected withthisinspection.
~cz8.WInspector's Signature 1994Conlillissions NationalBoard,State,Province, andEndorsements
(*)SEE"ATTACHMENT I"FORAPPLICABLE INFORMATION 2
R.E.G1NNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul5970S.National BoardNumberforUnitN/AATTACHMENT IA.CLASS1COMPONENTS:
Al.STEAMGENERATOR ADRAWINGS:
A-5SummaryNumberEtiamCategItemNumberComponent Component Type005700B-BB2.40LHTSW-ARLOWERHEAD-TO-TUBE SHEETWDASMEUT96-UT:PERFORMED BYB&W,REF'EPORT
()7705-1-22:
-ACCEPTABLE.
005900B-DB3.140INIR-ARINLETNOZZLEINSIDERADIUSSECTIONOEUT96-UT;NORECORDABLE INDICATIONS
-ACCEPT.>90%COVERAGE.
005990B-FB5.70NSE-1RSAFEEND-TO-NOZZLE (INLET)ASMEPTUT96-PT&UTr'ORECORDABLE INDICATIONS
-ACCEPTABLE.
PT&UTPERFORMED BYB&WUNDERREPORT()7705-1-55.
006000B-JB9.11PL-FW-I-ASW-R ELBOW-TO-SAFE ENDOEPTRT96-PT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
006100B-DB3.140ONIR-AROUTLETNOZZLEINSIDERADIUSSECTIONUT96-UT:NORECORDABLE INDICATIONS
-ACCEPTABLE.
NOTE:"COMPONENT TYPE",ZSDEFINEDASFOLLOWS:"ASME"=ITEMREQUIREDBYASMESECTIONXICODEAUG99=AUGMENTED PROGRAM-ITEMREQUIREDBYNRCCOMMITMENT "OE"=OWNERELECTED-NONMANDATORY EXAMINATIONS R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N1AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.)Al.STEAMGENERATOR A(CONT.)DRAWINGS:
A-5SummaryNumber006190ExamCategB-FItemNumberComponent aararaararraaaaaararaaaraaar B5.70NSE-2RNOZZLE-TO-SAFE END(OUTLET)Component TypePTUT96PT&UT'ERFORMED BYB&WsREPORTI77051566ACCEPTABLE.
UT;PERFORMED BYRG&ENORECORDABLE INDICATIONS
-ACCEPTABLE.
006200B-JB9.11PL-FW-ZX-ASW-R SAFEEND-TO-ELBOW (OUTLET)OEPTRT96-PT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
006430B-G-2B7.30ZMN-ARINLETMANWAYNUTS(20)VTMT,96-VT&MTSNORECORDABLE INDICATIONS
-ACCEPTABLE.
006435B-G-2B7.30IMS-AROEINLETMANWAYSTUDS(20)VTMT96-VT&MTS'ORECORDABLE INDZCATZONS
-ACCEPTABLE.
006530B-G-2B7.30OMN-AROUTLETMANWAYNUTS(20)OEVTMT96-VT&MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
006535B-G-2B7.30OMS-AROEOUTLET'MANWAYSTUDS(20)VTMT96-VT&MTS'ORECORDABLE INDICATIONS
-ACCEPTABLE.
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/'A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT~):A1.STEAMGENERATOR A(CONT.)DRAWINGS:
A-5SummaryNumberExamCategItemNumberComponent Component TypeBSSNDEExam006609F-AFl.40SGA-SLOESUPPORTCOMPONENT-LEGSATODVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
006641F-AF1.40SGA-MSMZDSUPPORTVT96-VT;NORECORDABLE ZNDICATIONS
-ACCEPTABLE.
006644F-AF1.40SGA-RSRINGSUPPORTOEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
A2.STEAMGENERATOR BDRAWINGS:
A-5SummaryNumber006700ExamItemCategNumberComponent SBSBRRSBBSRKBSRRBBRNrSBBBNfB-BB2.40LHTSW-BRLOWERHEAD-TO-TUBE SHEETWELDComponent TypeExamUT96UTrPERFORMED BYB&W6REPORTI77052"22fACCEPTABLE006900B-DB3.140INIR-BRINLETNOZZLEINSIDERADIUSSECTIONUT96-UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoadOntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT~)-aA2.STEAMGENERATOR B(CONT.)DRAWINGS:
A-5SummaryNumberExamItemCategNumberComponent Component TypeExam006990B-FB5.70NSE-3RSAFEEND-TO-NOZZLE (INLET)PTUT96PT&UTf'ERFORMED BYB&WSREPORTg7705255fACCEPTABLE.
UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
007000B-JB9.11PL-FW-III-R ELBOW-TO-SAFE END(INLET)ASMEPTRT96-PT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
007100B-DB3.140ONIR-BROUTLETNOZZLEINSIDERADIUSSECTIONUT96-UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
007190B-F'5.70NSE-4RNOZZLE-TO-SAFE END~(OUTLET)ASMEPTUT96-PT&UT;PERFORMED BYB&W,REPORT))7705-2-56,
-ACCEPTABLE.
UTS'ORECORDABLE INDICATIONS
-ACCEPTABLE.
007200B-JB9.11PL-FW-X-R SAFEEND-TO-ELBOW (OUTLET)ASMEPTRT96-PT&RT;PERFORMED BYBECHTEL(CONAM),-ACCEPTABLE.
007430B-G-2B7.30IMN-BROEINLETMANWAYNUTS(20)96-VT&MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
VT i
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990"1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~cul19706.National BoardNumberforUnitN/AATTACHMENT CLASS1COMPONENTS (CONT.):A2.STEAMGENERATOR B(CONT.)DRAWINGS:
A-5SummaryNumberItemCategNumberComponent Component Type007435B-G-2B7.30IMS-BROEINLETMANWAYSTUDS(20)VTMT96-VT&MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
007530B-G-2B7.30OMN-BROUTLETMANWAYNUTS(20)OEVTMT96-VT&MTaNORECORDABLE INDICATIONS
-ACCEPTABLE.
007535B-G-2B7.30OMS-BROUTLETMANWAYSTUDS(20)
OEVTMT96-VT&MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
007609F-AF1.40SGB-SLSUPPORTCOMPONENT LEGSHTOKOEVT96-VTrNORECORDABLE INDICATIONS
-ACCEPTABLE.
007641F-AF1.40SGB-MSMIDSUPPORTOEVT96-VTrNORECORDABLE INDICATIONS
-ACCEPTABLE
~007644F-AF1.40SGB-RSRINGSUPPORTOEVT96-VTr'ORECORDABLE INDICATIONS
-ACCEPTABLE.
0 R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.)A3.REACTORCOOLANTSYSTEM-LOOP ADRAWINGS:
A-3ASummaryNumberItemCategNumberComponent Component Type011000B9.31PL-FW-II/10A-RCO-2501-A 10"BRANCHWELDASMEPTUT96-PT;ACCEPTABLE
-1ROUNDEDINDICATION.
UTfNORECORDABLE INDICATIONS
-ACCEPTABLE.
A4.10-1N.PRESSURIZER SURGELINEDRAWINGS:
A-3DSummaryNumber014000ItemCategNumberComponent Component TypeB9.11AASMEREDUCER"TO-PIPE (SURGELINE)NDEExamUTPT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
014400F-AF1.10VRCU-1VARIABLESPRINGVT96VT-BPSIZiE149SETTING3319gSACCEPTABLE
~A5.2-ZN.PRESSURIZER SPRAYLINEDRAWINGS:
A-11SummaryNumberItemCategNumberComponent aaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaComponent Type025100B-J96-PT;NOB9.4019ASMECOUPLING-TO-PIPEaRECORDABLE INDICATIONS
-ACCEPTABLE.
'
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Znterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~oui1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.)A6.RESIDUALHEATREMOVALFROMLOOPAHOTLEGDRAWINGS:
A-15SummaryNumberItemCategNumberComponent Component Type031125F-AF1.10SRHU-33MECHANICAL SNUBBEROEVT96VTrS/N70649SETTING31/4r'ORECORDABLE INDICATIONS ACCEPTABLE.
A7.2"LETDOWNFROMREGENHTXDRAWINGS:
A-24SummaryNumberExamItemCategNumberComponent Component Type048200B-JB9.401NOZZLE-TO-PIPE PT96-PTr'ORECORDABLE INDICATIONS
-ACCEPTABLE'8.
SEALWATERTORCP-BDRAWINGS:
A-32SummaryNumber049370ExamItemCategNumberComponent RSBSCBBCQRCRBBCCCBBF-AF1.10SCVU-104MECHANICAL SNUBBERComponent TypemscBBQOENDEExamVT96VTrPSA19S/N24499SETTING29NORECORDABLE INDICATIONS ACCEPTABLE
~A9.2"CHARGINGTOLOOPBCOLDLEGDRAWINGS:
A-25SummaryNumber051300ExamCategB-JItemNumberComponent B9.4028PIPE-TO-NOZZLE Component TypeASMEPT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
R.E.GZNNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Oui19706.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.)A10.2"ALTERNATE CHARGINGTOLOOPACOLDLEGDRAWINGS:
A-26SummaryNumberItemCategNumberComponent Component TypeExam051600B-JB9.4021PIPE-TO-ELBOW ASMEPT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
052300B-JB9.4028ELBOW-TO-PIPE ASMEPT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
053300B-JB9.4038VALVE(383A)-TO-PIPE AUGPTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
A11.2"ALTERNATE CHARGINGTOLOOPBHOTLEGDRAWINGS:
A-27SummaryNumberExamCategZternNumberComponent Component Type054980B-JB9.409EASMETEE-TO-PIPE PT96-PT;NORECORDABLE INDZCATZONS
-ACCEPTABLE.
055100B-JB9.4011VALVE(393)-TO-PIPE AUGPTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
10 0
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999 Znterval,,
SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.commercial ServiceDate~Jul1970B.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.):A12.REACTORCOOLANTPUMPADRAWINGS:
A-7SummaryNumberZtemCategNumberComponent Component Type056812B-G-1B6.180STUD$12OEBOLTINGfINPLACEUT96-UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
OE056818B-G-1B6.180STUD()18BOLTING,INPLACE96-UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
UTA13.REACTORCOOLANTPUMPBDRAWINGS'-6 SummaryNumberItemCategNumberComponent Component Type058120BOLTRCP-BANCHORBOLTSBOLTSOEUT96-UT;INSIGNIFICANT; INDICATION STILLSEENONSTUDN2.NOCHANGESINCELASTEXAMINATION IN1995-ACCEPTABLE.
A14.H.P.SAFETYINJECTION LINETOLOOPBCOLDLEGDRAWINGS:
A-16SummaryNumber058300ItemNumberExamCategB-G-2B7.70Component BB~BBBBBBBBBBBBBBBBBBB~BBBBBBMBBBBMMBB V-842A(BOLTING) 10"DARLINGCHECKVALVEComponent TypeASMEVT96-VT;TAKINGCODECREDITTHISOUTAGE-ACCEPTABLE.
R.E.GINNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester GasaElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS1COMPONENTS (CONT.):A15.RESIDUALHEATREMOVALTOLOOPBCOLDLEGDRAWINGS:
A-14SummaryNumberExamCategItemNumber059300B-G-2B7.70Component V-720(BOLTING)10"VELANMOTOROPER.GATEVALVE1500NComponent TypeASMEVT96-VT;TAKINGCODECREDITTHISOUTAGE-ACCEPTABLE.
B.CLASS2COMPONENTS:
Bl.2"CHARGINGFROMREGENHTXDRAWINGS:
A-29SummaryNumberExamCategitemNumberComponent Component TypeExam050930C3.20CVU-54(IA)INTEGRALATTACHMENT PT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
050933F1.20RCVU-'54RIGIDRESTRAINT (IA)VT96-VT;DRAWINGDOESNOTSHOWMISSINGEDGEWELDS,ACTIONREPORT96-0433GENERATED.
ACCEPTASIS-DWGTOBECHANGED.NORECORDABLE INDICATIONS ACCEPTABLE.
12 8
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY14649'2.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B2.STEAMGENERATOR ADRAWINGS:
B-1SummaryNumberItemCategNumberComponent Component Type070700C1.30TSSW-AROETUBESHEET-TO-SHELL WELDUT96-UT:PERFORMED BYB&W,REPORTI7705-1-77
-ACCEPTABLE.
070900C-AC1.10LST-AROELOWERSHELL-TO-TRANSITION CIRCWELDUT96-UT;PERFORMED BYB&W,REPORT()7705-1-80,
-ACCEPTABLE.
071000C-AC1.10TUS-AROETRANSITION-TO-UPPER SHELLCIRCWELDUT96UTPERFORMED BYB&WSREPORTg77051160/159fACCEPTABLE 071100C-AC1.20USH-ARUPPERSHELL-TO-HEAD CIRCWELDOEUT96UTaPERFORMED BYB&WSREPORT()770511629ACCEPTABLE.
071200C-BC2.21FWIN-ARFEEDWATER INLETNOZZLETOVESSELWELDMTUT96-MT&UT;PERFORMED BYB&W,REPORTI'S17&7705-1-169,
-ACCEPTABLE.
071250C-BC2.22FWIN-ARFEEDWATER INLETNOZZLEINSIDERADIUSOEUT96-UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B2.STEAMGENERATOR A(CONT.)DRAWINGS'-1 SummaryNumberExamCategItemNumber071360C-CC3.10Component Component TypeAB1ROEEARTHQUAKE BRACKET-IANDEExamMT96MTaPERFORMED BYB&WSREPORT¹18fACCEPTABLE
~071362C-CC3.10AB2REARTHQUAKE BRACKET-IAOEMT96MTr'ERFORMED BYB&W9REPORT¹18fACCEPTABLE
~071364C-CC3.10AB3REARTHQUAKE BRACKET-IAOEMT96MTrPERFORMED BYB&WSREPORT¹189ACCEPTABLE 071366C-CC3.10AB4REARTHQUAKE BRACKET-IAMT96MTPERFORMED BYB&WSREPORT¹18fACCEPTABLE
~B3.,STEAMGENERATOR BDRAWINGSB-1SummaryNumber071400ExamItemCategNumberComponent mC-AC1.30TSSW-BRTUBESHEET-TO-SHELL WELDComponent TypemASMEUT96-UT;PERFORMED PYB&W,REPORT¹7705-2-77,
-ACCEPTABLE.
14 R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZCLASS2COMPONENTS (CONT.)B3.STEAMGENERATOR B(CONT.)DRAWINGS:
B-1SummaryNumber071600ExamCategC-AItemNumberComponent C1.10LST-BRLOWERSHELL-TO-TRANSITION CIRCWELDComponent TypeOENDEExamUT96-UT;PERFORMED BYB&W,REPORTN7705-2-80,
-ACCEPTABLE.
071700C-AC1.10TUS-BRTRANSITION-TO-UPPER SHELLCIRCWELDOEUT96UTSPERFORMED BYB&WSREPORTg77052160/159,-ACCEPTABLE.
071800C-AC1.20USH-BRUPPERSHELL-TO-HEAD CIRCWELDOEUT96-UTaPERFORMED BYB&W,REPORT()7705-2-162,
-ACCEPTABLE.
071900C-BC2.21FWIN-BRFEEDWATER INLETNOZZLETOVESSELWELDOEMTUT96-MT&UT;PERFORMED BYB&W,REPORTO'S18&7705-2-169,
-ACCEPTABLE.
071950C-BC2.22FWIN-BRFEEDWATER INLETNOZZLEINSIDERADIUSOEUT96-UTS'ORECORDABLE INDICATIONS
-ACCEPTABLE.
a072080C-CC3.10'BB1REARTHQUAKE BRACKET-IAOE96MTSPERFORMED BYB&WSREPORT()189ACCEPTABLE
~15 l
R.E.GZNNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)B3.STEAMGENERATOR B(CONT.)DRAWINGS:
B-1SummaryNumberExamCategItemNumberComponent Component Type072082C-CC3.10BB2REARTHQUAKE BRACKET-IAOEMT96-MT;PERFORMED BYB&W,REPORT¹18,-ACCEPTABLE.
072084C-CC3.10BB3REARTHQUAKE BRACKET-IAOE96-MTr'ERFORMED BYB&W,REPORT¹18,-ACCEPTABLE.
072086C-CC3.10BB4REARTHQUAKE BRACKET-IAMT96-MT;PERFORMED BYB&W,REPORT¹18,-ACCEPTABLE.
B4.CHARGINGPUMPATOPULSEDAMPENERDRAWINGS:
B-6SummaryNumber075700ExamCategC-F-1ItemNumberComponent C5.111CAP-TO-PIPE Component TypeExamVTPT96-PTaREJECTf'/4" LONGINDICATION WITHINARCSTRIKE,CONSTRUCTION, NOTSERVICEINDUCED.ACTION.REPORT96-0412GENERATED, CODEREPAIRMADE.RE-EXAM-ACCEPTABLE.
VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
075900C-F-1C5.113ELBOW-TO-PIPE ASMEPTUT96-PT&UTf'ORECORDABLE INDICATIONS
-ACCEPTABLE.
16
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.commercial ServiceDate~Jul19706.National BoardNumberforUnitN/JLATTACHMENT ICLASS2COMPONENTS (CONT.):B4.CHARGINGPUMPATOPULSEDAMPENER(CONT)DRAWINGSB-6SummaryNumberExamCategmItemNumberComponent.
Component Type077400F1.20RCVU-410RIGIDRESTRAINT (IA)OEVT96VTrREJECTSELFLOCK1NGNUTSLOOSE(4THREADS)fACTIONREPORT96-0411GENERATED.
RE-EXAMAFTERTIGHTENING
-ACCEPTABLE.
NOTSERVICEINDUCED.077401C-CC3.20CVU-410(IA)INTEGRALATTACHMENT ASMEPT96-PTrREJECT;POORORIGINALCONSTRUCTION WELDQUALITY.ACTIONREPORT96-0411GENERATED.
WELDREWORKED.
RE-EXAM-ACCEPTABLE.
NOTSERVICEINDUCED.B5.CHARGINGPUMPCTOPULSEDAMPENERDRAWINGS'-6 SummaryNumberExamItemCategNumberComponent Component Type076800C-F-1C5.112PIPE-TO-ELBOW ASMEPTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
17 R.E.GZNNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B6.CHARGINGPUMPBTOPULSEDAMPENERDRAWINGSB-6SummaryNumber077600ExamCategF-AItemNumberF1.20RComponent CVU-412RIGIDRESTRAINT (IA)Component TypeOEVT96-VT;REJECT;INTEGRALATTACHMENT ORIGINALCONSTRUCTION POORWELDQUALITYACTIONREPORT960411GENERATED'ELD REWORKEDf RE-EXAM-ACCEPTABLE.
NOTSERVICEINDUCED.077601C-CC3.20CVU-412(IA)INTEGRALATTACHMENT PT96-PTr'EJECTr'NTEGRAL ATTACHMENT ORIGIONAL CONSTRUCTION POORWELDQUALITY.ACTIONREPORT96-0411GENERATED.
WELDREWORKED, RE-EXAM-ACCEPTABLE.
NOTSERVICEINDUCED.B7.MAINSTEAMLOOPAINSIDECVDRAWINGS:
B-8SummaryNumberExamCa'tegItemNumberComponent Component Type079000C-F-2C5.51A-RNOZZLE-TO"ELBOW (S/G-A)OEMTUT96'-MTr'XAM PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
UT;NORECORDABLE
&INSZGNIFZCANT; GEOMETRY-ACCEPTABLE.
079175C-F-2C5.51A1ZPIPE-TO-PIPEOEMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
079200C-F-2C5.51A1-RPIPE-TO-PIPEOEMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
18 R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&Electric'Cor
.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial serviceDate~oui1970B.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)"B7.MAINSTEAMLOOPAINSIDECV(CONT)DRAWINGS:
B-8SummaryNumberItemCategNumberComponent Component Type079500'1.20VMSU-1VARIABLESPRINGOEVT96-VTf'ETTING 31/2"=11123O'S,NORECORDABLE INDICATIONS
-ACCEPTABLE.
079600F-AF1.20SMSU-2MECHANICAL SNUBBEROEVT96-VT;SETTING33/4",NORECORDABLE ZNDICATIONS
-ACCEPTABLE.
079700F-AF1.20SMSU-3MECHANICAL SNUBBER(ZA)VT96VTSETTING39NORECORDABLE INDICATIONS ACCEPTABLE 079750C-CC3.20MSU-3(IA)INTEGRALATTACHMENT MT96-MTr'ORECORDABLE INDICATIONS
-ACCEPTABLE.
080000"F-AF1.20VMSU-4VARIABLESPRINGOEVT96VTaSETTING11/4=>7989gSfNORECORDABLE INDICATIONS ACCEPTABLE.
080100F-AF1.20VMSU-5VARIABLESPRINGASMEVT96-VT:REJECT;LACKOFTHREADENGAGEMENT.
ACTIONREPORT96-0489GENERATED.
BECHTELPERFORMED REWORK.RE-EXAM-ACCEPTABLE.
NOTSERVICEINDUCED.19 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B8.MAINSTEAMLOOPAOUTSIDECVDRAWINGSB-9SummaryNumberExamCategItemNumberComponent Component TypeNDEExam081550C-F-2C5.52E1L1ELBOWLONGITUDINAL WELDASMEVTMTUT96-VT&MT;NORECORDABLE 1NDZCATIONS
-ACCEPTABLE.
UT;NORECORDABLE
&INSIGNIFICANT; NOCHANGESINCELASTEXAM-ACCEPTABLE.
081650C-F-2C5.51E1APIPE-TO-ELBOW VTMTUT96-VT&MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
UT;NORECORDABLE
&COUNTERBORE GEOMETRYa
-ACCEPTABLE.
B9.MAINSTEAMLOOPBINSIDECV6DRAWINGS'-8SummaryNumber084400ExamCategC-F-2C5.51A-RNOZZLE-TO-ELBOW (S/G-B)ItemNumberComponent Component TypeNDEExamMTUT96-MTaPERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
UT;NORECORDABLE IDGEOMETRY-ACCEPTABLE.
084600C-F-2C5.51Al-RPIPE-TO-ELBOW MTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
084700F-AvF1.20VMSU-6'ARIABLESPRINGVT96-VT;SETTING7900))'S,NORECORDABLE INDICATIONS
-ACCEPTABLE.
20 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)B9.MAINSTEAMLOOPBZNSZDECV(CONT.)DRAWINGS:
B-8SummaryNumberExamItemCategNumberComponent Component TypeExam084900F-A'1.20S MSU-7MECHANICAL SNUBBERASMEVT96-VT;SETTING3"&23/4".NORECORDABLE INDICATIONS
-ACCEPTABLE.
085200F-AF1.20SMSU-8HYDRAULIC SNUBBEROEVT96-VT;REJECTaINCORRECT SETTING&NUT/BOLTTURNSASONE.ACTIONREPORT96-0465GENERATED.
RE-EXAMAFTERADJUSTMENTS
-ACCEPTABLE.
NOTSERVICEINDUCED.085300F-AF1.20VMSU-9VARIABLESPRINGOEVT96-VTaSETTING=7400O'S,INSIGNIFICANT; LACKOFTHREADENGAGEMENT BYONETHREADOKPERMECH.ENG.LETTER-ACCEPTABLE.
085400F-AF1.20VMSU-10VARIABLESPRINGOEVT96VT.SETTING~8554gfSNORECORDABLE INDICATZONS ACCEPTABLE B10.MAINSTEAMLOOPBOUTSIDECVDRAWINGS'-10ASummaryNumber087625ExamCategItemNumberComponent mF1'0SMSU-25MECHANICAL SNUBBER(IA)I'omponent TypeOEExamVT96-VT;SETTING13/4",NORECORDABLE INDICATZONS
-ACCEPTABLE.
21 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492'.PlantR.E.Ginna NuclearPowerPlant,'1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul'970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B10.MAINSTEAMLOOPBOUTSIDECV(cont.)DRAWINGS:
B-10ASummaryNumberExamCategItemNumberComponent Component Type087630C-CC3.20MSU-25(IA)INTEGRALATTACHMENT ASME96-MT:NORECORDABLE INDICATIONS
-ACCEPTABLE.
Bll.FEEDWATER LOOPAOUTSIDECVDRAWINGS:
B-llSummaryNumberExamCategItemNumberComponent Component Type091225F-AF1.20SFWU-15MECHANICAL SNUBBER(ZA)VT96-VT;SETTING25/8",NORECORDABLE INDICATIONS
-ACCEPTABLE.
091226C-CC3.20FWU-15(ZA)ASMEINTEGRALATTACHMENT 96-MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B12.FEEDWATER LOOPAINSIDECVDRAWINGS:
B-12SummaryNumber092300ExamItemCategNumberComponent KKRRRRBSBSQSBRRRRRRRBSSS RR~~RRBSRF-AF1.20VFWU-6VARIABLESPRINGComponent TypeOEVT96-VT:SETTING=2556O'S,NORECORDABLE INDICATIONS
-ACCEPTABLE.
22 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)t1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoadOntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)B12.FEEDWATER LOOPAINSIDECV(CONT.)DRAWINGS:
B-12SummaryNumber092600ItemCategNumberComponent F1.20VFWU-4VARIABLESPRINGComponent TypeOEVT96-.VTlSETTING=2797O'S.NORECORDABLE INDICATIONS
-ACCEPTABLE.
093100F-AF1.20VFWU-2VARIABLESPRINGVT96VTaSETTING2104gS6NORECORDABLE INDICATIONS ACCEPTABLE 093400C-F-2C5.51DD3-RPIPE-TO-ELBOW OEMTRT96-MT&RTfPERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
093500F-AF1.20VFWU-1VARIABLESPRING(IA)OEVT96VTrSETTING2617gSfNORECORDABLE INDICATIONS ACCEPTABLE 093505C-CC3.20FWU-1(IA)INTEGRALATTACHMENT OEMT96-MTSNORECORDABLE INDICATIONS
-ACCEPTABLE.
093800C-F-2C5.51DD6-RELBOW-TO-PIPE OEMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970B.National BoardNumberforUnitN/JLATTACHMENT ICLASS2COMPONENTS (CONT.)'12.
FEEDWATER LOOPAINSIDECV(CONT,)DRAWINGS:
B-12SummaryNumber093900ExamCategItemNumberComponent C-F-2C5.51DD7-RPIPE-TO-ELBOW Component TypeOENDEExamMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
094000C-F-2C5.51DDS-RELBOW-TO-PIPE MTRT96-MT&RTaPERFORMED BYBECHTEL(CONAM)-ACCEPTABLE
.094200C-F-2C5.51DD10-RREDUCER-TO-ELBOW OEMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
094300C-F-2C5.51EE-RELBOW-TO-SAFE END(S/G-A)OEUTPT96-PT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
UT;NORECORDABLE
&INSIGNIFICANTROOTfMETALLURGI CALINTERFACE&COUNTERBORE ACCEPTABLE.
094310C-F-2C5.51E-RSAFEEND-TO-NOZZLE (S/G-A)OEUTPT96-PT&UT;PERFORMED BYB&W,REPORTO'S16&7705-1-140;
-ACCEPTABLE.
24 R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B13.FEEDWATER LOOPBOUTSIDECVDRAWINGS:
B-14SummaryNumberExamCategItemNumberComponent Component TypeNDEExam094850F-AF1.20RFWU-43RIGIDRESTRAINT OEVT96-VTaNORECORDABLE
&INSIGNIFICANT
-ACCEPTABLE.
B14.FEEDWATER LOOPBINSIDECVDRAWINGS:
B-13SummaryNumberExamCategItemNumberComponent Component Type097700F-AF1.20VFWU-13VARIABLESPRING(IA)OEVT96-VT:SETTING=3880()'S,NORECORDABLE INDICATIONS
-ACCEPTABLE.
098100F-AFl.20VFWU-11VARIABLESPRINGOEVT96-VT;SETTING2199OSS.NORECORDABLE INDICATIONS
-ACCEPTABLE.
098600F-AF1.20VFWU-10VARIABLESPRINGVT96VTSSETTING2315(tS9NORECORDABLE
&INSZGNIFICANTJLACKOFONETHREADFULLENGAGEMENT ATLOWERCLAMPSOKPERMECHENG~LETTERSNOTSERVICEINDUCED-ACCEPTABLE.
098825F-AFl.20VFWU-9VARIABLESPRINGOEVT96VTSSETTING2856gS9NORECORDABLE INDICATIONS ACCEPTABLE 25 R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990"1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B14.FEEDWATER LOOPBZNSZDECV(CONT.)DRAWINGS:
B-13SummaryNumber098900ExamCategC-F-2ItemNumberC5.51Component AA-RPIPE-TO-ELBOW Component TypeNDEExamMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
099000F-AF1.20VFWU-7VARIABLESPRING(IA)OEVT96-VT;SETTING=2856O'S,NORECORDABLE INDICATIONS
-ACCEPTABLE.
099005C-CC3.20FWU-.7(IA)INTEGRALATTACHMENT OE96-MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
099500C-F-2C5.51AA4-RPIPE-TO-ELBOW OEMTRT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
099800C-F-2C5.51AA7-RREDUCER-TO-ELBOW OERTMT96-MT&RT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
099900C-F-2C5.51BB-ROEUTELBOW-TO-SAFE ENDPT(S/G-B)VT96-PT;PERFORMED BYBECHTEL(CONAM)-ACCEPTABLE.
UT;NORECORDABLE
&INSIGNIFICANTa GEOMETRY&METALLURGICAL INTERFACE
-ACCEPTABLE.
VTaNORECORDABLE INDICATIONS
-ACCEPTABLE.
26 n'
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970B.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B14.FEEDWATER LOOPBINSIDECV(CONT.)DRAWINGS:
B-13SummaryNumberItemCategNumberComponent Component TypeNDEExam099910C-F-2C5.51B-RSAFEEND-TO-NOZZLE (S/G-B)OEUTPT96PT&UTaPERFORMED BYB&WfREPORTf)S17&770521409ACCEPTABLE.
B15.H.P.SAFETYINJECTION LINE8E-SZ-301 DRAWINGS:
B-16SummaryNumber104200ExamCategItemNumberComponent mfaKBBBBDKmRtRKRKR&rmrmF1.20RSZU-104RIGIDSUPPORT(IA)Component Typea9ataaaaaaVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
104210C-CC3.'20SIU-104(ZA)INTEGRALATTACHMENT PT96-PTr'ORECORDABLE INDICATIONS
-'ACCEPTABLE.
B16~H.P.SAFETYINJECTION LINE8G-SZ-301 DRAWINGS:
B-19SummaryNumber122600ExamCategItemNumberComponent meF1.20RRHU-112RIGIDSUPPORT(IA)Component TypeOEVT96-VTaNORECORDABLE INDICATZONS
-ACCEPTABLE.
122602C-CC3.20RHU-112(IA)INTEGRALATTACHMENT PT96-PT;NORECORDABLE INDICATIONS
<<ACCEPTABLE.
27 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990"1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ZCLASS2COMPONENTS (CONT.):B17.RESIDUALHEATREMOVALLINE6K-AC-151 DRAWINGS:
B-21SummaryNumber130050ExamCategItemNumberF1.20VComponent RHU-93VARIABLESPRING(IA)Component TypeOEExamVT96-VT/'ETTING
=1755((',NORECORDABLE
&INSIGNIFICANT; CANBODYHASLIGHTRUST&PEELINGPAINT.BASECHANNELHASHEAVYBARESIDUE,RE-EXAMAFTERCLEANING-NORECORDABLE
-ACCEPTABLE.
130055----C3.20RHU-93(IA)INTEGRALATTACHMENT PT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B18.RESIDUALHEATREMOVALLINE6C-AC-601 DRAWINGS:
B-19SummaryNumberItemCategNumberComponent RRDRBBRXRSNNS Component TypeNSMSNMBBBBMNSNDEExam157400C-F-117PIPE-TO-VALVE(857C)UTOEPT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B19.H.P.SAFETYINJECTION PUMPBSUCTZONLINEDRAWINGS:
B-16BSummaryNumber160500ExamItemC-F-1C5.21,18X8X4TEE-TO-PIPE rCategNumberComponent Component TypeNDEExamPTUT96-PT&UT/'ORECORDABLE INDZCATIONS
-ACCEPTABLE.
28 ie R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.commercial BeruiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)B20.H.P.SAFETYINJECTION PUMPASUCTZONLZNEDRAWINGS:
B-16BSummaryNumberExamCategItemNumberComponent Component Type160850F1.20RRHU-120OEVTRIGIDSUPPORT(IA)96-VT;NORECORDABLE
&INSIGNIFICANT; HEATTRACECLAMPEDTOSUPPORT,WELLNOTINTERFERE WITHSUPPORTFUNCTION-ACCEPTABLE.
160851C-CC3.20RHU-120(IA)INTEGRALATTACHMENT ASMEPT96-PTr'ORECORDABLE INDICATIONS
-ACCEPTABLE.
B21.H.P.SAFETYINJECTION LINE3A-SZ-1501 DRAWINGS:
B-37SummaryNumberExamCategItemNumberComponent Component TypeNDEExam161140C5.2112ELBOW-TO-PIPE PTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B22.H.P.SAFETYINJECTION LZNE4D-SZ-1501 DRAWINGS:
B-37SummaryNumber161425ExamCategF-AItemNumberF1.20AComponent PEN113ANCHORANCHOR(IA)Component TypeOEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
161426C-CC3.20PEN113ANCHOR(IA)INTEGRALATTACHMENT ASMEPT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
29
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970B.National BoardNumberfor'UnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B22.H.P.SAFETYZNJECTZONj'LINE 4D-SZ-1501 (CONT.)DRAWINGS:
B-37SummaryNumber161530ExamCategF-AItemNumberF1.20RComponent SIU-39RIGIDRESTRAINT (IA)Component TypeOEVT96-VT;ACTIONREPORT96-0434GENERATED DUETO0DEG.STRUTAT19DEG.OKASIS-DRAWINGTOBEREVISED.NOTSERVICEINDUCED-CONSTRUCTION.
NORECORDABLE INDICATIONS
-ACCEPTABLE.
161531C-CC3.20SZU-39(IA)INTEGRALATTACHMENT PT96-PT:NORECORDABLE INDICATIONS
-ACCEPTABLE.
B23.H.P.SAFETYINJECTION LINE2T-SZ-2501 DRAWZNGS:
B-39SummaryNumberExamItemCategNumberComponent Component Type161760C-F-1C5.306ASMEPIPE-TO-TEE PT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B24.H.P.SAFETYINJECTZON LINE2U-SZ-2501 DRAWINGS:
B-39SummaryNumber162180ZternCategNumberComponent F1.20ASZU-30ANCHOR(IA)OEVTNDEComponent TypeExam96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
30 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZCLASS2COMPONENTS (CONT.):B24.H.P.SAFETYINJECTION, LINE2U-SZ-2501 (CONT.)DRAWZNGS:
B-39SummaryNumber162181ExamItemCategNumberComponent C-CC3.20SIU-30(IA)INTEGRALATTACHMENT Component TypeASMEExamPT96-PT;NORECORDABLE
&1NSIGNIFICANT; SEVERALROUNDEDINDICATIONS THATWERE3/16"ORLESS-ACCEPTABLE.
162220C-F-1C5.3038PIPE-TO-VALVE (878F)ASMEPT96-PTr'ORECORDABLE INDICATIONS
-ACCEPTABLE.
B25.H.P.SAFETYINJECTION LINE3C-SZ-1501 DRAWINGS:
B-41SummaryNumberExamCategItemNumberComponent Component Type163030C-F-1C5.213ELBOW-TO-PIPE ASMEPTUT96-PT&UTrNORECORDABLE INDICATIONS
-ACCEPTABLE.
B26.H.P.SAFETYINJECTION LINE4E-SI-1501 DRAWINGS:
B-42SummaryExamNumberCateg163935F-AItemNumberComponent F1.20APEN101ANCHORANCHOR(IA)vComponent TypeOEExamVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
31
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna Nuclear.PowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.)B26.H.P.SAFETYZNJECTZONNLZNE 4E-SZ-1501 (CONT.)DRAWINGS:
B-42SummaryNumber163936EtiamCategC-CItemNumberC3.20Component PEN101ANCHOR(IA)INTEGRALATTACHMENT Component TypeASMEPT96-PT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
164000C-F-1C5.2138ASMEELBOW-TO-PIPE PTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
164360C-F-1C5.2160TEE-TO-REDUCER ASMEPTUT96-PT&UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B27.SERVICEWATERLINE6G-SW-125 DRAWZNGS'-50 SummaryNumberEtiam1ternCategNumberComponent Component Type173035F1.20APEN319ANCHORANCHOR(IA)OEVT96-VT:NORECORDABLE INDICATIONS
-ACCEPTABLE.
173036C3.20PEN319ANCHOR(IA)INTEGRALATTACHMENT OE96-MT:NORECORDABLE INDICATIONS
-ACCEPTABLE.
32 R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B28.SERVICEWATERLZNE8N-SW-125.
DRAWINGS:
B-50SummaryNumberExamCategItemNumber'omponent Component TypeExam173160C3.20SWU-81(IA)OEINTEGRALATTACHMENT MT'6-MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
173170----F1.20RSWU-81OEGUIDE(IA)VT96-VT;NORECORDABLE
&INSIGNIFICANT; PAINTBU1LD-UPINGAP-ACCEPTABLE.
B29.SERVICEWATERLINE88-SW-125 DRAWZNGS:
B-51SummaryNumberExamCategItemNumberComponent Component Type173860C3.20SWU-88(IA)OEINTEGRALATTACHMENT MT96-MT;NORECORDABLE INDICATIONS
'-ACCEPTABLE.
173870F1.20RSWU-88GUIDE(IA)VT96-VTJ'ORECORDABLE INDICATZONS
-ACCEPTABLE.
B30.SERVICEWATERLZNE8F-SW-125 DRAWINGS:
B-52SummaryNumber174460ItemCategNumberCOmponent C3.20SWU-89(ZA)INTEGRALATTACHMENT Component TypeOE96-MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
33
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- 1nterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS2COMPONENTS (CONT.):B30.SERVICEWATERLZNE8F-SW-125 (CONT.)DRAWINGS:
B-52SummaryNumberItemCategNumberComponent Component TypeNDEExam174470F1.20RSWU-89RIGIDRESTRAINT (IA)OEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
B31.SERVICEWATERLINE8B-SW-125 DRAWINGS:
B-53SummaryNumber175460ItemCategNumberC3.20Component SWU-42(IA)INTEGRALATTACHMENT Component TypeOEMT96-MTSNORECORDABLE 1NDICATZONS
-ACCEPTABLE.
175470-;--F1.20RSWU-42RIGIDRESTRAINT (ZA)VT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
C.CLASS3COMPONENTS:
Cl.DIESELGENERATOR BZ.W.COOLINGRETURNDRAWINGS:
C-36SummaryNumberExamCategItemNumberComponent Component Type500140D-BD2.20DG-1B(IA)INTEGRALATTACHMENT VT96-VT;REJECTS'RIGINAL CONSTRUCTION UNDERCUTWITHININTEGRALATTACHMENT.
OKPERMECH.ENG.MEMO.NOTSERVICEINDUCED.NORECORDABLE
&INSIGNIFICANT; GAPINPLATE-ACCEPTABLE.
34
R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ICLASS3COMPONENTS (CONT.)Cl.DIESELGENERATOR BtT.W.COOLINGRETURN(CONT.)DRAWINGS:
C-36SummaryNumberItemCategNumberComponent Component TypeExam500145F1.30RDG-1BRIGIDSUPPORT(ZA)OEVT96-REJECT;ORIGINALCONSTRUCTION UNDERCUTWITHININTEGRALATTACHMENT.
OKPERMECH.ENG.MEMO.NOTSERVICEINDUCED.NORECORDABLE
&INSIGNIFICANT; GAPINPLATE-ACCEPTABLE.
500150D-BD2.20DG-2B(IA)INTEGRALATTACHMENT ASMEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
500155F-AF1.30RDG-2BRIGIDSUPPORT(IA)OEVT96-VT;NORECORDABLE'INDICATIONS
-ACCEPTABLE.
aC2.AUX.FWPUMPSDZSCH-ZNTERMED.
BLDG.DRAWINGSC-1CSummaryNumber505260ExamItemCategNumberComponent BBQLSC'RRD BBCSRCZRZZZRSRBBRF1.30SAFU-103MECHANICAL SNUBBERComponent TypeOE'DEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
SETTINGS:
EAST3"S/N18184,WEST31/2"S/N18185.505320F-AF1.30SAFU-34~MECHANICAL SNUBBEROEVT96-VTS'ORECORDABLE INDICATIONS
-ACCEPTABLE.
SETTING=23/4".35 p~t R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ICLASS3COMPONENTS (CONT.)C2.AUX.FWPUMPSDZSCH-.~ZNTERMED.
BLDG.(CONT.)DRAWINGS:
C-1CSummaryNumberItemCategNumberComponent Component TypeNBQcRRc505500F-AF1.30SAFU-52MECHANICAL SNUBBEROEVT96-VTrNORECORDABLE 1NDICATIONS
-ACCEPTABLE.
SETTZNG=13/4"505750F-AF1.30SAFU-75MECHANICAL SNUBBEROEVT96-VT'ORECORDABLE ZNDICATIONS
-ACCEPTABLE.
SETTING=21/8".C3.COMPONENT COOLINGHEATEXCHANGER BDRAWINGSC-41SummaryNumberItemCategNumberComponent Component TypeNDEExam555200D-BD2.20CCW1B-W(IA)INTEGRALATTACHMENT ASMEVT96-VT;NORECORDABLE
&INSIGNIFICANT; LIGHTRUST-ACCEPTABLE.
555250F-AF1.40.CCW1B-WSUPPORTWEST(IA)VT96-VTrNORECORDABLE INDICATIONS
-ACCEPTABLE.
555300D-BD2.20CCWlB-E(IA)INTEGRALATTACHMENT ASMEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
555350F-A9F1.40CCW1B-ESUPPORTEAST(IA)VT96-VT;NORECORDABLE INDZCATIONS
-ACCEPTABLE.
36 I,
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ID.HIGHENERGYCOMPONENTS:
D1.MAINSTEAMTURBINEBUILDINGDRAWINGS:
HE-7ASummaryNumberItemCategNumberComponent Component Type200265HE-CBBPIPE-TO-ELBOW AUGUTMTVT96-MT&VT;REJECT-ARCSTRIKES,GOUGES&LUGSTUBS.NOTSERVICEINDUCEDCONSTRUCTION.
INDICATIONS REMOVEDBYGRINDING.
MT&VTRE-EXAMAFTERREPAIRS-ACCEPT.
UTTHICKNESS READINGS-ACCEPT.
UT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
D2.FEEDWATER LOOPAOUTSIDECVDRAWINGS:
HE-5SummaryNumberExamItemCategNumberComponent Component Type201700HE-CS*F1.20SFWU-26OEMECHANICAL SNUBBER(IA)VT96-VT;NORECORDABLE INDZCATIONS
-ACCEPTABLE.
201701HE-IA*C3.20FWU-26(IA)INTEGRALATTACHMENT AUGMT96-MTrNORECORDABLE INDICATIONS
-ACCEPTABLE.
201720HE-CS*F1.20RFWU-27RIGIDSUPPORT(IA)OEVT96-VT:NORECORDABLE
&INSIGNIFICANT; 2ADDITIONAL STANCHION LUGSHAVEBEENADDED,DRAWINGTOBEREVISED-ACCEPTABLE.
201721HE-IA*C3.20FWU-27(IA)INTEGRALATTACHMENT AUGMT96-MT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
37 e
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commeccial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT IE.LEAKAGETESTING:E1LEAKAGEEXAMZNATIONSCLASS19293DRAWINGSL-1SummaryNumber411000EtiamCategB-PItemNumberComponent IWB5221PT-7LEAKAGETESTOFREACTORCOOLANTSYSTEMComponent TypeASMEVT96-VT;NOEVIDENCEOFLEAKAGEATFINALPLATEAU.LASTPLATEAUWASHELDFOR4HRSATOPERATING TEMPERATURE
&PRESSUREBEFOREWALKDOWN.
ACCEPTABLE.
412100D-BIWD5221STANDBYAUXILIARY FEEDWATER PUMP"D"ASMEVT96-VTrNOEVIDENCEOFLEAKAGE.COMPLETED BOUNDARYTHISOUTAGE-ACCEPTABLE.
414000D-AIWD5221SERVICEWATEROUTSIDECONTAINMENT ASMEVT96-VT;NOEVIDENCEOFLEAKAGE.COMPLETED BOUNDARYTHISOUTAGE.-ACCEPTABLE.
415600C-H,IWC5221PRESSURIZER (TRC01)CLASS2INSTRUMENTATION ASMEVT96-VTf-ACCEPTABLE.
415650C-HIWC5221RPV(RPC01)CLASS2INSTRUMENTATION ASMEVT96-VT;-ACCEPTABLE.
38
,0 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Znterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT IF.STEAMGENERATOR EDDYCURRENTEXAMINATIONS:
Fl.STEAMGENERATOR ADRAWINGS:
N/ASummaryNumberExamItemCategNumberComponent Component TypeNDEExam802500B-QB16.20OPENGENERATOR TUBESBOBBINCOIL-100%FULLLENGTHASMEETET96-ET;SEE1996S/GEDDYCURRENTFINALREPORT&BWZFINALREPORTFORDETAILS,-ACCEPTABLE.
802600SG-ET----OPENGENERATOR TUBESOEETPERIPHERAL TUBESET96-ET'EE1996S/GEDDYCURRENTFINALREPORT&BWIFINALREPORTFORDETAILS,-ACCEPTABLE.
F2.STEAMGENERATOR BDRAWINGS:
N/ASummaryNumberItemCategNumberComponent Component TypeNDEExam803500B-QB16.20OPENGENERATOR TUBESBOBBINCOIL-100'8FULLLENGTHETET96-ETSEE1996S/GEDDYCURRENTFINALREPORT&BWIFINALREPORTFORDETAZLS,-ACCEPTABLE.
803600SG-ET----OPENGENERATOR TUBESOEETPERIPHERAL TUBESET96-ET;SEE1996S/GEDDYCURRENTFINALREPORT&BWIFINALREPORTFORDETAILS,-ACCEPTABLE.
39
,S R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Gi.nna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT IG.SNUBBERPROGRAMCOMPONENTS:
Gl.STEAMGENERATOR ADRAWINGS:
A-7FSummaryNumberItemCategNumberComponent Component TypeExam600080SN-VTSGA-7HYDRAULIC SNUBBERAUGVT96VTSSETTING381/8fS/N7728073ANORECORDABLE 1NDICATIONS ACCEPTABLE.
600090SN-VT----SGA-8HYDRAULIC SNUBBERAUGVT96VTSSETTING381/49S/N7728073ANORECORDABLE INDICATIONS ACCEPTABLE.aa600091SN-FT----SGA-8HYDRAULIC SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
G2.STEAMGENERATOR BDRAWINGS:
A-7FSummaryNumber600120.,SN-VTSGB-3HYDRAULIC SNUBBERExamItemCategNumberComponent Component TypeAUGNDEExamVT96VTSETTING381/2fS/N7728073ANORECORDABLE INDICATIONS ACCEPTABLE.
600130SN-VT----SGB-4HYDRAULIC SNUBBERAUGVT96-VT;SETTING383/8",S/N=7728073-A.
NORECORDABLE INDICATIONS
-ACCEPTABLE.
a40 J!
R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G3.TURBINEDRIVENAUX.FWPUMPSUCTIONDRAWINGS:
C-16SummaryNumberExamItemCategNumberComponent Component TypeExam600200SN-VTAFU-3MECHANICAL SNUBBERAUGVT96VTrSETTING29S/N209259NORECORDABLE INDICATIONSACCEPTABLE G4.AUX.FWPUMPSDZSCH-ZNTERMED~BLDG.DRAWINGS:
C-1ESummaryNumberExamItemCategNumberComponent Component TypeNDEExam600220SN-VTAFU-31MECHANICAL SNUBBERAUGVT96VTS'ETTING 23/49S/N244529NORECORDABLE INDICATIONS ACCEPTABLE
~600240SN-VT----AFU-34MECHANZCAL SNUBBERAUGVT96VTSETTING23/49'/N144489NORECORDABLE INDICATIONS ACCEPTABLE
~600260SN-VT----AFU-52MECHANICAL SNUBBERAUGVT96VTSSETTING13/49S/N244539NORECORDABLE INDICATIONS ACCEPTABLE
~600280SN-VT----AFU-75MECHANICAL SNUBBERAUGVT96-VT;SETTING21/8",S/N=20924,NORECORDABLE INDICATIONS
-ACCEPTABLE.
r
,
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.;Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G4.AUX.FWPUMPSDZSCH-ZNTERMED.
BLDG.(CONT.)DRAWINGS:
C-1ESummaryNumberEtiamCategItemNumberComponent Component Type600300SN-VT----AFU-98AUGMECHANICAL SNUBBERVT96-VT;SETTING19/16",S/N=24454,NORECORDABLE INDICATIONS
-ACCEPTABLE'00320 SN-VTAFU-101MECHANICAL SNUBBERAUGVT96VTSSETTING33/8fS/N157519NORECORDABLE INDICATIONSACCEPTABLE
~600339SN-VT----AFU-103(EAST)MECHANICAL SNUBBERAUGVT96VTSETTING3fS/N18184fNORECORDABLE INDZCATIONS ACCEPTABLE
~VT600340SN-VT----AFU-103(WEST)AUGMECHANICAL SNUBBER96-VT;SETTING31/2",S/N=18185,NORECORDABLE INDICATIONS
-ACCEPTABLE.
600360SN-VT----AFU-109HYDRAULIC SNUBBERAUGVT96VTJSETTING21/4fS/N30986NORECORDABLE INDICATIONS ACCEPTABLE
~600380SN-VT----AFU-111MECHANICAL SNUBBERAUGVT96VTSETTING21/16fS/N16377fNORECORDABLE INDICATIONS ACCEPTABLE 600400SN-VT----AFU-123MECHANICAL SNUBBERAUGVT96-VT;SETTING15/8",S/N=22485,NORECORDABLE INDICATIONS
-ACCEPTABLE.
42 0
-R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G4.AUX.FWPUMPSDISCH-1NTERMED.
BLDG.(CONT.)DRAWZNGS:
C-1ESummaryNumberExamItemCategNumberComponent Component Type600420SN-VTAFU-124MECHANICAL SNUBBERAUGVT96VTaSETTING2fS/N24451fNORECORDABLE INDICATIONS ACCEPTABLE G5.STEAMGENERATOR BBLOWDOWNLINEDRAWINGS:
B-31SummaryNumberItemExamCategNumberComponent Component TypeCSSZXNCSCBSNS600460SN-VTBDU-16MECHANICAL SNUBBERAUGVTVTaREJLOOSENUTSfMZSALIGNMENT ACTIONREPORTS9602469034590426&0535GENERATED DISPOSITIONOFACTIONREPORTS&MECHENGSMEMOACCEPT.SETTING=2 3/4"HOT,11/2"COLD.S/N=10182.VT-ACCEPT.
SERVICEINDUCED-SNUBBER PROGRAMREQUIREMENTS.
G6.AUX.COOLLINE4S-AC6-152 DRAWINGS:
B-29SummaryNumber600530ExamItemCategNumberComponent RRRRRSSR%%%ASSSN-VTCCU-43MECHANICAL SNUBBERComponent TypeMSSAUGNDEExamVT96-VT'ETTING 15/8",S/N=11462,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G7.AUX.COOLSYS.FRM.PUMP COOLOUT.TOPEN126DRAWINGS'-34 SummaryNumberExamCategItemNumberComponent Component TypeNDEExam600610SN-VT----CCU-57AUGMECHANICAL SNUBBERVT96VTa'ETTING21/29S/N181949NORECORDABLE INDICATIONS ACCEPTABLE
.43 0
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZSNUBBERPROGRAMCOMPONENTS (CONT.)G8.AUX.COOLL1NE4T-AC6-152 DRAWINGS:
B-30SummaryNumberExamCategItemNumberComponent Component Type600710SN-VTCCU-71MECHANICAL SNUBBERAUGVT96VTrSETTING21/2fS/N181939NORECORDABLE INDICATIONS ACCEPTABLE G9.2"LETDOWNTOREGENHTXDRAWINGS:
A-23SummaryNumberExamItemCategNumberComponent Component Type600880SN-VTCVU-26MECHANICAL SNUBBERAUGVT96VTSETTING29S/N20880fNORECORDABLE INDICATIONS ACCEPTABLE G10~2"CHARGINGTOREGENHTXDRAWINGS:
A-30SummaryNumber600900ExamCategSN-VTItemNumberComponent CVU-46MECHANICAL SNUBBERComponent TypeAUG.NDEExamVT96VTrSETTZNG29S/N385559NORECORDABLE INDICATIONS ACCEPTABLE G11.2"ALTERNATE CHARGINGTOLOOPBHOTLEGDRAWINGS'-27 SummaryNumber600920ExamCategItemNumberComponent SN-VT----CVU-49MECHANICAL SNUBBERComponent TypeAUGVT96-VT;SETTING11/2",S/N=9483,NORECORDABLE INDICATIONS
-ACCEPTABLE.
i4 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~oui1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G12.2"CVCSRELZEFLINETOPRTDRAWINGS:
B-32SummaryNumberItemCategNumberComponent Component Type600940SN-VTCVU-80MECHANICAL SNUBBERAUGVT96VTrSETTING11/29S/N235189NORECORDABLE INDICATIONS ACCEPTABLE G13.SEALWATERTORCP-BDRAWINGS'-32 SummaryNumberExamItemCategNumberComponent Component Type600960SN-VTCVU-103MECHANICAL SNUBBERAUGVT96VTeSETTING21/89S/N244509NORECORDABLE
&INSIGNIFICANT ACCEPTABLE.VT600980SN-VT----CVU-104AUGMECHANICAL SNUBBER96VTaSETTING29S/N24499NORECORDABLE INDICATIONS ACCEPTABLE
~G14.SEALWATERRETURNFROMRCP-ADRAWINGS:
B-34SummaryNumber9OCSBB601000ExamItemCategNumberComponent RRBBBBBSBSBB K%RBB9KDKRmt9BBBBKComponent TypeNDEExamSN-VT----CVU-186AUGVTMECHANICAL SNUBBER96VTeSETTING149S/N'65419NORECORDABLE INDICATZONSACCEPTABLE
~45
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G15.2"LETDOWNLINETONON-REGEN HTXDRAWINGS:
B-35SummaryNumberItemCategNumberComponent Component Type601040SN-VTCVU-345MECHANICAL SNUBBERAUGVT96VTSETTING11/49S/N94919NORECORDABLE INDICATIONS ACCEPTABLE 601060SN-VT----CVU-351MECHANICAL SNUBBERAUGVT96VTSETTING3/49S/N94729NORECORDABLE INDICATIONS ACCEPTABLE G16.CVCSLETDOWNLINETOMZXBEDDEMZNDRAWZNGS:
B-36SummaryNumberExamCateg601080SN-VTItemNumberComponent SNCVU-372MECHANZCAL SNUBBERAUGVTComponent TypeExam96VTr'ETTING 3/49S/N94789NORECORDABLE INDICATIONS ACCEPTABLE
~G17.FEEDWATER LOOPAINSIDECVDRAWZNGS:
B-12SummaryNumber601100ExamZternCategNumberComponent SN-VTFWU-3HYDRAULIC SNUBBERComponent TypeAUGVT96-VT;SETTING41/8",S/N438629REJECTr'EAVY OILRESIDUESACTIONREPORT96-0466GENERA/ED.
RE-EXAM-NORECORDABLE INDICATIONS
-ACCEPTABLE.
SNUBBERWASREPLACED.
SNUBBERPROGRAMREQUIREMENTS APPLY.46
,Illt R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas6ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G17.FEEDWATER LOOPAINSIDECV(CONT.)DRAWZNGS:
B-12Summary'umberExamZternCategNumberComponent Component Type601110SN-VTFWU-5HYDRAULIC SNUBBERAUGVT96-VT;REJECT;IMPROPERSETTING.ACTIONREPORT96-0590GENERATED.
SETTINGACCEPTEDBYMECH'NGMEMOSSETTING37/89S/N2500101529NORECORDABLE INDICATIONS
-,ACCEPTABLE.
SNUBBERPROGRAMREQUIREMENTS APPLY.G18.FEEDWATER LOOPBINSIDECVDRAWINGS:
B-13SummaryNumberExamItemCategNumberComponent Component Type601120SN-VTFWU-8MECHANICAL SNUBBERAUGVT96-VT;SETTING21/4",S/N=8033,NORECORDABLE INDICATZONS
-ACCEPTABLE.
601130SN-VT----FWU-12MECHANICAL SNUBBERAUGVT96VTrSETTING31/49S/N80349NORECORDABLE INDICATIONS ACCEPTABLE.
G19.FEEDWATER LOOPAOUTSIDECVDRAWINGS:
B-11SummaryNumberExamCategItemNumberComponent Component Type601140SN-VTFWU-15~MECHANICAL SNUBBERAUGVT96VTaSETTING25/89S/N93589NORECORDABLE INDICATIONS ACCEPTABLE
~
li R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492~PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/AB.Commercial ServiceDate~Jul19706.National BoardNumberforUnitN/RATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G19~FEEDWATER LOOPAOUTSIDECV(CONT~)DRAWINGSB-11SummaryNumberExamCategItemNumberComponent Component TypeExam601150SN-VTFWU-17MECHANICAL SNUBBERAUGVT96VTr'ETTING 43/49S/N93929NORECORDABLE
&INSZGNZFICANTf CORROSION STAINSONPAINTEDSURFACE-ACCEPTABLE.
601160SN-VT----FWU-18MECHANICAL SNUBBERAUGVT96VTr'ETTING 31/29S/N70679NORECORDABLE INDICATIONS ACCEPTABLE'01161 SN-FT----FWU-18MECHANICAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE'01170 SN-VT----FWU-20MECHANICAL SNUBBERAUGVT96VTrSETTING13/4rS/N70499NORECORDABLE ZNDICATZONS ACCEPTABLE 601180SN-VT----FWU-21HYDRAULIC SNUBBERAUGVT96-VTrSETTING313/16",S/N=2500-20-38, NORECORDABLE
&INSIGNIFICANT; FLUIDLEVELDOESNOTCORRESPOND WITHSNUBBERPISTONBY1"-ACCEPTABLE.
601190SN-VTFWU-23MECHANICAL SNUBBERAUGVT96VTrSETTING4fS/N86309NORECORDABLE INDICATIONS ACCEPTABLE.
R.E.GZNNANUCLEARPOWERPLANTInservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas6ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~oui1970S.National BoardNumberforUnitN/RATTACHMENT SNUBBERPROGRAMCOMPONENTS (CONT.)G19.FEEDWATER LOOPAOUTSIDECV(CONT.)DRAWINGS:
B-11SummaryNumberExamCategItemNumberComponent Component TypeExam601191SN-FTFWU-23MECHANICAL SNUBBERAUGFT96-FT'UNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
601200SN-VT----FWU-24MECHANICAL SNUBBERAUGVT96-VT:SETTING31/32",S/N=10061,NORECORDABLE INDICATIONS
-ACCEPTABLE.
601209SN-VT----FWU-26(EAST)MECHANICAL'NUBBER AUGVT96VTaSETTING3fS/N18179fNORECORDABLE ZNDZCATZONS ACCEPTABLE 601210SN-VT----FWU-26(WEST)MECHANICAL SNUBBERAUGVT96VTaSETTING3fS/N18180fNORECORDABLE INDICATIONS ACCEPTABLE G20.FEEDWATER LOOPBOUTSIDECVDRAWINGS:
HE-5SummaryNumber601220ExamCategSN-VTZternNumber'omponent FWU-32MECHANICAL SNUBBERComponent TypeAUGVT96VTrSETTING31/4fS/N=7053fNORECORDABLE
&ZNSIGNIFZCANTaZDTAGBROKEN-ACCEPTABLE.
49 iVt R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G20.FEEDWATER LOOPBOUTSIDECV(CONT.)DRAWINGS:
HE-5SummaryNumberExamItemCategNumberComponent Component TypeNDEExam601230SN-VT----FWU-38AUGMECHANICAL SNUBBERVT96VT/SETTING39/16/S/N9395/NORECORDABLE INDICATIONS ACCEPTABLE 601240SN-VT----FWU-39MECHANICAL SNUBBERAUGVT96VT!SETTING4/S/N9854516429NORECORDABLE INDICATZONS ACCEPTABLE 601250SN-VT----FWU-40MECHANICAL SNUBBERAUGVT96VT/'ETTING31/2/S/N70669NORECORDABLE
&INSZGNZFZCANTfBROKENIDTAG-ACCEPTABLE.
601260SN-VT----FWU-42MECHANICAL SNUBBERAUGVT96VT/SETTING41/49S/N61599NORECORDABLE INDICATIONSACCEPTABLE 601261SN-FT----FWU-42MECHANICAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
601270SN-VT----FWU-44HYDRAULIC SNUBBERAUGVT96-VT;SETTING3)/8"fS/N=G43864-02-20, NORECORDABLE INDICATIONS ACCEPTABLE.
50
R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990"1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ZSNUBBERPROGRAMCOMPONENTS (CONT.):G20.FEEDWATER LOOPBOUTSIDECV(CONT.)DRAWINGS:
HE-5SummaryNumberItemCategNumberComponent Component TypeNDEExam601280=SN-VTFWU-47MECHANICAL SNUBBERAUGVTa96VTSETTING45/86S/N74749INSIGNIFICANTACTIONREPORT960513GENERATED FORRIPPEDBOOT-ACCEPTABLE.
601290SN-VT----FWU-48MECHANICAL SNUBBERAUGVT96-VT;SETTING41/2",S/N47856REJECTaACTIONREPORT960513GENERATED
.TOADDRESSRADIALMOVEMENTOFSNUBBER.RE-EXAMAFTERCORRECTIONS ACCEPTABLE.
NOTSERVICEINDUCED.SNUBBERPROGRAMREQUIREMENTS APPLY.601300SN-VT----FWU-51AUGMECHANICAL SNUBBERVT96-VTvSETTING41/2",S/N=7483,NORECORDABLE
&INSIGNZFZCANTf'IGEON FECES-ACCEPTABLE.
601310SN-VT----FWU-52MECHANICAL SNUBBERAUGVT96VTaSETTING31/86S/N66079NORECORDABLE
&INSIGNIFICANT!
PIGEONFECES-ACCEPTABLE.
601320SN-VT-"--FWU-54MECHANICAL SNUBBERAUGVT96VTaSETTING46S/N74826NORECORDABLE
&INSIGNIFICANT!PIGEONFECESACCEPTABLE
.51 i
R.E.GINNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G20.FEEDWATER LOOPBOUTS1'DECV(CONT.)DRAWINGS:
HE-5SummaryExam1ternNumberCategNumberComponent Component Type601330SN-VTFWU-57MECHANICAL SNUBBERAUGVT96VTrSETTING3ACCEPTABLE.
S/N10064/NORECORDABLE
&ZNSIGNIFICANT/PIGEONFECESG21.MAINSTEAMLOOPAINSIDECVDRAWINGS:
B-8SummaryNumberExamItemCategNumberComponent Component Type601350SN-VT----MSU-2AUGMECHANICAL SNUBBERVT96VTrSETTING33/4/S/N70879NORECORDABLE INDICATIONS ACCEPTABLE 601360SN-VT----MSU-3MECHANICAL SNUBBERAUGVT96VT/'ETTING 39S/N7060/NORECORDABLE INDICATIONS ACCEPTABLE.
G22.MAINSTEAMLOOPBINSIDECVDRAWINGS:
B-8SummaryNumber601369ExamCategSN-VTItemNumberComponent SBMSU-7(TOP/WEST)
MECHANICAL SNUBBERComponent TypeAUGVT96-VT;SETTING28/4",S/N=7051,NORECORDABLE ZNDICATIONS
-ACCEPTABLE.
52
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.commercial BerviceDate~cul19706.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G22.MAINSTEAMLOOPBINSIDECV(CONT.)DRAWINGS:
B-8SummaryNumberExamItemCategNumberComponent Component Type601370SN-VTMSU-7(BOTTOM/EAST)
MECHANICAL SNUBBERAUGVT96VT!SETTING3rS/N7047/NORECORDABLE INDICATIONS ACCEPTABLE
~601380SN-VT----MSU-8HYDRAULIC SNUBBERAUGVT96-VT'EJECT; ACTIONREPORT96-0465GENERATED FORINCORRECT SETTING&LACKOF2THREADSFORFULLENGAGEMENT.
RE-EXAMAFTERCORRECTIONS.
NORECORDABLE INDICATIONS
-ACCEPTABLE.
SETTING3",S/N=G20968130.
NOTSERVICEINDUCED.SNUBBERPROGRAMREQUIREMENTS APPLY.G23.MAINSTEAMLOOPBOUTSIDECVDRAWINGS:
B-10ASummaryNumberExamCategItemNumberComponent Component Type601390SN-VT----MSU-12MECHANICAL SNUBBERVT96VT/SETTING35/8fS/N9400/NORECORDABLE
&INSIGNIFICANT/PIGEONFECES-ACCEPTABLE.
601399SN-VT----MSU-13(EAST)MECHANICAL SNUBBERAUGVT96-VT;SETTING31/8",S/N=1467,NORECORDABLE
&INSIGNIFICANT, PIGEONFECES-ACCEPTABLE.
601400SN-VT----MSU-13,(WEST)
MECHANICAL SNUBBERAUGVT96-VT;SETTING33/8",S/N=1464,NORECORDABLE
&INSIGNIFICANT, PIGEONFECES-ACCEPTABLE.
53 i
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberfoeUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G23.MAINSTEAMLOOPBOUTSIDECV(CONT.)DRAWZNGS:
B-10ASummaryNumberItemExamCategNumberComponent Component Type601409SN-VTMSU-15(NORTH)MECHANICAL SNUBBERAUGVT96VTSETTING33/8IS/N7476INORECORDABLE
&INSIGNIFZCANTIPIGEONFECES-ACCEPTABLE.
601410SN-VT----MSU-15(SOUTH)MECHANICAL SNUBBERAUGVT96VTSSETTING37/86S/N74779NORECORDABLE
&INSIGNIFICANTsPIGEONFECES-ACCEPTABLE.
601419SN-VT----MSU-16(NORTH)MECHANICAL SNUBBERAUGVT96-VT;REJECT;ACTIONREPORT96-0534GENERATED FORINCORRECT SETTING.SETTINGSACCEPTABLE PERACTIONREPORT&MECHENGMEMO.SETTINGSHOT=35/8",COLD=31/8";S/N=7481.NORECORDABLE
&INSIGNZFZCANT-PIGEONFECES-ACCEPTABLE.
SNUBBERPROGRAMREQUIREMENTS APPLY.601420SN-VT----MSU-16(SOUTH)MECHANICAL SNUBBERAUGVT96-VTSREJECT:ACTIONREPORT96-0534GENERATED TOADDRESSSETTING.SETTINGSACCEPTABLE PERACTIONREPORT&MECHENGMEMO.SETTZNGSS'OT
=43/16'OLD=33/4".S/N=7480.NORECORDABLE
&INSIGNIFICANT-PIGEON FECES-ACCEPT.
SNUBBERPROGRAMREQUIREMENTS APPLY.601429SN-VT----MSU-18(NORTH)MECHANICAL SNUBBERVT96VTSSETTING21/46S/N-7478INORECORDABLE
&INSZGNIFICANTsPIGEONFECES-ACCEPTABLE.
54 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Znterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G23.MAINSTEAMLOOPBOUTSIDECV(CONT.)DRAWINGS:
B-10ASummaryNumber601430SN-VTMSU-18(SOUTH)MECHANICAL SNUBBERItemCategNumberComponent Component TypeAUGNDEExamVT96VTrSETTING21/29S/N71976NORECORDABLE
&INSIGNIFICANT SPIGEONFECES-ACCEPTABLE.
601432SN-FT----,MSU-18(SOUTH)MECHANICAL SNUBBERAUGFT96-FTrTESTREQUIREDDUETOFUNCTIONAL TESTFAILUREIN1996.SNUBBERTESTEDOPERABLE.
601439SN-VT----MSU-19(NORTH)MECHANICAL SNUBBERAUGVT96VTrSETTING36S/N9369fNORECORDABLE
&INSIGNIFICANTS PIGEONFECESACCEPTABLE.
601440SN-VT----MSU-19(SOUTH)MECHANICAL SNUBBERAUGVT96-VT;SETTING27/8",S/N=9372,NORECORDABLE
&INSIGNIFICANT
-PIGEONFECES-ACCEPTABLE.
601441SN-FT----MSU-19(NORTH)MECHANICAL SNUBBERAUGFT96-FTr'UNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
601442SN-FT----MSU-19(SOUTH)MECHANICAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
55
,
R.E~GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990"1999
- Znterval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/A5.Commercial ServiceDate~cul19706.National BoardNumberforUnitN/AATTACHMENT ZSNUBBERPROGRAMCOMPONENTS (CONT.)G23.MAZNSTEAMLOOPBOUTSZDECV(CONT.)DRAWINGS:
B-10ASummaryNumberItemCategNumberComponent Component TypeNDEExam601450SN-VTMSU-22MECHANICAL SNUBBERAUGVT96VTaSETTING21/8fS/N93579NORECORDABLE
&INSZGNIFZCANTfPIGEONFECES-ACCEPTABLE.
601451SN-FT----MSU-22MECHANICAL SNUBBERAUG96-FTrFUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
601460SN-VT----MSU-25MECHANICAL SNUBBERVT96-VT;SETTING13/4",S/N=1465,NORECORDABLE
&INSIGNIFICANT, PIGEONFECES-ACCEPTABLE.
601469SN-VT----MSU-26(TOP)MECHANICAL SNUBBERAUGVT96-VT;SETTING5",S/N=9355,NORECORDABLE
&INSIGNIFICANT, PIGEONFECESACCEPTABLE..
601470SN-VT----MSU-26(BOTTOM)AUGVTMECHANICAL SNUBBER96VTrSETTING43/4fS/N46869NORECORDABLE
&INSIGNIFZCANT9PIGEONFECES-ACCEPTABLE.
601480SN-VT----MSU-27~MECHANICAL SNUBBERAUGVT96-VT;SETTING1",S/N=9398,NORECORDABLE
&INSIGNIFICANT, PIGEONFECESACCEPTABLE.
56
,l R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990"1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G23.MAINSTEAMLOOPBOUTSIDECV(CONT.)DRAWINGS:
B-10ASummaryNumberExamItemCategNumberComponent Component Type601490SN-VT----MSU-29AUGVTMECHANZCAL SNUBBER96-VT;SETTING41/4",S/N=1469,NORECORDABLE INDICATIONS
-ACCEPTABLE.
601500SN"VT----MSU-31MECHANICAL SNUBBERAUGVT96VTr'ETTING 21/29S/N93569NORECORDABLE INDICATIONS ACCEPTABLE 601510SN-VT----MSU-32MECHANICAL SNUBBERAUGVT96-VTr'ETTING 23/8",S/N=1093,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G24.MAINSTEAMLOOPAOUTSIDECVDRAWINGS:
B-9ASummaryNumber601520ExamZtemCategNumberComponent SN-VT----MSU-38MECHANICAL SNUBBERComponent TypeAUGNDEExamVT96VTrSETTING15/89S/N1090fNORECORDABLE INDICATIONSACCEPTABLE 601530SN-VT----MSU-39MECHANICAL SNUBBERAUGVT96VTSETTING43/49S/N10879NORECORDABLE INDICATIONS ACCEPTABLE
~601540SN-VT----MSU-40MECHANICAL SNUBBERAUGVT96-VTaSETTING45/8",S/N=1080,NORECORDABLE INDICATIONS
-ACCEPTABLE.
57
R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G24.MAINSTEAMLOOPAOUTSIDECV(CONT.)DRAWINGS:
B-9ASummaryNumberExamCategItemNumberComponent Component TypeExam601550SN-VTMSU-44MECHANICAL SNUBBERAUGVT96VTSETTING31/89S/N1468fNORECORDABLE
&INSIGNIFICANTfSNUBBERSCALEHASPAINTOVERSPRAY,
-ACCEPTABLE.
G25.MAINSTEAMLOOPBATMOSPHERIC VENTDRAWINGS:
B-10SummaryNumberExamItemCategNumberComponent Component Type601560SN-VTMSU-55MECHANICAL SNUBBERAUGVT96-VT;REJECT;ACTIONREPORT96-0518GENERATED.
SNUBBERINSTALLED BACKWARDS.
DCR'S96-0146/0147 GENERATED, DRAWINGTOBECHANGEDTOREFLECTCONFIGURATION.
NORECORDABLE INDICATIONS
-ACCEPTABLE.
SETTING23/4",S/N=18195.601570SN-VT----MSU-57MECHANICAL SNUBBERAUGVT96VTaSETTING31/4fS/N271829NORECORDABLE ZNDZCATIONS ACCEPTABLE.
601571SN-FT----MSU-57MECHANICAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDDUETOFAILUREIN1995.SNUBBERTESTEDOPERABLE.
58 I:li0I R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G26.MAINSTEAMLOOPAATMOSPHERIC VENTDRAWINGS:
B-9ASummaryNumbermar-ra601580ExamItemCategNumberComponent KKKBBDKKBBBBBBR~ÃKRRRKRKBBComponent TypeSN-VT----MSU-58AUGMECHANICAL SNUBBERVT96VTaSETTING31/8fS/N181879NORECORDABLE INDICATIONS ACCEPTABLE.601581SN-FT----MSU-58MECHANICAL SNUBBERAUGFT96-FTFUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
601590SN-VT----MSU-60MECHANICAL SNUBBERAUGVT96-VT;SETTING21/2",S/N=18197,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G27.MAINSTEAMLOOPBTOAUXFWPUMPTURBZNEDRAWINGS:
C-32SummaryNumberExamItemCategNumberComponent BBBBMMBBComponent TypeNDEExam601600SN-VT----MSU-72AUGMECHANICAL SNUBBERVT96VTaSETTING15/8fS/N157679NORECORDABLE INDICATIONSACCEPTABLE
~601601SN-FT----MSU-72MECHANICAL SNUBBERAUGFT96-FT'UNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
59 j~
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZSNUBBERPROGRAMCOMPONENTS (CONT".)G27.MAINSTEAMLOOPBTOAUXFWPUMPTURBINE(CONT.)DRAWINGS:
C-32SummaryNumberExamItemCategNumberComponent Component Type601610SN-VTMSU-74MECHANICAL SNUBBERAUGVT96VTSETTING31/4fS/N100669NORECORDABLE INDICATIONS ACCEPTABLE
~G28.MAINSTEAMLOOPBATMOSPHERIC VENTDRAWINGS'-10SummaryNumber601620SN-VTMSU-75MECHANICAL SNUBBERItemCategNumberComponent Component TypeAUGVT96VTrSETTZNG29S/N80309NORECORDABLE INDICATZONSACCEPTABLE aG29.MAINSTEAMLOOPATOAUXFWPUMPTURBINEDRAWINGS:
C-32SummaryNumber601630ExamItemCategNumber~BBMBBMSN-VTComponent MSU-78MECHANICAL SNUBBERComponent TypeAUGVT96VTeSETTING39S/N85799NORECORDABLE INDICATIONS ACCEPTABLE 601640SN-VT----MSU-80MECHANICAL SNUBBERAUGVT96-VT;SETTING21416",S/N.=18181,NORECORDABLE INDICATIONS
-ACCEPTABLE.
60 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZSNUBBERPROGRAMCOMPONENTS (CONT.):G29.MAINSTEAMLOOPATOAUXFWPUMPTURBINE(CONT.)DRAW1NGS:
C-32SummaryNumberExamCategSNItemNumberComponent Component Typeaaraagama=amNDEExam601650SN-VTMSU-82MECHANICAL SNUBBERVT96VTaSETTING27/8fS/N157689NORECORDABLE INDICATIONS ACCEPTABLE.
601659SN-VT----MSU-84(EAST)MECHANICAL SNUBBERAUGVT96VTSETTING21/2fS/N101089NORECORDABLE INDICATIONS ACCEPTABLE.
601660SN-VT----MSU-84(WEST)MECHANICAL SNUBBERAUGVT96VTfSETTING21/8fS/N-101419NORECORDABLE INDICATIONS ACCEPTABLE.
601670SN-VT----MSU-85MECHANICAL SNUBBERAUGVT96-VTr'ETTING 31/4",S/N=10074,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G30.6-ZN.RESZDHTREMOVALTORPV(LHSZ)DRAWINGS:
B-17SummaryNumber601680'RKKKKSSSN BBRSBSRBSRSN-VTRHU-8MECHANICAL SNUBBERExamItemCategNumberComponent Component TypeMSBAUGNDEExamVT96-VT:SETTING21/2",S/N=15755,NORECORDABLE INDICATIONS
-ACCEPTABLE.
61
/
R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Znterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoadOntarioNY145193.PlantUnit14.O~nerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G31.RESIDUALHEATREMOVALFROMLOOPAHOTLEGDRAWINGS:
A-15SummaryNumberExamItemCategNumberComponent Component TypeNDEExam601690SN-VT----RHU-30AUGMECHANICAL SNUBBERVT96-VTfSETTING11/16",S/N=7065,NORECORDABLE INDICATIONS ACCEPTABLE.
601700SN-VT----RHU-33MECHANICAL SNUBBERAUGVT96-VT;SETTING31/8".S/N=7064,REJECT:SNUBBERLOCKNUTWRONGWIDTHACCEPTABLE PERMECHENGMEMO,NORECORDABLE INDICATIONS
-ACCEPTABLE.
SNUBBERPROGRAMREQUIREMENTS APPLY.G32.RESIDUALHEATREMOVALLZNE8B-AC-601 DRAWINGS:
B-23SummaryNumber601710ExamItemCategNumberSN-VTComponent RHU-36MECHANICAL SNUBBERComponent TypeAUGVT96VTrSETTING21/29S/N157569NORECORDABLE INDICATIONSACCEPTABLE
~G33.RESIDUALHEATREMOVALTOLOOPBCOLDLEGDRAWINGS'-25SummaryNumber60172096ExamItemCategNumberComponent SN-VT----RHU-51MECHANICAL SNUBBER-VT;SETTING23/8",S/N=15752,NOComponent TypeAUGVTRECORDABLE INDICATIONS
-ACCEPTABLE.
62
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970B.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G33.RESIDUALHEATREMOVALTOLOOPBCOLDLEG(CONT.)DRAWZNGS:
'-25SummaryNumberExamItemCategNumberComponent Component Type601730SN-VT----RHU-53AUGMECHANICAL SNUBBERVT96VTaSETTING25/8fS/N15754fNORECORDABLE INDICATIONS ACCEPTABLE G34.RESIDUALHEATREMOVALLZNE6D-AC-601 DRAWINGS:
B-26SummaryNumberZtemCategNumberComponent Component TypeNDEExam601740SN-VT----RHU-61AUGMECHANICAL SNUBBERVT96VTSETTING23/8fS/N15733fNORECORDABLE INDICATIONSACCEPTABLE
~G35.RESIDUALHEATREMOVALLINE10E-AC-601 DRAWINGS:
B-20SummaryNumber601749Exam'CategSN-VTItemNumberComponent RHU-63(NORTH)MECHANICAL SNUBBERComponent TypeAUGmtNDEExamVT96VTaSETTING23/4fS/N16380fNORECORDABLE INDICATIONS ACCEPTABLE 601750SN-VT----RHU-63(SOUTH)MECHANICAL SNUBBERAUGVT96-VT:SETTING215/16",S/N=16375,NORECORDABLE INDICATIONS ACCEPTABLE.
63
'
R.E.GINNANUCLEARPOWERPLANTInservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G36.RESIDUALHEATREMOVALLINE10G-AC-601 DRAWINGS:
B-20ASummaryNumberExamItemCategNumberComponent Component TypeNDEExam601760SN-VT----RHU-69MECHANICAL SNUBBERAUGVT96VTSETTZNG21/4/S/N8629/NORECORDABLE INDICATIONS ACCEPTABLE
~601769SN-VT----RHU<<71(NORTH)MECHANICAL SNUBBERAUGVT96VT/SETTING27/16/S/N11466/NORECORDABLE INDICATIONS ACCEPTABLE
~AUG601770SN-VT----RHU-71(SOUTH)VTMECHANICAL SNUBBER96-VT/SETTING21/2",S/N=11465,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G37.RHRPUMPASUCTIONLINEDRAWINGS:
B-20ASummaryNumber601780ExamItemCategNumberSN-VTComponent RHU-72MECHANICAL SNUBBERComponent TypeAUGVT96VTJSETTING31/8/S/N8606/NORECORDABLE INDICATIONS ACCEPTABLE 64
R."E.GINNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY14649.2.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G38.RESIDUALHEATREMOVALLINE10D-AC-601 DRAWZNGS:
B-20SummaryNumberItemCategNumberComponent Component TypeExam601790SN-VTRHU-75MECHANICAL SNUBBERAUGVT96VTaSETTING37/169S/N86329NORECORDABLE
&INSIGNIFICANTSLIGHTCORROSION, MEDIUMTOHEAVYRUSTONBASEPLATE&FLOOR.T/CGENERATED AFTERCLEANUP-ACCEPTABLE'39.
RESIDUALHEATREMOVALLINE6K-AC-151 DRAWINGS:
B-21SummaryNumber601800ExamCategSN-VTItemNumberComponent RHU-92MECHANICAL SNUBBERComponent TypeSNAUGVT96VTSETTING21/49S/N163769NORECORDABLE
&INSIGNIFICANTSDRYBORICACIDRESIDUEONBASEPLATE~T/CGENERATED.
AFTERCLEANUP-ACCEPTABLE.
G40.H.P.SAFETYINJECTION LINEFROMRWSTDRAWINGS'-19SummaryNumberExamItemCategNumberComponent Component Type601810SN-VT----RHU-109AUGMECHANICAL SNUBBERVT96-VT;SETTING21/8",S/N=11463,NORECORDABLE INDICATIONS
-ACCEPTABLE'01811 SN-FT--RHU-109MECHANiCAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
65 l
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/A5.Commercial ServiceDate~cul1970B.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G40.H.P.SAFETYINJECTION LINEFROMRWST(CONT.)DRAWINGS:
B-19SummaryNumberItemCategNumberComponent Component Type601820SN-VTRHU-110AUGMECHANZCAL SNUBBERNDEExamVT96-VTrSETTING23/16",S/N=16373,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G41.H.P.SAFETYINJECTION PUMPASUCTIONLZNEDRAWZNGS:
B-16BSummaryNumberExam,ZternCategNumberComponent Component Type601830SN-VT-;--RHU-119AUGMECHANICAL SNUBBERVT96VTrSETTING13/49S/N157669NORECORDABLE ZNDICATIONSACCEPTABLE
~G42.H.P.SAFETYINJECTION LINE8J-SZ-151DRAWINGSB-19SummaryNumberExamItemCategNumberComponent SSSSSSSSSSrSrSSSRRSSSSSSComponent TypeMSSSSSSSSSS601840SN-VTRHU-123MECHANICAL SNUBBERAUGVT96-VTr'ETTING 21/2",S/N=15765,NORECORDABLE INDICATIONS
-ACCEPTABLE.
601841SN-FT----RHU-123MECHANICAL SNUBBERAUGFT96-FTrFUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
v'6 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/AS.commercial ServiceDate~Cul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G43.H.P.SAFETYINJECTION LZNETOLOOPACOLDLEGDRAWINGS:
A-17SummaryNumberExamItemCategNumberComponent Component Type601850SN-VT----SIU-3AUGVTMECHANICAL SNUBBER96-VT;SETTING33/16",S/N=8614,NORECORDABLE
&INSIGNIFICANT, NOIDTAG-ACCEPTABLE.
G44.H.P.SAFETYZNJECTZON LINETOLOOPBCOLDLEGDRAWINGS:
A-16SummaryNumberExamItemCategNumberComponent Component Type601860SN-VTSZU-47MECHANICAL SNUBBERAUGVT96-VT;SETTING3",S/N=15349,NORECORDABLE INDZCATIONS
-ACCEPTABLE.
G45.RESIDUALHEATREMOVALTOLOOPBCOLDLEGDRAWINGS:
A-14SummaryNumber601870ItemCategNumberComponent Component TypeaaaannfaSN-VT----SIU-52AUGMECHANICAL SNUBBERNDEExamVT96VTaSETTING21/2fS/N15348fNORECORDABLE INDICATIONS ACCEPTABLE.
G46.SVC.WTR.-TO A&BDIESELGEN.WTR.COOLERS DRAWINGS:
C-13SummaryNumber601890SN-VT~SWU-254MECHANICAL SNUBBERItemCategNumberComponent Component TypeAUGNDEExamVT96VTrSETTING11/8fS/N12508fNORECORDABLE INDICATIONS ACCEPTABLE
~67 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.commercial ServiceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT~):G47.SERVICEWATERLZNE8L-SW-125 DRAWZNGS:
B-SOASummaryNumberItemCategNumberComponent Component Type601900SN-VTSWU-308MECHANICAL SNUBBERAUGVT96VTrSETTING27/89S/N8031fNORECORDABLE INDICATIONS ACCEPTABLE 601910SN-VT----SWU-309MECHANICAL SNUBBERAUGVT96VTrSETTING33/89S/N100739NORECORDABLE INDICATIONS ACCEPTABLE G48.SVC.WTR.-INTMD.BLDG.
16"HD.TOPEN312-320DRAWZNGS:
C-16BSummaryNumberItemCategNumberComponent Component TypeExam601920SN-VT----SWU-370MECHANICAL SNUBBERAUGVT96VTrSETTING21/89S/N114649NORECORDABLE INDICATIONS ACCEPTABLE G49.STANDBYAUXFWTHRUPEN123TOBS/GFWHDZNCVDRAWZNGS:
C-24SummaryNumberaaaBBaBB601930Exam1ternCategNumberComponent aaaaaaaaaaaaaaaanmaaannaaaaaaaaaaaa SN-VT----AFU-205(AFW-10)HYDRAULIC SNUBBERComponent TypeAUGVT96VTrSETTING33/169S/N154039NORECORDABLE
&ZNSIGNZFICANTfFLUIDLEVELAPPROX.70't-ACCEPTABLE.
68 R.E.GZNNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/A6.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G49.STANDBYAUXFWTHRUPEN123TOBS/GFWHDINCV(CONT.)DRAWINGS:
C-24SummaryNumberExamItemCategNumberComponent Component Typem601940SN-VTAFU-208(AFW-13)HYDRAULIC SNUBBERAUGVT96VTSSETTING125/32fS/N129029NORECORDABLE INDICATIONS ACCEPTABLE.
601941SN-FT----AFU-208(AFW-13)HYDRAULIC SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDDUETOFAILUREIN1995.SNUBBERFAILEDFUNCTIONAL TEST.SNUBBERREPLACED.
SNUBBERTOBETESTEDIN1997.GSO.STANDBYAUXFWTHRUPEN119TOAS/GFWHDINCVDRAW1NGS:
C-20SummaryNumberItemExamCategNumberComponent Component Type601970SN-VTAFU-224(AFW-28)HYDRAULIC SNUBBERAUGVT96-VT;SETTING21/2",S/N=12906,NORECORDABLE
&INSIGNIFICANT, FLUIDLEVEL3/4FULL-ACCEPTABLE.
601971SN-FT----AFU-224(AFW-28)HYDRAULIC SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDDUETOFAILUREIN1995.SNUBBERFAILEDFUNCTIONAL TEST.SNUBBERWASRE-BUILT.
SNUBBERWILLBETESTEDIN1997.601980SN-VT----AFU-226(AFW-27)HYDRAULIC SNUBBERAUGVTf'6-VT;REJECT;ACTIONREPORT96-0443GENERATED DUETOSETTINGS.
SETTINGSACCEPTABLE PERACTIONREPORT&MECHENGMEMO.SETTINGSHOT=35/16'OLD=33/4",S/N=12901,NORECORDABLE INDICATIONS
-ACCEPTABLE.
SNUBBERPROGRAMREQUIREMENTS APPLY.69 R.E.GZNNANUCLEARPOWERPLANTZnservice Znspection Report1990-1999
- Znterval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AB.Commercial serviceDate~Jul19706.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G50.STANDBYAUXFWTHRUPEN119TOAS/GFWHDZNCV(CONT.)DRAWINGS:
C-20SummaryNumber601981SN-FTAFU-226(AFW-27)HYDRAULIC SNUBBERItemCategNumberComponent NDEComponent TypeExamAUGFT96-FTaFUNCTIONAL TESTREQUIREDDUETOSCOPEEXPANSZON FUNCTZONAL TESTFAILUREOFAFU-229.SNUBBERTESTEDOPERABLE.
,601990SN-VT----AFU-225(AFW-29)HYDRAULIC SNUBBERAUGVT96VTtSETT1NG13/46S/N129069NORECORDABLE
&INSIGNIFICANTfFLUIDLEVELAPPROX.60%-ACCEPTABLE.
602000SN-VT----AFU-227(AFW-31)MECHANICAL SNUBBERAUGVT96VTaSETTING41/89S/N25594,NORECORDABLE INDICATIONS
-ACCEPTABLE
~602001SN-FT----AFU-227(AFW-31)MECHANICAL SNUBBERAUGFT96-FTaFUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
G51.PRESS.RELIEF PMPRESS.TORELIEFMANIFOLDDRAWINGS:
S-2SummaryNumberSOSSSS602010ExamZternCategNumberComponent SN-VT----N601HYDRAULIC SNUBBERComponent TypeAUGVT96-VT;REJECT;ACTIONREPORT96-0285GENERATED FORLEAKINGOZL&LOOSENUT.ADJUSTMENTS MADE&OILCLEANED.'E-EXAM; NORECORDABLE INDICATIONS ACCEPTABLE.
SETTING39/16"S/N=6565.SNUBBERPROGRAMREQUIREMENTS APPLY.70 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoadOntarioNY145193.PlantUnit1-4.OwnerCertificate ofAuthorization (ZfReq.)N/A5.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G51.PRESS.RELIEF FMPRESS.TORELIEFMANIFOLD(CONT.)DRAWINGS:
S-2SummaryNumberExamCategZtemNumberComponent Component Type602020SN-VT----N602HYDRAULIC SNUBBERAUGVT96VTrSETTING27/16fS/N65686NORECORDABLE
&INSIGNIFICANTS FLUIDLEVEL3/4FULL-ACCEPTABLE.
602030SN-VT----N604HYDRAULIC SNUBBERAUGVT96VTaSETTING13/46S/N65666NORECORDABLE
&ZNSIGNZFICANTS FLUIDLEVEL1/2FULL-ACCEPTABLE.
602040SN-VT----N605HYDRAULIC SNUBBERAUGVTT96VTrSETTING23/4fS/N65616'ORECORDABLE
&INSZGNIFICANTSFLUZDLEVELATLEAST1/2FULL-ACCEPTABLE.
602050SN-VT----N607HYDRAULIC SNUBBERAUGVT96VTSSETTING33/4fS/N65629NORECORDABLE
&INSIGNIFICANTS FLUIDLEVEL1/2FULL-ACCEPTABLE.
602060SN-VT----N608HYDRAULIC SNUBBERAUGVT96-VTaREJECTaACTIONREPORT96-0287GENERATED FORLEAKINGOIL.RE-EXAMAFTERREPAIRS.NORECORDABLE INDICATIONS
-ACCEPTABLE.
SNUBBERPROGRAMREQUIREMENTS APPLY.71 P'
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report,1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.,89EastAve.Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G51.PRESS.RELIEF FMPRESS.TORELZEFMANIFOLD(CONT.)DRAWINGS:
S-2SummaryNumberExamItemCategNumberComponent Component Type602070SN-VTN615HYDRAULIC SNUBBERAUGVT96-VT;REJECT;ACTIONREPORT96-0283GENERATED TOADDRESSLEAKINGOIL.OILCOMINGFROMVENT-USEASIS.NORECORDABLE
&INSIGNIFICANT, FLUIDLEVEL1/2FULL-ACCEPTABLE.
SETTING23/8",S/N=6564.SNUBBERPROGRAMREQUIREMENTS APPLY.602080SN-VT----N616HYDRAULIC SNUBBERAUGVT96-VT;REJECT'CTZON REPORT96-0621GENERATED FORSETTING.SETTINGSACCEPTABLE PERACTIONREPORT&MECHENGMEMO.NORECORDABLE
&INSIGNIFZCANTS FLUIDLEVEL1/2FULLACCEPTABLE'ETTINGS HOT35/8COLD31/49'S/N18193'NUBBERPROGRAMREQUIREMENTS APPLY'02081 SN-FT----N616AUGHYDRAULIC SNUBBERFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE, SNUBBERWASREPLACED'52.
POWERPRESS.RELIEFLINEDRAWINGS:
S-1SummaryNumberItemCategNumberComponent Component Type602090SN-VTBBPS-2HYDRAULIC SNUBBERAUGVT96VTSETTING4i/89S/N,PD8723912449NORECORDABLE
&INSIGNIFICANTrFLUIDLEVEL1/8"REDSHOWING-ACCEPTABLE.
72 R.E.GZNNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoadOntario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.)G52.POWERPRESS.RELIEF LINE(CONT.)DRAWINGS:
S-1SummaryNumberItemCategNumberComponent Component TypeExam602100SN-VTPS-4HYDRAULIC SNUBBERAUGVT96VTSSETTING13/169S/NPD861441152fNORECORDABLE
&ZNSZGNIFICANTSFLUIDLEVEL1/8REDSHOWING3/8GREEN-ACCEPTABLE.
G53.3-IN.PRESSURIZER RELIEFLINEDRAWINGS:
A-12SummaryNumberItemCategNumberComponent Component TypeNDEExam602110SN-VTPS-5HYDRAULIC SNUBBERAUGVT96VTrSETTING23/4fS/NPD8723812469NORECORDABLE
&INSIGNIFICANT/
FLUIDLEVEL3/16RED1/8GREEN-ACCEPTABLE.
602120SN-VT----PS-6HYDRAULIC SNUBBERAUGVT96VTSSETTING31/2fS/NPD877671239fNORECORDABLE
&INSIGNZFICANTS FLUIDLEVEL5/8RED1/16GREEN-ACCEPTABLE.
602121SN-FT----PS-6HYDRAULIC SNUBBERAUGFT96-FTFUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
.602130SN-VT----PS-8HYDRAULIC SNUBBERAUGVT96VTSSETTING27/8fS/NPD8614411599NORECORDABLE
&INSIGNIFICANTJFLUIDLEVEL1/16GREEN1/4RED-ACCEPTABLE.
73 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant,1503 LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G54.POWERPRESS.RELIEF LINEDRAWZNGS:
S-1ASummaryNumberExamCategItemNumberComponent Component TypeExam602140SN-VTPS-9HYDRAULIC SNUBBERAUGVT96-VT;REJECT;ACTIONREPORTS96-0282&96-0685GENERATED FORSETTINGS&NOTIFICATION PROBLEM.RE-EXAMAFTERCORRECTION
-ACCEPTABLE.
SETTINGSACCEPTABLE PERMECHENGMEMO.SETTING33/4",S/N=PD86144-1154.
SNUBBERPROGRAMREQUIREMENTS APPLY.602150SN-VT----PS-10HYDRAULIC SNUBBERAUGVT96-VT;SETTING37/8",S/N=PD86144-1157, NORECORDABLE
&INSIGNIFICANT, FLUIDLEVEL1/32GREEN1/4RED-ACCEPTABLE.
602160SN-VT----'S-11HYDRAULIC SNUBBERAUGVT96VTr'ETTING 23/89S/NPD8614411569NORECORDABLE
&INSZGNIFICANTS FLUIDLEVEL1/4RED1/8GREEN-ACCEPTABLE.
G55.SEALWATERRETURNFROMRCP-BDRAWINGS:
S-3SummaryNumber602200SN-VTCVU-131MECHANICAL SNUBBERExamItemCategNumberComponent Component TypeAUGVT96VTSETTING21/29S/N254329NORECORDABLE INDICATIONS ACCEPTABLE602201SN-FT----CVU-131MECHANICAL SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.TESTEDOPERABLE.
74 e
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.commercial ServiceDate~cul1970S.National BoardNumberforUnitN/AATTACHMENT IISNUBBERPROGRAMCOMPONENTS (CONT.)G55.SEALWATERRETURNFROMRCP-B(CONT.)DRAWINGS:
S-3SummaryNumber602300ExamItemCategNumberComponent Component TypeSN-VT----CVU-550AUGMECHANICAL SNUBBERNDEExamVT96-VT;SETTING21/4",S/N=18190,NORECORDABLE INDICATIONS
-ACCEPTABLE.
G56.STANDBYAUXFWTHRUPEN123TOBS/GFWHDZNCVDRAWINGS:
C-24SummaryNumberExamCateg602400SN-VTItemNumberComponent AFU-209HYDRAULIC SNUBBERComponent TypeAUGNDEExamVT96VTaSETTING25/169S/N129049NORECORDABLE
&INSZGNZFICANTSFLUIDLEVEL20%,W/0TOBEGENERATED TOADDOILTORESERVOIR
-ACCEPTABLE.
G57.STANDBYAUXFWTHRUPEN119TOAS/GFWHDZNCVDRAWINGSC-20SummaryNumber602500ExamCategSN-VTItemNumberComponent AFU-229HYDRAULIC SNUBBERComponent TypeAUGVT96-VT:REJECT;ACTIONREPORT96-0432GENERATED DUETOSETTING.SETTINGSOKPERACTIONREPORT.NORECORDABLE
&INSZGNZFICANT, FLUIDLEVEL1/2FULLACCEPTABLE'ETTINGSS HOT41/8fCOLD213/169S/N12900SNUBBERPROGRAMREQUIREMENTS APPLY.75 0'
R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (ZfReq.)N/AS.commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ISNUBBERPROGRAMCOMPONENTS (CONT.):G58.STANDBYAUXFWTHRUPEN119TOAS/GFWHDZNCVDRAWINGS:
C-20SummaryExamNumberCategItemNumberComponent Component TypeExam602501SN-FTAFU-229HYDRAULIC SNUBBERAUGFT96-FT;FUNCTIONAL TESTREQUIREDBYSNUBBERPROGRAM.SNUBBERFAILEDFUNCTIONAL TESTSSCOPEEXPANSION REQUIREDTOINCLUDEAFU2269SNUBBERWASREPLACED, SNUBBERWILLBEFUNCTIONAL TESTEDIN1997.H.SEZSMZCSUPPORTS:
H1CVCSLETDOWNSPEN112TOREGHT~EXCH~DRAWINGS:
B-32SummaryNumber700100ExamCategSS-CSItemNumberComponent
~F1.20RCVU-84GUIDE&INTEGRALATTACHMENT Component TypeOEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
H2.MAZNSTEAM DRAWINGS:
B-9ASummaryNumber700450ExamCateg245SBRRBBQ SS-CSZtemNumberComponent
- F1.20RMSU-59RIGIDSUPPORT&INTEGRALATTACHMENT Component TypeOEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
76 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)1.OwnerRochester Gas&ElectricCor.,89EastAve.,Rochester NY146492.PlantR.E.Ginna NuclearPowerPlant1503LakeRoad,OntarioNY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitN/AATTACHMENT ZSEISMICSUPPORTS(Cont.)H2.MAZNSTEAM (CONT.)DRAWINGS:
B-9ASummaryNumberExamCategItemNumberComponent Component TypeExam700500SS-CS*F1.20RMSU-54RIGIDSUPPORT&INTEGRALATTACHMENT VT96VTfNORECORDABLE
&INSIGNEFZCANTfLOCKNUTSOBSERVEDTOBELOOSE9ADJUSTMENTS MADE6NOTSERVICEINDUCEDfSEE1994RESULTS&NCR940606ACCEPTABLE.
700530SS-CS*F1.20RMSU-49RIGIDSUPPORT&INTEGRALATTACHMENT OEVT96VTfNORECORDABLE
&INSIGNZFICANTfNEBASEPLATEISLOOSEfIAWNCR940649ATTACHMENT 1fITEM2fLATERALRESTRAINT ISNOTREQUIREDACCEPTABLE
~H3.S/GBLOWDOWNFROMPEN322&321TON/CPIPINGDRAWINGS:
SS-3SummaryNumberItemCategNumberComponent Component Type700680SS-CS*F1.20ABDU-23AUGANCHOR&INTEGRALATTACHMENT VT96-VTf'ORECORDABLE INDICATIONS
-ACCEPTABLE.
700700SS-CS*F1.20ABDU-27ANCHOR&INTEGRALATTACHMENT OEVT96-VT;NORECORDABLE INDICATIONS
-ACCEPTABLE.
77 R.E.GZNNANUCLEARPOWERPLANTZnservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)l.OwnerRochester Gas&ElectricCor.89EastAve.,Rochester NY14649"2.PlantR.E.Ginna NuclearPowerPlant,1503LakeRoad,Ontario,NY145193.PlantUnit14.OwnerCertificate ofAuthorization (IfReq.)N/AS.Commercial ServiceDate~Jul1970S.National BoardNumberforUnitNIAATTACHMENT ISEISMICSUPPORTS(Cont.):84.SAFETYZNJECTZON SYSTEMDRAWINGS:
A-17SummaryNumberItemCategNumberComponent Component Type700710SS-CS*F1.20RSIU-8RIGIDSUPPORTAUGVT96-VT;REJECT,ACTIONREPORT96-0445GENERATED FORFOREIGNMATERIALBETWEENPIPE&SUPPORTUSEASISPERACTIONREPORTSDRAWINGTOBEREVISEDTOINCLUDETHISMATERIAL.
NORECORDABLE INDICATIONS
-ACCEPTABLE.
f78 FORMNIS-2OWNER'SREPORTFORREPAIRSORREPLACEMENTS AsRuiredbtheProvisions oftheASMECodeSectionXI1.0wnerRochester Gas&ElectricCorDate13Setember199689EastAve.,Rochester, NY14649Sheet12.PlantR.E.GinnaNuclearPowerPlantUnitof271503LakeRoad,OntarioNY14519Address(*)RepairOrganization P.O.No.~JobNo.,etc.3.WorkPerformed byName(*)TypeCodeSymbolStampAuthorization No.N/AN/A4.Identification ofSystem(*)Address(*)Expiration DateN/AE.(a)Applioaeledonarrnoaon Code~19~Edidon~Addenda,~
Codedana(b)Applicable EditionofSectionXIUtilizedforRepairsorReplacements 1gpss6.Identi%cation ofComponents RepairedorReplacedandReplacement Components NameofComnentNameofManufacturer Manufacturer SerialNo.NationalBoardNo.OtherIdentification YearBuildRepairedReplacedorRelacementASMECode.Stamped(YesorNo7.Description ofWork8.TestsConducted:(')
Hydrostatic C)Pneumatic 0NominalOperating Pressure0Other0PressurepsiTestTemp.'FNOTE:Supplemental sheetsinformoflists,sketches, ordrawingsmaybeused,provided(1)sizeis8-1/2In.x11in.,(2)information initems1through6onthisreportisincludedoneachsheet,and(3)eachsheetisnumberedandthenumberofsheetsisrecordedatthetopofthisform.(')See"ATTACHMENT II"FORAPPLICABLE INFORMATION (12/82)ThisForm(E00030)maybeobtainedfromtheOrderDept.,ASME,345E.47thSt.,NewYork,N.Y.100171
FORMNIS-2(Back)9.Remarks Applicable Manufacturer's DataReportstobeattachedCERTIFICATE OFCOMPLIANCE Wecertifythatthestatements madeinthereportarecorrectandthis"conformstotherulesoftheASMECode,SectionXI.repairorreplacement TypeCodeSymbolStampCertificate oAutho'tionNo.SignedOvmerorOvmr'sDesignee, TitleN/AExpiration DateNIAFAKlekiIIninrDaeSembrCERTIFICATE OFINSERVICE INSPECTION I,theundersigned, holdingavalidcommission issuedbytheNationalBoardofBoilerandPressureVesselInspectors andtheStateorProvinceofandemployedbyofhaveinspected thecomponents described inthisOwner'sReportduringtheperiod*~M9'toxo4,andstatethattothebestofmyknowledge andbelief,theOvmerhasperformed examinations andtakencorrective measuresdescribed inthisOwner'sReportinaccordance viiththeinspection planandasrequiredbytheASMECode,SectionXI.Bysigningthiscertificate neithertheInspector norhisemployermakesanywarranty, expressed orimplied,concerning theexaminations andcorrective measuresdescribed inthisOwner'sReport.Furthermore, neithertheInspector norhisemployershallbeliableinanymannerforanypersonalinjuryorpropertydamageoralossofanykindarisingfromorconnected withthisinspection.
Inspector's Signature Datetg5'~Commissions NationalBoard,State,Province, andEndorsements
(')See"ATTACHMENT II"FORAPPLICABLE INFORMATION
(-)Repair,Replacement orModification asidentified within"ATTACHMENT II" R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Oavner:V442.Plant:R,E,GinnaNuclearPopoverPlant1503LakeRd.Ontario.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
- "'EPAIR, REPLACEMENT andMODIFICATION PROGRAMTheRepair,Replacement andModification (RR&M)Program,asidentified withinthe"Inservice Inspection (ISI)Program",
identifies component jurisdiction andassociated requirements.
Applicable Repair,Replacement orModification activities havebeenperformed inaccordance withASMESectionXICode,1986edition,noaddenda.Whenanitemundertherulesandrequirements ofthe"Inservice Inspection (ISI)Program"isfounddeficient, anEngineering "use-as-is" evaluation mayresult.Thisdetermination isindicated withintheISIProgramSummary,"Attachment I",fortheapplicable component withinthisreport.Ifthedeficiency resultsinaCodeRepair,Replacement orModification; thedeficiency willbeclassified asoneofthreecategorytypes.Thesecategorytypesshallconsistofa"CodeServiceInducedRejectable Indication",
a"CodeRejectable Indication" anda"Corrective ActionActivity".
A"CodeServiceInducedRejectable Indication" occurswhenacomponent undertheRR&MProgramcontainsanindication thatisbeyondASMESectionXICodeacceptable standards andwasdetermined tobe"ServiceInduced".
"ServiceInduced"indications, stemmingfromInservice Inspection Examinations (ISI),shallrequireadditional expandedexaminations.
Theassociated expandedexaminations shallbeperformed inaccordance totherequirements oftheASMESectionXICode.A"CodeRejectable Indication" occurswhenacomponent undertheRR&MProgramcontainsanindication thatisbeyondASMESectionXICodeacceptable standards andwasdetermined tobenot"ServiceInduced".
Thiscategoryincludesbutisnotlimitedtoitemssuchasweldingdiscontinuities fromamodification identified duringISIpreservice examinations orcomponent damagecausedbyhumaninvolvement.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:~.eV42.Plant:REGinnaNuclearPowerlant1503La!eRd.ntario.4593.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddenda'TTACHMFNT IIFA"Corrective ActionActivity" mayoccurwhenacomponent undertheRR&MProgramrequirescorrective action.Thiscorrective actionmaybearesultfromamaintenance operation thatidentifies aneedtoperformaCodeRepair,Replacement orModification.
Thiscategoryincludesbutisnotlimitedtoitemssuchasmachining acomponent tocorrectanidentified problemortheremovalandlaterreapplication ofhardfacematerialonpressureboundarysurfaces.
Thefollowing groupshaveperformed applicable Repair,Replacement andModification activities duringthe1996Outage.Eachgrouphasbeenidentified byanumberandwillcorrespond tothegroups'ame andaddress.Rochester GasandElectric, GinnaStationdepartments willnotbeidentified aslikecontractors butbygenericname.InthebelowlistingofRepairs,Replacements orModifications; theworkgroupwillbeidentified byanumberwithinthecomponent discussion.
1.Rochester Gas&Electric, GinnaStation1A.Rochester Gas&Electric, Laboratory
&Inspection Services2.NPSEnergyServices280KingofPrussiaRoadRadnor,Pa.19087'3.BechtelPowerCorporation 9801Washington Boulevard Gaithersburg, Maryland20878-5356 4.TeamLeak,Inc.,Syracuse, NewYork5.Babcock&WilcoxCanada R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:ci~.ec'cves42.Plant:R.E.GinnaNuclearPowerPlant1503LakeRd.OntarioN.Y.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
- Thefollowing information willreportapplicable Repairs,Replacements orModifications performed atR.E.GinnaNuclearPowerPlantduringthisreporting periodasrequiredbyASMESectionXICode.ASMEClass:1~Sstem:Pressurizer GORRMo.:96-E-0013A-RC8-2501 Construction Code:ASMESectionIII'86;WorkPerformed B:2NameofComonent:V430,V431CPlugs&CagesWorkDescrition/Remarks:
AReplacement activitywasinitiated forplugs&cagesassociated withValves430&431C.Thisactivitywascontrolled byWO¹'s19504164,19503981; andPCR96-032.Uponactivityconclusion, aVT-2LeakageExamination wasperformed
&acceptable underPT-7(01.1).2.ASMEClass:2~Sstem:SIGORRNo:95-E-012Construction Code:ASMESectionIII'86;WorkPerformed B:1NameofComonent:V891CWeldRepairWorkDescrition/Remarks:
AnASMESectionXICodeRepairwasperformed ontheupstreamsocketweldatValve891Cthatwasfoundleaking.Thisactivitywascontrolled byWO¹19501520&NCR95-052.Construction Surface(PT)&Visual(VT)examinations wereperformed andacceptable.
Uponconclusion oftheRepairCycle,aHydrostatic Testandaccompanying VT-2Examination wasperformed
&acceptable.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:Rnv442.Plant:R.GinnauclearPowerPlant1503Laked.OntarioN.Y14593.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddenda3.TTACHMF.ASMEClass:2~Sstern:RHRGORRNo.:96-001Construction Code:B31.1'55,SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent:FE-673Studs&NutsWorkDescrition/Remarks:
AReplacement activitywasinitiated forstuds&nutsassociated withFE-673.Thisactivitywascontrolled byWO¹19501415.
Uponreinstallation, anASMESectionXIVT-2Leakageexamination wasperformed andacceptable.
4.ASMEClass:2~Sstem:SAFWGORRNo.:96-002Construction Code:ASMEIII,NF1974WorkPerformed B:1NameofComonent:AFU-123SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportAFU-123.Thisactivitywascontrolled byWO¹19404238andActionReport95-0232.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
5.ASMEClass:l~Sstem:SteamGenerators GORRNo.:96-003Line:N/AConstruction Code:B31.1'55,SP-5291WorkPerformed B:1NameofComonent:S/G"B"Snubber(SGB-3)Replacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportSGB-3onS/G"B".Thisactivitywascontrolled byWO¹19404251andActionReport95-0232.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Iriterval, SecondPeriod,FourthOutage(1996)l.Owner:V42.Plant:R.EGinnaNuclearPowerPlant1503I.akeRd.ntario.Y.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddendaTTACHMEI6.ASMEClass:2~Sstem:CVCS-Letdown GORRNo.:96-004Construction Code:ASMEIIINF'74WorkPerformed B:1NameofComonent:CVU-80SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportCVU-80.Thisactivitywascontrolled byWO¹19404240andActionReport95-0232.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
7.ASMEClass:2~Sstem:CVCSGORRNo.:96-005Construction Code:ASMEIIINF'74,SP-5291,ME-318WorkPerformed B:1NameofComonent:CVU-372SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportCVU-372.Thisactivitywascontrolled byWO¹19404241andActionReport95-0232.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
8.ASMEClass:3~Sstem:AFWGORRNo.:96-006Construction Code:ASMEIIINF'74,SP-5291,ME-318WorkPerformed B:1NameofComonent:AFU-34SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportAFU-34.Thisactivitywascontrolled byWO¹19404236.
Uponreinstallation, aVT-3Preservice (Baseline) exam'.nation wasperformed andacceptable.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:ve2.Plant:R,F.GinnaNuclearPowerPlant150akeRd,OntarioNY145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddenda9.ASMEClass:2~Sstem:MSGORRNo.:96-008Construction Code:ASMEIIINF'74,SP-5291,ME-318WorkPerformed B:1NameofComonent:MSU-60SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportMSU-60.Thisactivitywascontrolled byWOg19501414andNCR95-039.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
10.ASMEClass:3~Sstem:SWGORRNo96-009/Construction Code:B31.1'55,GilbertSpecR0-2204,SP-5291WorkPerformed B:1NameofComonent:PSW01D,SWPumpDBowlAss'y&ShaftWorkDescrition/Remarks:
ABowlassemblywithshaftReplacement activitywasinitiated forServiceWaterPump"D"withpreviously rebuiltitems.Thisactivitywascontrolled byWO519500529, PCR95-023andNCR95-061.Uponreinstallation, aVT-3Preservice (Baseline)
'examination wasperformed andacceptable ontheassociated RigidRestraint.
Also,aVT-2Leakageexamination wasperformed andacceptable underPT-2.7.1ASMEClass:2~Sstem:MSGORRNo.;96-010"vConstruction Code:B31.1'55,SP-5291WorkPerformed B:4NameofComonent:V3517NutsWorkDescrition/Remarks:
AReplacement activitywasinitiated forValve3517CapNuts.Thisactivitywascontrolled byWO519503340andTM95-045.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)1.Owner:eter~~cVe442.Plant:R.E.GinnaNuclearPowerPlant1503I.akeRd.OntarioN.Y.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddendaTTACHMFNT I12.ASMEClass:3~Sstem:SWGORRNo.:96-011Construction Code:B31.1'55,SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent:ACA05,Piping&FittingsWorkDescrition/Remarks:
AReplacement activitywasinitiated forPenetration CoolerACA05,Piping&Fittings.
Thisactivitywascontrolled byWO¹19404349andActionReport96-0115.Construction CodeVTexaminations wereperformed andacceptable ontheSolderedCopperjoints.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
13.ASMEClass:3~Sstem:Aux.FWGORRNo.:96-013"vConstruction Code:B31.1'55,SP-5291,ASMEIII'86,B16.34WorkPerformed B:1NameofComonent:V4009DiscReplacement WorkDescrition/Remarks:
AReplacement activitywasinitiated fortheDiscassociated withValve4009.Thisactivitywascontrolled byWO¹'s19600808, 19600964.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.'4.
ASMEClass:3~Sstem:SWGORRNo:96-014/Construction Code:SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent:ESW08A,ESW09ABoltingWorkDescrition/Remarks:
AReplacement activitywasinitiated onboltingassociated withD/G"A"JacketWaterandLubeOilHeatExchangers (Shell&Tubesides)aswellasa1/2"boltonESW09A-WestBaseSupport.Thisactivitywascontrolled byWO¹19501745.
Construction CodeVTexaminations wereperformed andacceptable onESW09A-WestBaseSupport.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:ve442.Plant:R.E.GinnaNuclearPowerPlant15031akeRd.OntarioN.Y,145193.Applicable EditionofSectionXlUtilizedforRepairs,Replaccmcnts orModifications:
1986NoAddendaTTCHMEI15.ASMEClass:2~Sstem:SIGORRNo.:96-015Construction Code:B31.1'55,SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent;Piping&FittingsupstreamofV891CReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated for11/2"piping&fittingsupstreamofValve891Ctothe3"Header.Thisactivitywascontrolled byWO¹19501554andActionReport95-0394.Construction CodeVTandPTexaminations wereperformed andacceptable.
Uponcompletion ofthisreplacement
- activity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31.16.ASMEClass:2~Sstem:MSGORRNo.:96-017Construction Code:ASMEIII'77/'86WorkPerformed B:2NameofComonent:V3504A;Disc,Stem&BonnetBoltingWorkDescrition/Remarks:
AReplacement activitywasinitiated fortheDisc,Stem&BonnetBoltingassociated withValve3504A.Thisactivitywascontrolled byWO¹19504931.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable..
17.ASMEClass:2~Sstem:CVCSGORRNo.:96-019Line:3G-CH-151 Construction Code:B31.1'5,G-676262, SP-5291WorkPerformed B:1NameofComonent:V313DiscWorkDescrition/Remarks:
AReplacement activitywasinitiated fortheDiscassociated.
withValve313.Thisactivitywascontrolled byWO¹19502488.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination was.performed andacceptable.
10 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.2.3.Owner:e~zsVPlant:R..GinnaNuclearPowerPlant1503LakeRd,Ontario.Y14519Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
ATTACHMENT II18.ASMEClass:1~Sstem:RCSGORRNo.:96-024Construction Code:B31.1'55,MSS-SP-69, ASMEIII'86SP-5291WorkPerformed B:2NameofComonent:V431BInternals WorkDescrition/Remarks:
AReplacement activitywasinitiated forValve431BPlug,CageandSpacer.Also,theBonnetgasketareawasmodifiedtoallowfortheinstallation ofathickergasket.Thisactivitywascontrolled byWO¹19601119, ActionReport96-0375,PCR96-041andTE91-515.Construction CodePTexaminations were,performed andacceptable ontheclosureandseatsurfaces, andBonnet.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withPT-7(01.1).19.20.ASMEClass:3~Sstem:DieselGenerators GORRNo.:96-026Line:N/AConstruction Code:B31.1'55,SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent:ESW08B,ESW09BBoltingReplacement WorkDescrition/Remarks:
A'oltingReplacement activitywasinitiated onESW08B&ESW09BHeatExchangers.
Thisactivitywascontrolled byWO¹19501746andActionReport96-0041.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
ASMEClass:1~Sstem:RCS/Pressurizer GORRNo.:96-0273A-RC8-2501-B Construction Code:ASMEIII'86WorkPerformed B:2NameofComonent:Valves431A&431BGasketSeatRepairsWorkDescrition/Remarks:
ARepairbymetalremovalwasinitiated ontheBonnetgasketseatingsurfaceforValves431Aand431B.Thisactivitywascontrolled byWO¹19601119andPCR96-041.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withPT-7(01.1).11 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:tve42.Plant:R.E.GinnaNuclearPowePlatl3aked.OntarioY4593.Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
l986NoAddendaGORRNo96-028Corrective ActionActivity21.ASMEClass:3~Sstem:CCW3H-AC6-152 Construction Code:B31.1'55,G-676262, ASMEIII'86/'92WorkPerformed B:1NameofComonent:FIC609/613,Valves762A/B&PipingReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forFIC-609,FIC-613,Valves762A&762B,andassociated piping.Thisactivitywascontrolled byWO¹19320707andTE94-552.Construction CodeFinalSurface(PT/MT)examinations wereperformed andacceptable.
RootPassSurfaceexaminations werealsoperformed andacceptable.
Uponcompletion ofthisreplacement
- activity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31.22.ASMEClass:3~Sstem:AFWGORRNo.:96-0291~"'yConstruction Code:ASMEVIII,B31.1'55WorkPerformed B:1NameofComonent:EAF02A,EAF02BTubeAss'yReplacement WorkDescrition/Remarks:
AReplacement activitywasinitiated fortheShellandTubeAssemblyassociated withEAF02A&EAF02BAux.Feedwater LubeOilCoolers.Thisactivitywascontrolled byWO¹19503511andEWRME-JEB-A.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
12
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:eerasve42.Plant:R.E.GinnaNuclearpower Plant15031akeRd.Ontario.Y.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddenda23.ASMEClass:2~Sstem:MSGORRNo.:96-030Construction Code:B31.1'55,SP-5291,ASMEIII'86WorkPerformed B:1NameofComonent:Valve3516BoltingReplacement
&FlangeModification.
WorkDescrition/Remarks:
AboltingReplacement activitywasinitiated onValve3516.Also,thevalvebodyflangeareawasmachined.
Thisactivitywascontrolled byWO¹19502008.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
24.ASMEClass:3~Sstem:CCWGORRNo.:96-031Construction Code:B31.1'55,,G-676262, SP-5291,B16.5WorkPerformed B:2NameofComonent:Valve815AReplacement
&SpacerModification.
WorkDescrition/Remarks:
AboltedReplacement activitywasinitiated onValve815Aaswellastheinstallation ofanewspacer.Thisactivitywascontrolled byWO¹19400501andTSR96-563.AUponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
25.ASMEClass:2~Sstem:MSGORRNo.:96-032Construction Code:B31.1'55,SP-5291,B16.5'67WorkPerformed B:2NameofComonent:Valve3517BoltModification.
WorkDescrition/Remarks:
AModification activitywasinitiated onValve3517toreplaceanexisting13/4"Bonnetstudwithanew"stepstud.Thisactivitywascontrolled byWO¹19502007andPCR96-043.AUponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
13 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Olvner:cV42.Plant:RF.pinnaNuclearPowerPlant150al'eRd.OntarioN.Y,145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddenda26.ATTACHMFNT IASMEClass:2~Sstem:Standby.Aux.FNGORRNo.:96-0333C-FW-902S-1B Construction Code:ASMEIIINF'74/'86,SP-5291/ME-318 WorkPerformed B:1NameofComonent:AFU-229&AFU-208SnubberReplacements WorkDescrition/Remarks:
SnubberReplacement activities wereinitiated forsupportAFU-229andAFU-208.Theseactivities werecontrolled byWO¹'s19503968, 19503966andActionReports96-0302,96-0307.Uponreinstallation, aVT-3Preservice (Baseline) examinations wereperformedandacceptable.
27.ASMEClass:1~Sstem:S/GGORRNo.:96-034Line:N/AConstruction Code;ASMEIIINF'86,SP-5291/ME-318, SP-5378WorkPerformed B:3NameofComonent:SGB-4SnubberReplacements WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportSGB-4onS/G"B"RingSupportAssembly.
Thisactivitywascontrolled byWO¹19505112andSM-10034.4.17.
Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
28.ASMEClass:1~Sstem:RCSGORRNo.:96-035Construction Code:B31.1'55,SP-5291,ME-121WorkPerformed B:1NameofComonent:N616SnubberReplacements WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportN616.Thisactivitywascontrolled byWO¹19503972, ActionReport96-0621andEWR10204.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
e R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)1.Owner:eseas442.Plant:R.F.OinnaNuclearPowerPlant1503Ial;eRd.OntarioNY145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddendaTTACHMFWT I29.ASMEClass:3~Sstem:Aux.FNGORRNo.:96-037Construction Code:B31.1'55,SP-5291,ASMEIII'86/'92,B16.34'88.WorkPerformed B:2NameofComonent:Valve4007Replacement ReliefReuest:RR¹31(CodeCaseN-416-1)'orkDescrition/Remarks:
AReplacement activitywasinitiated forValve4007.Thisactivitywascontrolled byWO¹19601451.
Construction CodeVT,PTandRTexaminations wereperformed andacceptable.
RootPa'ssPTwasalsoperformed andacceptable.
Uponcompletion ofthisreplacement
- activity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31.30.ASMEClass:3~Sstem:Aux.FNGORRNo.':96-038Construction Code:B31.1'55,SP-5291,ASMEIII'86/'92,B16.34'88WorkPerformed B:2NameofCpmonent:Valve4008Replacement ReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forValve4008.Thisactivitywascontrolled byWO¹19601452.
Construction CodeVT,PTandRTexaminations wereperformed andacceptable.
RootPassPTwasalsoperformed andacceptable.
Uponcompletion ofthisreplacement
- activity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance'ith RG&EReliefRequest¹31.15 i
R.E.GINNANUCLEARPOWERPLANTInserviceInspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)1.Owner:tcV42.Plant:R,F..CrinnaNuclearPowerPlant150LakeRd.OntarioN.Y145193.Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
J*ATTACHMENT II31.ASMEClass:2~Sstem:Instrument AirGORRNo.:96-039aConstruction Code:B31.1'55,SP-5291WorkPerformed B:1NameofComonent:Valve5393,Spring&SeatReplacement WorkDescrition/Remarks:
AReplacement activitywasinitiated forthespring&seatassociated withValve5393.Thisactivitywascontrolled byWO¹19601403.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
32.ASMEClass:3~Sstem:CCWGORRNo.:96-040Construction Code:B31.1'55,G-676262, SP-5291,ASMEIII'86/'92WorkPerformed B:1NameofComonent:New2"Unions-Modification ReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AModification activitywasinitiated toinstallnew2"UnionsinCCWpipingto&fromtheRHRPumps.Thisactivitywascontrolled byWO¹'s19504169, 19601679andPCR96-053.Construction CodeVTandPTexaminations wereperformed andacceptable.
Uponcompletion ofthisactivity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31.16
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)1.Osvner:i~c'e.2.Plant:R.F.CiinnaNuclearPowerPlant1503I.ai'eRd.OntarioN.Y.14513.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddendaATTACHMENT ll33.ASMEClass:2~Sstem:BiowdownGORRNowt96-0422B-MS-600-1A 2A-MS-600-1B 2B-MS-600-1B Construction Code:B31.1'55,SP-5291,ASMEIII'86/'92'WorkPerformed B:1NameofComonent:2"BlowdownPipingforS/G"A"&"B"ReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AModification activitywasinitiated toreplaceexisting2"carbonsteelpipingwithCromeMolypipingfrombothSteamGenerators uptoandincluding thedownstream Teeconnection.
Thisactivitywascontrolled byWO¹19504580andTSR94-116.Construction CodeRT,PTandVTexaminations wereperformed andacceptable.
Uponcompletion ofthisactivity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31andPT-7(01.1)procedures.
34.ASMEClass:2/3~Sstem:MSGORRNo.:96-04330A-MS-600-1A 30B-MS-600-1 30A-MS-600-1 Construction Code:B31.1'55,SP-5291,B16.6'67WorkPerformed B:2NameofComonent:Valves3516,3517,3518,3519Modification WorkDescrition/Remarks:
AModification activitywasinitiated tomachinethebodyflangeareaofvalves3516,3517,3518and3519toachievepropergasketgroovedepth.A1so;onvalve3517,theretaining barwasreweldecLK Construction CodeVTexamination wasperformed andacceptable.
Theseactivities werecontrolled byWO¹'s19501739,
- 19501765, 19502007and19502008; ActionReports96-0417,96-0590andPCR96-059.Uponcompletion oftheseactivities, ASMESectionXI.LeakageTestsandassociated VT-2examinations wereperformed andacceptable.
17 R.E.GINNA'NUCLEAR POWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:eV42.Plant:R.F.OinnaNuclearPowerPlant1503LakeRd.OntarioY.14593.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
35.ASMEClass:2~Sstem:CVCS-Charging GORRNo.:96-044d'Construction Code:B31.1'55,G-676262, ASMEIII'86WorkPerformed B:lANameofComonent:8"CVCSWeld¹1RepairWorkDescrition/Remarks:
DuringanOwnerElectedPTexamination onweld8A-CH-2502
¹1,a3/4"linearindication wasidentified.
A.CodeRepairbymetalremovalwasinitiated.
Thisactivitywascontrolled byWO¹'s19601798,
- 19502368, ActionReport96-0412andPCR96-061.Uponcompletion oftheRepairCyclebymetalremoval,aPTexamination wasreperformed andacceptable.
UTthickness readingswere-alsoperformed andacceptable.
36.ASMEClass:l~Sstem:RCSGORRNo96-0454A-RC8-2501B Construction Code:B31.1'55,G-676262WorkPerformed B:1NameofComonent:Valves434,435Replacements WorkDescrition/Remarks:
AReplacement activitywasinitiated onValves434and435bymechanical means.Thisactivitywascontrolled byWO¹'s19501724and19501725.
Uponreinstallation; anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withprocedure PT-7(01.1).
37.ASMEClass:3~Sstem:MSGORRNo96-046Construction Code:B31.1'55,SP-5291WorkPerformed B:1NameofComonent:Valve3519,ItemsReplacement WorkDescrition/Remarks:
AReplacement activitywasinitiated onValve3519fortheShaft,Bushings, KeysandStuds.Thisactivitywascontrolled byWO¹19501765.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
18
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:vete.442.Plant:R.E.GinnaNucleaPowerlant150'1.al'eRd,Ontar'o.Y145193.Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
1986NoAddenda~*"'"38.ASMEClass:2~Sstem:MSGORRNo.:96-047Constr'uction Code:B31;1'55,SP-5291,ASMEIII'86/'92WorkPerformed B:1NameofComonent:Valve3504C&PipingReplacement ReliefReuest:RR¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated for11/2"pipingandValve3504C.Thisactivitywas.controlled byWO¹19600032andPCR96-018.Construction CodeVTandPTexaminations wereperformed andacceptable.
Uponcompletion ofthisreplacement
- activity, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31.39.ASMEClass:2~Sstem:FNGORRNo.:96-048Construction Code:.ASME IIINF'74,SP-5291,ME-318WorkPerformed B:1NameofComonent:FWU-3SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportFWU-3.Thisactivitywascontrolled byWO¹19601790andActionReport96-0466.Uponreinstallation, aVT-3Preservice (Baseline) examination wasperformed andacceptable.
40.ASMEClass:2~Sstem:MSGORRNo.:96-049Construction Code:B31.1/ASMEIII'77/'78WorkPerformed B:2NameofComonent:Valve3410,ItemsReplacement WorkDescrition/Remarks:
AReplacement activitywasinitiated onValve3410forthePilotPlugandStem.Thisactivitywascontrolled byWO¹19504890.
Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
19
,
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:~~E'cV442.Plant:R.F..CsinnaNuclearPowerPlant150I.aleRd.Onta'oN.Y.145193.Applicable EditionofSectionXIUtilizedforRep'airs, Replacements orModifications:.
41.ASMEClass:3~Sstem:CCWGORRNo96-050Construction Code:B31.1'55,G-676262, ASMEIII'86WorkPerformed B:1NameofComonent:FE-651BoltingReplacement WorkDescrition/Remarks:
ABoltingReplacement activitywasinitiated onFE-651.Thisactivitywascontrolled byWOii19500555andActionReport96-0626.Uponreinstallation, anASMESectionXILeakageTestandassociated VT-2examination wasperformed andacceptable.
42.ASMEClass:2~Sstem:EWGORRNoel96-051Construction Code:ASMEIIINF'74,SP-5291,ME-318WorkPerformed B:1NameofComonent:FWU-48SnubberReplacement WorkDescrition/Remarks:
ASnubberReplacement activitywasinitiated forsupportFWU-48.Thisactivitywascontrolled byWO819601937andActionReport96-0646.Uponreinstallation, aVT-3Preservice (Baseline) examination wasp'erformedandacceptable.
43.ASMEClass:l~Sstem:SteamGenerators GORRNo.:96-033/Construction Code:ASMEIII1986WorkPerformed B:5(Installation
=3)CodeStamed:YesNameofComonent:S/G"A&B",EMS01A,EMS01BReliefReuest:831(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"BueThisactivitywascontrolled byEWR'10034.
Applicable Construction CodePT,MT,RTandUTexaminations wereperformed andacceptable.
Construction CodeHydrostatic Testwasperformed andacceptable.
Applicable ASMESectionXIPreservice (Baseline) examinations wereperformed andacceptable asdocumented withinthe1996NIS-1"Attachment 1"section.Theseexaminations includedSurface,Volumetric andEddyCurrent.Uponinstallation, ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequestii31perprocedure PT-7(01.1)20 R.E.GINNANUCLEARPOPOVERPLANTInsetvice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:los442.Plant:.F.GinnaNuclearPowerPlant1503LaleRd.OntarioN.Y.145193.Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
1986NoAddendaI44,ASMEClass:1~Sstem:SteamGenerators GORRNo.:96-054Line:N/AConstruction Code:AWSDl.l,ASMEIIINF'74,SP-5378WorkPerformed B:3NameofComonent:S/G"A&B",LowerSupportsWorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A",and"B"LowerSupportsfortheSteamGenerator Replacement Project.Thisactivitywascontrolled byWOii's19600798,
- 19600802, EWR10034andSM's10034-4.23, 10034-4.15
.Construction CodeMTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
VT-3examinations wereperformed andacceptable.
45.ASMEClass:1~Sstem:SteamGenerators GORRNo.:96-055Line:N/AConstruction Code:AWSDl.l,ASMEIIINF'74,SP-5378WorkPerformed B:3NameofComonent:S/G"A&B",Intermediate SupportsWorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Intermediate SupportsfortheSteamGenerator Replacement Project.Thisactivitywascontrolled byWOI's19600798,
- 19600802, EWR10034andSM's10034-4.23, 10034-4.15
.Construction CodeVTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
VT-3examinations wereperformed andacceptable.
46.ASMEClass:1~Sstem:SteamGenerators GORRNo.:96-056Line:N/AConstruction Code:AWSDl.l,ASMEIIINF'74,SP-5378WorkPerformed B:3NameofCornonent:S/G"A&B",UpperRestraint RingsWorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"UpperRestraint RingsfortheSteamGenerator Replacement Project.Thisactivitywascontrolled byWO5's19600574,
- 19600575, EWR10034andSM's10034-4.22, 10034-4.21
.,Construction CodeMTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
VT-3examinations wereperformed andacceptable.
21 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report*1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owticr:~ev442.Plant:R.F.GinnanclearPopoverPlant1503LakeRd,'ntario N.Y.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
1986NoAddendaATTACHMENT I47.ASMEClass:l~Sstem:RCSGORRNo.:9,6-057Line:N/AConstruction Code:ASMEIII'86/'92,B31.1'55,G-676343, G-676496WorkPerformed B:3NameofComonent:S/G"A&B"RCSAttachment WeldsReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"RCSreattachment welds.Thisactivitywascontrolled byWO¹'s19600794,
- 19600799, EWR10034andSM's10034-7.12, 10034-7.13
.Construction CodePTandRTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
PT,RT/UTexaminations wereperformed andacceptable asdocumented withinthe1996NIS-1"Attachment 1"section.ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(01.1).48.ASMEClass:l~Sstem:RCSGORRNoet96-058/..~.""""I'onstruction Code:ASMEIII'86;B31.1'55,G-676343, G-676496WorkPerformed B:3NameofComonent:S/G"A&B",RCSHot&ColdLegRepairsWorkDescrition/Remarks:
ARepairactivitybymetalremovalwasinitiated forSteamGenerators "A"and"B"RCSHotandColdLegsonidentified pipinglocations toremoveoriginalconstruction defects,arcstrikes,andgouges.Thisactivitywascontrolled byWO¹'s19601418,
- 19601419, andActionReport96-0272.Uponcompletion oftheRepairCycle,PTexaminations aswellasUTthickness readingswereperformed andacceptable.
22
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:scV42.Plant:R,E,CrnnaNuclearPowerPlant1503I.al'eRd,OntarioN,Y,145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
49.ASMEClass:2~Sstem:FWGORRNoet96-059Line:N/AConstruction Code:ASMEIXI'86;B31.1'55,SP-5291WorkPerformed B:3NameofComonent:S/G"A&B";FWLoops"A&B"RepairsWorkDescrition/Remarks:
ARepairactivitybymetalremovalwasinitiated forSteamGenerators "A"and"B"Feedwater Loops"A&B"onidentified pipinglocations toremoveoriginalconstruction defects,arcstrikes,andgouges.Thisactivitywascontrolled byWO¹'s19601422,
- 19601423, andActionReport96-0269.Uponcompletion oftheRepairCycle,MTexaminations aswellasUTthickness readingswereperformed andacceptable.
50.ASMEClass:2~Sstem:FWGORRNo.:96-060Line:N/AConstruction Code:ASMEIII'86/'92,B31.1'55,SP-5291,ME-318WorkPerformed B:3NameofComonent:S/G"A&B"FWAttachment Welds.ReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated for.SteamGenerators "A"and"B"Feedwater reattachment welds.-Thisactivitywascontrolled byWO¹'s19600849,
- 19600848, EWR10034andSM's10034-7.06, 10034-7.07
.Construction CodePT/MTandRTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
PT/MT,RT/UTexaminations wereperformed andacceptable asdocumented withinthe1996NIS-1"Attachment 1"section.ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(01.1).23 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:s~~V442.Plant:.F.GinnauclearPowerPlant1503LakeRd.Ontario.Y145193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
51.ASMEClass:2~Sstem:MSGORRNo.:96-06130B-MS-600-1B Construction Code:ASMEIIINF1974WorkPerformed B:3NameofComonent:MSSupportReinstallations WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Mainsteam SpringCanSupportreinstallation.
Thereinstallation coverssupportsMSU-1,MSU-4,MSU-6andMSU-9.Thisactivitywascontrolled byWO¹'s19600800I 19600801I EWR10034IandSMs10034710100347.11.Up'onreinstallation, anASMESectionXIPreservice (Baseline)
VTexaminations wereperformed andacceptable.
52.ASMEClass:2~Sstem:MSGORRNoet96-062Line:N/AConstruction Code:ASMEI1I'86;B31.1'55,SP-5291WorkPerformed B:3NameofComonent:S/G"A&B";MSLoops"A&B"RepairsWorkDescrition/Remarks:
ARepairactivitybymetalremovalwasinitiated forSteamGenerators "A"and"B"Mainsteam Loops"A&B"onidentified pipinglocations toremoveoriginalconstruction defects,arcstrikes,and.gouges.
Thisactivitywascontrolled byWO¹'s19601420,
- 19601421, andActionReport96-0270.Uponcompletion oftheRepairCycle,MTexaminations aswellasUTthickness readingswereperformed andacceptable.
24 0,
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Osvner.estelesveste42.Plant:RFpinnanclerowerlat5031akcd.tario.145193.Applicable EditionofSectionXIUtilizedforRepairs,Replaccmcnts orModifications:
1986NoAddendaATTACHMENT I53.ASMEClass:2~Sstem:MSGORRNo.:96-063Line:N/AConstruction Code:ASMEIII'86/'92,B31.1'55,SP-5291,ME-318WorkPerformed B:3NameofComonent:S/G"A&B"MSAttachment WeldsReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Mainsteam reattachment welds.Thisactivitywascontrolled byWO¹'s19600800,
- 19600801, EWR10034andSM's10034-7.10, 10034-7.11
.Construction CodePT/MTandRTexaminations wereperformed andacceptable.
ASMESectionXIPreservice (Baseline)
MT,RT/UTexaminations wereperformed andacceptable asdocumented withinthe1996NIS-1"Attachment 1"section.ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(01.1).54.ASMEClass:2~Sstem:BlowdownGORRNo.:96-064Line:N/AConstruction Code:ASMEIII'86/'92,B31.1'55,SP-5291,ME-318WorkPerformed B:3NameofComonent:S/G"A&B"BlowdownAttachment WeldsReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Blowdownreattachment welds.Thisactivitywascontrolled byWO¹'s'9600355,
- 19600356, EWR10034.and SM's10034-6.01, 10034-6.02
.Construction CodeMTandRTexaminations were.performed andacceptable.
ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(01.1).25
,
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996).l.Owner:esaAt'ete442.Plant:R.E.GinnaNuclearowerPlant1503LakeRd,OntarioN.Y.45193.Applicable EditionofSectionXIUtilizedforRepairs,Replacements orModifications:
55.ATTACHKTFNT IIASMEClass:2~Sstem:FNGORRNo.:96-065Line:N/AConstruction Code:ASMEIII'86/'92,B31.1'55,SP-5291WorkPerformed B:3NameofComonent:S/G"A&B"Level&Instrumentation Lines,Condensate Pots.ReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Level&Instrumentation LinesandCondensate Pots.Condensate PotsreplacedincludeSFW01,SFW02,SFW03;SFW04,SFW05,SFW06,SFW07,andSFW08.Thisactivitywascontrolled byWO¹'s19600728,
- 19600727, EWR10034andSM's10034-7.08, 10034-7.09
.Applicable Construction CodeMTandRTexaminations wereperformed andacceptable.
ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(Ol.l).56.ASMEClass:2~Sstem:MSGORRNo.:96-066Line:N/AConstruction Code:ASMEIII'86/'92,'31.1
'55,SP-5291WorkPerformed B:3NameofComonent:S/G"A&B"Condensate PotstoFlowTransmitters ReliefReuest:¹31(CodeCaseN-416-1)WorkDescrition/Remarks:
AReplacement activitywasinitiated forSteamGenerators "A"and"B"Condensate PotstoFlowTransmitters.'low Transmitters replacedincludedSMS03A,SMS04A,SMSOSA,SMS06A,SMS03B,SMS04B,SMS05B,andSMS06B.Thisactivitywascontrolled byWO¹'s19600728,
- 19600727, EWR10034andSM's10034-7.08, 10034-7.09
.Applicable Construction CodeMTandRTexaminations wereperformed andacceptable.
ASMESectionXILeakageTestandaccompanying VT-2examination wasperformed andacceptable inaccordance withRG&EReliefRequest¹31perprocedure PT-7(01.1).
0 R.E.GINNANUCLEARPOWERPLANTInserviceInspection Report1990-1999Interval, SecondPeriod,FourthOutage(1996)l.Owner:cstevaset'est442.Plant:R.F..GinnaNuclearPowerPlant150LakeRdOntarioN.Y145193.Applicable EditionofSectionXlUtilizedforRepairs,Replacements orModifications:
1986NoAddendaATTACHMENT II57.ASMEClass:2~Sstem:CSGORRNo.:96-067Line:N/AConstruction Code:B31.1'55,G-676262, ASMEIII'86;ME-318WorkPerformed B:3NameofComonent:Containment SprayAttachment Welds&Supports.
WorkDescrition/Remarks:
.AReplacement activitywasinitiated toreinstall Containment Spray-piping weldsandSupportsthatwereremovedfortheSteamGenerator Replacement Project.Thisactivitywascontrolled byWO819600898, EWR10034,SM10034-4.01 andActionReport96-0241.Construction CodePTexaminations wereperformed ontheRoot/Final weldsandwereacceptable.
Construction CodeVTexaminations wereperformed andacceptable onassociated component supports.
ThesupportsexaminedincludedCSU-98,CSU-99,CSU-100,CSU-105,CSU-106,CSU1071CSU108ICSU109ICSU110ICSU111ICSU112ICSU117ICSU-118,CSU-119andCSU-120.AnASMESectionXIFlowTestandaccompanying VT-2examination wasperformed andacceptable.
58.ASMEClass:2~Sstem:FWGORRNo96-068/Construction Code:ASMEIII'86WorkPerformed B:3NameofComonent:FW"B"Loop,PunchMarkRepairstoWelds/Piping.
WorkDescrition/Remarks; ARepairactivitywasinitiated toremovePunchMarksonweld/base metalassociated withWeldsAA5andAA4R.Thisactivitywascontrolled byWO819600848, SM10034-7.07, BechtelNCR069andBechtelWP&IR/MTI No.P-FWB-01.PunchMarksonexistingweldswereremovedbymetalremoval.PunchMarksonpipingwereremovedbymetalremovalandrewelded.
Uponcompletion oftheRepairCycle,SurfaceMTexaminations wereperformed andacceptable onbothweldedandmetalremovalrepairs.Repairsbymetalremovalwerecontrolled toensurethatminimumwallthickness wasmaintained.
27 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mEROSION/CORROSION (MINWALL)
PROGRAMSUMMARYThissectionprovidesErosion/Corrosion examination detailsandinformation corresponding toitemsinspected duringthe1996Outage.Atotalof98itemswereexamined.
Thebreakdown ofthistotalisasfollows:monentTeTotalNumberPipesElbowsReducersTeesTotal453912298Thefollowing listsidentifies systemsofexaminedcomponents, systemcomponent resultsummaries, andcomponent resultdetails.SstemsofExaminedComonents:SYSTEMSMSR1A&1B2NDPASSTOSAHEATERANDCONDENSER MSR2A&2B2NDPASSTO'5BHEATERANDCONDENSER MSR1B4THPASSTOSAHEATER1A,2A,&3AL.P.HEATERDRAINSTOCONDENSER STEAMEXT.TOPRESEP.TANKB&4BL.P.HEATERSTEAMEXT.TOPRESEP.TANKA&4AL.P.HEATERSTEAMEXTRACTION TO5A&5BHEATERSFEEDWATER DISCHARGE (TURBINEBUILDING)
FEEDWATER TOS/G1A(CONTAINMENT)
FEEDWATER TOS/G1B(CONTAINMENT)
S/GBLOWDOWNTOFLASHTANK(TURBINEBUILDING)
FEEDWATER CLEANUP(CV-19)FEEDWATER CLEANUP(CV-19)MAINFEEDWATER PUMPRECIRCULATION GLANDSTEAMCONDENSER TOTURB.GEN.&GOV.MAINGLANDSTEAMTOTURB.GEN.&GOV.ENDSF.W.HTR.DRAINSYS.FROMH.DPUMPSTOH.T.TANKComponent thickness measurements wereperformed onthefollowing systems.DWG.NO.M-12AM-12BM-15BM-19M-21M-22M-75M-81M-84M-85M-88D-M-91M-91M-92M-99M-100M-103
R.E.GINNANUCLEARPOWERPLANTInserviceInspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mSstemComonentResultSummaries:
Thefollowing breakdownbysystemprovidesgeneralresultsonthecomponent typesthatwereexamined.
DWG.NO.SYSTEMM-12AMSR1A&1B2NDPASSTOSAHEATERANDCONDENSER Components Examined:
Results(%ofNominal):
4Pipes7>882Elbows188-823Reducers170-65M-12BMSR2A&2B2NDPASSTO5BHEATERANDCONDENSER Components Examined:
Results(%ofNominal):
1Elbow170-65M-15BMSR1B4THPASSTO5AHEATERComponents Examined:
Results(%ofNominal):
3Pipes3>882Elbows288-82M-19IA,2A,&3ALP.HEATERDRAINSTOCONDENSER Components Examined:
'esults(%ofNominal):
4Pipes9>884Elbows1ReducerM-21M-22STEAMEXT.TOPRESEP.TANKB&4BL.P.HEATERComponents Examined:
Results(%ofNominal):
3Pipes3>88STEAMEXT.TOPRESEP.TANKA&4AL.P.HEATERComponents Examined:
4PipesResults(%ofNominal):
1>883<65 R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIISYSTEMSTEAMEXTRACTION TO5A&5BHEATERSComponents Examined:
4Pipes2Elbows1TeeResults(%ofNominal):
5>88276-70FEEDWATER DISCHARGE (TURBINEBUILDING)
Components Examined:
1Pipe1Reducer1TeeResults(%ofNominal):
1>88182-761>88FEEDWATER TOS/GIA(CONTAINMENT)
Components Examined:
1Pipe3Elbows1ReducerResults(%ofNominal):
3Acceptable 2>88FEEDWATER TOS/G1B(CONTAINMENT)
Components Examined:
1Pipe3Elbows1ReducerResults(%ofNominal):
4Acceptable 1>88S/GBLOWDOWNTOFLASHTANK(TURBINEBUILDING)
Components Examined:
3Pipes2Elbows1Reducer'esults(%ofNominal):
3>88188-822<65 0
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT m,SYSTEMFEEDWATER CLEANUP(CV-19)Components Examined:
1ReducerResults(%ofNominal):
1>88MAINFEEDWATER PUMPRECIRCULATION Components Examined:
6Pipes3Elbows2ReducersResults'%
ofNominal):
9>88188-82176-70GLANDSTEAMCONDENSER TOTURB.GEN.&GOV.Components Examined:
4Pipes8ElbowsResults(%ofNominal):
7>88388-82176-701<65MAINGLANDSTEAMTOTURB.GEN.&GOV.ENDSComponents Examined:
4Pipes8ElbowsResults(%ofNominal):
370-659<65F.W.HTR.DRAINSYS.FROMH.DPUMPSTOH.T.TANKComponents Examined:
3Pipes1Elbow1ReducerResults(%ofnominal):
5>884
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails:Thefollowing listprovidesexamination resultdetailsoncomponents bydrawingnumberandsystemdescription.
The"Component Type"classification specified inthelistbelowcorresponds tothefollowing:
P=PipeE=ElbowT=TeeR=Reducer/Expander J=Expansion JointM-12AMSR1AA1B2NDPASSTO5AHEATERANDCONDENSER SummaryComp.Comp.NominalNominalMinimumMinimumNumberIDTeWall1Wall2Allowable ReadinPercentNDENominalMethod2220707R0.3000.4320.134,0.192 0.214,0.352 76-70UT.2220757AP0.4320.1920.415>88UT22208082220909E0.4320.4320.1940.1930.4030.413>88>88UTUT0.2680.423>8822229027E0.43222231029R0.4320.4370.274,0.203 0.482,0.440
>88UTUT22233031R0.3370.5940.154,0.284 0.400,0.567
>88UT 0
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-12BMSR2A&2B2NDPASSTO5BHEATERANDCONDENSER SummaryComp.Comp.NominalNominalMinimumNumrIDTWillWII2AllwIMinimumPercentNDERdinNminlh22289087E0.4320.1980.29070-65UT223090106P0.4320.2070.27176-70UTM-15BMSR1B4THPASSTO5AHEATERSummaryComp.Comp.NominalNominalMinimumNumberIDTeWall1Wall2Allowable MinimumPercentNDEReadinNominalMethod22722074P0.30022723075E0.30022724076P0.30022732084E0.30022733085P0.3000.1680.1690.1680.1710.1680.2910.2830.2600.2700.260>88>8888-82>8888-82UTUTUTUTUT
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
SummaryComp.Comp.NominalNominalMinimumNmerIDTWillWll2AllwlM-191A,2A,&3AL.P.HEATERDRAINSTOCONDENSER MinimumPercentRinNmin1NDEMethd23401001R0.5940.5000.207,0.174 0.567,0.522
>88UT23403003E0.50023404004P0.50023407007E0.50023407507AE0.5000.1760.1730.1740.1730.4950.4840.6040.505>88>88>88>88UTUTUTUT23408008E23409009P0.5000.5000.1740.1730.5170.484>88>88UTUT23428028P0.5000.1750.463>88UT23429029E0.5000.1770.460>88UTM-21STEAMEXT.TOPRESEP.TANKB&4BL.P.HEATERSummaryComp.Comp.NominalNominalMinimumMinimumPercentNDENumberIDTeWall1Wall2Allowable ReadinNominalMethod30138236BP037530138336CP0.37530138436DP0.37'5'0.1840.1840.1840.3470.3630.365>88>88>88UTUTUT R.E.GINNANUCLEARPO%ERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-22STEAMEXT.TOPRESEP.TANKA&4AL.P.HEATERSummaryComp.Comp.NominalNominalMinimumMinimumNumberIDTeWall1Wall2Allowable Readin'ercentNDENominalMethod30212137AAP0.37530212237ABP0.37530212337ACP0.37530212437ADP0.3750.1840.1840.1840.1840.2210.2100.2290.253<65<65<6570-65UTUTUTUTM-75STEAMEXTRACTION TO5A&5BHEATERSSummaryComp.Comp.NominalNominalMinimumNumberIDTeWall1Wall2Allowable MinimumPercentNDEReadinNominalMethod303080080.3750.2250.336>88UT30309009T0.37530310010P0.3750.2300.2250.3920.265>8876-70UTUT'30311011E0.3750.2340.359>88UT30312012P0.37530314014,E0.3750.2320.2250.2630.36376-70>88UTUT8
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-81FEEDWATER DISCHARGE (TURBINEBUILDING)
SummaryComp.Comp.NominalNominalMinimumMinimumPercentNDEmrIDTeWillW112Allw1ReinNminieh39006006R0.8440.9380.627,0.631 0.660,0.755
>88UT3900656AP0.93839001001T1.2810.6970.6970.8771.48>88>88UTUTM-84FEEDWATER TOS/G1A(CONTAINMENT)
SummaryComp.Comp.NominalNominalMinimumMinimumPercentNDENumberIDTeWall1Wall2Allowable ReadinNominalMethod39311011E0.93839312012P093839313013E09380.705N/A0.6060.8490.703'/A39315015R0.9381.1560.929,1.146 N/AAcceptable VT>88UTAcceptable VTAcceptable VT39316016E1.1560.7731.026>88UT9
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-85FEEDWATER TOS/G1B(CONTAINMENT)
SummaryComp.Comp.NominalNominalMinimumrIDTeWillW11211wleMinimumPercentNDEReinminiMh39363013E0.93839364014P0.93839365015E09380.7000.6060.706N/AN/AN/A39367017E0.9381.1560.704,0.903 N/AAcceptable VTAcceptable VTAcceptable VTAcceptable VT39368018P09380.8931.025>88N-88DS/GBLOWDOWNTOFLASHTANK(TURBINEBUILDING)
SummaryComp.Comp.NominalNominalMinimumMinimumPercentNDENumberIDTeWall1Wall2Allw1ReainNminalMeh38577077P0.3370.1430.308>88UT38577577AR0.3370.5000.143,0.224 0.279,0.467 88-82UT38577777B,P0.5000.2240.476>88UT385780783857907938582082E0500P0500E0.5000.2240.2240.2240.2380.2290.461'65(65>88UTUTUT 1'
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-91FEEDWATER CLEANUP(CV-19)SummaryComp.Comp.NominalNominalMinimumNumerIDTeWall1Wall2Allwa1MinimumPercentNDEReadinNminalMethd30086040R0.4320.3370.337,0.236 0.408,0.316
>88UTM-92MAINFEEDWATER PUMPRECIRCULATION SummaryComp.Comp.NominalNominalMinimumNmerIDTeWalllW112AllwlMinimumPercentNDEainNminalMth281040042810500528106006281070072811101128113013E0.594P0.5940.4480.3750.5230.553>88>88UTUTUTP0.337P0.3370.2180.1450.3430.286>88UT88-82UTR0.3370.3220.113,0.169 0.499,0.338
>88UTE0.5940.3370.466,0.267 0.612,0.612
>8828120020BE0.5940.3370.466,0.267 0.420,0.420
<65UT28121021281250252812702728128028P0.337P03370.2180.1120.3070.307>88>88P03220.1680.319>88R0.3370.3220.113,0.169 0.535,0.372
>88UTUTUTUT11 RE.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mComonentResultDetails(CONTINUED)
M-99GLANDSTEAMCONDENSER TOTURB.GE¹4GOV.SummaryComp.Comp.NominalNominalMinimumMinimumNmerIDTeWall1Wall2AllwaleRdinPercentNDENminlMeh37442643BE0.25837442743AP0.2580.1810.18'10.1030.213<6588-82UTUT37444044E02580.1810.241>88RT37448649BE025837448749AP0.25837450050E0.25837456657BE0.25837456757AP025837458058E0.25837462663BE025837462763AP0.25837464064E0.2580.1810.1810.1810.1810.1810.1810.1810.1810.1810.2300.2210.2360.2080.2290.2670.1850.2530.244>8888-82>8876-70>88>8876-70>8888-82UTUTRTUTUTRTUTUTRT12
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mComonentResultDetails(CONTINUED)
M-100MAINGLANDSTEAMTOTURB.GEN.&GOV.ENDSSummaryComp.Comp.NominalNominalMinimumNmrIDTeWalllWll2Allw1MinimumPercentNDERinNminalMeh37522222BE0.258375223'2CP0.25837522422DE0.25837532232BE0.25837532332CP0.25837532432DE0.25837541241BE0.25837541341CP0.25837541441DE0.25837550250BE0.258'7550350CP025837550450DE0.2580.1810.1810.1810.1810.1810.1810.1810.1810.1810.1810.1810.1810.0960.1750.1290.1740.1780.1550.0670.1450.0920.0640.1430.122<65UT70-65UT<65UT<65UT<65UT70-65UT<65UT<65UT<65UT<65UT70-65UT76-70UT13
.
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIComonentResultDetails(CONTINUED)
M-103F.W.HTR.DRAINSYS.FROMH.DPUMPSTOH.T.TANKSummaryComp.Comp.NominalNominalMinimummrIDTW111W112Allw1MinimumPercentNDERinminIeh32501001P0.21632502002E0.21632503003P0.2160.0720.0720.0720.2040.2010.202>88>88>88.UTUTUT,32531031R0.3000.4320.210,0.302 0.311,0.401
>88UT32530530AP0.3000.2100.294>88UTAdditional Insections:InadditiontotheErosion/Corrosion program,ServiceWatercomponents wereselectedtobesurveyedfromthefollowing drawings; RelatedSstemC-381-025 Sh1C-381-094 Sh1C-381-358 Sh1C-381-024 Sh3C-381-358 Sh3C-381-025 Sh4C-381-358 Sh4C-381-358 ShsC-381-358 Sh9C-381-358 Sh13C'-381-358 Sh14C-381-358 Sh16C-381-358 Sh17C-381-358 Sh22C-381-358 Sh27C-381-358 Sh34SWSuctionLineLoopAtoAux.Feedwater AHU-1BCoolingCoilsFrom4"SWto20"ReturnSWFromCCHXtoAnchoratWallCol.QSWSuctionLineLoopBAFWPumpAux.Bldg&SBAFPBldg.SWReturnFromCCWHXtoWallCol.QSWSuctionLoopAtoAFWPumpAuxBldg.&SBAFPBldg.SWFromSupplyHeadertoDistribution ManifoldSWReturnFromSFPHXSWIBAboveEl.253'6"FromPen.308,315,&323toCol.7SWIBAboveEl.253'6"From16"HeadertoPen.312,316,&,320SWIBAboveEl.253'6"16"&20"HeaderSWIBFrom14"HeadertoPen.201&209SWFrom20"HeadertoMDAFWPumpslA&.1BSWFormCont.Recirc.Unit1-CtoPen.315SWtoCont.RecircCoolingUnit1C&1DMotors"A"&"B"SWpumpsinScreenhouse
'
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIAdditional lnsections:(Continued)
~Dw¹C-381-358 Sh35C-381-358 Sh37C-381-358 Sh38C-381-358 Sh39D-304-695 D-304-696 33013-2027 RelatedSstem"C"k"D"SWPumpsinScreenhouse SWD/GBldg."RoomA"SWD/GBldg."RoomA2BSWD/GBldg."RoomB"ServiceWater(Auxiliary Building)
ServiceWater(Auxiliary Building)
ServiceWaterSupplykReturntoSFPHX82ServiceWaterResultDetailsThefollowing listprovidesexamination'result detailsonservicewatercomponents bydrawingnumberandsystemdescription.
Thecomponent IDwasprovidedbyengineering support.The"Component Type"classification specified inthelistbelowcorresponds tothefollowing:
P=PipeE=ElbowR=Reducer/Expander C-381-025 Sh1SWSuctionLineLoopAtoAux.Feedwater Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW251-01P0.2370.0950.232>88RTC-381-094 Sh1AHU-1BCoolingCoilsFrom4"SWto20"ReturnComp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW941-01P0.1450.0640.151>88RT
~l, RE.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIServiceWaterResultDetailsCONTINUED C-381-358 Sh1SWFromCCHXtoAnchoratWallCol.QComp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW01-01P0.3750.1500.31684UTC-381-024 Sh3SWSuctionLineLoopBAFWPumpAux.Bldg&SBAFPBldg.Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW243-01P0.2370.0950.231>88UTC-381-358 Sh3SWReturnFromCCWHXtoWallCol.QComp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW03-01PSW03-02P0.3750.3750.1500.1500.3530.328>8887UTUTC-381-025 Sh4SWSuctionLoopAtoAFWPumpAuxBldg.&SBAFPBldg.Comp.IDComp.TeNominalMinimumMinimumPercentNDEWallAllowable ReadinNominalMethodSW254-01P0.2370.1160.19181RT16
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIServiceWaterResultDetailsCONTINUED C-381-358 Sh4SWFromSupplyHeadertoDistribution ManifoldComp.IDComp.NominalMinimumMinimumPercentNDETe~WallAllowable ReadinNominalMethodSW04-01PSW04-02P0.2160.2160.0860.0860.1490.20470>88RTRTC-381-358 ShsSWReturnFromSFPHXComp.IDComp.TeNominalWaiiMinimumAllowable MinimumPercentNDEReadinNominalMethodSW05-01P0.2800.2420.20272RTC-3S1-358 Sh9SWIBAboveEl.253'6"FromPen.308,315,&323toCol.7Comp.IDComp.TeNominalWailMinimum.MinimumAllowable ReadinPercentNDENominalMethodSW09-01.PSW09-02PSW09-03E0.3220.1'330.3750.1290.0530.1500.3020.0850.392>8875>88UTRTUTC-381-358 Sh13SWIBAboveEl.253'6"From16"HeadertoPen.312,316,&320Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW13-01PSW13-02P0.3750.2800.1500.1120.3470.270>88>88UTUT R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT IIIServiceWaterResultDetailsCONTINUED C-381-358 Sh14SWIBAboveEl.253'6"16"&20"HeaderComp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadin'ominalMethodSW14-01E0.2370.0960.19080RTC-381-358 Sh16SWIBFrom14"HeadertoPen.201&209Comp.IDComp.TeNominalWailMinimumAllowable MinimumPercentNDEReadinNominalMethodSW16-01P0.2030.1430.130(65RTC-381-358 Sh17SWFrom20"HeadertoMDAFWPumps1A&1BComp.IDComp.TeNominalWailMinimumAllowable MinimumPercentReadinNominalNDEMethodSW17-01ESW17-02P0.2370.2370.1300.1330.2060.1778775RTRTC-381-358 Sh22SWFormCont.Recirc.Unit1-CtoPen.315Comp.IDComp.TeNominalWaiiMinimumMinimumPercentNDEAllowable Readin.NominalMethodSW22-01P0.2370.0950.18478RT R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mServiceWaterResultDetailsCONTINUED C-381-358 Sh27SWtoCont.RecircCoolingUnit1C41DMotorsComp.IDComp.TeNominalWallMinimum'llowable MinimumReadinPercentNDENominalMethodSW27-01P0.2030.0810.196UTC-381-358 Sh34"A"4"B"SWpumpsinScrenhouse Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW34-01PSW34-02P0.3220.3750.1590.1850.3480.358>88>88UTUTC-381-358 Sh35"C"4"D"SWPumpsinScreenhouse Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW35-01PSW35-02PSW35-03P0.2370.3750.1330.1170.1850.0660.3830.2870.284>8876>88RTUTUTC-381-358 Sh37SWD/GBldg."RoomA"Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSW37-01P0.2370.0950.148(65UT19 i
R.E.GINNANUCLEARPOWERPLANTInservice Inspection Report1990-1999
- Interval, SecondPeriod,FourthOutage(1996)ATTACHMENT mServiceWaterResultDetailsCONTINUED C-381-358 Sh38SWD/GBldg."RoomA&BComp.IDComp.TeNominalWattMinimumAllowable MinimumPercentNDEReadinNominalMethodSW38-01R0.2370.1260.258>88RTC-381-358 Sh39SWD/GBldg."RoomB"Comp.IDComp.TeNominalWaltMinimumAllowable MinimumReadinPercentNDENominalMethodSW39-01P0.2370.1010.229>88RTD-304-695 ServiceWater(Auxiliary Building)
Comp.IDComp.TeNominalWaitMinimumAllowable MinimumPercentNDEReadinNominalMethodSWXX-01P0.1130.0790.08071RT,D-304-696 ServiceWater(Auxiliary Building)
Comp.IDComp.TeNominalWaiiMinimumMinimumPercentNDEAllowable ReadinNominalMethodWXX-02P0.0650.046~0.02640RT33013-2027 ServiceWaterSupply&ReturntoSFPHX¹2Comp.IDComp.TeNominalWallMinimumAllowable MinimumPercentNDEReadinNominalMethodSWXX-03P0.3650.1460.338>88UT20
N