ROCHESTER GAS ANDELECTRIC CORPORATION S9 EAST AVENUE,ROCHESTER, NY 14649 NUCLEARREGULATORYCOMMISSION INSERVICE INSPECTION REPORT FOR THE THIRDINTERVAL(1990 - 1999)

THIRD PERIOD, FIRST OUTAGE (1997)

AT R. E. GINNANUCLEARPOWER PLANT REVISION 0 MARCH 27, 1998 9804ibOi09 98040b PDR ADOCK 05000244 8

PDR

R. E. GINNANUCLEARPOWER PLANT NUCLEARREGULATORYCOMMISSION INSERVICE INSPECTION REPORT THBU)INTERVAL (1990 - 1999)

THIRD PERIOD, FIRST OUTAGE (1997)

OWNERS DATASHEET Date: 27 March, 1998 Owner:

Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York 14649 Plant Location and Unit No.:

R. E. Ginna Nuclear Power Plant Unit One 1503 Lake Road Ontario, New York 14519 Commercial 0 eratin Date:

July 1970 A

licable Code:

ASME Section XI, 1986 Edition, No Addenda

R E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

TABLEOF CONTENTS Introduction and Synopsis Summary ofWork Accomplished Class I Components Class 2 Components Class 3 Components High Energy Components Design Break/Consequential Break Weld Examinations and Component Support Examinations Steam Generators System Pressure Testing Leakage Testing Service Induced Rejectable Components - Expanded Examinations Snubbers Visual Examinations / Functional Testing Seismic Support Program Erosion/Corrosion (Minwall)Program Attachment I Attachment II Attachment III ISI Program Examination Summary Repair, Replacement 8'c Modification Program Summary Erosion/Corrosion (Minwall)Program Summary

R E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

INTRODUCTIONAND SYNOPSIS:

Inservice Inspection (ISI) activities for 1997 were performed on components within Class 1, 2, 3, High Energy Piping, Steam Generator Tubes, Seismic Supports and Snubbers.

ISI examinations were concluded on January 6, 1998. Examination methods included Visual (VT), Liquid Penetrant (PT), Magnetic Particle (MT), Ultrasonic (UT), Radiographic (RT), and Eddy Current (ET).

Functional Testing (FT) and System Pressure Tests were also performed.

Erosion/Corrosion examinations were also performed during this time.

Personnel involved included RG&:E Laboratory and Inspection

Services, Sonic Systems International, Master Lee Services Corporation, ABB Combustion Engineering Corporation, GPU, Quality Inspection Services, Ginna Station Quality Control and the Ginna Station Results/Test Group.

Additional Support Personnel included individuals from the following departments:

Ginna Station Insulators, Maintenance, Electricians, Pipe Fitters, Health Physics, Turbine Maintenance, RG&E General Maintenance and Ginna Station System Engineering.

ASME SECTION X

ISUMMARY

OF WORK'ACCOMPLISHED:

Upon conclusion ofthe 1997 Outage, 86.2% ofASME Section XICode required examinations for the Third Interval ISI Program has been completed. A detailed component summary ofall outage ISI activities with their associated results can be found within "Attachment I".

CLASS 1 COMPONENTS:

A total of 191 ASME, Augmented or Owner Elected components were examined.

The examinations for these components consisted of83,VT's, 49 PT's, 33 MT's, 51 UT's and 1 RT. A total of217 examinations were performed on Class 1 Components.

CLASS 2 COMPONENTS:

Atotal of 143 ASME or Owner Elected Components were examined.

The examinations for these components consisted of 83 VT's, 27 PT's, 34 MT's, 4 RT's, and 16 UT's for a total of 164 examinations.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

CLASS 3 COMPONENTS:

A total of 126 ASME or Owner Elected Components were examined utilizing the VT visual examination method.

HIGHENERGY COMPONENTS:

Forty-Six (46) Augmented or Owner Elected items associated withthe High Energy Program were examined during the 1997 Outage. The examinations for these items on welds, component supports and associated integral attachments consisted of42 VT's, 38 MT's, 25 RT's and 8 UT's for a total of 113 examinations.

STEAM GENERATOR TUBING:

ASME and Owner Elected Examinations were performed on tubes in the "A" and "B" Steam Generators.

The following examinations were performed on both Generators.

100% tube end to tube end Eddy Current examination utilizing Bobbin coils Visual Examination ofone (1) Manufacturers Plug Diagnostic examinations in specific areas were sampled 10% sample ofall roll transitions 20% ofRow 1 and 2 U-bends 100% ofall tubes that vary from Manufacturer tube proximity design Steam Generator Eddy Current Examination details are documented in the Rochester Gas &,

Electric 1997 Steam Generator Eddy Current Final Report.

SYSTEM PRESSURE TESTS:

L~kT A total oftwenty-eight (28) Leakage Examinations were performed.

Leakage tests performed included one (1) Class 1, Reactor Coolant System (PT-7) examination, twenty-six (26) Class 2 or 3 examinations and one (1) High Energy Feedwater.

R. E. GINNANUCLEARPO%ER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Service Induced Re ectable Com onents - Ex anded Examinations:

There were six (6) components that was classified initiallyas "Service Induced Rejectable". The followinglist identifies the components that would have had expanded examinations performed.

CVU-98 Component Support - Owner Elected Exam SWU-176 Component Support - Owner Elected Exam RHU-62 Component Support - Owner Elected Exam Penetration 402 Lug Integral Attachment - Code Exam (See Note ¹1)

MSU-41 Component Support Integral Attachment - Code Exam (See Note ¹2)

SWU-327 Component Support Integral Attachment - Code Exam (See Note ¹3)

Notes ttl After expansion, Metallurgical investigation stated that the indications were due to original construction/fabrication

¹2 Action Report 98-0413 generated for missed expansion.

¹3 No Code expansion required, owner elected expansion.

SNUBBER PROGRAM:

Visual Examinations / Functional Testin A total of 22 Snubber component supports were Visually (VT) examined. These Augmented examinations were performed to satisfy Ginna Station Snubber Program commitment.

Atotal oftwenty-two (22) snubbers were Functionally Tested (FT) during the 1997 outage. From the twenty-two snubbers that were originally scheduled, twelve (12) were mechanical snubbers and ten (10) were hydraulic snubbers.

Snubber Functional Tests (FT) were performed on the followingsupports.

Mechanical Snubbers AFU-3 FWU-26(East)

SIU-47 AFU-101 CCU-43 FWU-26(West)

MSU-29 CVU-550 FWU-24 MSU-32 FWU-32 RHU-110 H draulic Snubbers:

SGB-4 AFU-229 FWU-21 N607 AFU-208 N608 AFU-224 N615 AFU-226 PS-8

R E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

SEISMIC SUPPORT PROGRAM:

Atotal ofeleven (11) Augmented or Owner Elected Seismic Supports were inspected utilizingthe visual (VT) examination technique.

EROSION/CORROSION MINWALLPROGRAM:

Atotal of 117 items were examined during the 1997 Outage.

The breakdown ofthis total is as follows:

~~

CT~

Pipes Elbows Bends Reducers Tees Total Number 47 34 12 12 12 The statements made in this report and attachments are correct and the examinations and corrective measures taken conform to the Rules ofthe ASME Code,Section XI.

Prepared By:

Frank A. Klepac ISI Engineer 8/u w/9$-

Date Approve By y/~>/p h Michael J.

apo to Date Manager, Laboratory and Inspection Services, Technical Performance and Field Inspections

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Certificate ofInservice Ins ection I, the undersigned, holding a valid commission issued by the National Board ofBoiler and Pressure Vessel Inspections and the State or Province ofNew York and employed by The Hartford Steam Boiler Ins ection and Insurance Com an have inspected and/or verified the components described withinthis report and associated Attachments during the stated reporting time frame, and state to the best of my knowledge and belief, the Owner has performed examination and corrective measures described in this Report in accordance with the requirements of the ASME Code,Section XI.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss ofany kind arising from or connected with this inspection.

Reviewed By: -~E Z. 'l~~

~~~7d ANII's Signature Date

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As uired b the Provisions ofthe ASME Code Rules

1. Owner Rochester Gas

& Electric Cor 89 East Ave.

Rochester N.Y. 14649

2. Plant (Naine and Address ofOwner)

R.E.

Ginna Nuclear Power plant 1503 Lake Road Ontario NY 14519

3. Plant Unit
5. Commercial Service Date Zul 1970 (Name and Address ofPlant)
4. Owner CertificateofAuthorization(ifrcquired)
6. National Board Number forUnit N/A N/A Component or Appurtenance Manufacturer or Installer Manufacturer or Installer Serial No.

State or Province No.

National Board No.

(*) SEE "ATTACHMENT I" FOR APPLICABLE INFORMATION Note: Supplemental shccts in formoflists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each shcct, and (3) each sheet is numbered and the number ofsheets is recorded at thc top ofthis form (12/86)

This form(E0029) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ07007 2300

FORM NIS-1 (Back) 8.

Examination Dates 7/02/96 to 1/06/98

9. Inspection Interval from 1990 to 1999 10.

Applicablc Editions ofSection XI 1986 Addenda No 11.

Abstract ofExaminations, Include a listofexaminations and a statement conccming status ofwork required forcurrent interval.

(*)

12.

Aletract ofConditions Noted.

(*)

13.

Abstract ofConectivc Measures Recommcndcd and Taken.

(*)

We certifythat statements made in this report arc correct and thc examinations and corrective measures taken conform to thc rules ofthe ASME Code, Section N/A Certificate ofAuthorization No. (ifapplicable)

Date 27 March N A Expiration Date 19 98 Signed ochestcr Gas 8r, Electric Co ration By Owener ISI Enginccr CERTIFICATE OF INSERVICE INSPECTION i, ti>> undmsigned, holding a v iid commission issued by tho National Board ofthdtcr and prcssure Vmsci inspectors and the desto or pmvinm of~

rgdc and cmpioyedby th of have inspected thc components dcscribcd in this Ownei's Rcport during the period to r

dy'nd state that to the best ofmy knowledge and belief, thc Owner has performed examinations and taken corrcctivc mcasurcs described in

's Owner's Rcport in accordance withthc inspection plan and as required by the ASME Code, Section)G.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective mcasurcs dcscribcd in this Owner's RcporL Furthermore, neither the Inspector nor his cmploycr shall bc liable in any manner for any personal injuryor property damage or a loss ofany kind arising from or conncctcd withthis inspection.

Inspectoi's Signature Date

~

A 19~4 Commissions National Hoard, State, Province, and Endorsements

(*) SEE "ATTACHMENT I" FOR APPLICABLE INFORMATION 2.

R.

E ~

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Periodf First Outage (1997) 1.

Owner Rochester Gas"

& Electric Cor.,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/'A S.Commercial Service Date

~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I A.

CLASS 1 COMPONENTS:

REACTOR PRESSURE VESSEL DRAWINGS: A-1 Summary Number Exam Categ Item Number Component NDE Component Type Exam 000702 B-N-1 B13.10 RPV INTERIOR VESSEL INTERIOR ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'01033 B-G-1 B6.10 NUT I33 CLOSURE NUTS, REMOVED(48TOT)

ASME 97 -MT-NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001034 B-G-1 B6.10 NUT g34 CLOSURE NUTS, REMOVED(48TOT)

ASME 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001035 B-G-1 B6.10 NUT 835 CLOSURE NUTS, REMOVED(48TOT)

ASME 97 MT NO RECORDABLE INDZCATZONSF 90%

COVERAGE OBTAINED ACCEPTABLE.

001036 B-G-1 B6.10 NUT 036 CLOSURE NUTS, REMOVED(48TOT) 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

NOTE:

"COMPONENT 'TYPE" IS DEFINED AS FOLLONS:

"ASME"= ITEM REQUIRED BY ASME SECTION XI CODE "AUG" = AUGMENTED PROGRAM ITEM REQUIRED BY NRC COMMITMENT "OE"

= OWNER ELECTED NON MANDATORY EXAMINATIONS

R.

E ~

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor

~

89 East Ave.,Rochester NY 14649

2. Plant RE ED Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. )

REACTOR PRESSURE VESSEL (CONT ~ )

DRAWINGS: A-1 Summary Exam Number Categ 001037 B-G-1 Item Number Component B6.10 NUT ¹37 CLOSURE NUTS, REMOVED(48TOT)

Component Type Exam 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001038 B-G-1 B6.10 NUT ¹38 CLOSURE NUTS, REMOVED(48TOT) 97 MT NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

00i039 B-G-1 B6.10 NUT ¹39 CLOSURE NUTS, REMOVED(48TOT)

ASME 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAZNED ACCEPTABLE.

001040 B-G-1 B6.10 NUT ¹40 CLOSURE NUTS, REMOVED(48TOT) 97 MT NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

001041 B-G-1 B6.10 NUT ¹41 CLOSURE NUTSSREMOVED(48TOT)

ASME MT 97 -MT:

NO RECORDABLE INDICATIONS, >

90'4 COVERAGE OBTAINED ACCEPTABLE.

001042 B-G-1 B6.10 NUT ¹42 CLOSURE NUTS, REMOVED(48TOT)

ASME 97 MT NO RECORDABLE INDZCATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1

4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1

COMPONENTS (CONT.):

REACTOR PRESSURE VESSEL (CONT.)

DRAWINGS'-1 Summary Exam Item Number Categ Number 001043 B-G-1 B6.10 Component NUT ¹43 CLOSURE NUTS, REMOVED(48TOT)

Component Type Exam ASME 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001044 B-G-1 B6.10 NUT ¹44 CLOSURE NUTS, REMOVED(48TOT)

ASME MT 97 -MT:

NO RECORDABLE ZNDZCATIONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

II 001045 B-G-1 B6.10 NUT ¹45 CLOSURE NUTS, REMOVED(48TOT)

MT 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001046 B-G-1 B6.10

NUT ¹46 CLOSURE NUTS, REMOVED(48TOT) 97 MT NO RECORDABLE ZNDICATZONSS 90%

COVERAGE OBTAINED ACCEPTABLE 001047 B-G-1 B6.10 NUT ¹47 CLOSURE NUTS, REMOVED(48TOT) 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001048 B-G-1 B6.10 NUT ¹48 CLOSURE NUTS, REMOVED(48TOT) 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

R.

E ~

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas"

& Electric Cor

~,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant, 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT ~

)

REACTOR PRESSURE VESSEL (CONT.)

DRAWINGS A-1 Summary Exam Number Categ 001133 B-G-1 Item Number Component CZRCR %CCRC B6.30 STUD 533 CLOSURE STUD, REMOVED(48TOT)

ASME MT UT Component Type Exam 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001134 B-G-1 B6.30 STUD 534 CLOSURE STUD, REMOVED(48TOT)

MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

001135 B-G-1 B6.30 STUD N35 CLOSURE STUD, REMOVED(48TOT)

ASME MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

001136 B-G-1 B6.30 STUD N36 CLOSURE STUDf REMOVED (48TOT) 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001137 B>>G-1 B6.30 STUD N37 CLOSURE STUD, REMOVED(48TOT)

ASME MT UT 97 MT

& UT NO RECORDABLE INDICATIONSf > 90~

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GINNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4 ~ Owner Certificate of Authorization (If Req.)

N/'A 5.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR PRESSURE VESSEL (CONT. )

DRAWINGS: A-1 Summary Exam Z tern Number Categ Number 001138 B-G-1 B6.30 Component STUD 538 CLOSURE STUD/ REMOVED ( 4 STOT)

Component Type NDE Exam MT UT 97 MT

& UT NO RECORDABLE INDICATIONS/ >

90%

COVERAGE OBTAZNED - ACCEPTABLE.

001139 B-G-1 B6.30 STUD 539 CLOSURE STUDS REMOVED ( 4 STOT )

ASME MT UT 97 -MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001140 B-G-1 B6.30 STUD ()40 CLOSURE STUD, REMOVED(48TOT)

ASME MT UT 97 -MT

& UT:

NO RECORDABLE ZNDICATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

001141 B-G-1 B6.30 STUD I41 ASME CLOSURE STUD, REMOVED(48TOT)

MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90'h COVERAGE OBTAINED ACCEPTABLE.

001142 B-G-1 B6.30 STUD 042 CLOSURE STUD, REMOVED(48TOT)

ASME MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001143 B-G-1 B6.30 STUD 543 CLOSURE STUD/ REMOVED ( 4 STOT)

MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONS,> 90%

COVERAGE OBTAINED ACCEPTABLE.

R.

E ~

GINNA NUCLEAR POWER PLANT Inservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

REACTOR PRESSURE VESSEL (CONT.)

DRAWINGS'-1 Summary Exam Number Categ Item Number Component NDE Component Type Exam 001144 B-G-1 B6.30 STUD ¹44 ASME CLOSURE STUD, REMOVED(48TOT)

MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001145 B-G-1 B6.30 STUD ¹45 CLOSURE STUD, REMOVED(48TOT)

MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

001146 B-G-1 B6.30 STUD ¹46 CLOSURE STUD, REMOVED(48TOT)

MT UT 97

-MT

& UT NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

001147 B-G-1 B6.30 STUD ¹47 CLOSURE STUDf REMOVED (48TOT)

ASME MT UT 97 -MT

& UT:

NO RECORDABLE INDICATIONS,>

90%

COVERAGE OBTAINED ACCEPTABLE.

001148 B-G-1 B6.30 STUD ¹48 CLOSURE STUD, REMOVED(48TOT)

MT UT 97 MT

& UT NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

001207 B-G-1 B6.40 THREADS IN FLANGE STUD HOLES 33 THRU 48 ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR PRESSURE VESSEL (CONT. )

DRAWINGS: A-1 Summary Etiam Number Categ 001333 B-G-1 Item Number Component B6.50 WASHER ()33 CLOSURE WASHERS (48TOT)

Component Type VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001334 B-G-1 B6.50 WASHER g34 CLOSURE WASHERS (48TOT)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001335 B>>G-1 B6 F 50 WASHER g35 CLOSURE WASHERS (48TOT)

ASME 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001336 B-G-1 B6. 50 WASHER g36 CLOSURE WASHERS (48TOT)

VT 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE.

001337 B-G-1 B6.50 WASHER g37 CLOSURE WASHERS (48TOT)

VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

001338 B-G-1 B6.50 WASHER g38 CLOSURE WASHERS (48TOT)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Bervice Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT CLASS 1 COMPONENTS (CONT. ):

REACTOR PRESSURE VESSEL (CONT. )

DRAWINGS: A-1 Summary Etiam Number Categ NBBNmt 001339 B-G-1 Item Number Component MMMNN M~~ ~met B6 ~ 50 WASHER ¹39 CLOSURE WASHERS (48TOT)

Component Type VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

001340 B-G-1 B6. 50 WASHER ¹40 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001341 B-G-1 B6.50 WASHER ¹41 CLOSURE WASHERS (48TOT) 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 001342 B-G-1 B6. 50 WASHER ¹42 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE.

001343 B-G-1 B6. 50 WASHER ¹43 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001344 B-G-1 B6. 50 WASHER ¹44 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

10

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A s.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT

)

REACTOR PRESSURE VESSEL (CONT. )

DRAWINGS: A-1 Summary Exam Number Categ Item Number Component NDE Component Type Exam 001345 B-G-1 B6 ~ 50 WASHER

$ 45 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

001346 B>>G-1 B6. 50 WASHER

()46 CLOSURE WASHERS (48TOT)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS - ACCEPTABLE.

001347 B-G-1 B6.50 WASHER 547 CLOSURE WASHERS (48TOT) 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 001348 B-G-1 B6.50 WASHER g48 CLOSURE WASHERS (48TOT) 97 -VT:

NO RECORDABLE INDICATIONS - ACCEPTABLE ~

VT 001603 B-A B1 ~ 40 RVP-HFW (32-1)

ASME CLOSURE HEAD-TO-FLANGE CIRC WELD MT UT 97 -MT

& UT: TAKING CREDIT FOR PREVIOUS EXAM. NO RECORDABLE INDICATIONS ACCEPTABLE.

)

96%

COVERAGE OBTAINED.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Bervice Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

PRESSURIZER DRAWINGS: A-4 Summary Etiam Number Cate g 003800 B-B Item Number Component Component Type B2.12 V-2 ASME LOWER SHELL VERTICAL WELD (LONGITUDINAL)

NDE Etiam UT 97 -UT-'O RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

003900 B-B B2.11 C-1 UPPER HEAD-TO-UPPER SHELL CIRC WELD UT 97 -UT:

NO RECORDABLE ZNDICATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

STEAM GENERATOR B DRAWINGS: A-6 Summary Etiam Number Categ 007609 F-A Item Number F1.40 Component SGB-SL SUPPORT COMPONENT LEGS H TO K ASME VT Component Type Etiam 97 -VT:

NO RECORDABLE INDICATIONS & ZNSIGNIFICANT: DOUBLE NUTS NOT REQUIRED ACCEPTABLE.

REACTOR COOLANT SYSTEM-LOOP A DRAWINGS: A-3B Summary E~am Number Categ 011700 B-J'tem Number B9.32 Component Type Component PL-FW-XIZ-ASW/2B-RCO-2 ASME 501-A 2" BRANCH WELD PT 97 -PT:

NO RECORDABLE INDZCATZONS, 90+0 COVERAGE OBTAINED ACCEPTABLE.

12

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Bervice Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT SYSTEM-LOOP A DRAWINGS'-3B Summary Exam Number Categ Item Number Component Component Type 012000 B-J B9.11 PL-FW-XZZZ ASME ELBOW-TO-PUMP(RCP-A)

PT UT 97 -PT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT 1/8 DIA

& 1/4 9

90%

COVERAG" OBTAINED ACCEPTABLE. UT:

NO RECORDABLE INDICATIONS, <

90%

COVERAGE OBTAINED RR g17, BEST EFFORT EXAMINATION ACCEPTABLE.

REACTOR COOLANT SYSTEM-LOOP B DRAWINGS: A-3G Summary Exam Item Number Categ Number 013600 B-J B9.11 Component PL-FW-VIZI PUMP(RCP-B)-TO-PIPE ASME PT UT NDE Component Type Exam 97 -PT:

NO RECORDABLE INDICATIONS, UT:

ACCEPTABLE.

PT

& UT:

90%

COVERAGE OBTAINED 3-IN. PRESSURIZER SPRAY LINE DRAWINGS: A-10 Summary Exam Number Categ 014600 B-J Item Number B9.21 Component Component Type Exam A

NOZZLE-TO-PIPE PT BBBB tmRNBRNNB C

B 9 RCBBBBNB BNBBB BBD NBB 9

97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

015200 B-J B9.21 ASW-4 PIPE-TO-ELBOW ASME PT 97 PT NO RECORDABLE ZNDZCATZONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

13

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

3-ZN.

PRESSURIZER SPRAY LINE (CONT. )

DRAWINGS: A-10 Summary Exam Number Categ 016700 B-J Ztem Number B9.21 Component DSW-2 PIPE-TO-ELBOW Component'ype ASME PT 97 -PT:

NO RECORDABLE INDICATIONS, > 90'OVERAGE OBTAINED ACCEPTABLE.

021300 F-A F1.10V RCU-6 VARIABLE SPRING ASME VT 97 -VT:

NO RECORDABLE INDICATIONS, SETTING 385 ACCEPTABLE.

2-ZN.

PRESSURIZER SPRAY LINE DRAWINGS A-11 Summary Exam Number Categ 022900 B-J Item Number Component B9.40 8

PIPE-TO-TEE ASME PT NDE Component Type Exam 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

023500 B-8 B9.40 10 PIPE-TO-ELBOW PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

025000 B-J B9.40 18 PIPE-TO-COUPLING ASME PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Periodf First Outage (1997) 1.

Owner Rochester Gas a Electric Cor 89 East Ave. Rochester NY 14649

,2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~oui 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

2-IN. PRESSURIZER SPRAY LINE DRAWINGS: A-11 Summary Exam Number Categ Item Number Component Component Type 025900 B-J B9.40 26 ELBOW-TO-PIPE ASME PT 97 PT NO RECORDABLE INDIGATIONS 6 90%

COVERAGE OBTAINED ACCEPTABLE ~

026000 B-J B9.40 27 PIPE-TO-REDUCER AUG PT RT 97 -PT:

NO RECORDABLE INDICATIONS ACCEPTABLE. RT:

ZNSZGNIFZCANTa ZUC 8 1 1/2" TO 2 f IUC 8 ¹26 SUCK UP 8

2 1/2 9

TUNG 8 ¹Sf FILM ARTIFACT 8 5

7 ACCEPTABLE ~

4-ZN.

PRESSURIZER RELIEF LINE DRAWINGS'-12 Summary Exam Ztem Number Categ Number WBB 026200 B-J B9.11 Component A

SAFE END-TO-ELBOW (RELIEF LINE)

ASME PT UT Component Type Exam 97 UT NO RECORDABLE INDICATIONS ACCEPTABLE PT INSIGNIFICANT 8

4 1/4 f 1/8" DIAMETER ROUNDED INDZCATION ACCEPTABLE.

90%

COVERAGE OBTAINED.

3-ZN.

PRESSURIZER RELIEF LINE DRAWINGS A-12 Summary Exam Ztem Number Categ Number BS M&&

SN WWMM ~

SBSNBB 027000 B-J B9.21 Component Component Type BB SBBBSNNS R

BBR SNBB R CQR ~

BS NS 9

NS~RRS SB B

ASME REDUCER-TO-VALVE(516)

NDE Exam PT 97 -PT:

NO RECORDABLE ZNDZCATIONS, 90%

COVERAGE OBTAINED - ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

3-ZN.

PRESSURIZER RELIEF LINE (CONT.)

DRAWINGS: A-12 Summary Exam Number Categ 027100 B-J Item Number B9. 21 Component C

VALVE(516) -TO-PIPE Component Type Exam PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

4-IN. PRESSURIZER RELIEF LINE DRAWINGS A-13 Summary Exam Number Categ 027400 B-J Item Number Component B9.11 REDUCER-TO-ELBOW ASME PT UT Component Type Exam 97 -PT:

NO RECORDABLE INDICATIONS. UT: INSIGNIFICANT: SLAG IS FABRICATION INDICATION AND IS OUT OF THE AREA OF INTEREST NO THRU WALL DEPTH

- ACCEPTABLE.

LAM SCAN PERFORMED IN 1974.

90%

COVERAGE OBTAINED.

RESZDUAL HEAT REMOVAL TO LOOP B COLD LEG DRAWINGS'-14 Summary Exam Item Number Categ Number Component 029400 B-J B9.11 B

PIPE-TO-VALVE(721)

ASME PT UT Component Type Exam 97 -PT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ONE SIDED EXAM ACCEPTABLE.

16

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

RESIDUAL HEAT REMOVAL FROM LOOP A HOT LEG DRAWINGS A-15 Summary Exam Item Number Categ Number Component Component Type Exam Mms 030700 B-J B9.11 C

VALVE(700) -TO-PIPE ASME PT UT 97 PT

& UT NO RECORDABLE INDICATIONSS > 90$

COVERAGE OBTAINEDS LAM SCAN PERFORMED IN 1980 ACCEPTABLE.

032500 F-A Fl. 10R RHU-32 RIGID RESTRAINT ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

H.P.

SAFETY ZNJECTZON LINE TO LOOP B COLD LEG DRAWINGS: A-16 Summary Exam Number Categ 033700 F-A Item Number Component Fl.lov SIU-50 VARIABLE SPRING Component Type ASME 97 -VT:

NO RECORDABLE INDICATIONS, SETTING 1465 O'S ACCEPTABLE.

H.P.

SAFETY INJECTION LINE TO LOOP A COLD LEG DRAWINGS: A-17 Summary Exam Number Categ 035400 B-J Item Number Component B9.11 GSW-1 ELBOW-TO-PIPE Component Type Exam PT UT 97 PT

& UT NO RECORDABLE INDICATIONSS

> 90 5 COVERAGE OBTAINEDS NO CHANGE SINCE LAST EXAM - ACCEPTABLE.

17

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commerciel service Date ~Jul 1970 6.Netionnl Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

6-ZN. RESID HT REMOVAL TO RPV (LHSZ)

DRAWINGS: A-14 Summary Exam Number Categ 037700 B-K-1 Item Number Component B10.10 RHU-10 (IA)

INTEGRAL ATTACHMENT OE PT NDE Component Type Exam 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

037800 F-A F1.10R RHU-10 RZGZD HANGER (IA)

VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

2" H.P.

SAFETY INJECTION TO LOOP A HOT LEG DRAWINGS: A-20 Summary Exam Number Categ 040900 B-J Ztem Number Component B9 ~ 40 ASW-13 2" PIPE-TO-BRANCH CONNECTION ASME PT Component Type Exam 97 -PT:

NO RECORDABLE 1NDICATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

H.P.

SAFETY INJECTION LINE DRAWINGS: A-21 Summary Exam Item Number Categ Number aaa aa a aa a aaaaaaa 041800 B-J B9.40 NDE Component Component Type Exam aaaa~aaaaaa Bsa GSW-16 ASME PT PIPE-TO-ELBOW 97 -PT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE. >

90%

COVERAGE OBTAINED.

18

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

2" LETDOWN FROM LOOP B CROSSOVER DRAWINGS: A-23A Summary Exam Item Number Categ Number 042700 B-J B9.40 Component 1

NOZZLE-TO-PZ PE Component Type ASME PT 9'7 PT'O RECORDABLE ZNDZCATZONSS 90%

COVERAGE OBTAINED ACCEPTABLE ~

043000 F-A F1.10V CVU-38 VARIABLE SPRING VT 97 -VT:

NO RECORDABLE INDICATIONS, SETTING 150 ACCEPTABLE.

2" LETDOWN TO REGEN HTX DRAWINGS: A-23 Summary Exam Number Categ 045600 B-J Item Number Component CSSSSC~

SSSSCBSSS¹S ~

SSSSSS B9.40 25 ELBOW-TO-PIPE ASME PT Component Type Exam 97 PT NO RECORDABLE INDZCATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

046600 B-J B9 ~ 40 30 PIPE-TO-ELBOW ASME PT 97 -PT:

NO RECORDABLE INDICATIONS & INSZGNIFZCANT: 1/8" POR 8 TOE OF WELD AT 5 3/8".

90%

COVERAGE OBTAINED ACCEPTABLE.

046800 B-K-1 B10. 10 CVU-29 (IA)

INTEGRAL ATTACHMENT OE PT 97 -PT:

NO RECORDABLE ZNDZCATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

19

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas 6 Electric Cor.,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/'A 5.Commercial Service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

2" LETDOWN TO REGEN HTX (CONT.)

DRAWINGS: A-23 Summary Exam Number Categ 046820 F-A Item Number Component Component Type Exam MBB F1.10R VT CVU-29 ASME RIGID RESTRAZNT (ZA) 97 -VT:

NO RECORDABLE ZNDZCATZONS ACCEPTABLE.

048100 B-J B9.40 42 PIPE-TO-NOZZLE ASME PT 9'7 PT NO RECORDABLE ZNDZCATIONSf >

9'0%

COVERAGE OBTAINED ACCEPTABLE 2"

LETDOWN FROM REGEN HTZ DRAWINGS: A-24 Summary Exam Item Number Categ Number Component 048274 B-J B9.40 30 PIPE-TO>>VALVE(202)

Component Type Bmmemmt PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

SEAL 'WATER TO RCP-B DRAWINGS: A-32A Summary Exam Ztem Number Categ Number Component Component Type Exam 049040 F-A F1.10R CVU-90 RIGID RESTRAINT (ZA)

OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'0

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

SEAL WATER TO RCP-B (CONT.)

DRAWINGS'-32A Summary Etiam Ztem Number Categ Number 049041 B-K-1 B10.10 Component

~~BBBB~~ NB~

CVU-90 (ZA)

INTEGRAL ATTACHMENT OE PT NDE Component Type Etiam 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

049050 B-J B9.40 59 ELBOW-TO-PIPE PT 97 -PT:

REJ:

ACTION REPORT 97-1777 GENERATED

& CLEARED/ SOCKET-FABRICATION AND TOOL MARK INDICATIONS WERE SURFACE CONDITIONED FOR NDE.

RE-EXAM, NO RECORDABLE INDICATIONS/

ACCEPTABLE' 90%

COVERAGE OBTAZNED ~

INDICATION ON FITTING ORIG.

CONSTRUCTION.

049085 F-A F1.10R CVU-91 GUIDE OE VT 97 -VT: NO RECORDABLE INDZCATZONS ACCEPTABLE.

049090 B-J B9.40 52 PIPE-TO-COUPLING ASME PT 97 -PT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT, RANDOM ROUNDED ZNDZCATIONS EQUAL TO OR LESS THAN 1/32" DZA. CHIPPING HAMMER MARKS, 90%

COVERAGE OBTAINED ACCEPTABLE.

049100 F-A Fl.10R CVU-92 GUIDE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

049125 F-A F1.10R CVU-93 RIGID RESTRAINT OE VT 97 -VT: NO RECORDABLE ZNDZCATIONS ACCEPTABLE.

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant RE E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

SEAL WATER TO RCP-B (CONT.)

DRAWINGS: A-32A Summary Etiam Item Number Categ Number 049150 F-A F1.10R Component Component Type CVU-94 OE RIGZD RESTRAINT NDE Etiam VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE-049155 F-A F1.10R CVU-95 U-BOLT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

049160 F-A F1.10R CVU-96 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

049175 F-A F1.10R CVU-97 RIGID RESTRAINT OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

049180 B-J B9.40 40 PIPE-TO-TEE ASME PT 97 PT NO RECORDABLE ZNDZCATIONSf > 90%'OVERAGE OBTAINED ACCEPTABLE'49205 F-A Fl. 10R CVU-98 OE RIGID HANGER VT 97 -VT: OWNER ELECTED EXAM: REJECT:

ACTION REPORT 97-1673 GENERATED TO ADDRESS LOOSE NUT ON STRUT.

RE-EXAM AFTER TIGHTENING ACCEPTABLE - NO RECORDABLE INDICATIONS'2

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

l. Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~cul 1970 S.National Board'Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

SEAL WATER TO RCP-B (CONT ~

)

DRAWINGS: A-32A Summary Exam Number Categ 049220 F-A Item Number Component F1.10R CVU-99 U-BOLT Component Type Exam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

049235 B-J B9.40 31 ASME PT PIPE-TO-ELBOW 97 -PT:

NO RECORDABLE INDICATIONS, >

99%

COVERAGE OBTAINED ACCEPTABLE.

049255 B-J B9.40 27 PIPE-TO-ELBOW ASME PT 97 -PT:

NO RECORDABLE INDICATIONS, > 90't COVERAGE OBTAINED ACCEPTABLE.

049265 F-A Fl.lOR CVU-100 U-BOLT OE VT 97 -VT: NO RECORDABLE INDZCATIONS ACCEPTABLE.

049280 F-A Fl ~ 10R CVU-101 GUIDE OE 97 -VT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE.

049305 B-J B9.40 19PIPE-TO-ELBOW'T 97 -PT:

NO RECORDABLE INDICATIONSS >

90%

COVERAGE OBTAINED ACCEPTABLE.

049320 B-J B9.40 16 ELBOW-TO-PIPE ASME PT 97 -PT:

NO RECORDABLE INDICATIONS,> 90%

COVERAGE OBTAINED ACCEPTABLE.

23

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

SEAL WATER TO RCP-B (CONT.)

DRAWINGS: A-32A Summary Exam Number Categ Item Number Component Component Type Exam 049325 F-A F1. 10R CVU-102 OE GUIDE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'49365 F-A F1.10S CVU-103 MECHANICAL SNUBBER VT 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: SETTING 2 6

TRANSITION TUBE TO CLAMP ATTACHED WITH COTTER PINS, CVU-104 IS BOLTED.

ACCEPTABLE.

049370 F-A F1.10S CVU-104 MECHANZCAL SNUBBER OE VT 97 VT'O RECORDABLE INDICATIONS & INSIGNZFICANTr'RANSITION TUBE TO CLAMP ZS ATTACHED WITH BOLTSS CVU 103 IS ATTACHED WITH COTTER PINSS SETTING 2 ACCEPTABLE.

049380 B-J B9.40 7

VALVE(304D)-TO-PIPE ASME PT 97 -PT:

NO RECORDABLE INDICATIONS9 90'8 COVERAGE OBTAINED ACCEPTABLE.

049415 B-J B9.40 1

P1PE-TO-FLANGE(RCP-B)

PT 97 -PT:

NO RECORDABLE ZNDZCATIONS, 90'I)

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.commercial Bervice Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

SEAL HATER TO RCP-A DRAHZNGS'-31A Summary Exam Number Categ 049550 F-A Item Number Component F1.10R CVU-171 RIGID RESTRAINT OE VT Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

049595 F-A F1.10A CVU-172 ANCHOR (IA)

OE VT 97 VT'O RECORDABLE INDZCATZONSf TOTAL ZA WELD LENGTH ZS 9

f DRAWING CALLS FOR 7 3/8" ACCEPTABLE.

049596 B-K-1 B10. 10 CVU-172 (IA)

INTEGRAL ATTACHMENT OE PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

049605 B-J B9.40 41 ELBOW-TO-PIPE ASME PT 97 -PT:

NO RECORDABLE INDICATIONS, > 90t COVERAGE OBTAINED ACCEPTABLE.

049610 F-A F1.10R CVU-173 U-BOLT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE ~

049625 F-A F1.10R CVU-174 U-BOLT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

25

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT-):

SEAL WATER TO RCP-A (CONT.)

DRAWINGS: A-31A Summary Emma Ztem Number Categ Number Component 049630 F-A F1.10R CVU-175 U-BOLT Component Type OE VT 97 -VT:

NO RECORDABLE INDZCATZONS ACCEPTABLE.

049655 F-A F1.10R CVU-176 U-BOLT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

049685 F-A F1.10R CVU-177 GUIDE VT 97 -VT: ZNSIGNIFICANT, SHIM SIDE HAS NO GAP.

NON-SHIM SIDE HAS 1/8" AIR GAP.

ACCEPTABLE PER ME-121.

049690 F-A Fl.10R CVU-178 U-BOLT VT 97 -VT-'O RECORDABLE INDICATIONS ACCEPTABLE.

049695 F-A Fl. 10R CVU-179 GUXDE OE VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFXCANT: SHIM SIDE HAS NO GAP, NON-SHIM SIDE HAS 1/8" AIR GAP ACCEPTABLE ~

049700 F-A Fl. 10R CVU-180 RIGID RESTRAINT ASME VT 97 -VT:

NO RECORDABLE INDICATXONS & INSIGNIFICANT: NO BOTTOM SPACER REQUIRED PER MANUFACTURER ACCEPTABLE.

26

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas' Electric Cor

~,89 East Ave.,Rochester NY 14649

2. Plant RE E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/iL ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

SEAL WATER TO RCP-A (CONT.)

DRAWINGS: A-31A Summary Exam Number Categ 049755 F-A Item Number Component F1.10A CVU-187 ANCHOR (IA)

OE VT NDE Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE ~

049756 B-K-1 B10.10 CVU-187 (IA)

INTEGRAL ATTACHMENT OE PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE-049760 F-A Fl.10R CVU-188 GUIDE OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

049785 F-A F1.10R CVU-189 U-BOLT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

049860 B-J B9.40 1

PIPE-TO-FLANGE(RCP-A)

ASME PT 97 PT NO RECORDABLE ZNDZCATIONS 9 9 O'8 COVERAGE OBTAINED ACCEPTABLE ~

R.

E ~

GZNNA NUCLEAR POWER PLANT Inservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1

COMPONENTS (CONT. ):

2" CHARGING TO LOOP B COLD LEG DRAWINGS: A-25 Summary Exam Ztem Number Categ Number Component aaaa 050730 B-J B9.40 21B VALVE(9314)-TO-PIPE Component Type Exam BBBB 1 R~

BBBBBBa PT ASME 97 PT NO RECORDABLE ZNDICATZONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

050749 B-J B9.40 21F TEE-TO-PIPE PT 97 -PT:

REJ:

ACTION REPORT 97-1778 CLEARED WHEN ADDITIONAL NDE SURFACE CONDITIONING WAS PERFORMED.

> 90'h COVERAGE OBTAINED. METALURGZST REVIEWED

& IDENTIFIED SUSPECT AREA AS ORIGIONAL CONSTRUCTION LACK OF FUSION

& CRATER CRACK.

RE-EXAM ACCEPTABLE.

2" CHARGING TO LOOP B COLD LEG DRAWINGS'-25 Summary Exam Number Categ 050900 B-J'tem Number Component B9.40 24 PIPE-TO-ELBOW ASME PT Component Type Exam 97 -PT:

NO RECORDABLE INDICATIONS, > 908 COVERAGE OBTAINED ACCEPTABLE.

2" ALTERNATE CHARGING TO LOOP A COLD LEG DRAWINGS: A-26 Summary Exam Item Number Categ Number Component

~BBBBBBM MBBMBB BBBBB MMMBBW BB

~nniNBBBN 051500 F-A F1.10R CVU-23 GUIDE NDE Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: BOTTOM OF SUPPORT

& PZPZNG AROUND SUPPORT WERE HEAVILY COVERED WITH BORATED WATER RESIDUE ACCEPTABLE.

28

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

2" ALTERNATE CHARGING TO LOOP A COLD LEG (CONT-)

DRAWINGS: A-26 Summary Exam Ztem Number Categ Number Component 051700 B-J B9.40 22 ELBOW-TO-PIPE ASME PT Component Type Exam 97 PT NO RECORDABLE INDICATIONSS >

90'8 COVERAGE OBTAINED ACCEPTABLE.

051800 B-J B9.40 23 PIPE-TO-ELBOW PT 97 -PT:

NO RECORDABLE ZNDICATIONSS

> 9'0$

COVERAGE OBTAINED ACCEPTABLE.

052400 B-J B9.40 29 PIPE-TO-ELBOW ASME PT 97 PT NO RECORDABLE ZNDZCATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

052800 B-J B9.40 33 COUPLING-TO-PIPE ASME PT 97 PT NO RECORDABLE ZNDZCATIONSS

> 90$

COVERAGE OBTAINED ACCEPTABLE.

2" LETDOWN FROM LOOP B CROSSOVER DRAWINGS'-23A Summary Exam Item Number Categ Number Component 056100 B-J B9 ~ 40 2A PIPE-TO-VALVE(507)

Component Type Exam r

Bs f ~~

~rm sm PT OE 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

29

R.

E ~

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990<<1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date

~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT Z CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A DRAWINGS: A-7 Summary Exam Number Categ Item Number Component Component Type Exam Ram BB BB Bmmt 056701 B-G-1 B6.200 NUT ¹1

BOLTING, VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

056702 B-G-1 B6. 200 NUT ¹2

BOLTING, VT 97 -VT:

NO RECORDABLE INDZCATIONS ACCEPTABLE.

056703 B-G-1 B6. 200 NUT ¹3

BOLTING, ASME VT 97 -VT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE'56704 B-G-1 B6. 200 'UT ¹4

BOLTING, VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056705 B-G-1 B6.200 NUT ¹5

BOLTING, ASME 97 -VT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE'56706 B-G-1 B6. 200 NUT ¹6

BOLTING, ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056707 B-G-1 B6.200 NUT ¹7

BOLTING, VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

30

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

l. Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1070 B.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT. )

DRAWINGS: A-7 Summary Exam Item Number Categ Number Component 056708 B-G-1 B6.200 NUT 58

BOLTING, NDE Component Type Exam ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

056709 B-G-1 B6.200 NUT 59

BOLTZNG, 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 056710 B-G-1 B6.200 NUT Ilo

BOLTZNG, 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 056711 B-G-1 B6.200 NUT 511

BOLTING, ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056712 B-G-1 B6.200 NUT 112

BOLTING, 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 056713 B-G-1 B6. 200 NUT ()13

BOLTING, ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

056714 B-G-1 B6.200 NUT g14

BOLTING, 97 -VT:

NO RECORDABLE ZNDICATIONS ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

l. Owner Rochester Gas' Electric Cor.,89 East Ave. Rochester NY 14649
2. plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/'A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT.)

DRAWINGS: A-7 Summary Exam Number Categ 056715 B-G-1 Item Number Component B6.200 NUT ¹15

BOLTING, ASME VT NDE Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'56716 B-G-1 B6.200 NUT ¹16

BOLTING, VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056717 B-G-1 B6. 200 NUT ¹17 BOLTINGS ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056718 B-G-1 B6. 200 NUT ¹18

BOLTING, ASME VT 9'7 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE-056719 B-G-1 B6. 200 NUT ¹19
BOLTING, VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056720 B-G-1 B6. 200 NUT ¹20

BOLTING, VT 97 -VT:

NO RECORDABLE INDICAT1ONS - ACCEPTABLE.

056721 B-G-1 B6.200 NUT ¹21

BOLTING, ASME VT 97 -VT:

NO RECORDABLE ZNDICATIONS ACCEPTABLE.

32

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant, 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Xf Req.)

N/A 5.Commercial Service Date ~oui 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT.)

DRAWINGS: A-7 Summary Eram Number Categ 056722 B-G-1 Item Number B6.200 Component NUT ¹22

BOLTING, Component Type ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056723 B-G-1 B6.200 NUT ¹23 BOLTZNGf VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

056724 B-G-1 B6.200 NUT ¹24

BOLTING, VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

056801 B-G-1 B6.180 STUD ¹1 ASME

BOLTING, 97 -UT:

NO RECORDABLE XNDICATZONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

056802 B-G-1 B6.180 STUD ¹2 BOLTINGf UT 97 -UT:

NO RECORDABLE INDZCATXONS, > 908. COVERAGE OBTAINED ACCEPTABLE.

056803 B-G-1 B6.180 STUD ¹3 ASME

BOLTING, 97 -UT:

NO RECORDABLE INDICATZONS, >

90%

COVERAGE OBTA'INED ACCEPTABLE.

056804 B-G-1 B6.180 STUD ¹4

BOLTING, 97 -UT-NO RECORDABLE INDICATXONS, >

90%

COVERAGE OBTAINED ACCEPTABLE'3

R. E.

GINNA NUCLEAR POHER PLANT Inservice Inspection Report 1990-1999 Intenral, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1570 S.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT.)

DRARINGS: A-7 Summary Exam Item Number Categ Number 056805 B-G-1 B6. 180 Component, STUD 55

BOLTlNG, Component Type Exam UT 97 -UT:

NO RECORDABLE INDICATIONS/ >

90%

COVERAGE OBTAINED ACCEPTABLE.

056806 B-G-1 B6.180 STUD N6 BOLTING/

UT 97 -UT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

90%

COVERAGE OBTAINED.

056807 B-G-1 B6.180 STUD 07

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

056808 B-G-1 B6.180 STUD

()8

BOLTZNG, UT 97 UT NO RECORDABLE INDICATIONS/ > 90't COVERAGE OBTAINED ACCEPTABLE 056809 B-G-1 B6.180 STUD N9
BOLTING, ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

056810 B-G-1 B6.180 STUD 810 ASME

BOLTING, UT 97 -UT:

NO RECORDABLE ZNDICATIONS

& INSIGNIFICANT: GEOMETRIC SIGNAL SEEN FROM MACHINED AREA APPROX.

1" FROM BOTTOM OF STUD.

90%

COVERAGE OBTAINED ACCEPTABLE.

34

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas"

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Service Date ~Jul 1970 G.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT.)

DRAWINGS: A-7 Summary Exam Number Categ 056811 B-G-1 Item Number Component B6.180 STUD ¹ll

BOLTING, Component Type Exam UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED - ACCEPTABLE.

056812 B-G-1 B6.180 STUD ¹12

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, > 99$

COVERAGE OBTAINED ACCEPTABLE'56813 B-G-1 B6 ~ 180 STUD ¹13

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, > 90'b COVERAGE OBTAINED ACCEPTABLE.

056814 B-G-1 B6.180 STUD ¹14

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.'56815 B-G-1 B6.180 STUD ¹15

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, > 90%.COVERAGE OBTAINED ACCEPTABLE.

056816 B-G-1 B6.180 STUD ¹16

BOLTZNG, ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

35

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Service Date ~cul 1970 S.National Boaru Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP A (CONT.)

DRAWINGS A-7 Summary Eram Item Number Categ Number Component 056817 B-G-1 B6.180 STUD ¹17

BOLTING, NDE Component Type Etiam ASME UT 97 -UT-NO RECORDABLE INDICATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

056818 B-G-1 B6.180 STUD ¹18

BOLTING, ASME UT 97 UT NO RECORDABLE INDZCATZONSS 99%

COVERAGE OBTAINED ACCEPTABLE.

056819 B-G-1 B6.180 STUD ¹19

BOLTING, UT 97 UT NO RECORDABLE ZNDICATIONSS

> 90't COVERAGE OBTAINED ACCEPTABLE.

056820 B-G-1 B6. 180 STUD ¹20

BOLTING, ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

056821 B-G-1 B6.180 STUD ¹21

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90%.COVERAGE OBTAINED ACCEPTABLE.

056822 B-G-1 B6. 180 STUD ¹22

BOLTING, UT 97 -UT:

NO RECORDABLE INDICATIONS, >

90'h COVERAGE OBTAINED ACCEPTABLE.

36

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 1 COMPONENTS (CONT.):

REACTOR COOLANT PUMP A (CONT. )

DRAWINGS: A-7 Summary Etiam Number Categ 056823 B-G-1 Item Number Component B6. 180 STUD N23

BOLTING, Component Type ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, > 90t COVERAGE OBTAINED ACCEPTABLE.

056824 B-G-1 B6.180 STUD 124

BOLTING, ASME UT 97 -UT:

NO RECORDABLE INDICATIONS, >

9'0%

COVERAGE OBTAINED ACCEPTABLE.

REACTOR COOLANT PUMP B DRAWINGS: A-7 Summary Etiam Ztem Number Categ Number BBBBBBBBmrmmmm 058000 F-A F1.40 Component Component Type Etiam VT NBKBXBBNBBBBBf Krm&BBBBK NB K f

KBBKKKBBRRD EBB-1 EYEBAR 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

058050 F-A F1.40 EBB-2 EYEBAR VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

058130 F-A F1.40 LEG L SUPPORT COMPONENTS 97 -VT: NO RECORDABLE INDICATZONS ACCEPTABLE.

37

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor

. 89'ast Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT Z CLASS 1 COMPONENTS (CONT. ):

REACTOR COOLANT PUMP B (CONT. )

DRAWINGS: A-7 Summary Exam Z tern Number Categ Number 058140 F-A F1.40 NDE Component Component Type Exam LEG M ASME VT SUPPORT COMPONENTS 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

058150 F-A F1.40 LEG N SUPPORT COMPONENTS ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

B ~

CLASS 2 COMPONENTS:

2" LETDOWN FROM REGEN HTX DRAWINGS: A-24 Summary Exam Number Cate g 048278 Ztem Number Component Component Type F1.20R CVU-140 OE U-BOLT VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

CHARGING PUMP A TO PULSE DAMPENER DRAWINGS: B-6 Summary Exam Number Categ Ztem Number Component Component Type Exam 076000 C-F-1 C5.11 4

PIPE-TO-ELBOW ASME PT UT 97 PT 6 UT NO RECORDABLE INDICATIONS9 )

90%

COVERAGE OBTAINED ACCEPTABLE ~

38

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

l. Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~cul 1970 B.National Board Number for Unit N/A ATTACHMENT 1 CLASS 2 COMPONENTS (CONT. ):

CHARGING PUMP A TO PULSE DAMPENER

{CONT.)

DRAWINGS: B-6 Summary Exam Z tern Number Categ Number Component 077900 F-A F1.20R CVU-415 RIGID RESTRAINT (IA)

OE VT Component Type Exam 97 -VT: REJECTr 2 OVERSIZE NUTS

& LACK OF GOOD WELD. ACTION REPORT 97-1699 GENERATED.

SEE ZSIM-025 FOR ACCEPTANCE OF OVERSIZE NUTS

& ACTZON REPORT FOR ACCEPTANCE OF INCOMPLETE WELDf NOT SERVICE INDUCED ACCEPTABLE 077901 C-C C3.20 CVU-415 (IA)

ASME PT INTEGRAL ATTACHMENT 97 -PT:

REJECT; ACTION REPORT 97-1699 GENERATED FOR LACK OF COMPLETE WELD.

NOT SERVICE INDUCED ACCEPTABLE, )

90%

COVERAGE OBTAINED.

RESIDUAL HEAT REMOVAL PUMP A DRAWINGS: B-28 Summary Exam Ztem NDE Number Categ Number Component Component Type Exam NB 078940 F1.40 RHR PUMP A SUPPORT ¹1 OE VT SHAFT END SUPPORT 97 -VT: NO RECORDABLE INDICATIONS, BOLT FLOATS AS A LEVELER ALL PUMPS HAVE SAME CONFIGURATION, LIGHT RUST

ACCEPTABLE'78945 F1.40 RHR PUMP A SUPPORT ¹2 OE SPLIT LINE SUPPORT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: LIGHT RUST - ACCEPTABLE.

078950

F1.40 RHR PUMP A SUPPORT ¹3 OE SPLIT LINE SUPPORT VT 97 -VT: NO RECORDABLE ZNDZCATZONS

& ZNS1GNIFZCANT: LIGHT RUST ACCEPTABLE.

39

R. E.

GZNNA NUCLEAR POWER PLANT lnservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.} N/A S.commercial Service Data ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT Z CLASS 2 COMPONENTS (CONT. ):

MAIN STEAM LOOP A OUTSIDE CV DRAWINGS'-9 Summary Exam Item Numbex Categ Numbex 080401 C-C C3 ~ 20 Component NDE Component

Type, Exam PS-A, PEN 401 ANCHOR ASME MT (OUTCV)

PT INTEGRAL ATTACHMENT 97 -ADDITIONALEXAM FOR PEN 402 REJECTS MT

& PT:

REJECT.

RE-EXAM AFTER REPAIRS SEE RR

SUMMARY

SHEET R97065 FOR ACCEPTABLE SECTION XI EXAM. >

90%

COVERAGE OBTAINED~

MAIN STEAM LOOP A INSIDE CV DRAWINGS B-9 Summary Exam Number Categ 080451 C-C Item NDE Number Component Component Type Exam mst C3

~ 20 PS-B, PEN 401 ANCHOR ASME MT (INCV}

PT INTEGRAL ATTACHMENT 97 -ADDITIONALEXAM FOR PEN 402 REJECT.

MT

& PT:

REJECT:

8B 10" INDICATION.

4B 1 1/2" INDICATION.,REPAIRED BT WELDING. SEE RR

SUMMARY

I R97070 FOR ACCEPTANCE EXAM. NO RECORDABLE INDICATIONS ACCEPTABLE.

90%

COVERAGE OBTAINED.

MAIN STEAM LOOP A OUTSIDE CV DRAWINGS'-9 Summary Exam Number Categ 081310 C-C Ztem Number Component C3.20 MSU-44 (ZA)

INTEGRAL ATTACHMENT Component Type Exam 97 ADDITIONALEXAM FOR PEN 402 REJECT MT NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

40

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/'A 5 C.ommercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT.):

MAIN STEAM LOOP A OUTSIDE CV (CONT.)

DRAWINGS: B-9 Summary Etiam Item Number Categ Number 081800 C-F-2 C5.51 Component Component Type F

ASME PIPE-TO-ELBOW VT MT UT 97 -MT:

NO RECORDABLE INDICATIONS. VT: INSIGNIFICANT: VARIOUS ARC STRIKES, GOUGES

& LINE UP LUG ZNDICATZONSf THESE WERE IDENTIFIED ZN 86 EXAM UT: INSIGNIFICANT: ACCEPTABLE. ) 908 COVERAGE OBTAINED.

081850 C-F-2 C5.52 FL1 ELBOW LONGITUDINAL WELD ASME MT UT 97 -MT

& UT NO RECORDABLE INDZCATIONSf )

90%

COVERAGE OBTAZNEDf NO CHANGE SINCE LAST EXAM ACCEPTABLE.

082000 F-A F1.20V MSU-41 VARIABLE SPRING (ZA)

ASME VT 97 -VT:

NO RECORDABLE INDZCATZONS, SETTING 5068 ACCEPTABLE.

082005 C-C C3.20 MSU-41 (IA)

INTEGRAL ATTACHMENT 97 -MT: REJECT 1 LUG, LINEAR INDICATION IN LUG BASE METAL-ACTION REPORT 97-1848 GENERATED. USE-AS-IS PER ENG.

ONLY 4 OF THE 6

LUGS ARE REQUIRED.

90%

COVERAGE OBTAINED ACCEPTABLE.

083400 F-A Fl ~ 20R MSU-36 GUIDE (IA)

ASME VT 97 -VT: NO RECORDABLE ZNDICATIONS ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.Commercial Service Date

~oui 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

MAIN STEAM LOOP A OUTSIDE CV (CONT.)

DRAWINGS'-9 Summary Exam Number Categ 083405 C-C Item Number Component C3.20 MSU-36 (IA)

INTEGRAL ATTACHMENT Component Type Exam ASME 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

MAIN STEAM LOOP A ATMOSPHERIC VENT DRAWINGS: B-9A Summary Exam Number Categ 083900 C-F-2 Item Number Component BBBBBBBBBBammm ~~~

~

~BBBBNB C5.51 G2-BC-2-A PIPE-TO-VALVE(3507)

ASME MT RT VT NDE Component Type Exam 97 -VT, MT OBTAINED RT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: >

90%

COVERAGE ACCEPTABLE.

MAIN STEAM LOOP B INSIDE CV DRAWINGS'-8 Summary Exam Ztem Number Categ Number 084460 C-F-2 C5.52 Component AL2 ELBOW LONGITUDINAL WELD NDE Component Type Exam MT UT 97 -UT: ZNSZGNIFICANT: MODE CONVERSION ACCEPTABLE. MT: REJECT:

ACTION REPORT 97-1845 GENERATED.

INDICATIONS SAME AS EXISTED BEFORE

& ON ELBOW EXAM THIS OUTAGE - ORIGIONAL FABRICATION INDICATION. SURFACE CONDITIONING PERFORMED RE-EXAM ACCEPT.

90%

COVERGE OBTAINED.

42

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave., Rochester NY 14649

2. plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT Z CLASS 2 COMPONENTS (CONT.):

MAIN STEAM LOOP B INSIDE CV (CONT.)

DRAWINGS B-8 Summary Exam Number Categ Item Number 084500 C-F-2 C5.51 Component A3 ELBOW-TO-PIPE Component Type ASME MT RT 97 -MT:

NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT-POROSITY SLAG ACCEPTABLE.

90%

COVERAGE OBTAINED.

085900 F A Fl ~ 20A PS Af PEN 402 ANCHOR OE (ZNCV)

ANCHOR (IA)

VT 97 VT INSIGNIFICANT LO TDCS 2

UNDERCUT 1/8 LONG X 1/32 TOE DOWNSTREAM P.B.

ACCEPTABLE.

085901 C-C C3.20 PS-A, PEN 402 ANCHOR ASME

( INCV)

INTEGRAL ATTACHMENT 97 -MT

& PT:

REJECT; INDICATIONS AT TOE OF GUSSET WELDS IN BASE MATERIAL.

ACTION REPORT 97-1846 GENERATED. A CODE WELD REPAIR WAS PERFORMED.

RE EXAM ACCEPTABLE'EE

SUMMARY

RR97054 EXAM RECORDS 97GP1799 97GP1809 97GP192

& 97GM244 FOR RE-EXAMS.

MAIN STEAM LOOP B OUTSIDE CV DRAWINGS B-10A Summary Exam Item Number Categ Number 085950 F-A F1.20A Component PS-B, PEN 402 (OUTCV)

ANCHOR (IA)

ANCHOR OE VT NDE Component Type Exam 97 -VT: INSIGNIFICANT: UNDERCUT AT 7" DOWNSTREAM, AT TOE, 1/8" X 1/32" DEEP ACCEPTABLE.

R.

E ~

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas 6 Electric Cor

~,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. )

MAIN STEAM LOOP B OUTSIDE CV DRAWINGS'-10A Summary Exam Number Categ St~

085951 C-C Item Number C3

~ 20 Component MM~CC~MMCX~

Component Type Exam PS-Bf PEN 402 ANCHOR ASME (OUTCV)

INTEGRAL ATTACHMENT 9I MT NO RECORDABLE INDZCATIONSS

> 90'5 COVERAGE OBTAINED ACCEPTABLE'T:

ALSO PERFORMEDS NO RECORDABLE INDICATIONS ACCEPTABLE'86330 C-C C3 ~ 20 MSU-12 (IA)

ZNTEGRAL ATTACHMENT ASME 97 ADDITIONAL EXAM FOR PEN 402 REJECTS MT NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

086530 C-C C3

~ 20 MSU-13 (ZA)

INTEGRAL ATTACHMENT ASME 97 -ADDITIONALEXAM FOR PEN 402 REJECTS MT:

NO RECORDABLE INDZCATIONSf 90%

COVERAGE OBTAINED ACCEPTABLE'86805 C-C C3 ~ 20 MSU-15 (IA)

INTEGRAL ATTACHMENT ASME 97 -ADDITIONALEXAM FOR PEN 402 REJECT

~

MT:

NO RECORDABLE INDICATIONS, 90%

COVERAGE OBTAINED ACCEPTABLE'88125 F-A

~

F1 '0S MSU-29 OE MECHANICAL SNUBBER (ZA)

VT 97 -VT:

NO RECORDABLE INDICATIONS, SETTING 2 1/4"

ACCEPTABLE'88130 C-C C3

~ 20 MSU-29 (IA)

INTEGRAL ATTACHMENT ASME 97 MT NO RECORDABLE INDZCATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GINNA NUCLEAR POWER PLANT Inservice inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Co 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

MAIN STEAM LOOP B OUTSIDE CV DRAWINGS'-10A Summary Etiam Number Categ 088400 C-F-2 Item Number Component C5.51 Component Type Etiam J1 ASME VT PIPE-TO-ELBOW MT UT 97 VT9 MT

& UT NO RECORDABLE INDICATIONS 6 9 0 8 COVERAGE OBTAINED ACCEPTABLE 088450 C-F-2 C5.52 J1L1 ELBOW LONGITUDINAL WEI D ASME MT UT 97

-MT

& UT:

NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

088820 F-A F1.20S MSU-32 OE MECHANICAL SNUBBER (IA)

VT 97 -VT:

NO RECORDABLE INDZCATIONS, SETTING 1 1/4" ACCEPTABLE.

088821 C"C C3.20 MSU-32 (ZA)

INTEGRAL ATTACHMENT ASME 97 MT NO RECORDABLE INDICATIONS 6 9 0%

COVERAGE OBTAINED ACCEPTABLE ~

R. E.

GINNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

MAIN STEAM LOOP B ATMOSPHERIC VENT DRAWINGS: B-10 Summary Exam Number Categ 090400 C-F-2 Item Number C5.51 Component Component L2-BC-2-A ASME PZPE-TO-VALVE(3506)

NDE Type Exam MT RT VT 97 -VT

& MT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE. RT: INSIGNIFICANT:

ACCEPTABLE. ALL EXAMS >

90%

COVERAGE OBTAINED.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS: B-11 Summary Exam Z tern Number Categ Number Component amam~maam Bmr am~ma~

M ~ ~ ~~~~~~mam maam~maam 091901 C-C C3.20 PS-A, PEN 403 ANCHOR (OUTCV)

ZNTEGRAL ATTACHMENT NDE Component Type Exam ASME 9'7 ADDITIONAL EXAM FOR PEN 402 REJECT

~ MT'O RECORDABLE INDICATIONS/

90%

COVERAGE OBTAINED ACCEPTABLE'EEDWATER LOOP A INSIDE CV DRAWINGS B-12 Summary Exam Number Categ NBNB~NBBNM 091951 C-C Ztem Number C3. 20 Component PS Bf PEN 403 ANCHOR (INCV)

INTEGRAL ATTACHMENT NDE Component Type Exam

~M~NB?mmamc~mm¹~~

ASME MT PT 97 ADDITIONAL EXAM FOR PEN 402 REJECTS MT

& PT:

NO RECORDABLE INDICATIONS ON LUGS

& PRESSURE BOUNDARY FUSION ZONE ~

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/'A B.commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

FEEDWATER LOOP B OUTSZDE CV DRAWINGS: B-14 Summary Exam Item Number Categ Number 094575 F-A F1.20V NDE Component Component Type Exam FWU-41 ASME VT VARIABLE S PRING 97 -VT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE.

SETTING 5670 O'S.

094600 C-F-2 C5.51 M

PIPE-TO-VALVE(3994)

ASME VT MT RT UT 97 -VT

& MT:

NO RECORDABLE INDICATIONS. RT: INSIGNIFICANT: 2 IUC INDICATIONS 8 14 75

& 15 75 WERE EXAMINED WITH UT TO OBTAIN SZZEf 90%

COVERAGE OBTAINED ACCEPTABLE.

097400 F-A Fl.20A PS-A, PEN 404 ANCHOR OE (OUTCV)

ANCHOR

( ZA) 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 097401 C-C C3.20 PS-A, PEN 404 ANCHOR ASME (OUTCV)

INTEGRAL ATTACHMENT MT PT 97 -PT

& MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT.):

FEEDWATER LOOP B INSIDE CV DRAWINGS: B-13 Summary Etiam Number Categ 097450 F-A Ztem Number Component F1.20A PS-B, PEN 404 ANCHOR

( ZNCV)

ANCHOR (IA)

NDE Component Type E~

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

097451 C-C C3.20 PS-B, PEN 404 ANCHOR ASME (INCV)

ZNTEGRAL ATTACHMENT 97 -MT: NO RECORDABLE ZNDICATZONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

PT ALSO PERFORMEDf SEE RR FOR EXAM RECORD ACCEPTABLE'.

P.

SAFETY INJECTION LINE 8E-SI-301 DRAWINGS'-16A Summary Etiam Number Categ 104875 F-A Item Number Component F1.20R SIU-102 GUIDE NDE

, Component Type Emm OE 9 I -VT: NO RECORDABLE INDICATIONS ACCEPTABLE ~

104950 C-F-1 26N OE PT PIPE-TO-TEE UT 97 -PT

& UT:

NO RECORDABLE INDICATIONSS 90%

COVERAGE OBTAINED ACCEPTABLE.

R.

E ~

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant RE ED Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/'A B.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT.)

H.P ~

SAFETY INJECTION LINE 8F-SI-301 DRAWINGS: B-16A Summary Etiam Number Categ CR 107220 F-A Item Number Component Fl ~ 20A SZU-100 ANCHOR (IA)

Component Type Etiam KECK RKK K~

ss SZR~

~CRX5 OE 97 -VT:

NO RECORDABLE INDICATIONS, PART OF EXAM PERFORMED WITH FIBERSCOPE DUE TO LIMITATIONS FOR DIRECT VISUAL ACCEPTABLE.

107221 C-C C3

~ 20 SIU-100 (IA)

INTEGRAL ATTACHMENT ASME PT 97 -PT:

NO RECORDABLE INDZCATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

107410 C-F-1 29N ELBOW-TO-PIPE OE PT UT 9I -PT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

6-ZN.

RESZD HT REMOVAL TO RPV (LHSZ)

DRAWINGS'-18 Summary Etiam Z tern Number Categ Number Component Component Type

%~~SR CC~Q RRCCCCCCC CltCRCZCRQCCCQOC25C CCZSC RXCCCZCV C CRCCCV 111225 F-A F1 '0R RHU-14 ASME RIGID RESTRAINT (IA) 97 -VT:

NO RECORDABLE INDICATIONS - ACCEPTABLE.

111230 C-C C3

~ 20 RHU-14 (IA)

INTEGRAL ATTACHMENT PT 97 PT NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

6-ZN, RESZD HT REMOVAL TO RPV (LHSZ)

(CONT. )

DRAWINGS: B-18 Summary Exam Z tern Number Categ Number 111250 F-A F1.20R Component RHU-13 RIGID RESTRAINT Component Type Exam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

112200 F-A F1. 20R RHU-18 RIGID RESTRAINT (IA) 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 112210 C-C C3.20 RHU-18 (1A)

PT INTEGRAL ATTACHMENT 97 -PT:

NO RECORDABLE INDICATZONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

H ~ P.

SAFETY ZNJECTION LINE FROM RWST DRAWINGS: B-19 Summary Exam Number Categ 120300 F-A Item Number Component F1. 20R RHU-100 RIGID SUPPORT (ZA)

Component Type VT 97 VT NO RECORDABLE INDICATIONS & INSIGNIFICANT ARC STRIKESS SEE NCR93 071 ACCEPTABLE.

120301 C-C C3.20 RHU-100 (IA)

OE INTEGRAL ATTACHMENT PT 97 -PT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: L= 2 1/2, 1/32" PORE; L

39 1/16 PORE 7 L

8 1/29 3/1 6

( 1/1 6 PORES 3/1 6 BLEEDOUT) 90%

COVERAGE OBTAINED ACCEPTABLE.

50

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LINE SL-SZ-151 DRAWINGS: B-19 Summary Exam Item Number Categ Number 122000 F-A F1.20R Component Component Type Exam RHU-111 OE RIGID SUPPORT (1A) 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE'22001 C-C C3. 20 RHU-111 (IA)

INTEGRAL ATTACHMENT ASME PT 97 -PT:

NO RECORDABLE INDICATIONS. )

90%

COVERAGE OBTAINED ACCEPTABLE.

RESIDUAL HEAT REMOVAL LINE 10B-AC-601 DRAWINGS'-20 Summary Exam Item Number Categ Number 130725 F-A F1.20R Component Component Type RHU-77 OE RIGID SUPPORT (IA) 97 -VT-INSIGNIFICANT: ACTION REPORT 97-1935 GENERATED TO REMOVE BORIC ACID

& CORROSION.

RE-EXAM REVEALED THAT THE PIPE IS IN CONTACT WITH PLATE BUT NO WELD COULD BE CLEARLY IDENTIFIED. ACCEPTABLE PER ENGINEERING.

130730 C-C C3.20 RHU-77 (IA)

INTEGRAL ATTACHMENT ASME PT 97 PT INSIGNIFICANT 1/16

& 1/8 ROUNDED INDICATZONSf ACCEPTABLE PER CODE.

90%

COVERAGE OBTAINED.

51

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Bound Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

RESIDUAL HEAT REMOVAL LINE 10D-AC-601 DRAWINGS: B-20 Summary Exam Z tern Number Categ Number Component 132900 F-A F1.20V RHU-62 VARIABLE SPRING (IA)

Component Type OE NDE Exam VT 97 -VT; NO RECORDABLE

& REJECT; SPRING CAN SETTING OFF.

ACTION REPORT 97-2013 GENERATED. ACTION REPORT PART 4 LETTER F ADDRESS OPERABILITY/

CONTINUED SERVICE.

RE-EXAM WILL BE PERFORMED UPON COMPLETION OF THE WO.

132905 C-C C3.20 RHU-62 (IA)

INTEGRAL ATTACHMENT PT 97 -PT:

INSIGNIFICANT, WELD IS ZN AS WELDED CONDITION WZTH ROUGH SURFACESS 90%

COVERAGE OBTAINED ACCEPTABLE.

RESZDUAL HEAT REMOVAL LINE 10E-AC-601 DRAWINGS: B-20 Summary Exam Number Categ BSS BB 136500 F-A Item Number Component Fl. 20R RHU-64 RIGID RESTRAINT Component Type Exam ana K

RS=BSSBBB-SNB=BSBSBBSBRK ~nma 97 -VT:

NO RECORDABLE 1NDZCATZONS ACCEPTABLE.

RESIDUAL HEAT REMOVAL LINE 10C-AC-601 DRAWINGS: B-20A Summary Exam Number Categ 137805 C-C Z tern Number Component Component Type C3. 20 RHU-68 (IA)

OE INTEGRAL ATTACHMENT PT 97 -PT:

NO RECORDABLE INDICATIONS & INSZGNIFZCANT: NO CHANGE SINCE LAST EXAM - ACCEPTABLE'2

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649 2

~ Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Bervice Date

~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

RESIDUAL HEAT REMOVAL LINE 10H-AC-601 DRAWINGS: B-24 Summary Exam Number Categ 140950 F-A Item Number Component F1.20A RHU-46 ANCHOR

( IA)

NDE Component Type Exam OE 97 -VT:

NO RECORDABLE INDICATIONS, > 90$

COVERAGE OBTAINED - ACCEPTABLE.

RESIDUAL HEAT REMOVAL LINE 8C-AC-601 DRAWINGS: B-24 Summary Exam Number Categ 143200 C-F-1 Item Number Component 12 PIPE-TO-ELBOW OE PT UT NDE Component Type Exam 97 -PT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

RESIDUAL HEAT REMOVAL LINE 6D-AC-601 DRAWINGS: B-26 Summary Exam Item Number Categ Number Component NB ~BB 146600 F-A F1.20V RHU-60 VARIABLE SPRING (IA)

OE VT Component Type Exam 97 VT NO RECORDABLE INDICATIONSf C&L SPRING CAN N568 SIZE 79 SETTING 504 g Sf ACCEPTABLE ~

146620 C-C C3.20 RHU-60 (IA)

INTEGRAL ATTACHMENT ASME PT 97 -PT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: ARC STRIKESf USE AS IS PER ENGINEERING (ISIM 024)

ON ARC STIKESf 90%

COVERAGE OBTAINED ACCEPTABLE.

53

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

RESIDUAL HEAT REMOVAL LINE 6D-AC-601 (CONT. )

DRAWINGS: B-26 Summary Exam Number Categ

~BBBBBBNB

~~ax~~

146900 C-F-1 Item Number Component mama 3

PIPE-TO-ELBOW OE PT UT Component Type Exam Bmoc%

BB BBKBBBBBBBBtmtmmarm 97 -PT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

RESIDUAL HEAT REMOVAL LINE 6B-AC-601 DRAWINGS: B-25 Summary Exam Number Categ 150300 C-F-1 Item Number Component 2

ELBOW-TO-VALVE(712A)

OE PT UT NDE Component Type Exam 97 -PT:

NO RECORDABLE ZNDZCATIONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

UT:

NO RECORDABLE INDICATIONS & ZNSIGNIFICANT: ROOT GEOMETRY ZNDZCATZON SEEN NOT SERVICE INDUCED,

> 90'5 COVERAGE OBTAINED ACCEPTABLE.

CS PUMP SUCTION PIPING DRAWINGS'-19 Summary Exam Number Categ 159100 F-A Item Number Component Component Type F1.20R RHU-101 OE RIGID SUPPORT (IA) 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'59105 C-C C3 ~ 20 RHU-101 (IA)

INTEGRAL ATTACHMENT OE PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.commercial Service Date ~oui 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT.):

H.P.

SAFETY INJECTION PUMP C SUCTION LINE DRAWINGS B-1 6B Summary Exam Number Categ BBNB 160664 F-A Item Number Component F1.20R RHU-113 RIGID SUPPORT (IA)

Component Type Exam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

160665 C-C C3.20 RHU-113 (ZA)

INTEGRAL ATTACHMENT ASME PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

H.P.

SAFETY ZNJECTZON PUMP A SUCTZON LINE DRAWINGS: B-16B Summary Exam Z tern Number Categ Number 160750 F-A Fl. 20V Component RHU-118 VARIABLE SPRING OE VT NDE Component Type Exam 97 VT NO RECORDABLE INDICATZONSf ME 303 REQUIRES 173¹ ACTUAL 182¹ ACCEPTABLE.

H. P.

SAFETY INJECTION LINE 3A-SZ-1501 DRAWINGS'-37 Summary Exam Z tern Number Categ Number 161120 F-A F1.20R Component SIU-82 GUIDE Component Type Exam

~C$

BBR BBBNB RKNB NBBBBNBBBB BB~

OE VT 97 -VT: NO RECORDABLE INDZCATIONS - ACCEPTABLE ~

161150 F-A F1.20R SZU-81 OE GUIDE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'5

R. E.

GZNNA NUCLEAR POWER PLANT Znservice inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~cul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LINE 3A-SZ-1501 (CONT. )

DRAWINGS: B-37 Summary Exam Item Number Categ Number Component ms 161160 F-A F1 '0R SZU-80 RIGID RESTRAINT OE VT NDE Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

161220 F-A F1.20R SIU-78 RIGID RESTRAINT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'61300 F-A F1.20R SZU-74 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

161310 C-F-1 C5.21 21 ASME PT PIPE-TO-REDUCER UT 97 -PT

& UT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

> 90t COVERAGE OBTAINED.

H. P.

SAFETY INJECTION LINE 4D-SZ-1501 DRAWINGS: B-37 Summary Exam Number Categ SNOBS~

161360 C-F-1 Ztem Number Component C5.21 25 PIPE-TO-ELBOW ASME NDE Component Type Exam PT UT 97 -PT

& UT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

90%

COVERAGE OBTAINED.

56

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1
4. Owner Certificate of Authorization (Zf Req.)

N/A 9.0ommeroial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LINE 4D-SZ-1501 (CONT. )

DRAWINGS: B-37 Summary Exam Number Categ MBNMM~NN Nnr 161470 C-F-1 Item Number Component Rnaa NBBN~

ca C5.21 35 PIPE-TO-ELBOW ASME PT UT Component Type Exam Burn&mr R R

BNrmnn&D RB RR R

BBRBN 97 -PT

& UT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

161490 F-A Fl. 20R SIU-43 RIGID RESTRAINT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

161500 F-A F1.20R SIU-42 RIGID RESTRAINT OE VT 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE.

161540 F-A F1.20R SIU-40 RIGID RESTRAINT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

H. P.

SAFETY ZNJECTZON LINE 2T-SI-2501 DRAWINGS'-39 Summary Exam Item Number Categ Number Component NXB MN?BB 161730 C-F-1 C5. 30 4

PIPE-TO-ELBOW Component Type Exam PT 97 PT NO RECORDABLE INDICATIONS9 90%

COVERAGE OBTAINED ACCEPTABLE ~

57

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 5.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LINE 2T-SZ-2501 (CONT. )

DRAWINGS: B-39 Summary Exam Item Number Categ Number Component 161750 F-A F1.20R SIU-33 GUIDE Component Type OE VT 97 -VT:

NO RECORDABLE INDICATZONS, ACCEPTABLE.

161860 F-A F1.20R SIU-35 U-BOLT OE VT 97 -VT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE.

161890 F-A F1.20R SIU-36 U-BOLT OE VT a

97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

H. P.

SAFETY INJECTION LINE 2U-SI-2501 DRA'WINGS'-39 Summary Exam Item Number Categ Number Component Component Type 162070 F-A F1.20R SIU-32 OE GUIDE VT 97 VT NO RECORDABLE ZNDICATZONSf INSIGNIFICANT GROUT BASE WAS DAMAGED ON ONE

CORNER, WOg 19703424 GENERATED

ACCEPTABLE.

58

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit, 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LZNE 3B-SZ-1501 DRAWINGS: B-40 Summary Number Exam Item Categ Number Component Component Type Exam 162600 F-A Fl.20R aaaar=ca

=mac@mr amer= aa

==-a= amatmaa~a SIU-92 RIGID RESTRAINT VT 97 -VT: NO RECORDABLE ZNDICATIONS ACCEPTABLE.

162610 F-A F1.20R SIU-91 GUIDE OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

162640 F-A F1.20R SIU-90 GUIDE (IA)

OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

162641 C-C C3. 20 SIU-90 (IA)

INTEGRAL ATTACHMENT ASME PT 97 -PT:

NO RECORDABLE INDICATIONS ACCEPTABLE-162670 F-A F1.20R SIU-89 RIGID RESTRAINT OE 97 -VT: NO SIGNIFICANT RECORDABLE INDICATIONS, LOOSE NUT TOP PIPE CLAMP BOLT THREADS ARE MASHED TO PREVENT REMOVAL ACCEPTABLE.

162700 F-A Fl. 20R SIU-88 GUIDE OE VT 9 7 VT NO RECORDABLE INDICATIONS 9 PIPE NOT CENTERED PER DRAWING ACCEPTABLE 59

R-E.

GXNNA NUCLEAR POWER PLANT Xnservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas'& Electric Co 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LXNE 3B-SX-1501 (CONT. )

DRAWINGS: B-40 Summary Exam Number Categ Item Number Component NDE Component.

Type Exam 162760 F-A F1.20R SIU-69 RIGID RESTRAINT OE VT 97 -VT'O RECORDABLE INDICATIONS ACCEPTABLE.

162770 C-F-1 C5.21 18 PIPE-TO-TEE PT UT 97 -PT:

NO RECORDABLE ZNDZCATZONS

& INSZGNZFZCANT: POROSITY THROUGH OUT WELD CROWN.

UT:

NO RECORDABLE INDICATIONS. PT

& UT:

90%

COVERAGE OBTAINED ACCEPTABLE.

H. P.

SAFETY INJECTION LINE 3C-SZ-1501 DRAWINGS B-41 Summary Exam Item Number Categ Number Component 163040 F-A F1.20R SZU-86 GUIDE OE VT Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

H. P.

SAFETY INJECTION LINE 3D-SZ-1501 DRAWINGS B-41 Summary Exam Item Number Cate g Number Component 163270 F-A F1.20R SIU-70 GUIDE OE VT NDE Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

60

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner certificate of Authorization (If Req.)

N/'A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

a H. P.

SAFETY INJECTION LINE 3D-SZ-1501 (CONT. )

DRAWINGS: B-41 Summary Exam Item Number Categ Number R~RDBB ammmammmmm R

mmmm%

163300 C-F-1 C5.21 Component K~~NBNBBBBBRKBBKDBBBBKK 20 ELBOW-TO-PIPE ASME PT UT NDE Component Type Exam Bmmamaam arne 97 -PT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: SEVERAL PORES IN WELD CROWN.

UT:

NO RECORDABLE INDICATIONS. PT

& UT: >

90%

COVERAGE OBTAINED ACCEPTABLE.

H. P.

SAFETY INJECTION LINE 3E-SZ-1501 DRAWINGS B-42 Summary Exam Z tern Number Categ Number CRRBN NBRr RRRR RR BB 163630 F-A F1.20R Component

~~BBNBBBNB SZU-67 RIGID RESTRAINT OE VT Component Type Exam 97 -VT:

NO RECORDABLE ZNDICATIONS ACCEPTABLE'63680 F-A F1.20R SIU-64 GUIDE OE VT 97 -VT:

NO RECORDABLE ZNDICATIONS ACCEPTABLE-163750 F-A F1.20R SZU-61 RIGID SUPPORT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

61

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT.):

H. P.

SAFETY INJECTION L'INE 4E-SZ-1501 DRAWINGS'-43 Summary Exam Number Categ 164030 F-A Item Number Fl. 20V Component.

SIU-22 VARIABLE SPRING OE VT NDE Component Type Exam 97 VT NO RECORDABLE INDZCATIONSS SETTING 4246 BERGEN PATTERSON VS1 ACCEPTABLE.

164060 F-A F1.20R SZU-20 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

164070 F-A F1.20R SIU-19 RIGID RESTRAINT OE VT 97 -VT'O RECORDABLE INDICATIONS ACCEPTABLE.

164090 F-A F1.20V SIU-18 VARIABLE SPRING OE VT 97 -VT: NO RECORDABLE ZNDICATZONS, SETTING 528, BERGEN PATTERSON SIZE 8

VS1C ACCEPTABLE.

164150 F-A F1.20R SZU-17 RIGID RESTRAINT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

164190 F-A F1.20R SZU-14 RIGID SUPPORT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

62

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY INJECTION LINE 4E-SZ-1501 (CONT. )

DRAWINGS: B-43 Summary Emun Z tern Number Categ Number Component BBBBB BBBB ~m BB 164200 F-A F1.20R SZU-15 GUIDE OE VT Component Type Etiam 97 -VT-NO RECORDABLE INDICAT1ONS ACCEPTABLE.

164310 F-A F1.20R SIU-12 GUIDE OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

164320 F-A Fl. 20V SIU-11

'ARIABLE SPRING OE VT 97 -VT:

NO RECORDABLE INDICATIONS & OTHER: ACTION REPORT 97-1795 GENERATED DUE TO DRAWING SPECIFIED SPRING CAN THAT WAS NOT INSTALLED ZN THE FIELD.

DWG WAS NOT UPDATED WHEN CHANGE OCCURED. USE-AS-IS CORNER LADA SIZE 5, SETTING 3/4" - ACCEPTABLE.

H. P.

SAFETY INJECTZON LINE 2S-SZ-2501 DRAWINGS: B-44 Summary Etiam Item Number Categ Number Component 164590 F-A F1.20R SZU-10 GUIDE Component Type OE VT 97 VT NO RECORDABLE INDICATIONS & ZNSIGNIFZCANTf MINOR BORIC ACID ON BASE PLATE ACCEPTABLE.

63

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1
4. Owner Certificate of Authorization (If Req.)

N/A 5.commerciel Service Date ~Jul 1970 6.National Boerd Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

H. P.

SAFETY ZNJECTZON LINE 2R-SZ-2501 DRAWZNGS: B-45 Summary Exam Item NDE Number Categ Number Component Component Type Exam aaaaaa aaaaaaa aa aaaa aaaaa aaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaa aaamm 164870 F-A F1.20R SIU-9 OE VT GUIDE 97 VT NO RECORDABLE INDICATIONS & INSIGNIFICANTf MONOR BORIC ACID ON BASE PLATE ACCEPTABLE.

164950 C-F-1 C5.30 15 PIPE-TO-ELBOW ASME PT 97 PT NO RECORDABLE INDICATIONS f 9 0%

COVERAGE OBTAINED ACCEPTABLE ~

164960 C-F-1 C5.30 16 ELBOW-TO-PIPE PT 97 -PT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

CONTAINMENT SPRAY PUMP B OUTLET PIPING DRAWINGS: B-47 NDE Component Type Exam aaaaaa aaa aaaaaaaaaaaaaaaa OE VT Summary Exam Z tern Number Categ Number Component ammaamra aaaa aa ~aaaaa a~

aa 168340 F-A F1.20R CSU-57 RIGID SUPPORT (IA) 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: ARC STRIKES-ACTION REPORT 97-1207 GENERATEDf USE-AS-IS PER ENGINEERING (ISIM-024)

ACCEPTABLE.

168342 C-C C3. 20 CSU-57 (IA)

INTEGRAL ATTACHMENT PT 97 PT REJECTf ARC STRIKESf ACTION REPORT 97 1207 GENERATEDf ACCEPTABLE PER ENGINEERING 1/2 LAP WHERE ORIGIONAL LINE UP LUGS WERE REMOVEDf ACTION REPORT 97 21 18 GENERATEDf ACCEPTABLE PER ENGINEERINGf NOT SERVICE INDUCED RE-EXAM IN 1999 ACCEPTABLE.

64

R.

E ~

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

RESIDUAL HEAT EXCHANGER A DRAWINGS'-109 Summary Etiam Ztem Number Categ Number 169042 C-B C2.33 Component INSRHE-1A INLET NOZZLE-TO-SHELL WELD Component Type ASME NDE Etiam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

169052 C-B C2.33 ONSRHE-1A ASME OUTLET NOZZLE-TO-SHELL WELD 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

169130 C-C C3.10 1A-1 (IA)

SUPPORT LEG ¹1 TO VESSEL WELD OE VT 97 VT NO RECORDABLE ZNDICATIONSf SUPPORT LEG MATERIAL TO BE CARBON STEEL AS PER JOSEPH OAT DRAWING 4807 REV 1

ACCEPTABLE'69140 C-C C3.10 1A-2 (IA)

SUPPORT LEG ¹2 TO VESSEL WELD OE VT 97 -VT:

NO RECORDABLE INDICATIONS, SUPPORT LEG MATERIAL IS CARBON STEEL AS PER JOSEPH OAT DRAWING 4807 REV.

1

ACCEPTABLE'69150 C-C C3. 10 1A-3 (ZA)

SUPPORT LEG ¹3 TO VESSEL WELD OE VT 97 VT NO RECORDABLE INDICATIONSf SUPPORT LEGS ARE CARBON STEEL AS PER JOSEPH OAT DRAWING 4807 REV.

1 ACCEPTABLE.

65

R.

E ~

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649 2 ~ Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial Service Date ~cul 1970 BNNational Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

RESIDUAL HEAT EXCHANGER B DRAWINGS'-109 Summary Escam Number Categ 169242 C-B Item Number Component C2.33 INSRHE-1B INLET NOZZLE-TO-SHELL WELD Component Type OE NDE Etiam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

169252 C-B C2.33 ONSRHE-1B OE OUTLET NOZZLE-TO-SHELL WELD 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

SERVICE WATER LINE 6E-SW-125 DRAWINGS'-51 Summary Etiam Number Categ 173645 Item Number Component Component Type F1.20A PEN 316 ANCHOR OE ANCHOR (IA)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

173646 C3.20 PEN 316 ANCHOR (IA)

OE INTEGRAL ATTACHMENT 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

66

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant RE E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

SERVICE WATER LINE 6D-SW-125 DRAWINGS B-51C Summary Exam Item Number Categ Number 174295 F1.20A Component PEN 311 ANCHOR ANCHOR (IA)

NDE Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE.

174296 C3.20 PEN 311 ANCHOR (IA)

OE INTEGRAL ATTACHMENT 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

SERVICE WATER LINE 6C-SW-125 DRAWZNGS: B-52 Summary Exam Item Number Categ Number 174395 F1.20A Component PEN 320 ANCHOR ANCHOR (IA)

OE VT NDE Component Type Exam 97 -VT: INSIGNIFICANT: ARC STRIKES/SPATTER - ACCEPTABLE.

174396 C3.20 PEN 320 ANCHOR (IA)

OE INTEGRAL ATTACHMENT 97 MT NO RECORDABLE INDICATIONS f 9 0%

COVERAGE OBTAINED ACCEPTABLE ~

67

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas 6 Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

SERVICE WATER LINE SF-SW-125 DRAWINGS: B-52 Summary Exam Item Number Cate g Number Component 174540 C3.20 SWU-91 (IA)

INTEGRAL ATTACHMENT NDE Component Type Exam OE 97 MT NO RECORDABLE INDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

174550 F1.20R SWU-91 GUIDE (ZA)

OE VT 97 -VT:

NO RECORDABLE ZNDICATIONS - ACCEPTABLE ~

174610 C3.20 SWU-95 (IA)

INTEGRAL ATTACHMENT OE 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

SERVICE WATER LINE SF-SW-125 (CONT.)

DRAWINGS: B-52 Summary Exam Item Number Categ Number Component 174620 F1.20R SWU-95 GUIDE (IA)

NDE Component Type Exam OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990 1 999 Interval f Third Periodf First Outage

( 1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

SERVICE HATER LINE 8E-SW-125 DRAWINGS: B-52B Summary Exam Item Number Categ Number Component 175060 C3. 20 SWU-46 (IA)

INTEGRAL ATTACHMENT Component Type Exam OE 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

175070 F1.20R SWU-46 GUIDE (IA)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE-SERVICE WATER LINE 8B-SW-125 DRAWINGS'-53 Summary Exam Number Categ BS MBB 175480 Item Number Component F1.20R SWU-43 RIGID RESTRAINT NDE Component Type Exam OE VT 97 -VT: REJECTS ACTION REPORT 97-17429 EXAM STATED WRONG STRUT SIZE.

PO

& MFG CATALOG ALONG WITH FIELD EXAM VERIFIED STRUT SIZE MEASUREMENT ACCEPTABLE AS IS.

SERVICE HATER LINE 8A-SW-125 DRAWINGS: B-53A Summary Exam Item Number Categ Number Component 175780 C3.20 SWU-19 (IA)

INTEGRAL ATTACHMENT Component Type Exam OE 97 -MT: NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

69

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/'A 5.commercial service Date

~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 2 COMPONENTS (CONT. ):

SERVICE WATER LINE 8A-SW-125 (CONT. )

DRAWINGS'-53A Summary Exam Z tern Number Categ Number Component NDE Component Type Exam 175790 F1.20R SWU-19 OE RIGID RESTRAINT (IA)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

STANDBY AUX FW THRU PEN 119 TO A S/G FWHD ZNCV DRAWINGS: C-20 Summary Exam Number Categ 176140 Item Number Component Fl.20R AFU-218 (AFW-20)

GUIDE (ZA)

NDE Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: UNEVEN LEG ON 270 DEGREE LUG BOTTOM SIDE ACCEPTABLE.

176141 C3

~ 20 AFU-218 (AFW-20)

(IA)

OE INTEGRAL ATTACHMENT 97 MT NO RECORDABLE ZNDICATIONSf >

90%

COVERAGE OBTAINED ACCEPTABLE.

I 176160 --

F1. 20R AFU-219 (AFW-21)

GUIDE (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

176161 C3.20 AFU-219 (AFW-21)

(IA)

OE INTEGRAL ATTACHMENT 97 -MT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

70

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I C.

CLASS 3 COMPONENTS:

COMP. COOL.HT.EXCHS. TO RESIDUAL HT.EXCHS ~

DRAWINGS: C-4 Summary Exam Item Number Categ Number aa ma m

a aaaBBBNBBBB 500525 F-A F1. 30R Component CCU-137 RIGID RESTRAINT (IA)

OE VT Component Type Exam 97 -VT-NO RECORDABLE INDICATIONS & INSIGNIFICANT, LUGS

& PIPE ARE CORRODEDf SOME AREAS NOT PAINTED. WORK REQUEST N018709 GENERATED TO REMOVE CORROSION

& PAINT EXPOSED SURFACES.

ACCEPTABLE.

500540 D-B D2.20 CCU-139 (ZA)

ZNTEGRAL ATTACHMENT ASME VT 9'7 -VT: NO RECORDABLE INDICATIONS & INSIGNIFZCANTa CORROSION ON PIPE IN PENETRATION.

- ACCEPTABLE.

COMP ~ COOL ~ PMPS

~

6 SUC ~ FM RES

~ HT EX & SG TK DRAWINGS: C-6 Summary Exam Item Number Categ Number NBMM9N 500775 F-A F1.30V Component CCU-158 VARIABLE SPRING (ZA)

OE VT NDE Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT. ON UPPER SPRING CAN ATTACHMENT BOLTS 6 ONE SPRING CAN HAS DOUBLE NUT ASSEMBLYf ONE SPRING CAN HAS S1NGLE NUT ASSEMBLY.

OK PER NCR '94-124

& 86-033.

ACCEPTABLE.

500800 F-A F1.30V CCU-165 VARIABLE SPRING OE VT 97 -VT:

NO RECORDABLE ZNDICATZONS. SETTING PER ME-303, COLD 1608 O'S, ACTUAL 1696 'CCEPTABLE.

71

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

&. Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.ED Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~cul 1979 5.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

COMP. COOL. PMPS., SUC. ZK RES. HT.EX. & SG. TK (CONT. )

DRAWINGS: C-6 Summary Exam Item Number Cate g Number Component 500810 F-A F1.30R CCU-166 RIGID RESTRAINT OE VT Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE ~

500820 D-B D2. 40 CCU-167 (IA)

INTEGRAL ATTACHMENT VT 9 I VT:

NO RECORDABLE INDICATIONS & ZNSZGNIFZCANT: WELD IS HEAVILY OXIDIZED, WR/TR 018786 GENERATED ACCEPTABLE.

500825 F-A F1.30V CCU-167 VARIABLE SPRING (ZA)

OE VT 9 I VT NO RECORDABLE INDICATIONS & INSZGNIFZCANT WELD HEAVILY OXIDIZED/

WO/TR 018786 GENERATED, SETTING 2918

()'S ACCEPTABLE.

500840 D-B D2.40 CCU-169 (IA)

INTEGRAL ATTACHMENT VT 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: CORROSION/OXZDZZATION ON INTEGRAL ATTACHMENT/ WO/TR 018785 GENERATED ACCEPTABLE 500845 F-A F1.30V CCU-169 VARIABLE SPRING (ZA)

OE VT 97 -VT:

NO RECORDABLE INDZCATIONS & INSIGNIFICANT: WR/TR 018785 GENERATED FOR CORROS ION/OXIDIZATION ON INTEGRAL ATTACHMENT/ SETTING 20 1 3 I S ACCEPTABLE.

72

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I SW COMP. COOL.& SP.FUEL PZT HT EZS.,DZSCH DRAWINGS C-11 Summary Exam Number Categ smmssmm Msmms 501680 Ztem Number Component D2. 20 SWU-176 (IA)

INTEGRAL ATTACHMENT OE VT NDE Component Type Exam 97 -VT: INSIGNIFICANT; MZNOR CORROSION ON IA LUGS ACCEPTABLE.

501685 Fl.30R SWU-176 RZGZD RESTRAINT (IA)

OE VT 97 -VT: REJECT'CTION REPORT 97-1847 GENERATED TO ADDRESS BROKEN RETAINING RING ON PIN.

RE-EXAM AFTER CORRECTIVE ACTION - ACCEPTABLE'ZN WAS REPLACED.

INITIAL EXAM WAS NOT A CODE REQUIRED EXAM.

501800 D2.20 SWU-188 (IA)

INTEGRAL ATTACHMENT VT 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE.

501805 F1.30R SWU-188 GUIDE (IA)

OE 97 -VT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE.

SVC.WTR.-TO COMP ~ COOL.& SP.FL.PZT HT.EXS.

DRAWINGS'-12 Summary Exam Item

~

NDE Number Categ Number Component Component Type Exam 501905 F-A Fl. 30R SWU-194 ASME VT RIGID HANGER (IA) 97 -VT: NO RECORDABLE INDICATZONS & INSIGNIFICANT: MINOR CORROSION ON PIPE, WELD & ATTACHMENT ACCEPTABLE.

73

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SVC. WTR. -TO COMP. COOL. & SP. FL. PZT HT.EXS.

(CONT. )

DRAWZNGS: C-12 Summary E~am Item Number Categ Number Component tNR NB 501930 D-C D3.50 SWU-197 (IA)

INTEGRAL ATTACHMENT Component Type Etiam 7 Mmttmfm~

VT 97 -VT-NO RECORDABLE INDICATIONS & INSIGNIFICANT: MINOR CORROSION ON INTEGRAL ATTACHMENTf >

90%

COVERAGE OBTAINED ACCEPTABLE.

501935 F-A F1.30R SWU-197 RIGID SUPPORT (ZA)

VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: MINOR CORROSION ON INTEGRAL ATTACHMENT ACCEPTABLE.

501940 D-C D3.50 SWU-198 (IA)

INTEGRAL ATTACHMENT VT 97 -VT:

NO RECORDABLE INDICATIONS & ZNSZGNIFICANT: MINOR CORROSION ON PIPE

& INTEGRAL ATTACHMENT, >

90%

COVERAGE OBTAINED ACCEPTABLE.

VT 501945 F-A Fl.30R SWU-198 RIGID SUPPORT (IA)

~.

97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT-MINOR CORROSION ON INTEGRAL ATTACHMENT ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Peri'od, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor

~

89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SVC WTR FROM PEN 308 6 31 1 6 315

& 323 DRAWINGS: C-14 Summary Exam Item Number Categ Number Component

~ss~

502440 D-B D2. 20 SWU-295 (IA)

ZNTEGRAL ATTACHMENT NDE Component Type Exam ASME VT 97 -VT:

NO RECORDABLE INDICATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

502445 F-A F1.30R SWU-295 RIGID HANGER (IA) 9'7 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'VC.WTR.

-INTERMED. BLDG.16"

& 20" HDRS ~

DRAWINGS'-16 Summary Exam Item Number Categ Number Cougionent 502720 D-B D2. 20 SWU-316 (ZA)

INTEGRAL ATTACHMENT NDE Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: PIPE INTEGRAL ATTACHMENTS CORRODED.

NORTH IA THICKNESS 1/8".

PER ENG.

MEMO-PIPE LUGS ARE NOT UTILIZED WITHIN NEW DESIGNf ABANDOME ZN PLACEf USE-AS-IS ACCEPTABLE.

502725 F-A F1.30R SWU-316 GUIDE (ZA)

VT 97 VT'NSZGNIFICANTf OTHERs ACCEPTABLE PER ENGINEERING MEMOf CORROSION EXISTS ON THE LUG PART OF THE SUPPORT NOT THE PRESSURE BOUNDARY.

502825 D-B D2. 20 SWU-327 (IA)

INTEGRAL ATTACHMENT ASME VT 97 -VT: REJ:

ACTION REPORT 97-1849 GENERATED FOR THINNING OF LUG DUE TO RUSTf ACCEPTABLE PER ENGINEERING,

> 908 COVERAGE OBTAINED. WO() 19702317 GENERATED TO CLEAN UP WELD AND PAINT. RE-EXAM -ACCEPTABLE 75

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date

~cul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SVC. WTR. -INTERMED. BLDG.16"

& 20" HDRS.

(CONT. )

DRAWINGS: C-1 6 Summary Exam Item Number Categ Number Component 502830 F-A F1.30V SWU-327 VARIABLE SPRING (IA)

OE VT NDE Component Type Exam 97 VT NO RECORDABLE INDICATIONS/ SETTING 1734/

ACCEPTABLE.

SVC.WTR. -ZNTMD.BLDG.14 "HD.TO CHILL. A&B DRAWINGS: C-16A Summary Exam Number Categ BBBB R

BBKBB~

503120 D-B Item Number Component NDE Component Type Exam D2.20 SWU-349 (IA)

ASME VT INTEGRAL ATTACHMENT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: MINOR CORROSION ON PIPE

& WELD.

90%

COVERAGE OBTAINED ACCEPTABLE.

503125 F-A F1.30R SWU-349 RIGID SUPPORT (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: FLOOR ATTACHMENT PLATE ON DWG ZS 8 X 5 X 1/2 IS ACTUALLY 1'0 X 5 X 1/2

/

WEEP HOLE PAINTED SHUT HOLE OPENED BY NDE TECH

ACCEPTABLE.

503130 D-B D2.20 SWU-350 (IA)

INTEGRAL ATTACHMENT ASME VT 97 -VT: NO RECORDABI E INDICATIONS & INSIGNIFICANT: MINOR CORROSION ON PIPE AND WELD/

90%

COVERAGE OBTAINED ACCEPTABLE ~

503135 F-A F1.30R SWU-350 RIGID SUPPORT (IA)

OE VT 97 -VT:

NO RECORDABLE INDZCATIONS

& INSIGNIFICANT: FLOOR ATTACHMENT PLATE ON DWG ZS 8 X 8 X 5/8" IS ACTUALLY 8 X 10 X 5/8" ACCEPTABLE.

76

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~Jul 1970 G.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SVC.WTR. -ZNTMD.BLDG.14 "HD.TO CHILL. A&B (CONT. )

DRAWINGS: C-16A Summary Exam Number Categ 503170 D-B Item Number Component Component Type Exam D2.20 VT SWU-354 (IA)

ASME INTEGRAL ATTACHMENT 97 -VT: NO RECORDABLE INDICAT1ONS ACCEPTABLE.

503175 F-A F1.30R SWU-354 RIGID RESTRAINT (IA)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

SVC. WTR. -ZNTMD.BLDG.16" & 20" HEADERS DRAWINGS: C-1 6 Summary Exam Number Categ 503215 F-A Item Number Component F1.30R SWU-362 GUIDE Component Type Exam OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

SVC WTR PUMPS AfBf C

& D DISCH ~ SCR HOUSE DRAWINGS C-17 Summary Exam Item Number Categ Number Component 503335 F-A F1. 30R SWU-619 (N730)

GUIDE Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: 1/16" TOLERANCE FOR CLEARANCE' CLEARANCE ON EAST SIDEf 1/8 OPPOSITES 90%

COVERAGE OBTAINED ACCEPTABLE.

77

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas a Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4

~ Owner Certificate of Authorization (If Req.)

N/A 5.commercial Service Date J~ul 1970 6.National Board Number for Unit N/A ATTACHMENT Z CLASS 3 COMPONENTS (CONT. ):

SVC.WTR.-PUMPS A,B,C 0 D DISCH.SCR.HOUSE (CONT.)

DRAWZNGS: C-17 Summary Number Etiam Categ BBB Item Number Component Component Type aamcmaaa=m=

rmca tmaamt-mt=

aaBBBBBBa a BB===

503345 F-A F1. 30R SWU-620 (N731)

GUIDE OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

503355 F-A F1.30R SWU-621 (N732)

GUIDE OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

503365 F-A F1. 30R SWU-622 (N733)

GUIDE OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'03370 D-B D2.20 SWU-623 (N734)

(IA)

ASME INTEGRAL ATTACHMENT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 503375 F-A F1.30R SWU-623 (N734)

GUIDE (IA)

ASME VT 97 -VT NO RECORDABLEf ZNSIG 6 REJ ITEM 59 WASHER NOT INSTALLEDf LIGHT CORROSION.

SADDLE DISTORTED. ACTION REPORT 97-2105 GENERATED.

PART 2 LETTER C JUSTIFIES CONTINUED OPERABILITY-NOT SERVICE INDUCED.

VT 503380 D-B D2.20 SWU-624 (N735)

(IA)

ASME INTEGRAL ATTACHMENT 97 VT INSIGNIFICANT CORROSIONf RANDOM AND MODERATE9 SEE NCR 88 028 ACCEPTABLE.

90%

COVERAGE OBTAINED.

78

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant, 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date

~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SVC WTR PUMPS A9 B 9 C

& D DZSCH SCR HOUSE

( CONT

)

DRAWINGS C 17 Summary Exam Number Categ 503385 F-A Item Number Component F1.30R SWU-624 (N735)

GUIDE (IA)

Component Type 97 -VT: NO RECORDABLE INDICATIONS 6 INSIGNIFICANT: CORROSION ACCEPTABLE.

90%

COVERAGE OBTAINED.

503435 F-A F1.30R SWU-629 (N740)

GUIDE OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'03470 D-B D2.20 SWU-633 (N744)

(ZA)

ASME INTEGRAL ATTACHMENT VT 97 VT NO RECORDABLE INDICATIONS9

> 90 0 COVERAGE OBTAINED ACCEPTABLE ~

503475 F-A F1.30R SWU-633 (N744)

RIGID SUPPORT (IA)

ASME 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE' 503480 D-B D2. 20 SWU-634 (N745)

(IA)

ASME INTEGRAL ATTACHMENT 97 -VT:

NO RECORDABLE INDICATIONS, >

90'8 COVERAGE OBTAINED ACCEPTABLE.

503485 F-A F1.30R SWU-634 (N745)

RIGID SUPPORT (IA) 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 79

R.

E ~

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 CCIMPONENTS (CONT. ):

AUX. FW PUMPS DZSCH ZNTERMED. BLDG.

DRAWINGS'-1F Summary Etiam Z tern Number Categ Number 505050 F-A F1.30R Component Component Type AFU-13 OE RIGID RESTRAINT (NRC 50%)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505070 F-A F1.30R AFU-15 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505090 F-A F1.30R AFU-17 RIGID RESTRAINT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 505105 F-A F1.30R AFU-18 RIGID RESTRAINT (IA)(NRC 50%)

VT 97 -VT:

NO RECORDABLE INDICATIONS, >

90'5 COVERAGE OBTAINED ACCEPTABLE.

505130 F-A F1.30R AFU-21 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505150 F-A F1.30R AFU-23 GUIDE (NRC 50%)

OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

80

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DISCH ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1F Summary Exam Ztem Number Categ Number 505160 F-A F1.30R Component AFU-24 RIGID RESTRAINT Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505200 F-A Fl. 30R AFU-28 OE RIGID HANGER (NRC 50%)

VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505210 F-A F1.30R AFU-29 GUIDE (NRC 50%)

OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505340 F-A F1. 30R AFU-36'IGID RESTRAINT OE VT 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE.

505400 F-A F1.30R AFU-42 RIGID RESTRAINT OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505420 F-A F1.30R AFU-44 GUIDE (NRC 50'h)

OE VT 97 -VT: NO RECORDABLE INDZCATZONS ACCEPTABLE-81

R. E.

GZNNA NUCLEAR POWER 'PLANT Znsenrice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519 3

~ Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT Z CLASS 3 COMPONENTS (CONT ~ ):

AUX.

FW PUMPS DZSCH - ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1F Summary Exam Z tern Number Categ Number Component maamRBBBBR RRR~CR

~R C

RRRBB RR BBBBBBmaRBBBBBBRBBR 505430 F-A F1.30V AFU-45 VARIABLE SPRING Component Type Exam BB ammtBBMmr OE VT 97 VT NO RECORDABLE ZNDZCATIONS9 SETTING 315¹ Sf SERIAL ¹ N EG 13512 82 300 Bi TYPE B, SIZE 5.

505450 F-A F1.30R AFU-47 GUIDE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'05460 D-B D2.20 AFU-48,(ZA)

INTEGRAL ATTACHMENT ASME VT 97 -VT:

NO RECORDABLE INDICATIONS - ACCEPTABLE ~

505465 F-A F1.30R AFU-48 GUIDE (ZA)

OE>>

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505470 D-B D2.20 AFU-49 (IA)

INTEGRAL ATTACHMENT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505475 F-A F1.30R AFU-49 GUIDE (IA)

OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

82

R.

E ~

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DZSCH INTERMED. BLDG.

(CONT. )

DRAWINGS: C-1F Summary Exam Number Categ 505570 F-A Item Number Component F1.30R AFU-107 RIGID RESTRAINT Component Type Exam OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

TURB AUX FW PUMP DISCHARGE DRAWINGS: C-1 Summary Exam Number Categ 505616 F-A Item Number Component F1.30R N960 RIGID HANGER OE VT Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505618 F-A F1.30R N961 RIGID HANGER OE VT 97 -VT: NO RECORDABLE ZNDICATZONS ACCEPTABLE.

AUX. FW PUMPS DZSCH - INTERMED. BLDG.

DRAWINGS: C-1 Summary Exam Item Number Categ Number Component 505620 D-B D2.20 AFU-62 (IA)

INTEGRAL ATTACHMENT NDE Component Type Exam VT 97 -VT:

NO RECORDABLE INDICATZONS,)

90%

COVERAGE OBTAZNED - ACCEPTABLE.

83

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DISCH ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1 Summary E'en Item Number Categ Number Component 505625 F-A F1.30R AFU-62 RIGID SUPPORT (IA)

ASME VT NDE Component Type E~am 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505650 F-A F1.30R AFU-65 OE RIGZD RESTRAINT (NRC 50%)

VT 97 -VT:

NO RECORDABLE INDICATIONS - ACCEPTABLE.

505660 D-B D2. 20 AFU-66 (ZA)

INTEGRAL ATTACHMENT ASME VT 97 -VT:

NO RECORDABLE INDZCATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

505665 F-A F1.30R AFU-66 RIGID RESTRAINT (IA)

ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505770 F-A Fl ~ 30R AFU-77 GUIDE (NRC 50%)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505790 F-A F1.30R AFU-79 GUIDE (NRC 50%)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505800 F-A F1.30R AFU-80 RIGID HANGER VT 97 -VT: NO RECORDABLE INDZCATIONS ACCEPTABLE.

R. E.

GINNA NUCLEAR POWER'LANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/'A B.Commercial Service Date ~Jul 1970 B.National Board Nmaner for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DISCH - ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1 Summary Exam Item Number Categ Number Component 505810 D-B D2.20 AFU-90 (ZA)

INTEGRAL ATTACHMENT Component Type ASME VT 97 -VT:

NO RECORDABLE ZNDZCATZONS, 90%

COVERAGE OBTAINED ACCEPTABLE.

505815 F-A F1.30A AFU-90 ANCHOR (ZA)

(NRC 50$ )

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505830 F-A F1.30R AFU-92 RlGZD RESTRAINT OE VT 97 -VT:

NO RECORDABLE ZNDICATIONS ACCEPTABLE.

505850 F-A F1.30R AFU-94 GUIDE OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE ~

505860 F-A F1.30R AFU-95 RIGID RESTRAINT OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

505880 F-A F1.30V AFU-97 OE VARIABLE SPRING (NRC 50%)

VT 97 -VT: NO RECORDABLE INDICATIONS & ZNSZGNIFICANT: HEAVY RUST INSZDE SPRZNG CANf WR/TR GENERATED.

SETTING 347 ACCEPTABLE.

85

R. E.

GINNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1

4.

Owner Certificate of Authorization (Zf Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DZSCH - ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1 Summary ~am Number Categ 505900 F-A Item Number Component F1.30R AFU-81 RIGID RESTRAINT Component Type Etiam OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505910 D-B D2. 20 AFU-82 (ZA)

INTEGRAL ATTACHMENT ASME VT 97 -VT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE.

505915 F-A F1.30R AFU-82 RIGID SUPPORT (ZA)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505950 F-A F1. 30R AFU-86 OE RIGID RESTRAINT (NRC 50%)

VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505965 F-A F1.30A AFU-112 ANCHOR (ZA)

(NRC 50%)

OE 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE.

505970 F-A F1.30R AFU-113 GUIDE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

505990 F-A F1.30R AFU-115 GUIDE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE'6

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. owner Rochester Gas a Electric Cor 89 East Ave.,Rochester NY 14649 2

~ Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519

3. plant Unit 1
4. Owner Certificate of Authorization (If Req.)

N/A 5.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

AUX. FW PUMPS DZSCH ZNTERMED. BLDG.

(CONT. )

DRAWINGS: C-1 Summary ~am Item Number Categ Number Component BmamR~R

~msc Bm c ms~ms sma BBQzz QRr ~~m Bsm 506000 F-A F1.30R AFU-116 RIGID RESTRAINT OE VT NDE Component Type Emm 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

506015 F-A F1.30R AFU-117 GUIDE OE VT 97 -VT: NO RECORDABLE ZNDICATZONS ACCEPTABLE ~

506020 F-A Fl. 30R AFU-118 GUIDE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

506030 F-A F1.30R AFU-119 RIGZD RESTRAINT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

506050 F-A F1.30R AFU-121 RIGID RESTRAINT OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE ~

506060 F-A F1.30V AFU-122 VARIABLE SPRING OE VT 97 -VT:

NO RECORDABLE ZNDZCATZONSf SETTING 190

ACCEPTABLE'7

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1 ~ Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649 2

~ Plant R.E.Ginna Nuclear Power Plant, 1503 Lake Road Ontario NY 14519

3. Plant Unit 1
4. Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

STANDBY AUX FW FRM PEN 119 AUX FW PUMP C

DRAWINGS: C-21 Summary Exam Number Categ 507370 D-B Item Number Component Component Type Exam VT D2. 20 AFU-274 (AFW-87)

(IA)

ASME INTEGRAL ATTACHMENT 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: SHIM ¹10 INSTALLED BEHIND ITEM ¹16 TOP

& BOTTOMS TO ENSURE CONTACT WZTH WALL ACCEPTABLE'07375 F-A F1. 30A AFU-274 (AFW-87)

ANCHOR (IA)

(NRC 50'h)

VT 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: SHIM ¹10 INSTALLED BEHIND ITEM ¹ 1 9 TOP

& BOTTOM/

TO ENSURE CONTACT WITH WALL ACCEPTABLE ~

507410 F-A F1. 30R AFU-162 (AFW-91)

GUIDE (NRC 500)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

SAFW PUMP A RECZRC TO CONDENSATE SUPPLY TK DRAWINGS'-22A Summary Exam Item Number Categ Number 507482 F-A F1.30R Component AFU-166 GUIDE OE VT NDE Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE-507483 F-A F1.30R AFU-167 GUIDE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

88

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial service Date ~Jul 1970 G.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SAFW PUMP A RECZRC TO CONDENSATE SUPPLY TK (CONT. )

DRAWINGS: C-22A Summary Exam Z tern Number Categ Number Component 507484 F-A Fl.30R AFU-168 GUIDE OE VT Component Type Exam 97 -VT: NO RECORDABLE ZNDICATZONS ACCEPTABLE.

STANDBY AUX FW FRM PEN 119 - AUX FW PUMP C

DRAWINGS: C-23 Summary Exam Number Cate g 507525 D-B Item NDE Number Component Component Type Exam

~mmmm

~

am~am

~am~ma

~BB Bma D2 ~ 20 AFU-194 (AFW-100)

(IA) ASME VT INTEGRAL ATTACHMENT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

507526 F-A F1.30A AFU-194 (AFW-100)

ANCHOR (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

t 507530 D-B D2. 20 AFU-193 (AFW-101) (ZA)

ASME INTEGRAL ATTACHMENT VT 97 -VT-NO RECORDABLE INDICATIONS, > 90%"COVERAGE OBTAINED ACCEPTABLE.

507535 F-A Fl. 30A AFU-193 (AFW-101)

ANCHOR

( IA)

OE VT 97 -VT-NO RECORDABLE INDZCATZONS ACCEPTABLE.

89

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario NY 14519
3. Plant Unit 1
4. Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

STANDBY AUX FW FRM PEN 119 - AUX FW PUMP C

(CONT.)

DRAWINGS: C-23 Summary Exam Z tern Number Categ Number Component 507600 F-A F1.30R AFU-191 (AFW-105)

GUIDE NDE Component Type Exam VT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: 1/16" SHIM USED TO MEET 0" GAP AT BOTTOM OF PIPE

- ACCEPTABLE.

STANDBY AUX FW FRM PEN 123 AUX FW PUMP D DRAWINGS: C-25 Summary Exam Number Categ 508340 D-B Item Number D2.20 Component AFW-116 (ZA)

ZNTEGRAL ATTACHMENT Component Type Exam ASME 97 VT NO RECORDABLE INDICATIONS/ >

90%

COVERAGE OBTAINED ACCEPTABLE.

508345 F-A F1.30A AFW-116 ANCHOR (IA)

(NRC 50$ )

OE 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

AFU-STANDBY AUX FW FRM PEN 123 - AUX FW PUMP D DRAWINGS'-22 Summary Exam Number Categ 508440 D-B Item Number Component D2. 20 Component Type AFU-188 (AFW-107)

(ZA) ASME INTEGRAL ATTACHMENT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

90

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

STANDBY AUX FW XVhf PEN 123 - AUX FW PUMP D DRAWINGS: C-22 Summary Exam Item Number Categ Number Component 508445 F-A F1.30R AFU-188 (AFW-107)

GUIDE (ZA)

NDE Component Type Exam BS ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

SAFW PUMP B RECZRC TO CONDENSATE SUPPLY TK DRAWINGS: C-22 Summary Exam Item Number Cate g Number CSB CC~CCC C CCC 508470 F-A F1.30A Component Component Type CCCCCCCCCCCCCCCCCCCCCC CCCCCCCCCC CCCCC AFU-171 (AFW-117)

OE ANCHOR 'ZA)

Exam VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

508475 D-B D2.20 AFU-171 (AFW-117)

(IA) ASME INTEGRAL ATTACHMENT 97 -VT:

NO RECORDABLE ZNDZCATIONS ACCEPTABLE.

VT 508476 F-A F1.30R AFU-172 GUIDE OE VT 97 -VT:

NO RECORDABLE ZNDICATZONS ACCEPTABLE.

508477 F-A F1.30R AFU-173 GUIDE OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

508478 F-A F1.30R AFU-174 OE GUIDE VT 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE.

91

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.Commercial Service Date ~cul 1970 S.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

SW SUPPLY TO SAFW PUMP D DRAWINGS: C-28 Summary Exam Number Categ 508933 F-A Item Number Component

~%mama NSBBRCCBS~S ma F1.30R SWU-514 (SW-142)

GUIDE (IA)

OE VT NDE Component Type Exam 97 -VT: NO RECORDABLE ZNDICATIONS ACCEPTABLE.

MAIN STEAM SUPPLY TO AUX FW PUMP TURBINE DRAWINGS: C-32 Summary Exam Item Number Categ Number Component

~SS RD 9

BSR R

SBC 509000 D-B D2. 20 MSU-62 (IA)

INTEGRAL ATTACHMENT Component Type ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

509005 F-A F1.30R MSU-62 RIGID SUPPORT (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS - ACCEPTABLE ~

MAIN STEAM LOOP A TO AUX FW PUMP TURBINE DRAWINGS: C-32 Summary Exam Item Number Categ Number Component 509210 D-B D2.20 MSU-83 (IA)

INTEGRAL ATTACHMENT NDE Component Type Exam ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

509215 F-A F1.30R MSU-83 GUIDE (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE'2

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas' Electric Cor.,89 East Ave. Rochester NY 14649
2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT.):

AUX FW PUMP A FLOW CONTROL BYPASS DRAWINGS: C-1G Summary Emun Number Categ 510055 D-B Item Number Component D2.20 AFU-140 (ZA)

INTEGRAL ATTACHMENT Component Type VT 97 -VT:

NO RECORDABLE INDICATIONS, )

90%

COVERAGE OBTAINED ACCEPTABLE.

510060 F-A F1.30R AFU-140 GUIDE (ZA)

OE 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

AUX FW PUMP B FLOW CONTROL BYPASS DRAWINGS: C-1H Summary Etiam Ztem Number Categ Number Component Component Type 510090 F-A F1.30R AFU-57 OE GUIDE VT 97 -VT-NO RECORDABLE INDICATIONS ACCEPTABLE.

510095 D-B D2.20 AFU-58 (IA)

INTEGRAL ATTACHMENT VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

510100 F-A F1.30R AFU-58 GUIDE (IA)

OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

93

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date

~cul 1970 B.National Board Number for Unit N/A ATTACHMENT I CLASS 3 COMPONENTS (CONT. ):

COMPONENT COOLING WATER SURGE TANK DRAWZNGS: C-42 Summary Exam Number Cate g 555400 D-B Item Number Component D2.20 CCWST-1 (IA)

ZNTEGRAL ATTACHMENT NDE Component Type Exam ASME VT 97 -VT: NO RECORDABLE INDICATIONSf STITCH WELD 6 X 2 (2

L6 C TO C)

ACCEPTABLE.

555450 F-A F1.40 CCWST-1 RIGID SUPPORT (ZA)

ASME VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

555500 D-B D2.20 CCWST-2 (ZA)

INTEGRAL ATTACHMENT VT 9'7 VT NO RECORDABLE ZNDICATIONS9 2

LONG STITCH WELDS 9 6

ON CENTERf ACCEPTABLE.

555550 F-A F1.40 CCWST-2 RIGID SUPPORT (ZA)

ASME VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

R. E.

GZNNA NUCLEAR POWER PLANT Znsezvice Inspection Report, 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Coz 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I D.

HZGH ENERGY COMPONENTS:

MAIN STEAM LOOP A OUTSIDE CV DRAWINGS'-9 Summary Exam Number Categ 200005 HE-DB Item Number Component D

PIPE-TO-ELBOW PEN.

401 AUG VT MT RT NDE Component Type Exam 97 -VT

& MT-NO RECORDABLE INDICATIONSf > 90'8 COVERAGE OBTAINED ACCEPTABLE.

RT:

NO RECORDABLE INDICATIONS & ZNSZGNIFZCANT: NO APPARENT CHANGE SINCE LAST EXAM, >

90%

COVERAGE OBTAINED ACCEPTABLE.

200010 HE-DB D1 ELBOW-TO-PIPE AUG VT MT RT 97 -VT

& MT:

NO RECORDABLE INDICATIONS - ACCEPTABLE. RT: INSIGNIFICANT:

COUNTERBORE

& SLAG 8 24" ACCEPTABLE. > 90%

COVERAGE OBTAINED IN ALL METHODS.

200015 HE-DB Fl ELBOW-TO-PIPE AUG VT MT RT 97 -VT

& MT: NO RECORDABLE INDICATIONS ACCEPTABLE. -RT: INSIGNIFICANT: 1/4" SLAG 8 16",

SCATTERED CORROSION ACCEPTABLE.

90%

COVERAGE OBTAINED IN ALL METHODS' MAIN STEAM LOOP B OUTSIDE CV DRAWINGS: B-10A Summary Exam Item Number Categ Number Component 200030 HE-DB D

PIPE-TO-ELBOW PEN.

402 Component Type AUG NDE Exam VT MT RT 97 -MT'O RECORDABLE INDICATIONS - ACCEPTABLE ~ VT: INSIGNIFICANT: GOUGES 8

46 9

2 3/4 LONGS 3/8 WIDES 1/32 DEEP ~

LOCALIZED CORROSION

& PITTINGS 1/64" TO 1/32" ACCEPTABLE. RT: INSIGNIFICANT: ACCEPTABLE. ALL METHODS 90%

COVERAGE OBTAINED.

95

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date

~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT HIGH ENERGY COMPONENTS (CONT. ):

MAIN STEAM LOOP B OUTSIDE CV (CONT.)

DRAWINGS B-10A Summary Exam Number Categ 200035 HE-DB Ztem Number Component H1 PIPE-TO-ELBOW AUG NDE Component Type Exam VT MT RT 97 MT NO RECORDABLE INDICATIONS VT INSZGNZFZCANT GOUGES 49 APPEARS TO BE FROM LINE UP LUG REMOVAL LOCATED AT 24 3/8" < 1/32" DEEP.

RT: INSIGNIFICANT:

SMALL PITS

& PORE.

NO CHANGE SINCE LAST EXAM.

200040 HE-DB Jl PIPE-TO-ELBOW AUG VT MT UT 97 -TAKING CREDIT FOR ISI EXAMINATION PERFORMED UNDER

SUMMARY

NUMBER 088400.

VTS MT

& UT-NO RECORDABLE ZNDICATZONS ACCEPTABLE' 908 COVERAGE OBTAINED IN ALL METHODS.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS: HE-5 Summary Exam Item Number Categ Number 200060 HE-DB Component Ul ELBOW-TO-PIPE Component Type AUG VT MT UT 97 -VT

& MT:

NO RECORDABLE INDICATIONS & 'INSIGNIFICANT: APPROX.

85%

OF WELD EXAMINED UT NO RECORDABLE ZNDICATZONSf APPROX 90%

COVERAGE OBTAINED. ALL EXAMINATIONS ACCEPTABLE'00065 HE-DB U2 PIPE-TO-ELBOW AUG VT MT UT 97 -VT, MT

& UT

> 90%

COVERAGE OBTAINED ACCEPTABLE ~

MT 3 ZNDZCATIONS 1/4" LONG 8 22",

1 3/4" LONG 8 22 1/4",

& 5/8" LONG 8 23 1/4"'NDICATZONS FROM PZPZNG FABRICATION PROCESSS NOT SERVICE ZNDUCEDf SEE METALLURGZST REPORT ACCEPTABLE

. AS ZS.

96

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997)

1. Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649
2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP A OUTSIDE CV (CONT. )

DRAWZNGS: HE-5 Summary Exam Z tern Number Categ Number 200070 HE-DB Component AA PIPE-TO-PIPE Component Type AUG NDE Exam VT MT UT 97 VTS MT

& UT NO RECORDABLE INDICATIONS & INSIGNIFICANT ACCEPTABLE ~

SEE METALLURGICALREPORT FOR MT INDICATZONSS INDICATIONS WERE DUE TO ORIGIONAL CONSTRUCTION ACCEPTABLE.

FEEDWATER LOOP B OUTSIDE CV DRAWINGS: HE-5 Summary Exam Item Number Categ Number Nss ssss csssmsmmssmms Nsssfmsmssssmt 200080 HE-DB Component.

F4 ELBOW-TO-PIPE NDE Component Type Exam SB

~SBNS AUG VT MT UT 97 VT9 MT

& UT a NO RECORDABLE ZNDICATZONS9

> 90 m COVERAGE OBTAINEDS NO CHANGE SZNCE LAST EXAMINATION ACCEPTABLE.

200085 HE-DB N

AUG VALVE(3994) -TO-ELBOW VT MT RT 97 -VT

& MT:

NO RECORDABLE INDICATIONS. RT: INSIGNIFICANT: DROP THROUGH,

IUC, CASTING INDICATIONS & CONCAVZTY ACCEPTABLE.

90%

COVERAGE OBTAINED.

97

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Periodf First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649 2 ~ Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Bervice Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

MAIN STEAM LOOP A OUTSIDE CV DRAWINGS'-9 Summary Exam Z tern Number Categ Number BB 200100 HE-CB Component D2 PIPE-TO-ELBOW Component Type AUG VT MT RT 97 VTf MT

& RT'CCEPTABLE ~

90%

COVERAGE OBTAINEDB NO APPARENT CHANGE SINCE LAST EXAMINATION, LONG SEAM ON INNER

& OUTERDOSE OF ELBOW.

200105 HE-CB D3 ELBOW-TO-PIPE AUG VT MT RT 97 -VT

& MT:

NO RECORDABLE ZNDZCATIONS, >

90%

COVERAGE OBTAINED ACCEPTABLE.

RT:

NO RECORDABLE INDICATIONS & INSIGNIFZCANT: NO APPARENT CHANGE SINCE LAST EXAM, 90%

COVERAGE OBTAINED ACCEPTABLE.

FEEDWATER TURBINE BUILDING DRAWINGS'E-6 Summary Exam Item Number Categ Number Component 200325 HE-CB A8" BRANCH WELD AUG VT MT NDE Component Type Exam 97 -VT

& MT:

NO RECORDABLE INDICATIONS, > 90$

COVERAGE OBTAINED ACCEPTABLE.

RT:

NO RT PERFORMED DUE TO CONFZGURATZON.

98

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1
4. Owner Certificate of Authorization (Zf Req.)

N/A B.Commercial Bervice Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER TURBINE BUILDING (CONT. )

DRAWINGS'E-6 Summary Exam Z tern Number Categ Number Component NB~NB~

200330 HE-CB B8" BRANCH WELD-TO-ELBOW AUG VT MT RT Component Type Exam 97 -VT & MT:

NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT: PORE 9

2 '

6 POROSITY 8

13 9

21 1/2

& 22 1/2 6

PITTING & CORROSION IN PIPE SIDE ACCEPTABLE. > 90'4 COVERAGE OBTAINED ZN ALL METHODS.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS: HE-5 Summary Exam Number Categ

~~mmrmam Bmmtmmama NB 200365 HE-CB Z tern Number Component Component Type

~~BBBNBB~

aggsm~armW fm~ ~NBN ~BBBBB Bmmmtmam~

T2 AUG PIPE-TO-ELBOW NDE Exam VT MT RT 97 -VTf MT

& RTr NO RECORDABLE ZNDICATZONS

& INSZGNIFZCANT: >

90%

COVERAGE OBTAINED ACCEPTABLE.

200370 HE-CB T3 ELBOW-TO-PIPE AUG VT MT RT 97 VT9 MT

& RT NO RECORDABLE INDICATIONS

& ZNSZGNZFZCANT RT POROS ITY9 90%

COVERAGE OBTAINED ACCEPTABLE.

200375 HE-CB U7 ELBOW-TO-PIPE AUG VT MT RT 97 -MT:

NO RECORDABLE ZNDZCATZONS ACCEPTABLE. VT: ZNSIG: NCR89-346 ADDRESSED THE REMNANT ON THE WELD CAP ACCEPT.

RT: INSIGNIFICANT: TUNGSTEN, CONCAVITY

& POROSITY, SEE EXAM RECORD FOR DETAILS ACCEPT.

90%

COVERAGE OBTAINED ZN ALL EXAM METHODS.

99

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, Fixst Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1
4. Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP A OUTSIDE CV (CONT.)

DRAWINGS: HE-5 Summary Exam Numbex Categ 200380 HE-CB Item Number Component U5 PIPE-TO-ELBOW AUG VT MT RT NDE Component Type Exam 97 -VT

& MT:

NO RECORDABLE INDICATIONS. RT:

NO RECORDABLE INDICATIONS

& INSIGNIFICANT COUNTERBORE ACCEPTABLE. > 90'h COVERAGE OBTAINED WITH VT

& RT.

APPROX-80%

OF WELD EXAMINED WITH MT DUE TO PENETRATION.

200385 HE-CB U6 ELBOW-TO-ELBOW AUG VT MT RT 97 -VT

& MT: NO RECORDABLE ZNDICATZONS ~

RT:

NO RECORDABLE

& ZNSIGNIFICANT ROUNDED INDICATION 8 30" = 1/16".

ACCEPTABLE.

200390 HE-CB V

ELBOW-TO-PIPE AUG VT MT RT 97 -VT

& MT: NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT:

SLAG, POROSITY, IUC

& DROP THROUGH AT VARIOUS LOCATIONS ACCEPTABLE.

90'h COVERAGE OBTAINED ZN ALL METHODS.

200395 HE-CB VA PIPE-TO-FLANGE AUG VT MT RT 97 -VT

& MT:

NO RECORDABLE INDICATIONS, < 80$

COVERAGE OBTAINED DUE TO SUPPORT CLAMP WITHIN 1/4 OF TOE OF WELD'EMOVAL NOT REQUIREDf NOT ASME CODE EXAM RT:

ZNSZG:

NO BACKING STRIP AT VARIOUS LOCATIONS/LOOSEf POROSITY,>

90%

COVERAGE OBTAINED-ACCEPT 100

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP A OUTSIDE CV (CONT. )

DRAWINGS: HE-5 Summary Exam Item Number Categ Number

%mmmm 200400 HE-CB Component VB PI PE-TO-FLANGE Component Type AUG NDE Exam mm&msmm VT MT RT 97 VT INSIGNZFZCANTS GRIND OUT LESS THAN 1/32 MT NO RECORDABLE INDICATIONS.

RT:

NO RECORDABLE INDICATIONS & ZNSIGNZFICANTr INTERNAL CONCAVITY 8 0".

ACCEPTABLE.

FEEDWATER LOOP B OUTSIDE CV DRAWINGS: HE-5 Summary Exam Item Number Categ Number Component 200465 HE-CB F3 PIPE-TO-ELBOW AUG VT MT RT UT NDE Component Type Exam 97 -VTI MT

& UT:

NO RECORDABLE INDICATIONS - ACCEPTABLE'T: INSIGNIFICANT:

1/16" PORE 8 11" ACCEPTABLE.

> 90t COVERAGE OBTAINED ZN ALL METHODS.

200470 HE-CB F5 ELBOW-TO-PIPE AUG VT MT UT 97 -VT, MT & UT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: > 90'5 COVERAGE OBTAINED ACCEPTABLE.

200475 HE-CB Fl PIPE-TO-PIPE AUG VT MT RT 97 VT

& MT NO RECORDABLE INDICATIONSS APPROX'2%

OF WELD EXAMINED.

RT INSIGNIFICANT & GEOMETRYI 90%

COVERAGE OBTAINED'LL EXAMS ACCEPTABLE 101

0 0

R. E.

GZNNA NUCLEAR POWER PLANT

~

Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas'& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP B OUTSZDE CV (CONT. )

DRAWINGS: HE-5 Summary Exam Ztem Number Categ Number Component 200480 HE-CB F2 PIPE-TO-ELBOW AUG VT MT UT NDE Component Type Exam 97 -MTf VT

& UT:

90%

COVERAGE OBTAINED ACCEPTABLE.

NO CHANGE SINCE LAST EXAM.

200485 HE-CB G

ELBOW-TO-PIPE AUG VT MT UT 97 -VT, MT & UT:

NO RECORDABLE INDZCATIONS &'NSIGNIFICANT: >

90%

COVERAGE OBTAINED ACCEPTABLE.

200490 HE-CB G2 PIPE-TO-ELBOW AUG VT MT RT 97 -MT:

NO RECORDABLE INDICATIONS ACCEPTABLE. VT:

NO RECORDABLE INDICATIONS

& INSIGNIFICANT: ARC STRIKES WERE SURFACE CONDITIONED PRZOR TO '97 SEE ISIM-022 - ACCEPT.

RT: INSIGNIFICANT: PZT

& ROUNDED INDICATION - ACCEPT.

90%

COVERAGE OBTAINED.

200495 HE-CB G1 ELBOW-TO-PIPE AUG VT MT RT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: ARC STRIKES WERE SURFACE CONDITIONED SEE ZSIM-022 -ACCEPTABLE. MT:NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT: PITTING ACCEPTABLE'0$

COVERAGE OBTAINED.

102

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial Bervice Date ~Jul 1970 6.National Board Numtet for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP B OUTSIDE CV (CONT. )

DRAWINGS'E-5 Summary Exam Number Categ 200500 HE-CB Item Number Component G3 PIPE-TO-ELBOW Component AUG NDE Type Exam maaBN kaama VT MT RT 97 -VT

& MT:

NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT: 1/4" SLAG 8 23 3/8",

PORE 8 23 3/4" ACCEPTABLE.

90%

COVERAGE OBTAINED ZN ALL METHODS.

200505 HE-CB G4 ELBOW-TO-PZPE AUG VT MT RT 97 -VT

& MT:

NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT: IUC 8 32" ACCEPTABLE.

90%

COVERAGE OBTAINED IN ALL METHODS.

200510 HE-CB H

PIPE-TO-PIPE AUG VT MT RT 97 -VT INSIGNIFICANT: HAMMER MARKD - ACCEPTABLE. MT:

NO RECORDABLE INDICATIONS ACCEPT ~

RT INSZGNZFZCANT'/8 PORE 8

75 6

EROSION OF BACKZNG RING AT VARIOUS LOCATIONS (7 9

16

& 36

)

6 IVC 8 30 32 ACCEPT 90%

COVERAGE OBTAINED ALL METHODS.

200525 HE-CB H1 PIPE-TO-PIPE AUG VT MT RT 97 -VT

& MT: NO RECORDABLE INDICATIONS ACCEPTABLE. RT: INSIGNIFICANT: TUNGSTEN, PORESf PITTZNG

& IUC AT VARIOUS LOCATIONSf SEE EXAM RECORD FOR DETAILS ACCEPTABLE.

90%

COVERAGE OBTAINED ZN ALL METHODS.

103

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

MAIN STEAM TURBINE BUILDING DRAWINGS'E-7A Summary Exam Ztem Number Categ Number Component BN 201140 HE-CS

  • F1.20S MS-150 (Sj)

HYDRAULIC SNUBBER (IA)

OE VT NDE Component Type Exam 97 -VT: NO RECORDABLE INDICATIONS & INSZGNIFICANT: SETTING 2 1/4" MINOR WEEPING OF FLUID 8 RESIVOR FITTINGSf WR/TR 018768 GENERATED - ACCEPTABLE.

201141 HE-IA

  • C3.20 MS-150 (S7)

(ZA)

ZNTEGRAL ATTACHMENT AUG 97 -MT:

NO RECORDABLE INDICATIONS, > 90'k COVERAGE OBTAINED ACCEPTABLE.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS'-11 Summary Exam Item Number Cate g Number Component 201560 HE-CS

  • F1.20V FWU-19 VARIABLE SPRING AUG VT NDE Component Type Exam 97 -VT-NO RECORDABLE INDICATZONSf SETTING 3559 ACCEPTABLE.

201620 HE-CS

  • F1.20V FWU-22 VARIABLE SPRING OE VT 97 -VT: NO RECORDABLE ZNDZCATIONSf SETTINGS 1241N S EASTf 1173/

S WESTf ACCEPTABLE.

201740 HE-CS "F1.20A FWU-28 ANCHOR (ZA)

OE VT 97 -VT:

NO RECORDABLE INDICATIONS, <

90%

COVERAGE OBTAINED DUE TO LIMITATIONS OF SUPPORT NOT ASME SECTION XZ CODE EXAM CLASS Q LINE ACCEPTABLE.

104

R. E.

GZNNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave.,Rochester NY 14649 2 ~ Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario, NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I HZGH ENERGY COMPONENTS (CONT. ):

FEEDWATER LOOP A OUTSIDE CV (CONT. )

DRAWINGS: B-11 Summary Exam Number Categ 201741 HE-IA Item Number Component

  • C3.20 FÃU-28 (IA)

INTEGRAL ATTACHMENT Component Type AUG 9I -MT:

NO RECORDABLE ZNDICATIONS, < 90'h COVERAGE OBTAINED DUE TO LIMITATIONS OF SUPPORTf NOT ASME SECTION XI CODE EXAM CLASS Q LINE ACCEPTABLE.

FEEDWATER LOOP B OUTSIDE CV DRAWINGS: HE-5 Summary Exam Number Categ 202000 HE-CS Item Number Component stmmat Mnmnm ¹

  • F1.20V FWU-31.

VARIABLE SPRING AUG VT NDE Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS, SETTING 2797 ACCEPTABLE.

MAIN FEEDWATER LINE OUTSIDE CV DRAWINGS: HE-6 Summary Exam Number Categ tm

~BNBNM 202140 HE-CS Item Number Component

  • F1.20V FW-39 (S27)

VARIABLE SPRING OE VT Component Type Exam 97 VT NO RECORDABLE INDICATIONSf SETTING 6009N S

ACCEPTABLE.

202240 HE-CS

  • F1. 20A FW-45 (S32)

ANCHOR (IA)

OE 97 -VT NO RECORDABLE INDICATIONSf <

70%

COVERAGE OBTAINEDf NOT A CODE EXAM ACCEPTABLE.

105

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I HIGH ENERGY COMPONENTS (CONT. ):

MAIN FEEDWATER LINE OUTSIDE CV (CONT. )

DRAWINGS: HE-6 Summary Exam Item Number Categ Number Component 202241 HE-ZA

  • C3.20 FW-45 (S32)

(IA)

INTEGRAL ATTACHMENT NDE Component Type Exam AUG 9 7 MT NO RECORDABLE INDICATIONS f

< 5 0 8 COVERAGE OBTAINEDf NOT A CODE EXAM ACCEPTABLE.

FEEDWATER RECZRC LINE DRAWINGS: HE-6 Summary Exam Ztem Number Categ Number Component 202360 HE-CS

  • F1.20R CD-170 (S38)

GUIDE (IA)

NDE Component Type Exam VT 97 -VT:

NO RECORDABLE INDZCATZONS ACCEPTABLE.

202361 HE-IA

  • C3.20 CD-170 (S38)

(IA)

INTEGRAL ATTACHMENT AUG 97 -MT:

NO RECORDABLE INDICATIONS, )

90%

COVERAGE OBTAINED ACCEPTABLE.

'I 106

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas 6 Electric Cor.,89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT Z E.

LEAKAGE TESTZNG:

LEAKAGE EXAMINATIONS CLASS 1,2,3 DRAWINGS: N/A Summary Exam Item NDE Number Categ Number Component Component Type Exam 411000 B-P IWB5221 PT-7 LEAKAGE TEST OF ASME VT REACTOR COOLANT SYSTEM 97 "VT-NO RECORDABLE INDICATIONS AFTER REWORK ON 11/18/97, ACCEPTABLE.

SEE EXAM FOR DETAILS.

411100 C-H IWC5221 MAINSTEAM INSIDE CONTAINMENT ASME VT 97 VT NO RECORDABLE INDZCATZONSS EXAM OF MS SYSTEM INSZDE CONTAINMENT ON BOTH LOOPS PERFORMED ACCEPTABLE.

411200 C-H IWC5221 MAINSTEAM OUTSIDE CONTAINMENT VT 97 VT NO RECORDABLE INDICATZONS ACCEPTABLE'ROM PEN 401/4029 ALL CLASS 2 AND 3 PIPING.

411300 D-B IWD5221 MS TO TDAFWP VT 97 -VT: INSIGNIFICANT: WR/TR 18798 GENERATED FOR LIGHT RUST ON STEM OF V4347C/

LEAKAGE ON SWING ARM OF CHECK VALVE 3504B ACCEPTABLE.

411500 C-H IWC5221 FW INSIDE CONTAINMENT ASME FEEDWATER SYSTEM INCV 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

VT 411700 D-B IWD5221 AUX FW "A" PUMP ASME VT 97 -VT REJECT PACKING LEAK ON V4357.

WO 018761 GENERATED.

RE-EXAM NO EVIDENCE OF LEAKAGE ACCEPTABLE.

107

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

l. Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649
2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial Service Date ~cul 1970 6.National Board Number for Unit N/A ATTACHMENT I LEAKAGE TESTING (CONT. ):

LEAKAGE EXAMINATIONS CLASS 1 6 2 6 3 DRAWINGS'/A Summary Number 411800 Exam Z tern Cate g Number Component

~BBB M t M NB~M D-B IWD5221 AUX FW "B" PUMP Component Type Exam Mf BB NNBBMSN VT 97 -VT:

NO RECORDABLE INDZCATIONS

& INSIGNIFZCANT: WR/TR WRITTEN TO ADDRESS V4350 LEAK

(

1 DROP EVERY 1 1/2 MIN.

FROM STEM)

ACCEPTABLE.

LEAKAGE EXAMINATIONS HIGH ENERGY DRAWINGS: N/A Summary Exam Number Categ Item Number Component NDE Component Type Exam 412200 HE-LK HE FEEDWATER AUG VT 97 VT REJECTs V 4285 CAP LEAKING RE EXAM AFTER REWORKf ACCEPTABLE.

LEAKAGE EXAMINATIONS CLASS 1,2,3 DRAWZNGS'/A Summary Exam Item NDE Number Categ Number Component Component Trpe Beam 412300 C-H IWC5221 STEAM GEN BLOWDOWN ASME VT INSIDE CONTAINMENT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

412400 C-H IWC5221 STEAM GEN BLOWDOWN ASME VT OUTSIDE CONTAINMENT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: PACKING LEAK ON V5734, 1

DROP PER MIN.

(WO WRITTEN)

ACCEPTABLE'08

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Bervice Date

~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I LEAKAGE TESTZNG (CONT. ):

LEAKAGE EXAMINATIONS CLASS 1 9 2 9 3 DRAWINGS'/A Summary Emun Number Categ 412500 C-H Item Number Component Component Type IWC5221 SAFETY INJECTION "A" ASME PUMP IN/OUT CONTAINMENT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: WR/TR GENERATED FOR DRY BORON ON BONNET

& PACKING GLAND ON VALVES 840B

& 828A ACCEPTABLE.

BORON ON PACKZNG AREA OF V825A ACCEPTABLE.

412600 C-H IWC5221 SAFETY INJECTION "B" ASME PUMP IN/OUT CONTAINMENT VT 97 -VT: NO RECORDABLE ZNDZCATIONS

& INSIGNIFICANT: WR/TR 018777 GENERATED FOR DRY BORON ON PACKING GLAND ON VALVES 8284, 840B

& BONNET OF VALVE 840Br ACCEPTABLE.

412700 C-H ZWC5221 SAFETY INJECTION "C" ASME PUMP OUTSIDE CONTAINMENT 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: BORIC ACID ON THE FOLLOWING 871Af 870Bf 18 16Af 1815Bf WO/TR 018800 GENERATED ACCEPTABLE 412800 C-H ZWC5221 SAFETY ZNJECTZON t

ASME ACCUMULATOR 1 (A)

VT 97 -VT:

NO RECORDABLE INDICATIONS & ZNS1GNZFICANT: BORIC ACID RESIDUE RANDOM LIGHT AND DRY ACCEPTABLE.

412900 C-H IWC5221 SAFETY INJECTZON ACCUMULATOR 2 (B)

VT 97 -VT:

NO RECORDABLE ZNDICATIONS & INSIGNIFICANT:V865 PACKING LEAK BORIC ACID RESIDUES RANDOM DRY

& LIGHT. V865 PACKING LEAK REPAIRED ON 11/18/97 VERIFIED NDE EXAMINER ACCEPTABLE.

109

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I LEAKAGE TESTING (CONT. ):

LFamaAGE EXAMINATIONS CLASS 1 9 2 9 3 DRAWINGS: N/A Summary Etiam Number Categ 413200 C-H Item NDE Number Component Component Type Etiam mm&R&amrmnm

~~ama~mammmBR~NB

~~~ma&tram Bar am~

IWC5221 RHR LOW PRESSURE ASME VT "A" PUMP 97 -VT: INSIGNIFICANT: WO 19703045 GENERATED FOR SLIGHT BORON ACCUMULATION (DRY)

NOTED ON BONNET TO BODY OF V850A

& PACKING OF 705C ACCEPTABLE.

413300 C-H IWC5221 RHR LOW PRESSURE "B" PUMP VT 97 -VT: INSIGNIFICANT: WO 19703045 GENERATED TO ADDRESS SLIGHT BORON ACCUMULATION (DRY)

NOTED ON BONNET TO BODY OF V850A

& PACKZNG OF 705C ACCEPTABLE.

413400 C-H ZWC5221 RHR PUMP "A" IN/OUT CONT.

VT VT REJECTr BA ON VALVES 7 1 1Af 7009 701 9 7209 72 1 9 7 15

& 2747 (WO GENERATED)

LEAK ON FLANGE OF "A" RHR HX -

1 DROP EVERY 45 SEC.

ACTION REPORT 97-1623 GENERATED.

PERFORMED VT ON BOLTING, RE-EXAM ACCEPTABLE.

413500 C-H IWC5221 RHR PUMP "B" ZN/OUT CONT.

ASME 97 -VT-REJ-ACTION REPORT 97-1622 GENERATED TO ADDRESS BA RESIDUE ON FLANGE

& BOLTING ON RHR HT EX "B". BOLTING IN QUESTION WAS REMOVED AND VT EXAM EVALUATION. BOLTING REPLACED, RE-EXAMINED. VT EXAM ACCEPTABLE.

SYSTEM ENG.

ACCEPTED BOLTING CORROSION 413900 D-A IWD5221 SERVICE WATER INSIDE CONTAINMENT 97 -VT: INSIGNIFICANT: MILD RANDOM CORROSION ACCEPTABLE.

VT 110

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road, Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.Commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I LEAKAGE TESTING (CONT.):

L1UQaAGE EXAMINATIONS CLASS 1 9 2 9 3 DRAWINGS'/A

, 414100 D-A Summary Exam Number Categ Item Number Component ZWD5221 SERVZCE WATER TO AUX FW PUMP "A" Component Type Exam Msssmss VT 9'7 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE.

414200 D-A IWD5221 SERVICE WATER TO AUX FW PUMP "B" 97 -VT:

NO RECORDABLE ZNDICATIONS & INSIGNZFZCANT: WR/TR GENERATED FOR VALVE 4350 LEAK FROM STEM

(

1 DROP EVERY 1.5 MIN.)

ACCEPTABLE.

414700 C-H IWC5221 LETDOWN SYSTEM IN/OUT CONTAINMENT ASME VT 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: BORIC ACID RESIDUES RANDOM LIGHTS' ACCEPTABLE.

414900 C-H ZWC5221 BORIC ACID TANKS ASME PIPING VT 97 VT INSIGNIFICANT WR/TR 018745 GENERATED TO ADDRESS BA ON VALVE PACKINGS

V827A, 826C

- ACCEPTABLE.

415500 D-B IWD5221 SPENT FUEL POOL COOLING-A INSIGNIFICANT WR/TR 0 1 8739 GENERATED TO ADDRESS BA RESIDUE ON V782 9 8655

& 8614.

MZNOR CORROSZON ON FLANGE FE8667 ACCEPTABLE.

415550 D-B IWD5221 SPENT FUEL POOL COOLING-B ASME VT 97 -VT: INSIGNIFICANT: WR/TR 018739 GENERATED FOR BA ON VALVE PACKING V782, 8655

& 8614.

MINOR CORROSION ON FLANGE FE8667 ACCEPTABLE.

111

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor.,89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial service Date

~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I LEAKAGE TESTING (CONT. ):

LEAKAGE EXAMINATIONS CLASS 19 29 3 DRAWINGS'/A Summary Exam Ztem Number Categ Number Component 415600 C-H IWC5221 PRESSURIZER (TRC01)

CLASS 2 INSTRUMENTATION ASME VT Component Type Exam 97 -VT:

NO RECORDABLE INDICATIONS & INSIGNIFICANT: RANDOM BORIC ACID RESIDUES

REMOVED, ACCEPTABLE.

415650 C-H IWC5221 RPV (RPC01)

CLASS 2 INSTRUMENTATION ASME VT 97 VT'NSIGNIFICANT'593A BORZC ACID RESIDUE FOUNDr DECON

& TZGHTEN STEM NUTS, RECHECKED SWAGELOK FITTING TO V500 ACCEPTABLE.

F.

STEAM GENERATOR EDDY CURRENT EXAMINATIONS:

STEAM GENERATOR A DRAWINGS: N/A Summary Exam Number Cate g 802500 B-Q Ztem NDE Number Component Component Type Exam B16.20 OPEN GENERATOR TUBES ASME ET BOBBIN COIL 100%

FL VT 97 -ET:

100'h OF THE "A" S/G WAS EXAMINED, SEE 1997 S/G EDDY CURRENT FINAL REPORT FOR DETAILS'T PERFORMED ON THE THIMBLE TUBE PLUGS NO RECORDABLE INDICATIONS ACCEPTABLE.

112

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I STEAM GENERATOR EDDY CURRENT EXAMINATIONS:

(CONT. )

STEAM GENERATOR B DRAWINGS: N/A Summary Exam Number Categ 803500 B-Q Item Number Component Component Type B16.20 OPEN GENERATOR TUBES ASME BOBBIN COIL 100%

FL ET VT 97 ET 100%

OF THE B

S/G WAS EXAMINEDf SEE 1997 S/G EDDY CURRENT FINAL REPORT FOR DETAILS. VT:

PERFORMED ON THE THIMBLE TUBE PLUGf NO RECORDABLE INDICATIONS ACCEPTABLE.

G.

SNIJBBER PROGRAM COMPONENTS:

STEAM GENERATOR B DRAWINGS'-7F r

Summary Exam Z tern Number Categ Number Component Component Type Exam 600130 SN-VT SGB-4 HYDRAULIC SNUBBER AUG VT 97 -VT: INSIGNZFICANT: LOWER BOLTS FACING WALL CUT DIAGONALLY & NO FULL THREAD ENGAGEMENT 360 DEG W/ NOT. ACCEPTABLE.

ON GENERATOR SIDE THE BOTTOM RIGHT

& NEAR BOTTOM LEFT LOCK NUTS DO NOT HAVE FULL THREAD ENGAGEMENT, SNUBBER WET'ROM INSTALLATION ACCEPTABLE.

600131 SN-FT SGB-4 HYDRAULIC SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL I AH-16

ACCEPTABLE'13

R. E.

GZNNA NUCLEAR POSER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT.):

TURBINE DRIVEN AUX. FR PUMP SUCTION DRAWINGS: C-16 Summary Exam Number Categ 600200 SN-VT Item Number Component AFU-3 MECHANICAL SNUBBER Component Type Exam AUG 97 VT NO RECORDABLE INDZCATZONSS SETTING 2 ACCEPTABLE-600201 SN-FT AFU-3 MECHANICAL SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL g '20925 ACCEPTABLE.

AUX. FW PUMPS DZSCH ZNTERMED. BLDG.

DRAWINGS: C-1C Summary Number RBSBB 600320 Exam Item Categ Number Component SN-VT AFU-101 MECHANICAL SNUBBER AUG VT NDE Component Type Exam 97 VT NO RECORDABLE ZNDZCATZONSS SETTING 3 1/4 9

SERIAL 5 15751 ACCEPTABLE.

600321 SN-FT AFU-101 MECHANICAL SNUBBER AUG FT 97 FT TESTED

& REINSTALLEDS SERIAL I 15751 ACCEPTABLE.

AUX.COOL LINE 4S-AC6-152 DRAWINGS'-29 Summary Exam Item Number Categ Number BBBSBBSB BB BB~

600530 SN-VT NDE Component Component Type Exam CCU-43 AUG VT MECHANICAL SNUBBER 9 7 VT NO RECORDABLE INDIGATIONS 9 SETTING 1 5/8 ACCEPTABLE ~

114

0, 0'

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas"

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant RE E.Ginna Nuclear Power Plant,1503 Lake Road Ontario NY 14519
3. plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT.):

AUX.COOL LINE 4S-AC6-152 (CONT. )

DRAWINGS B-29 Summary Exam Ztem Number Categ Number Component 6

mmm 600531 SN-FT CCU-43 MECHANICAL SNUBBER Component Type Exam AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL I 11462 ACCEPTABLE.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS'E-5 Summary Exam Item Number Categ Number Component 601180 SN-VT FWU-21 HYDRAULIC SNUBBER AUG VT NDE Component Type Exam 97 -VT: NO RECORDABLE ZNDZCATZONS

& INSIGNIFICANT: JAM NUTS DO NOT REQUIRE FULL THREAD ENGAGEMENT PER ME-121 'APE RESIDUE HAS BEEN REMOVEDf INSULATION NOT CAUSING ANY RESTRICTIONS ACCEPTABLE.

SETTING 3 1/8.

601181 SN-FT FWU-21 HYDRAULIC SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL I 2500-20-38 ACCEPTABLE.

601200 SN-VT FWU-24 MECHANICAL SNUBBER AUG VT 97 VT NO RECORDABLE INDICATIONSf SETTING 2 1/4 ACCEPTABLE.

601201 SN-FT FWU-24 MECHANZCAL SNUBBER AUG 97 FT TESTED

& REZNSTALLEDf SERIAL I 1 006 1 ACCEPTABLE 115

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT. ):

FEEDWATER LOOP A OUTSIDE CV (CONT. )

DRAWINGS: HE-5 Summary Exam Number Categ 601209 SN-VT Item Number Component FWU-26 (EAST)

MECHANZCAL SNUBBER NDE Component Type Exam VT AUG 97 VT NO RECORDABLE ZNDICATZONSf SETTING 2 1/2 ACCEPTABLE.

601210 SN-VT FWU-26 (WEST)

MECHANICAL SNUBBER AUG VT 97 VT NO RECORDABLE ZNDICATZONSB SERIAL ¹ 181806 SETTING 2 1/2 ACCEPTABLE.

601211 SN-FT FWU-26 (EAST)

MECHANICAL SNUBBER AUG 97 FT TESTED

& INSTALLED WITH SPAREf SERIAL ¹ 18179 ACCEPTABLE.

601212 SN-FT FWU-26 (WEST)

MECHANICAL SNUBBER AUG FT 97 -FT-TESTED

& REINSTALLED, SERIAL ¹ 18180 ACCEPTABLE.

FEEDWATER LOOP B OUTSIDE CV DRAWINGS: HE-5 Summary Exam Item Number Cate g Number Component 601220 SN-VT FWU-32 MECHANICAL SNUBBER NDE Component Type Exam AUG 97 VT NO RECORDABLE ZNDZCATZONSf SETTING 3 3/8 6

ACCEPTABLE.

601221 SN-FT FWU-32 MECHANICAL SNUBBER AUG FT 97 -FT:

TESTED

& REINSTALLED, SERIAL ¹ 7053 ACCEPTABLE.

116

R. E.

GZNNA NUCLEAR POWER PIaANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649 2

~ Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519

3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT.):

MAIN STEAM LOOP B OUTSIDE CV DRAWINGS: B-10A Summary Exam Number Categ 601490 SN-VT Item Number Component MSU-29 MECHANICAL SNUBBER Component AUG Type Exam VT 97 -VT:

NO RECORDABLE INDICATIONSf SETTING 2 1/4"

- ACCEPTABLE.

601491 SN-FT MSU-29 MECHANICAL SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL ¹'1469

- ACCEPTABLE.

601510 SN-VT MSU-32 MECHANICAL SNUBBER VT 97 VT NO RECORDABLE INDICATIONSf SETTING 1 1/4 f

ACCEPTABLE.

601511 SN-FT MSU-32 MECHANICAL SNUBBER AUG FT 97 -FT:

TESTED

& REINSTALLED, SERIAL ¹ 1093

- ACCEPTABLE.

H. P.

SAFETY INJECTION LINE FROM RWST DRAWZNGS: B-19 Summary Exam Number Categ 601820 SN-VT NDE Component Type Exam NBNBB M AUG VT Ztem Number Component RHU-110 MECHANICAL SNUBBER 97 -VT: NO RECORDABLE INDICATIONS, SETTING 2 1/8",

SERIAL ¹ 16373, PSA-1 ACCEPTABLE.

601821 SN-FT RHU-110 MECHANICAL SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL ¹ 16373 ACCEPTABLE.

117

R. E.

GINNA NUCLEAR POWER PLANT Inservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave.,Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road, Ontario NY 14519 3 ~ Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.commercial Service Date ~Jul 1970 B.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT.)-

H.P-SAFETY ZNJECTZON LZNE TO LOOP B COLD LEG DRAWINGS: A-16 Summary Emm Number Categ 601860 SN-VT Item Number Component SIU-47 MECHANICAL SNUBBER AUG VT NDE Component Type Em'7

-VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

601861 SN-FT SZU-47 MECHANICAL SNUBBER AUG FT 97 "FT: TESTED

& REZNSTALLED, SERIAL ()'15349 ACCEPTABLE.

STANDBY AUX FW THRU PEN 123 TO B S/G FWHD ZNCV DRAWZNGS: C-24 Summary Etiam Item Number Categ Number Component mrna=

~BN-mrna+ Bmaaarm ~a a=nummmmm~a Nnaaa 601940 SN-VT AFU-208 (AFW-13)

HYDRAULIC SNUBBER Component Type Etiam Mmt VT AUG 97 -VT: NO RECORDABLE INDICATIONS & INSIGNIFICANT: PIN TO PZN 18",

PISTON TO PIN 4 1/2",

PISTON LENGTH 2 1/4",

DRAWING CALLS FOR PZN TO PZN 18 5/16 f

SERIAL I 129029 SETTING 1 17/32 ACCEPTABLE'01941 SN-FT AFU-208 (AFW-13)

HYDRAULIC SNUBBER AUG FT 97 FT TESTED

& RE INSTALLED9 SERIAL g 1 2 902 9 RETEST DUE TO FUNCTIONAL FAILURE ZN 1996 ACCEPTABLE.

118

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I SNTJBBER PROGRAM COMPONENTS (CONT. ):

STANDBY AUX FW THRU PEN 119 TO A S/G FWHD ZNCV DRAWINGS'-20 Summary Exam Z tern Number Categ Number Component 601970 SN-VT AFU-224 (AFW-28)

HYDRAULIC SNUBBER Component Type AUG VT 97 VT NO RECORDABLE INDICATIONS/ SETTING 3 9

SERIAL I 12907 ACCEPTABLE.

601971 SN-FT AFU-224 (AFW-28)

HYDRAULIC SNUBBER AUG 97 FT TESTED

& REINSTALLED WITH PRETESTED SPARE/

SERIAL I 12907/

GORR 97-029 - ACCEPTABLE.

601980 SN-VT AFU-226 (AFW-27)

HYDRAULIC SNUBBER AUG VT 97 VT NO RECORDABLE INDICATIONSS SETTING 2 7/8 9

SERIAL I 12903 ACCEPTABLE.

601981 SN-FT AFU-226 (AFW-27)

HYDRAULIC SNUBBER AUG FT 97 FT TESTED

& RE INSTALLED WITH PRETESTED SPARE 9 SERIAL g 12 9 03 9 GORR 97 030 ACCEPTABLE.

PRESS.RELZEF FM PRESS.TO RELZEF MANIFOLD DRAWINGS: S-2 Summary Exam Item Number Categ Number Component 602050 SN-VT N607 HYDRAULIC SNUBBER NDE Component Type Exam AUG 9 7 VT NO RECORDABLE INDICATIONS 9 SETTING 3 1/2 9

SERIAL g

65 62 ACCEPTABLE ~

119

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A S.commercial Service Date ~Jul 1970 S.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS tCONT.):

PRESS.RELIEF 224 PRESS. TO RELIEF MANIFOLD (CONT. )

DRAWINGS: S-2 Summary Exam Item Number categ Namber component 602051 SN-FT N607 HYDRAULIC SNUBBER NDE Component Type Exam AUG 97 -FT:

TESTED

& REZNSTALLED WITH REBUILT SEAL ASSY, SERIAL I 6562 ACCEPTABLE.

602060 SN-VT N608 HYDRAULIC SNUBBER AUG 9 7 VT NO RECORDABLE INDICATIONS 9 SETT ING 3 1/2

/

SERIAL g

65 63 ACCEPTABLE 602061 SN-FT N608 HYDRAULIC SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED WITH REBUILT SEAL ASSY/

SERIAL 5 6563 ACCEPTABLE.

602070 SN-VT N615 HYDRAULIC SNUBBER AUG 97 VT NO RECORDABLE INDICATIONS/ SETTING 2 3/8 f

SERIAL I 6567 ACCEPTABLE.

602071 SN-FT N615 HYDRAULIC SNUBBER AUG 97 FT TESTED

& REZNSTALLED WITH PRETESTED SNUBBER'ERIAL I 6567/

GORR 97 032 ACCEPTABLE.

120

R. E.

GINNA NUCLEAR POWER PLANT Znservice Inspection Report 1990>>1999 Interval, Third Period, First Outage (1997) 1.

Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A 5.Commercial Service Date ~Jul 1970 6.National Boned Number for Unit N/A ATTACHMENT Z SNUBBER PROGRAM COMPONENTS, (CONT ~ ):

3-ZN.

PRESSURIZER RELIEF LINE DRAWINGS'-12 Summary Exam Number Categ 602130 SN-VT Ztem NDE Number Component Component Type Exam PS-8 AUG VT HYDRAULIC SNUBBER 97 VT NO RECORDABLE INDICATIONS9 SETTING 2 7/8 9 1/ 1 6 GREENf 5/ 1 6 REDf SERIAL I PD 86144-1159 ACCEPTABLE.

602131 SN-FT PS-8 HYDRAULIC SNUBBER AUG FT 97 -FT:

TESTED

& REINSTALLED, SERIAL

() 1159 ACCEPTABLE.

SEAL WATER RETURN FROM RCP-B DRAWINGS: S-3 Summary Exam Item Number Categ Number Component 602300 SN-VT CVU-550 MECHANICAL SNUBBER AUG VT NDE Component Type Exam 97 VT NO RECORDABLE INDICATIONSf SETTING 2 2 f SERIAL I 181909 ACCEPTABLE.

602301 SN-FT CVU-550 MECHANICAL SNUBBER AUG 97 -FT:

TESTED

& REINSTALLED, SERIAL 0 18190 ACCEPTABLE.

121

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear power Plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (If Req.)

N/A B.Commercial Service Date

~Jul 1970 6.National Board Number for Unit N/A ATTACHMENT I SNUBBER PROGRAM COMPONENTS (CONT. ):

STANDBY AUX FW THRU PEN 119 TO A S/G FWHD ZN DRAWINGS: C-20 Summary Exam Number Categ 602500 SN-VT Ztem Number Component AFU-229 HYDRAULIC SNUBBER NDE Component Type Exam AUG 97 -VT: INSIGNIFICANT: SETTING REJ.

ENGINEERING ACCEPTED SETTING 8 1 5/8" SETTING RE-EXAM DURING HOT STARTUP

& FOUND SETTING 8 2 15/16".

ENGINEERING DETERMINED THAT LINE ZS IN HOT MODE AT 78 DEG.

SEE ZSIM-023 MEMO DATED 11/19/97 ACCEPTABLE.

602501 SN-FT AFU-229 HYDRAULIC SNUBBER AUG FT 97 -FT'ESTED

& REPLACED WITH PRETESTED UNIT

& REINSTALLED ACCEPTABLE.

H.

SEISMIC SUPPORTS:

TURBINE DRIVEN AUX. FW PUMP SUCTION DRAWINGS: C-16 Summary Exam Number Categ 700080 SS-CS Item NDE Number Component Component Type Exam

  • F1.20R AFU-6 AUG VT RIGID HANGER 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

122

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Inspection Report 1990-1999 Znterval, Third Period, First Outage (1997) 1.

Owner Rochester Gas

& Electric Cor 89 East Ave. Rochester NY 14649

2. Plant R.E.Ginna Nuclear Power Plant,1503 Lake Road Ontario, NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/A 5.commercial Service Date ~oui 5970 6.National Board Number for Unit N/A ATTACHMENT SEISMIC SUPPORTS (Cont.):

RC PRESSURE RELIEF MANIFOLD TO PRT DRAWINGS'S-2 Summary Exam Z tern Number Categ Number Component 700130 SS-CS

  • F1. 20R CVU-129 GUIDE

& IA NDE Component Type Exam OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

FEEDWATER LOOP A OUTSIDE CV DRAWINGS B-11 Summary Exam Z tern Number Categ Number Component 700350 SS-CS

  • F1.20V FWU-19 VARIABLE SPRING NDE Component Type Exam

~MBBMM~M AUG VT 97 VT NO RECORDABLE INDICATIONSJ SETTING 3439 5

S ACCEPTABLE.

MAINSTEAM DRAWINGS: B-9A Summary Exam Z tern NDE Number Categ Number Component Component Type Exam 700470 SS-CS

  • F1.20R MSU-51 OE VT RIGID SUPPORT

& IA 97 -VT: REJECT:

MISSING WASHER, ACTION REPORT 97-1728 GENERATED.

WASHER RESTORED UNDER WO I 19703278.

ALL SUPPORTS OF THIS TYPE ON THIS SYSTEM WERE EXAMINED THIS OUTAGE.

RE-EXAM ACCEPTABLE.

700480 SS-CS

  • F1.20R MSU-52 RIGID SUPPORT

& IA 97 VT RE JECT LOOSE NUTS J ACTION REPORT 97 1725 GENERATEDJ LOOSE NUTS TIGHTEN UNDER WO I 19703281.

ALL SUPPORTS OF THIS TYPE ON THIS SYSTEM WERE EXAMINED THIS OUTAGE.

RE-EXAM ACCEPTABLE'23

R. E.

GZNNA NUCLEAR POWER PLANT Znservice Znspection Report 1990-1999 Interval, Third Period, First Outage (1997)

1. Owner Rochester Gas' Electric Cor 89 East Ave. Rochester NY 14649
2. Plant R.E.Ginna Nuclear power plant 1503 Lake Road Ontario NY 14519
3. Plant Unit 1 4.

Owner Certificate of Authorization (Zf Req.)

N/'A B.Commercial Service Date ~cul 1970 B.National Board Number for Unit N/A ATTACHMENT I SEISMIC SUPPORTS (Cont.):

MAINSTEAM (CONT. )

DRAWINGS: B-9A Summary Exam Item Number Categ Number Component 700490 SS-CS

  • F1.20R MSU-53 RIGID SUPPORT

& ZA NDE Component Type Exam smarm~

OE VT 97 -VT: REJECT:

LOOSE NUT. ACTION REPORT I 97-1726 GENERATED.

LOOSE NUT TIGHTEN UNDER WO

() 19703277.

ALL SUPPORTS OF THIS TYPE ON THIS SYSTEM WERE EXAMINED THZS OUTAGE.

RE-EXAM ACCEPTABLE.

700500 SS-CS

  • F1.20R MSU-54 RIGID SUPPORT

& IA OE VT 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

700510 SS-CS

  • F1.20R MSU-47 RIGID SUPPORT

& IA OE VT 97 -VT: NO RECORDABLE INDICATIONS ACCEPTABLE ~

700520 SS-CS

  • F1.20R MSU-48 RIGID SUPPORT

& IA OE VT 97 -VT: REJ:

ONE BOLT HAS LOOSE NUT. ACTION REPORT 97-1727 GENERATED.

RE-EXAM AFTER TIGHTENING ACCEPTABLE. ALL SUPPORTS OF THIS TYPE EXAMINED THIS OUTAGE.

700530 SS-CS

  • F1.20R MSU-49 OE RIGID SUPPORT

& IA VT 97 -VT: REJ:

ONE BOLT HAS LOOSE NUT. ACTION REPORT 97-1724 GENERATED.

RE-EXAM AFTER TIGHTENING ACCEPTABLE. JACKING PLATE DISTORTION PREVIOUSLY ACCEPTED ON NCR 94-064.

ALL SUPPORTS OF THIS TYPE EXAMINED THIS OUTAGE.

700540 SS-CS

  • F1.20R MSU-50 RIGID SUPPORT

& IA AUG 97 -VT:

NO RECORDABLE INDICATIONS ACCEPTABLE.

124

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As R uiredb the Provisions of the ASME Code Section XI 1.0wnerRochester Gas

& Electric Cor Date 89 East Aveep Rochester, NY 14649 Sheet

2. Plant R.E.

Ginna Nuclear Power Plant Unit 27 March 1998 of 20 s 1 1503 Lake Road

Ontario, NY 14519 Address

(*)

Repair Organization P.O. No., Job No., etc.

3. Work Performed by

(*)

Type Code Symbol Stamp Authorization No.

N A N/A

4. Identification of System

(*)

Address

(*)

Expiration Date N/A

5. (at Applicants Consttnctlon Code~ t9~ Edillon~ Addenda,~

Cade Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements1

6. Identificatio of Components Repaired or Replaced and Replacement Components Name of Com nent Name of Manufacturer Manufacturer Serial No.

National Board No.

Other Identlflcatlon Year Build Repaired Replaced or Re lacement ASME Code Stamped (Yes or No

7. Description of Work
8. Tests Conducted:(')

Hydrostatic P Pneumatic P Nominal Operating Pressure P

Other p Pressure psi Test Temp.~F NOTE: Supplemental sheets ln form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(') See "ATTACHMENT II" FOR APPLICABLE INFORMATION (12/82)

This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N. Y. 10017 1

FORM NIS-2 (Back) 9.Remarks Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

repair or replacement Type Code Symbol Stamp Certificate o Aut rizatio Signed Ovmer or Owner's De (gnee, Title a

I i

Expiration Date Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by of have inspected the components described In this Ovmei's Report during the period 6I 1/96 to

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Ovmei's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described ln this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuryor property damage or a loss of any kind arising from or connected viiththis inspection.

Inspector's SIgnature Date

~ ~ 7 19~9'ommissions National Board, State, Province, and Endorsements

(')

See "ATTACHMENT II" FOR APPLICABLE INFORMATION

(") Repair, Replacement or Modification as Identified within "ATTACHMENT II"

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

e V

e 2.

Plant:

.E. Ginna Nuclear Power Plant 1503 I.ake Rd Ontario N.Y. 14519 3.

Applicable Edition ofSection XIUtilized forRepairs, Replacements or Modifications:

1986 No Addenda

REPAIR, REPLACEMENT and MODIFICATION PROGRAM The Repair, Replacement and Modification (RR&M) Program, as ideni ified within the "Inservice Inspection (ISI)

Program",

identifies component jurisdiction and associated requirements.

Applicable Repair, Replacement or Modification activities have been performed in accordance with ASME Section XI Code, 1986 Edition, No Addenda or the 1992 Edition with 1992 Addenda for IWE/IWL (Containment).

When an item under the rules and requirements of the "Inservice Inspection (ISI)

Program" is found deficient, an Engineering "use-as-is" evaluation may result.

This determination is indicated within the ISI Program

Summary, "Attachment I", for the applicable component within this report.

If the deficiency results in a

Code

Repair, Replacement or Modification; the deficiency will be classified as one of three category types.

These category types shall consist of a

"Code Service Induced Rejectable Indication",

a "Code Rejectable Indication" and a

"Corrective Action Activity".

A "Code Service Induced Rejectable Indication" occurs when a

component under the RR&M Program contains an indication that is beyond ASME Section XI Code acceptable standards and was determined to be "Service Induced".

"Service Induced" indications, stemming from Inservice Inspection Examinations (ISI),

shall require additional expanded examinations.

The associated expanded examinations shall be performed in accordance to the requirements of the ASME Section XI Code.

A "Code Rejectable Indication" occurs when a component under the RR&M Program contains an indication that is beyond ASME Section XI Code acceptable standards and was determined to be not "Service Induced".

This category includes but is not limited to items such as welding discontinuities from a modification identified during ISI preservice examinations or component damage caused by human involvement.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

ve 4

2.

Fiant:

.E, Ginna Nuclear Power Plant 1503 Lake Rd. Ontario N,Y, 14519 3.

Applicable Edition ofSection XlUtilized for Repairs, Replacements or Modifications:

A "Corrective Action Activity" may occur when a

component under the RR&M Program requires corrective action.

This corrective action may be a result from a maintenance operation that identifies a need to perform a Code Repair, Replacement or Modification.

This category includes but is not limited to items such as machining a

component to correct an identified problem or the removal and later reapplication of hardface material on pressure boundary surfaces.

The following groups'ave performed applicable

Repair, Replacement and Modification activities.

Each group has been identified by a number and will correspond to the groups'ame and address.

Rochester Gas and Electric, Ginna Station departments will not be identified as like contractors but by generic name.

In the below listing of Repairs, Replacements or Modifications; the work group will be identified by a

number within the component discussion.

1.

Rochester Gas 6 Electric, Ginna Station 2.

Trentec 4600 East Tech Drive Cincinnati, Ohio 45245 3.

Anchor Darling (see item N5 below, company was bought) 4.

Crane Movats 2825 Cobb International Pkwy Kennesaw Ga.

30144 5.

BW/IP International PO Box 3428 701 First St.

Williamsport, Pa.

17704

R. E. GINNANUCLEARPO%ER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) 1.

Owner:

s 2.

Plant: R.E. Ginna Nuclear owe Plant 1503 l.ake Rd. Ontario

.Y 1451 3.

Applicable Edition ofSection XIUtilizedfor Repairs, Replacements or Modifications:

1986 No Addenda TTAC E

The following information will report applicable

Repairs, Replacements or Modifications performed at R.

E.

Ginna Nuclear Power Plant during this reporting period as required by ASME Section XI Code.

l.

ASME Class: l

~S stem:

RCS GORR No.: 97-001 2 ~

~

tY Construction Code:

B31.1 '55, G-676262, B16.34, ASME III '86 Work Performed B:

1 Name of Com onent:

V434 Replacement Work Descri tion/Remarks:

A Replacement activity was initiated on Valve 434 by mechanical means.

This activity was controlled by WO ¹ 19602411..

Upon reinstallation, an ASME Section XI VT-2 Leakage Exam was performed and acceptable.

2.

ASME Class:

3

~S stem:

SW GORR No.: 97-002 Line: N/A v

Construction Code:

B31.1 '55, R0-2204, ME-318, ASME III '86 Work Performed B

1 Name of Com onent:

SW Pump "A" (PSWOlA),

Pump Ass'y

& Pipe Column Bolting Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for

.the Pump Ass'y and Pipe column bolting associated with SW Pump "Ane This activity was controlled by WO

¹ 19602068.

Upon reinstallation, an ASME Section XI Preservice examination was performed and acceptable for the support.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) 1.

Owner:

2.

Plant: R.E. Ginna Nuclear Power Plant 1503 I.ake Rd. Ontario N.Y. 14519 3.

Applicable Edition ofSection XIUtilizedfor Repairs, Replacements or Modifications:

TT CHMENT I 3.

ASME Class:

2

~S stem:

CS GORR No.: 97-003 Line: 2D-SI-151 Construction Code:

B31.1 '55, G-676262, ME-318 86/i92 Work Performed B

1 Name of Com onent:

2" CS Piping Replacement Relief Re uest:

RR ¹31 (Code Case N-416-1)

Work Descri tion/Remarks:

A Replacement activity was initiated to remove and install new 2"

piping associated with Containment Spray Test Line. This activity was controlled by Action Report 96-0733, PCR No.96-082 and WO ¹ 19602601.

Installation Code VT and PT NDE was performed and acceptable in accordance with Code Case N-416-1.

Upon completion of this

activity, an ASME Section XI VT-2 Leakage Examination was performed and acceptable.

4.

GORR No.:

97-004 Corrective Action Activity ASME Class:

3

~S stem:

AFS 3B-FN7-900-1B Construction Code:

B16.34

'96, ASME III '86 Work Performed B

1 Name of Com onent:

MOV's 4007

& 4008 Plug Replacements installation of Stem to Disk Tack Welds Work Descri tion/Remarks:

A Replacement activity was initiated for the Plugs associated with Valves 4007 4008.

This activity was controlled by PCR's96-038

& 96-039, MDCN 1164 and WO ¹'s

19603073, 19602744.

Tack welds were applied to the Stem to Disks.

Installation Code VT examinations were performed and acceptable.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

c V

e 2.

Plant:

Ginna uclear owerPlant150 1 akeRd OntarioN.Y 14 19 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

5.

TTACHME I

ASME Class:

3

~S stem:

SW GORR No.: 97-005 Line: N/A Construction Code:

B31.1 '55, SP-5291, R0-2204, ASME III '86 Work Performed B

1 Name of Com onent:

Discharge Flange Bolting Replacement, SW Pump "D"

Work Descri tion/Remarks:

A Replacement activity was initiated for the discharge flange bolting (7/8") associated with SW Pump "D"

(PSW01D).

The existing bolting was replaced with longer bolts of the same diameter.

This activity was controlled by WO ¹ 19603328 which required that the bolts be replaced one at a time.

6.

ASME Class: l

~Sstem:

CVCS-Letdown GORR No.:

97-006 Construction Code:

B31.1 '55, G-676270, ASME III '86 Work Performed B

1 Name of Com onent:

V427; Stem, Plug

& Cage Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for the

stem, plug and cage associated with Valve 427.

This activity was controlled by WO ¹ 19602428 and Action Report 96-0699.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable.

7.

GORR No 97-007 Corrective Action Activity ASME Class:

2

~S stem:

RHR 6C-SI-151 6D-SI-151 Construction Code:

B16.34 1967 Work Performed B

1 Name of Com onent:

V857A/B/C Disk Modification Work Descri tion/Remarks:

A Modification activity was initiated to drill a pressure relieving hole in the disk associated with Valves

857A, 857B and 857C. This activity was controlled by PCR 96-107 and WO ¹'s
19604158, 19604159 and 19604160.

Upon reassembly, an ASME Section XI VT-2 Leakage examination was performed and acceptable.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

V 2.

Plant: R.E. Ginna uclear Power P ant 1503 Lake Rd. Ontario N.Y. 1451 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

22 TT CHMENT I S.

ASME Class:

2

~S stem:

SAFE GORR No.:

97-008 2

~

2onstruction Code:

ASME III, NF, 1974 Work Performed B

1 Name of Com onent:

Supports AFU-226/229 Shim Replacement AFU-228 Spring Adjustment.

Work Descri tion/Remarks:

A Modification activity was initiated for the addition of shims to component supports AFU-226 and AFU-229. Spring Can support adjustment was also made by repositioning AFU-228. This activity was controlled by PCR 96-113 and WO ¹'s 19604544 and 19604115.

Upon reinstallation, a VT-3 Preservice (baseline) examination was performed and acceptable.

9.

ASME Class:

2

~S stem:

MS GORR No 97-009 Construction Code:

B16.34

'67, ASME III '86 Work Performed B

1

& 3 Name of Com onent:

V3505A Disk Replacement.

Work Descri tion/Remarks:

A Replacement activity was initiated for the Disk associated with Valve 3505A. This activity was controlled by WO ¹ 19603128.

Upon reinstallation, an ASME Section XI Leakage Test and associated VT-2 examination was performed and acceptable.

10.

GORR No.:

97-010 Cancelled 11.

GORR No.:

97-011 Cancelled

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

V Ci 2.

Plant:

.F Ginna Nuclear Power Plant 150 Lake Rd. Ontario N.Y. 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

TT CH E

I 12.

ASME Class:

3

~Sstem:

SW GORR No.:

97-012 Line: N/A Construction Code:

B31.1 '55, R0-2204, SP-5291, ME-318, ASME III '86 Work Performed B

1 Name of Com onent:

SW Pump "B" Reducing Flange Face Repair, and Replacement of Expansion Joint (SSW03)

& Bolting as well as Pipe Column Bolting.

Work Descri tion/Remarks:

On SW Pump "B" a reducing flange face was repaired by welding and remachined.

Expansion joint (SSW03) and bolting was replaced as well as the pipe column bolting associated with SW Pump "B". These activities were controlled by WO I's 19602289

& 19600827, and PCR 9 96-080 Rev.

1.

Installation Code VT

& PT examinations were performed and acceptable on the flange face repair.

Upon reinstallation, an ASME Section XI VT-2 leakage examination was performed and acceptable on the expansion joint and flange connection.

Also, a preservice VT-3 examination was performed and acceptable on the pipe column support.

13.

ASME Class:

3

~S stem:

SW GORR No.:

97-013 Line: N/A Construction Code:

B31.1 '55, R0-2204, SP-5291, ME-318, ASME III '86 Work Performed B

1 Name of Com onent:

SW Pump "C" Discharge Flange

& Pipe Column Bolting Replacement Work Descri tion/Remarks:

A 7/8" Bolting Replacement activity was initiated for the Pump discharge flange and Pump pipe column.

This activity was controlled by WO 5's

19600828, 19603327 and SM-95-075.4.

Flange bolting was replaced one at a time.

Upon re-assembly, an ASME Section XI VT-3 Preservice examination was performed and acceptable for the Pump pipe column support.

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

V 2.

Plant: R,E, Oinna Nuclear Power P ant 150 1 akeRd. OntarioN.Y. 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

JMWI *<<

TT CHMK I

14.

ASME Class:

2

~S stem:

CVCS GORR No.:

97-014 Line: N/A t'!'onstruction Code:

ASME III '65

& '86, G-676370 Work Performed B

1 Name of Com onent:

"A" Charging Pump (PCH01A) Inlet Valve Seat Center Plunger Replacement Work Descri tion/Remarks:

A Replacement activity was initiated by mechanical means for the Inlet Valve Seat Center Plunger associated with the "A" Charging Pump.

This activity was controlled by WO ¹ 19700590.

15.

ASME Class:

3

~S stem:

CCW GORR No.:

97-015 Line: N/A Construction Code:

ASME III NF 86I B31 1

73I SP 5291 ME 318 Work Performed B

1 Name of Com onent:

CCU-189, Component Support Modification Work Descri tion/Remarks:

A Modification activity was initiated on Component Support CCU-189 to remove the interference from the 3 x 3 tubesteel kicker from MOV 813.

This activity was controlled by WO

¹ 19701607.

Upon reinstallation, a

VT-3 Installation Code examination was performed and acceptable on component support CCU-189.

16.

ASME Class:

3

~S stem:

CCW GORR No.:

97-016 Construction Code:

ASME III '86, SP-5291, ME-318 Work Performed B

1 Name of Com onent:

FE-651, Studs

& Nuts Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for studs

& nuts associated with FE-651.

This activity was controlled by WO ¹ 19602079, Action Report 96-0676 and M 130.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable.

10

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

v e

e 2.

Plant: R.E. Ginna Nuclear Power Plant 150 Lake Rd. Ontario N,Y, 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

17.

ASME Class:

2

~S stem:

REST GORR" No.: 97-017 Line: N/A Construction Code: API-650, SP-5275 Add "A" Work Performed B

1 Name of Com onent:

RWST 20" Roof Manway Cover Modification Work Descri tion/Remarks:

A Modification activity was initiated on the 20" RWST Roof Manway cover.

This activity installed a plexiglass viewing port within the 20" Manway cover by cutting out a

rectangle within the cover.

This activity was controlled by WO ¹ 19220710 a

PCR ¹97-036.

18.

ASME Class:

3

~S stem:

CCW GORR No.: 97-018 Line: N/A Construction Code:

EWR-10182, SP-5291, ASME III '86 Work Performed B

1 Name of Com onent:

CCW Heat Exchanger "B" (EAC01B), Bolting Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for associated bolting in the Rigid Support of the Component Cooling Water Heat Exchanger "B". The existing 7/8" diameter bolts were replaced with 1" diameter bolts. This activity was controlled by WO ¹ 19702146.

Upon reinstallation, a

VT-3 Preservice examination was performed and acceptable.

4 19.

ASME Class:

2

~S stem:

CVCS GORR No.: 97-019 Construction Code:

B31.1 '55, G-676262, G-676257, B16.34, ASME III '86 Work Performed B

1 Name of Com onent:

RV203, Internals Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for Valve 203.

This activity consisted of installing a disk insert, disk ring pin stem and nozzle assembly.

This activity was controlled by WO ¹ 19404441 and CMP-37-06-203.

11

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990- 1999 Interval, Third Period, First Outage (1997) l.

Owner:

es e a

ve 464 2.

Plant:

.E, Ginna Nuclear Power Plant 1503 Lalle Rd. Ontario N,Y, 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

Tl'H E

I 20.

ASME Class:

3

~S stem:

CCW GORR No.: 97-020

~ ~

V Construction Code:

B31.1 '55, G-676262, ME-318, ASME III '86 Work Performed B:

1 Name of Com onent:

V732, Fastener Replacement Work Descri tion/Remarks:

A mechanical Replacement activity was initiated for fasteners associated with Valve 732.

This activity was controlled by WO ¹ 19603527 and CMP-37-06-73.

21.

ASME Class:

Q

~S stem:

FW GORR No.:

97-021 Construction Code:

ASME III NF -'73/86, O&M Part 4 '90 Work Performed B

1 Name of Com onent:

FWU-26E, Snubber Replacement Work Descri tion/Remarks:

A Snubber Replacement activity was initiated for FWU-26E support.

This activity was controlled by WO ¹ 19603881.

Upon completion of the installation, a

Snubber Program VT-3 Preservice examination was performed and acceptable.

22.

ASME Class:

3

~S stem:

SAFW GORR No.: 97-022 Construction Code:

ASME III '74/'86 Work Performed B:

4 Name of Com onent:

V9629A, Stem Modification Work Descri tion/Remarks:

A Modification activity was initiated for Valve 9629A Stem to allow for the installation of a strain gage.

The stem was milled with some threads removed.

This activity was controlled by WO ¹ 19603596 and PCR 97-080.

12

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

ve 2.

Plant: R.E. Ginna Nuclear Power Plant 1503 Lake Rd. Ontario N.Y 4519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

TPACHMENT I 23 ASME Class:

1

~Sstem:

CVCS-Letdown GORR Noe 1

97-023 Construction Code:

ASME III '86 Work Performed B

1 Name of Com onent:

Elbow Material Defect Weld Repair between V202 and orifice.

Work Descri tion/Remarks:

A Code Repair activity was initiated for an Elbow base material defect between Valve 202 and the orifice located on this 2" line. This activity was controlled by WO ¹ 19703194 and M73.10.

Installation Code NDE was performed and acceptable which consisted of VT and PT examinations.

As required by ASME Section XI, a

VT exam was performed which was the method that originally identified this condition.

ASME Section XI PT Baseline examination was performed and acceptable.

An ASME Section XI VT-2 Leakage examination is not required for this Code Repair but one was performed and acceptable during PT-7.

24.

ASME Class:

Q/3

~S stem:

PN GORR No.:

97-024 Construction Code:

B31.1

'55, SP-5291, B16.34, ASME III '86 Work Performed B

1 Name of Com onent:

V4271/4272 Stem

& Plug Replacement Work Descri tion/Remarks:

A Replacement activity by mechanical means was initiated for stems and plugs associated with Valves 4271 and 4272. This activity was controlled by WO ¹ 19703117.

13

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

e er V

4 4 2.

Plant: R.F. Ginna Nuclear Power Plant 1503 I ake Rd Ontario 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

25.

TT CHMENT I ASME Class:

1

~S stem:

CVCS-Charging GORR No.:

97-025 "v

Construction Code:

B31.1 '55, G-676262, ME-318 ASME III '86/'92 Work Performed B

1 Name of Com onent:

V304D

& Associated 2" Piping Replacement Relief Re uest:

RR ¹31 (Code Case N-416-1)

Work Descri tion/Remarks:

A Replacement activity was initiated for Valve 304D and associated 2" piping.

This activity was controlled by WO ¹ 19601222. Installation Code VT and PT NDE was performed and acceptable in accordance with Code Case N-416-1.

Upon completion of this activity, an ASME Section XI VT-2 Leakage Examination was performed and acceptable under PT-7.

ASME Section XI Preservice (Baseline)

PT NDE was performed and acceptable.

26.

ASME Class:

1

~Sstem:

RCS GORR No.: 97-026 Construction Code:

B31.1 '55, B16.34, G-676279 Work Performed B

1 Name of Com onent:

V434 Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for Valve 434.

The existing valve was removed by mechanical means and one installed that had the bellows replaced.

This activity was controlled by WO ¹ 19603517.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable under PT-7.

27.

ASME Class:

1

~S stem:

RCS GORR No.: 97-027 Construction Code:

B31.1 '55, B16.34, G-676279 Work Performed B

1 Name of Com onent:

V435 Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for Valve 435.

The existing valve was removed by mechanical means.

This activity was controlled by WO ¹ 19603518.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable under PT-7.

14

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

e V

2.

Plant: R.E Ginna Nuclear Power Plant 1503 Lake Rd. Ontario N,Y l45 9 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

VFACHME 28.

ASME Class:

2

~S stem:

RHR GORR No.:

97-028 Line: N/A Construction Code:

ASME III '65,

'86, ASME VIII '65 Work Performed B

5 Name of Com onent:

Bolts

& Nuts Replacement RHR Hx "A" (8)

RHR Hx "B" (6)

Work Descri tion/Remarks:

A Replacement activity was initiated dealing with bolts and nuts on the "A" and "B"

RHR Heat Exchangers.

Eight (8) bolts

& nuts were replaced on the "A"

and six (6) bolts

& nuts on the "Bue This activity was controlled by WO I's 19703122

& 19703123, and Action Reports 97-1623

& 97-1622.

A VT bolting examination was performed as required by ASME Section XI on both the "A"

& "B" Hx's.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable in conjunction with the ISI periodic testing.

29.

ASME Class:

2

~S stem:

SAFW GORR No.:

97-029 90 ~

I Construction Code:

ASME III NF 1974 Work Performed B

1 Name of Com onent:

AFU-224 Snubber Replacement Work Descri tion/Remarks:

A Snubber Replacement activity was initiated for AFU-224 component support.

This activity was controlled by WO 5

19603917.

Upon reinstallation, a

VT-3 Baseline examination was performed and acceptable.

30.

ASME Class:

2

~Sstem:

SAFW GORR Noet 97-030 Construction. Code:

ASME III NF 1974 Work Performed B

1 Name of Com onent:

AFU-226 Snubber Replacement Work Descri tion/Remarks:

A Snubber Replacement activity was initiated for AFU-226 component support.

This activity was controlled by WO 5

19603892.

Upon reinstallation, a

VT-3 Baseline examination was performed and acceptable.

15

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

V 2.

Plant:

.E. Ginna Nuclear Power Plant 1503 Lal<e Rd. Ontario N.Y. 14519 3.

Applicable Edition ofSection XIUtilizedfor Repairs, Replacements or Modifications:

31.

ASME Class:

2

~S stem:

SAFW GORR No.:

97-031 t

y Construction Code:

ASME III NF 1974 Work Performed B

1 Name of Com onent:

AFU-229 Snubber Replacement Work Descri tion/Remarks:

A Snubber Replacement activity was initiated for AFU-229 component support.

This activity was controlled by WO ¹ 19603893.

Upon reinstallation, a

VT-3 Baseline examination was performed and acceptable.

32.

ASME Class:

1

~S stem:

RCS GORR No.:

97-032 Construction Code:

ASME III NF 1974 Work Performed B

1 Name of Com onent:

N615 Snubber Replacement Work Descri tion/Remarks:

A Snubber Replacement activity was initiated for N615 component support.

This activity was controlled by WO ¹ 19603896.

Upon reinstallation, a

VT-3 Baseline examination was performed and acceptable.

33.

ASME Class:

3

~Sstem:

DG GORR No.:

97-033 Line: N/A Construction Code:

B31.1

'55, SP-5291, ME-318, ASME III '86 Work Performed B

1 Name of Com onent:

DG "B" Air Start 2" Threaded Union Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for a 2" threaded union on the "B" Diesel Generator Air Start by mechanical means.

This activity was controlled by WO ¹ 19604436.

34.

GORR No.:

97-034 Cancelled 16

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

es e

2.

Plant:

Ginna Nuclear Power Plant 1 0 I.ake Rd Ontario N.Y. 1451 3.

Applicable Edition ofSection XlUtilized for Repairs, Replacements or Modifications:

TTAC E

H 35.

ASME Class:

3

~S stem:

SW GORR No.: 97-035 Line:

1 1/2" t

t y

Construction Code:

B31.1 '55, SP-5291, ASME III '86/'92 Work Performed B

1 Name of Com onent:

Valves

4769, 4754

& 4755 and associated 1 1/2" Piping Replacement Relief Re uest:

RR ¹31 (Code Case N-416-1)

Work Descri tion/Remarks:

A Replacement activity was initiated for the 1

1/2" piping and valves

4769, 4754

& 4755.

This activity was controlled by WO ¹ 19700510, TE 92-553

& CGIEE 95-012.

Upon completion of this socket soldering operation, Installation Code VT examinations were performed and acceptable.

An ASME Section.XI VT-2 Leakage examination was performed and acceptable.

36.

ASME Class:

2

~S stem:

SW/HVAC GORR No.: 97-036 Line: N/A Construction Code:

B31.1 '55, SP-5291, ASME III '86/'92 Work Performed B

1 Name of Com onent:

Replacement of Flexible Metal Joints Flange Bolting Relief Re uest:

RR ¹31 (Code Case N-416-1)

Work Descri tion/Remarks:

A Replacement activity was initiated for flexible metal joints

& flange bolting. This activity was controlled by WO ¹'s 19703357

& 19702841. Installation Code RT examinations were performed and acceptable in accordance with Code Case N-416-1.

Upon completion of this activity, an ASME Section XI VT-2 Leakage examination was per formed and acceptable.

17

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

ve 2.

Plant: R.F. Ginna Nuclear Power Plant 1503 l.ake Rd. Ontario N.Y 14519 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

1986 No Addenda TT CHMENT I 37.

ASME Class:

2

~S stem:

MS GORR No.:

97-037 Line: N/A d

d d

Construction Code:

Base Metal: B31.1 '55, SP-5291, ASTM A155-65 GR C55 Class 1

Gusset:

B31.1 '55, SP-5291 Work Performed B

1 Name of Com onent:

Pen.

401/401 Pipe Base Metal

& Gusset Repairs Work Descri tion/Remarks:

Pipe Base Metal and Gusset Weld Repairs were performed on Penetrations 401 402.

This activity was controlled by Action Report 97-1846, WO ¹'s

19603652, 19703371 and 19703372, PCR ¹97-089

& M73.10.

Code repair cycle was performed and results documented.

Installation NDE performed on the Pipe Base metal included VT, PT/MT and RT, all were acceptable.

Installation NDE performed on the Gussets include VT and PT/MT, all were acceptable.

Upon completion of the

repairs, ASME Section XI Preservice (baseline)

Surface examinations were performed and acceptable.

38.

ASME Class: l

~S stem:

RCS GORR No.:

97-038 Construction Code:

B31.1 '55, MSS-SP-69 Work Performed B

5 Name of Com onent:

V431A Bonnet Modification

& Valve Trim Replacement.

Work Descri tion/Remarks:

A Modification activity was initiated to machine the Bonnet gasket area t accept a thicker gasket.

During this time the valve trim was replaced associated with Valve 431A. This activity was controlled by WO

¹ 19603470.

A PT exam was performed on the gasket seating surface.

Upon reinstallation, an ASME Section XI VT-2 Leakage examination was performed and acceptable during PT-7.

18

R. E. GINNANUCLEARPOWER PLANT Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

e 2.

Plant: R.E. Ginna Nuclear Power Plant 1503 Lake Rd. Ontario N.Y. 14519 3.

Applicable Edition ofSection XIUtilizedforRepairs, Replacements or Modifications:

39.

ASME Class:

2

~Sstem:

Service Air GORR No.: 97-039 Construction Code:

B31.1 '55, SP-5291, B16.34

'90 Work Performed B

1 Name of Com onent:

V7141 Replacement Work Descri tion/Remarks:

A Replacement activity was initiated for Valve 7141. This activity was controlled by WO ll 19401373.

Upon reassembly, an ASME Section XI VT-2 Leakage examination was performed and acceptable during PT-7.

40.

ASME Class:

3

~S stem:

CCN GORR No.: 97-040 1.5E-AC6-152 Construction Code:

ASME III '86, ME-318 Work Performed B

1 Name of Com onent:

FE-643/645 Flange Bolting Replacement Work Descri tion/Remarks:

A Flange Bolting Replacement activity was initiated for FE-643

& FE-645.

This activity was controlled by WO 5 19500554.

19

R. E. GINNANUCLEARPOWER PLANT Inserv ice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997) l.

Owner:

2.

Plant: R.

irma uc ear ower a

a e

d. 0 4

9 3.

Applicable Edition ofSection XIUtilized for Repairs, Replacements or Modifications:

TFA E

T 41.

ASME Class:

MC

~S stem:

Containment GORR Most 97-041 Line: N/A Construction Code:

AISC '63, ASME III '86 ASME Section XI: 1992 IEW Work Performed B

1, 2

Name of Com onent:

Personnel

& Equipment. Hatches Replacements of Shaft Seal Ass'y, Shaft Seal Box

& Shaft, Shaft Seal Housing Spot Welds.

Work Descri tion/Remarks:

A Replacement activity was initiated for both the Personnel and Equipment hatches (SPP01

& SPP02).

The replacement included the Shaft Seal Assembly, Shaft Seal Box

& Shaft for both hatches.

Also, a Seal Shaft Housing had spot welds installed.

This activity was controlled by WO I'

19701507, 19701508, PCR 8 97-075

& Action Reports 97-0610 and 97-0712. Installation Code NDE was performed on the spot welds which consisted of VT

& PT examinations and were acceptable.

Upon completion of this activity, an Appendix J Type B leakage test was performed and acceptable for both hatches.

The ASME Section XI VT-2 leakage examination was not performed and Action Report 98-0272 generated to address this missed examination.

42.

ASME Class:

1/2 ~Sstem:

S/G "A" GORR No.: 97-042 Line: N/A Construction Code:

ASME III 1986 Work Performed B

1 Name of Com onent:

Replaced 1

Primary Manway Stud 1

Secondary Hand Hole Cover Stud.

Work Descri tion/Remarks:

A Replacement activity was initiated for 1 Primary Manway Stud and 1 Secondary Hand Hole Cover Stud on Steam Generator "A" (EMS01A). This activity was controlled by GMS-43-06-PRIMINST GMS-43-11-HANDCOVER.

Augmented Installation NDE was performed and acceptable which consisted of MT for the Primary Stud and VT for the Secondary Stud.

Upon re-assembly, an ASME Section XI VT-2 Leakage examination was performed and acceptable during PT-7.

20

R K Ginna Nuclear Power Plant Inservice Inspection Report 1990- 1999 Interval, Third Period, First Outage (1997)

Attachment III Krosion/Corrosion (Minwall)Program Summary This section provides Erosion/Corrosion examination details and information corresponding to the items inspected during the 1997 Outage.

A total of 117 components were examined, Com onent Pipes Elbows Bends Reducers Tee Total the breakdown ofthis total, by component type is as follows:

Total 47 34 12 12 12 117 The following lists identify systems ofexamined components, system component summaries, and component result details.

S stems of examined Com onents Component thickness measurements were performed on the following systems:

DWG.

No SYSTEMS M-1 M-2 M-5 MW M-7A M-7B M-11A M-11B M-12A M-12B M-18 M-31 M-32 MAIA M<IB M<5 M-81 M-82 M-83 M-88D M-92 M-93 M-104 A/B FW PUMP DISCHARGE TO 5A/5B HEATERS 5 A/BFW HEATERS TO FW HEADER HEATERS 4A/4B TQ FEEDWATER SUCTION FEEDWATER SUCTION TO PUMPS A/B

'EATER DRAINTANKDISCHARGE COND. PUMP ANDHEATERDRAINTANKDISCHARGE TO FW SUCTION MSR IA& 1B 2nd PASS DRAIN MSR 2A &2B 2nd PASS DRAIN,~

MSR 1A&1B2nd PASS TQ 5A HEATER AND CONDENSER MSR 2A&2B2nd PASS TQ 5B HEATER AND CONDENSER MSR 2A&2B4th PASS TO CONDENSERS MSR 1A & IB HEATERDRAINTANKAND CONDENSER MSR 2A&2B TO HEATER DRAINTANK 5A HEATERDRAINTO4A LP HEATER 5B HEATERDRAINTO 4B LPHEA~

PRESEPARATOR A/BTQ HEATERDRAINTANK&CONDENSER FEEDWATER DISCHARGE (TURBINEBUILDING)

FEED WATERDISCHARGE (INTERMEDIATEBUILDING)

FEEDWATER DISCHARGE (INTERMEDIATEBUILDINGANDFACADE)

S/G BLOWDQWNTQ FLASHTANK(TURBINEBUILDING)

MAINFEEDAWIZRPUMP RECIRCULATION FEEDWATER BYPASS LINE CONDENSATE LP FW HEATERS FORM 3A/B TO HEATERS 4A/B

R E Ginna Nuclear Power Plant Inservice Inspection Rcport 199o - 1999 Interval, Third Period, First Outage (1997)

S stem Com onent Result Summaries:

DWG.

No SYSTEM M-1 A/B FW PUMP DISCHARGE TO 5A/5B HEATERS Components examined:

Results (% Nonunal) 1 Pipe 2

>88 1 Elbow M-2 M-5 5 A/BFW HEATERS TO FW HEADER Components examined:

Results (% Nominal) 1 Tee 1 >88 HEATERS 4A/4B TO FEEDWATER SUCTION Components examined:

Results (% Nominal) 2 Elbows 2

>88 M-6 FEEDWATER SUCTION TO PUMPS A/B Components examined:

Results (% Nominal) 1 Pipe 2 >88 1 Elbow M-7A HEATER DRAINTANKDISCHARGE Components examined:

Results (% Nominal) 1 Pipe 2 >88 1 Elbow M-7B M-11A M-11B COND. PUMP AND HEATER DRAINTANKDISCHARGE TO FW SUCTION Components examined:

Results (% Nominal) 1 Elbow 1 >88 MSR 1A & 1B 2nd PASS DRAIN Components examined:

Results (% Nominal) 2 Pipes 3 >88 3 Bends (90 Degree) 2 88-82 MSR 2A &2B 2nd PASS DRAIN Components examined:

Results (% Nominal) 2 Pipes 4 >88 2 Bends (90 Degree)

M-12A MSR 1A&1B2nd PASS TO 5A HEATERAND CONDENSER Components examined:

Results (% Nominal) 2 Reducers 2 >88 M-12B MSR 2A&2B2nd PASS TO 5B HEATERAND CONDENSER Components examined:

Results (% Nominal) 2 Reducers 2 >88

R K Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

S stem Com onent Result Summaries Continued:

DWG.

No SYSTEM M-18 M-31 M-32 M-41A MSR 2AA2B4th PASS TO CONDENSERS Components earned:

Results (% Nominal) 4 Elbows 7 >88 4 Pipes 1 76-70 MSR 1A 4 1B HEATERDRAINTANKAND CONDENSER Components examined:

Results (% Nominal) 3 Pipes 6

>88 3 Bends (90 Degree)

MSR 2A Ec 2B TO HEATER DRAINTANK Components examined:

Results (% Nominal) 4 Pipes 8 >88 4 Bends (90 Degree) 5A HEATER DRAINTO4A LP HEATER Components examined:

Results (% Nominal) 1 Reducer 2 >88 1 Tce M-$1B SB HEATER DRAINTO 4B LP HEATER Components examined:

Results (% Nominal) 1 Reducer 2 >88 1 Tee M-45 PRESEPARATOR A/BTO HEATER DRAINTANKSc CONDENSER Components examined:

Results (% Nominal) 2 Pipes 2 >88 1 Elbow 1 82-76 1 Tee 1 76-70 M-81 FEEDWATER DISCHARGE (TURBINEBUILDING)

Components examined:

Results (% Nominal) 4 Pipes 11 >88 5 Elbows 1 88-82 2 Reducers 1 76-70 2 Tees M-82 M-83 FEED WATERDISCHARGE (INTERMEDIATEBUILDING)

Components examined:

Results (% Nominal) 2 Elbows 2 >88 1 Tee 1 88-82 FEEDWATER DISCHARGE (INTERMEDIATEBUILDINGAND FACADE)

Components examined:

Results (% Nominal) 3 Pipes 4 >88 2 Elbows 1 82-76

R K Ginna Nuclear Power Plant Inservice Inspection Report 199o - 1999 Interval, Third Period, First Outage (1997)

S stem Com onent Result Summaries Continued:

DWG.

No M-88D SYSTEM S/G BLOWDOWNTO FLASH TANK(TURBINEBUILDING)

Components examined:

Results (% Nominal) 2 Pipes 3 >88 1 Elbow 2 88-82 2 Tees M-92 MAINFEEDAWTER PUMP RECIRCULATION Components examined:

Results (% Nominal) 2 Pipes 4 >88 1 Elbow 1 Tee M-93 FEEDWATER BYPASS LINE Components examined:

15 Pipes 11 Elbows 2 Reducers 1 Tee Results (% Nonunal) 9 >88 3 88-82 9 82-76 3 76-70 2 7645 3 (65.

M-104 CONDENSATE LP FW HEATERS FORM 3A/B TO HEATERS 4A/B Components examined:

Results (% Nominal) 1 Pipe

~

5 >88 1 Elbow 2 Reducers 1 Tee Com onent Result Details The followinglist provides examination result details on components by draweing number and system description. The "Component Type" classification, specified in the list below, corresponds to the following:

P= Pipe E= Elbow T= Tee R= Reducer B=90 Deg Bend M-1 A/B FW PUMP DISCHARGE TO 5A/5B HEATERS Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum lD Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 200240 200250 24 E

0.938 0.703 0.987

>88 UT 25 P

0.938 0.604.

0.910

>88 UT

R K Ginna Nuclear Power Plant Inservice Inspection Rcport 1990 - 1999 Interval, Third Period, First Outage (1997)

Com oncnt Result Details CONTINUED M-2 5 A/BFW HEATERS TO FW HEADER Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall I Wall 2 Allowable Readin Nominal Method 201375 37A T

1.281 1.003 1.279

>88 UT M-5 Summary Number 205310 205330 HEATERS 4A/4B TO FEEDWATER SUCTION Percent NDE Nominal Method Comp.

Comp.

Nominal Nominal Minimum Minimum Wall I Wall 2 Allowable Readin 31 E

0375 0.250 0.354

>88 UT 33 E

0375 0.250 0.406

>88 UT FEEDWATER SUCTION TO PUMPS A/B Summary Number 206010 206020 Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall I Wall 2 Allowable Readin Nominal Method 1

E 0375 0.250 0.358

>88 UT 2

P 0.375 0.248 0.342

>88 UT M-7A Summary Number HEATER DRAINTANKDISCHARGE Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent NDE Nominal Method 207250 207260 25 E

0.375 0.217 0.332

>88 UT 26 P

0.375 0.213 0.323

>88 UT M-7B Summary Number COND. PUMP AND HEATER DRAINTANKDISCHARGE TO FW SUCTION Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall I Wall 2 Allowable Readin Nominal Method 208735 73A E

0.322

'.178 0.303

>88 UT M-11A MSR 1A & 1B 2nd PASS DRAIN Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID T

Wall I Wall 2 Allowable Readin Percent NDE Nominal Method 215740 215750 215760 215770 215780 74 B

0.432 75 P

0432 76 B

0.432 77 P

0.432 78 B

0.432 0.270 0.392 0.270 0.383 0.270 0.379 0.270 0.417 0.270 0.375

>88 RT 0

>88 RT 0 88-82 RT 0

>88 RT 0 88-82 RT 0

R E Ginna Nuclear Power Plant Inservice Inspection Rcport 1990 - 1999 Interval, Third Period, First Outage (1997)

Com onent Result Details CONTINUED M-11B MSR 2A &2B 2nd PASS DRAIN Summary Number 216310 216320 216330 216340 Comp.

Comp.

Nomminal Nominal Minimum Minimum Percent ID Wall I Wall 2 Allowable Readin Nominal 109 B

0.432 0.270 0.469

>88 110 P

0.432 0.270 0.443

>88 111 B

0.432 0.270 0.495

>88 112 P

0.432'.270 0.467

>88 NDE Method RT0 RT0 RT0 RT0 M-12A MSR 1A&1B2nd PASS TO 5A HEATERAND CONDENSER Summary Number 222210 222215 Comp.

Comp.

Nominal ID Wan I Nominal Minimum Minimum Wall 2 Allowable Readin Percent Nominal 20 R

21A R

0.337 0.432 0.295/0:378 0.393

>88 0.337 0.432 0.295/0.378 0.375

>88 NDE Method M-12B Summary Number MSR 2A&2B2nd PASS TO SB HEATERANDCONDENSER Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent Nominal NDE Method 222780 222790 76 R

0.337 0.432 0295/0.378 0.422

>88 78 R

0.337 0.432 0.295/0.378 0.406

>88 M-18 MSR 2A&2B4th PASS TO CONDENSERS Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Rcadin Percent Nominal NDE Method 232010 232020 232030 232031 232050 232060 232180 232190 01 E

0.300 02 P

0.300 03 E

0.300 03A P

0.300 05 E

0 300 06 P

0 300 18 E

0.300 19 P

0.300 0.171 0.290 0.168 0.276 0.171 0.277 0.168 0.270 0:171 0.275

'0.168 0.264 0.171 0.290 0.168 0.274

>88

>88

>88

>88

>88

>88

>88

>88 M-31 Summary Number MSR 1A & 1B HEATER DRAINTANKAND CONDENSER Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent Nominal NDE Method 260080 260082 260230 260232 260285 260286 08 B

0.432 08B P

0.432 23 B

0.432 23B P

0.432 28E B

0.432 28F P

0.432 0.270 0.417 0.270 0.417 0.270 0.400 0.270 0.400 0.270 0.408 0.270 0.417

>88

>88

>88

>88

>88

>88 RT0 RT0 RT0 RT0 RT0 RT0

R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Com onent Result Details CONTINIJED M-32 MSR 2A 4 2B TO HEATERDRAINTANK Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall 1

Wall 2 Allowable Readin Nominal Method 261022 261030 261031 261251 261252 261510 261511 02B B

0.432 03 P

0.432 03A B

0.432 25A B

0.432 25B P

0.432 51 B

0.432 51A P

0.432 0.270 0.410 0.270 0.420 0.270 0.416 0.270 0.388 0.270 0.417 0.270 0.374 0.270 0.420

>88 RT 0

>88 RT 0

>88 RT 0

>88 RT 0

>88 RT 0

>88 RT 0

>88 RT 0 M<1A SA HEATER DRAINTO4A LP HEATER Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID T

Wall I Wall 2 Allowable Readin Percent NDE Nominal Method 290325 290340 32A R

34 T

0.432 0.594 0.237/0.431 0.459

>88 UT 0.594 0.274 0.595

>88 UT M-41B Summary Number SB HEATER DRAINTO 4B LP HEATER Comp.

Comp.

Nominal Nominal Minimum Minimum ID T

Wall 1.

Wall 2 Allowable Readin Percent NDE Nominal Method 291325 291340 71A R

73 T

0.432 0.594 0.237/0.321 0.496

>88 UT 0.594 0.274 0.633

>88 UT M-lS Summary Number 298190 298200 298290 298440 PRESEPARATOR A/B TO HEATER DRAINTANK&CONDENSER Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall I Wall 2 Allowable Readin Nominal Method 19 E

0.432 0.169 0.349

>88 UT 20 P

0.432 0.167 0.321 76-70 UT 29 T

0.432 0.187 0.388

>88 UT 44 P

0.432 0.178 0.411

>88 UT

R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Com onent Result Details CONTINUED M-81 Summary Number 390060a~

390060b 390065 390091 390120 390130 390140 390150 390160 390210 390250 390257 390270 390280 FEEDWATER DISCHARGE (TURBINEBUILDING) 0.627/0.631 0.606 0.627/0.631 0.695 0.697 0.872 0.706 0.870 0.705 0.903 0,606 0.885 0.705 0.921 0.606 0.894 0.705 0.982 0.627/0.631 0.606 0.705 0.968 0.606 0.883 0.705 0.837 0.606 0.921 6

R 0.844 6

R 0.844 6A P

0.938 9A T

0.938 12 E

0.938 13 P

0.938 14 E

0.938 15 P

0.938 16 E

0.938 21 R

0.844 0.938 25 E

0.938 25B T

0.938 27 E

0.938 28 P

0.938 Comp.

Comp, Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 65 UT 76-70 UT

>88 UT

>88 UT

>88 UT

>SS UT

>8S UT

>88 UT

>88 UT 88-82 UT

>88 UT

>88 UT

>88 UT

>SS UT

  • Component ¹ 6 was rejected based on the results from exam
a. The component was repaired by weld overlay and reexamined, the results ofthe exam are b.

M-82 Summary Number FEED WATERDISCHARGE (INTERMEDIATEBUILDING)

Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall 1

Wall 2 Allowable Readin Nominal Method 392010 392020 392082 01 E

02 E

08B P

0.938 0.938 0.938 0.705 0.931 0.704 0.991 0.706 0.797

>88 UT

>88 UT 88-82 UT M-S3 FEEDWATER DISCHARGE (INTERMEDIATEBUILDINGAND FACADE)

Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 392510 392520 392570 392573 392574 01 E

02 P

07 E

07A P

07B P

0.938 0.938 0.938 0.938 0.938 0.705 0.985 0.606 0.874 0.710 0.921 0.706 0.758 0.706 0.859

>88 UT

>88 UT

>88 UT 82-76 UT

>88 UT

R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Com onent Remit Details CONTINIJED MUSD Summary Number S/G BLOWDOWNTO FLASH TANK(TURBINEBUILDING)

Comp.

Comp, Nominal Nominal Minimum Minimum Percent ID Wall 1

Wall 2 Allowable Readin Nominal NDE Method 385230 385392 385780 385790 385800 23 39B 78 79 80 T

0.300 P

0.337 E

0.500 P

0.500 T

0.500 0;500 0.170 0.311 0.178 0.293 0.249 0.426 0.249 0.461 0.249/0.262 0.487

>88 88-82 88-82

>88

>88 M-92 MAINFEEDAWTER PUMP RECIRCULATION Summary Number 281010 281060 281070 281230 Comp ID 01 06 07 23 Comp.

Nominal Nominal Minimum Minimum Wall I Wall 2 Allowable Readin T

0.594 0.445 0.875 E

~

0.337 0.594 0.267/0.466 0.607 P

0.337 0.218 0.320 P

0.337 0.214 0.338 Percent Nominal

>88

>88

>88

>88 NDE Method M-93 FEEDWATER BYPASS LINE Summary Number Comp.

ID Comp.

Nominal Nominal Minimum Minimum Wall I Wall 2 Allowable Readin Percent Nominal NDE Method 394000 *a 394000 b

394010 *a 394010 b

232020 a 232020 b

394035 394040 232070 394080 b

394100 394110 394130 a 394130 b

394140 a

394140 b

394150 *a 394150 EI 394160 a 394160 b

394170 a 394170 b

394180 a 394180 b

Ol Ol 02 02 03 03 04 05 07 09 11 12 13 13 14 14 15 15 16 16 17 17 18 18 P

0.375 0.244 P

0.375 0.244 E

0.375 0.240 E

0.375 0.240 P

0.375 0.244 P

0.375 0.244 R

0.375 0.337 0.240 R

0.375 0.337 0.240 P

0.337 0.202 P

0.337

'0.202 E

0.337 0.237 P

0.337 0.202 E

0.337 0.237 E

0.337 0.237 P

0.337 0.201 P

0.337 0.201 E

0.337 0.237 E

0.337 0.237 P

0.337 0.201 P

0.337 0.201 E

0.337 0.237 E

0.337 0.237 P

0.337 0.201 P

0.337 0.201 0.166 0.362 0.198 0.418 0.275 0.359 0.343 0.301 0.279 0.322 0.304 0.280 0.261 0.382 0.304 0.316 0.199 0.384 0.245 0.323 0.248 0.339 0.235 0.322

<65

>88

<65

>88 76-70

>88

>88 82-76 88-82

>88

>88 88-82 82-76

>88

>88

>88

<65

>88 76-70

>88 76-70

>88 7045

>88 UT UT UT UT UT UT UT UT UT UT RT0 RT0 UT UT UT UT UT UT UT UT UT UT UT UT

R E Ginna Nuclear, Power Plant Inservice Inspection Rcport 1990 - 1999 Interval, Third Period, First Outage (1997)

Com onent Result Details CONTINUED M-93 Sununary Number 394190 *a 394190 b

394200 a

394200 b

394120 394220 394250 b

394260 394270 394280 394290 394300 394310 394320 394340 19 E

0337 19 E

0337 20 P

0.337 20 P

0.337 21 T

0.375 23 P

0337 25 P

0.337 27 E

0337 28 P

0.337 29 E

0.337 30 P

0.337 31 E

0.337 32 P

0.337 33 E

0.337 34 P

0.337 0.237 0.227 0.237 0.343 0.201 0.268 0.201 0.319 0.240 0.342 0.201 0.269 0.202 0.321 0.237 0.275 0.201 0.280 0.237 0.269 0.201 0.301 0.237 0.308 0,201 0.262 0.237 0.270 0.201 0.269 FEEDWATER BYPASS LINE(continued)

Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 70%5 UT

>8&

UT 82-76 UT

>88 UT

>88 UT 82-76 UT

>88 UT 82-76 RT 0 88-82 RT 0 82-76 UT

>88 UT

>88 UT 82-76 UT 82-76 UT 82-76 UT

  • Indicates unacccptablc results for initial examination.

a Indicates the results ofthc initialexamination.

b Indicates thc results ofthe baseline czamination, after.rcplaccmcnt.

M-104 CONDENSATE LP FW HEATERS FORM 3A/B TO HEATERS 4A/B Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 326010 326020 326210 326220 326230 0.225 0.347 0.250 0.414 0.248 0.374 0.248 0.555 0.248/0.251 0.366 1

R 0.375 0.375

>88 UT 20 E

0.375

>88 UT 21 P

0.375

>88 UT 22 T

0.375 0.375

>88 UT 23 R

0.375 0.375

>88 UT 10

Service Water R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

In addition to the Erosion/Corrosion Pragram, Service Water components were selected to be surveyed from the followingdrawings:

~Dw.0 33013-2624 C-381424 SH 3 C-351-358 SH 2 C-351-358 SH 4 C-351-358 SH 5 C-351-358 SH 7 C-351-358 SH 9 C-351-358 SH 12 C-351-358 SH 13 C-351-358 SH 14 C-351-358 SH 16 C-351-358 SH 19 C-351-358 SH 21 C-351-358 SH 28 C-351-358 SH 30 C-351-358 SH 37 C-351-358 SH 39 D-304496 Related S stem SW System to Containment recirc Fan Unit¹ 1~

SW Suction Line Loop B AuxFW Pump to Aux. Bldg. and New Pump Bldg.

SW From CCWHXto Anchor at Column L SW from Supply Header toDistribution Manifold SW Return Rom SFPHX SW Return &pm Penetration Cooling Coil Plenum SW Inter. Bldg. above El. 253'4" from Pen 308, 315, k 323 to Col. 7 SW Inter. Bldg. above El. 253'4" from Pen 209 k 201 to Header SW Inter. Bldg. above El. 253'4" from 16" Hdr. to Pen ¹ 312, 316, 319 4 320 SW Inter. Bldg. above El. 253K'16"-20" Headers SW Inter. Bldg. from 14" Header to Pen. 201 4 209 SW Analysis Diagram Recirc Unit 1D to Pen 323 SW from Continuous Recirc. Unit¹1A to Pen. 308 SW Inside Reactor from Pen 203 to Reactor Cavity Cooler SW Inside Reactor from Pen 201 to Reactor Cavity Cooler SW D/G BuildingRoom "A" SW D/G Building Room "B" SW Sections AuxiliaryBuilding Service Water Result Details The followinglist provides examination result details on service water components, by drawing number and system description. The component type classification specified in the list below corresponds to the following:

P= Pipe E= Elbow R= Reducer T-fee 33013-2624 Summaiy Number SW System to Containment recir'c Fan Unit¹ 1-C Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 799701 SW/EC420 E 0.237 0.1763 0.226

>88 UT 799717 SW/EC419 P 0.237 0.1763 0.214

>88 UT C-381-024 SH 3 SW Suction Loop B Aux FW Pump to Aux. Bldg. and New Pump Bldg.

Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 799702 SW/EC407 P 0.237 0.0632 0.208 88-82 UT 11

R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Service Water Result Details Continued C-351-358 SH 2 Summary Number SW From CHOIXto Anchor at Column L Comp.

Comp.

Nominal Nominal Minimum Minimum Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 799703 SW/EC416 E(R)

Q.375 Q.375 Q.23Q Q,3Q4 82-76 UT Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 799707 SW/EC405P 0.0778 0.097

<65 RT 0.216 C-351-358 SH 4 SW from Supply Header toDistribution Manifold C-351-358 SH 5 SW Return from SFPHX Summary Number Percent NDE Nominal Method 0.206 0.165

<65 UT 799705

  • SW/EC403 P 0.280 Comp.

Comp.

Nominal Nominal Minimum Minimum Wall 1

Wall 2 Allowable Rcadin Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum 1D Wall 1

Wall 2 Allowable Readin 0.135 0.203 799704 SW/EC415 P 0.375 C-351-358 SH 7 SW Return from Penetration Cooling Coil Plenum Percent NDE Nominal Method

<65 RT C-351-358 SH 9 SW Inter. Bldg, above El. 253'W" from Pcn 308 315 &323 to CoL 7 Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum 1D Wall 1

Wall 2 Allowable Readin Percent NDE Nominal Method 799708

~

SW/EC406 P 799709 SW/EC418 E 799710 SW/EC412 P 0.133 0.322 0.375 0.0755 0.052 0.116 0.268 0.0956 0.336

<65 UT 76-70 UT

>88 UT C-351-358 SH 12 SW Inter. Bldg. above El. 253'A" from Pcn 209 &201 to Header Summary Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE Number ID Wall 1

Wall 2 Allowable Readin Nominal Method 799711 SW/EC402T 0.203 0.1167 0.196

)88 RT C-351-358 SH 13 SW Inter. Bldg. above EL 253'<" from 16" Hdr. to Pcn ¹312p16p19& 320 Summary Comp.

Comp.

Nominal Nominal Minimum Minimum percent NDE Number ID Wall 1

Wall 2 Allowable Readin Nominal Method 799712 SW/EC423 P 0.375 0.135 0.259 76-70 UT 12

R K Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Service Water Result Details Continued C-351-358 SH 14 SW Inter. Bldg. above El. 253'A" -16"-20" Headers Percent NDE Nominal Method Comp.

Comp.

Nominal Nominal Mtnunum Mtmmum ID Wall 1

Wall 2 Allowable Readin Summary Number 799713 SW/EC412 P 0.375

>88 UT C-351-358 SH 16 SW Inter. Bldg. from 14" Header to Pen. 201 4 209 Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent NDE Nominal Method 799714

  • SW/EC404 P 0.203 0.1806 0.144 76-70 UT Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Summary Number 0.1008 0.352 799715 SW/EC022 E

0.280 C-351-358 SH 19 SW Analysis Diagram Recirc Unit 1D to Pcn 323 Percent NDE Nominal Method

>88 UT C-351-358 SH 21 SW, from Continuous Rccirc. Unit 01A to Pcn. 308 Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent NDE Nominal Method 799716 SW/EC421 E 0.280 0.1008 0.323

>88 UT C-351-358 SH 28 SW Inside Reactor from Pcn 203 to Reactor Cavity Cooler Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall I Wall 2 Allowable Readin Nominal Method 799718

  • SW/EC425 E 0.203 0.1777 0.109

<65 RT C-351-358 SH 30 SW Inside Reactor from Pcn 201 to Reactor Cavity Cooler.

Summary Number 0.1777 0.125 0.203 799719

~

SW/EC425 E Comp.

Comp.

Nominal Nominal Minimum Minimum ID Wall I Wall 2 Allowable Readin Percent NDE Nominal Method

<65 RT C-351-358 SH 37 SW D/G BuildingRoom "A" Summary Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE Number ID Wall I Wall 2 Allowable Readin Nominal Method 799720 799721 SW/EC-010 P SW/EC411 E 0.237 0.237 0.028 0.198 0.095 0.198

&8"82 UT 88-82 UT 13

Summary Number Comp.

Comp.

Nominal Nominal Minimum Minimum Wall 1

Wall 2 Allowable Readin 799722 SW/EC%09 E 799723 SW/EC408 P 0.237 0.237 0.095 0.213 0.064 0.207 R E Ginna Nuclear Power Plant Inservice Inspection Report 1990 - 1999 Interval, Third Period, First Outage (1997)

Service Water Result Details Continue C-351-358 SH 39 SW D/G BuildingRoom "B" Percent NDE Nominal Method

>88 UT

>88 UT D-304496 Summary Number SW Sections AuziliaryBuilding Comp.

Comp.

Nominal Nominal Minimum Minimum Percent NDE ID Wall 1

Wall 2 Allowable Readin Nominal Method 799724 SW/EC414 P 799725

~

SW/EC401 P

  • Indicates unacceptable thickness 0.063 0.063 0.0525 0.063 0,0525 0.047