Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17265A72119 July 1999ISI Rept for Third Interval (1990-1999) Third Period, Second Outage (1999) at Re Ginna Npp.Boric Acid
Packing leak
Hydrostatic
VT-2
Earthquake
Liquid penetrant
ML17265A22727 March 1998Rev 0 to ISI Rept for Third Interval (1990-1999) Third Period,First Outage (1997) at Re Ginna Nuclear Power Plant.Boric Acid
Packing leak
Weld Overlay
Hydrostatic
Anchor Darling
VT-2
B.5.b Mitigating Strategies
Liquid penetrant
ML17264A68313 September 1996Rev 0 to Re Ginna Nuclear Power Plant 1996 ISI Program Rept.Boric Acid
Hydrostatic
VT-2
Earthquake
Liquid penetrant
ML17264A12324 July 1995ISI Rept for Third Interval (1990 - 1999) Second Period, Third Outage (1995) at Re Ginna Nuclear Power Plant, Rev 0Boric Acid
Packing leak
Hydrostatic
VT-2
Liquid penetrant
ML17263A72530 June 1994NRC ISI Rept for Third Interval (1990-1999) Second Period, Second Outage (1994) at Re Ginna Nuclear Power Plant.Boric Acid
Packing leak
Hydrostatic
VT-2
B.5.b Mitigating Strategies
Liquid penetrant
ML17263A3397 June 1993Inservice Insp Rept for Third Interval (1990 - 1999) Second Period,First Outage (1993) at Re Ginna Nuclear Power Plant.Boric Acid
Packing leak
Weld Overlay
Hydrostatic
VT-2
B.5.b Mitigating Strategies
Liquid penetrant
ML17263A24415 April 1993Rev 0 to Summary Exam Rept for 1993 SG Eddy Current Insp at Re Ginna Nuclear Power Station.Hydrostatic
ML17262A94831 July 1992Rev 0 to Inservice Insp Rept for Third Interval (1990-1999) First Period,Third Outage (1992) at Re Ginna Nuclear Power Plant.Boric Acid
Packing leak
Hydrostatic
Anchor Darling
VT-2
Liquid penetrant
ML17262A58319 July 1991Inservice Insp Rept Third Interval (1990 - 1999).Boric Acid
Hydrostatic
Anchor Darling
VT-2
Liquid penetrant
ML17261B13913 July 1990Rev 0 to, Inservice Insp Rept for Third Interval (1990-1991),First Period,First Outage (1990) at Re Ginna Nuclear Power Plant.Boric Acid
Hydrostatic
VT-2
Liquid penetrant
ML17262A18630 April 1990Steam Generator Inservice Insp Eddy Current Exam Rept.
ML17251A98329 February 1988Summary Exam Rept for 1988 Steam Generator Eddy Current Insp.Hydrostatic
ML17261A4315 March 1987Summary Exam Rept for 1987 Steam Generator Eddy Current Insp, Summarizing Observations & Corrective Action from Insp Performed During Feb 1987 OutageHydrostatic
ML17250A80410 November 1980Corrected Pages 1 & 9 to 801105 Revision to Inservice Insp Program for 1980-89Nondestructive Examination
ML17250A7545 November 1980Inservice Insp Program for 1980-89,Revision 4,App B to QA ManualHydrostatic
Nondestructive Examination
Liquid penetrant