Updated: 4/26/2012 - Seabrook Notice of Public Meeting No.12-013 with NextEra Energy Seabrook, LLC
ML12111A199
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/20/2012
From: Burritt A L
Reactor Projects Branch 3
To:
Shared Package
ML12055A186 List:
References
MN 12-013
Download: ML12111A199 (5)


Text

UPDATE MN No.12-013 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING

April 20, 2012

Licensee: NextEra Energy, Seabrook, LLC

Facilities: Seabrook Station, Unit No. 1 (Seabrook)

Docket Nos: 50-443 Date/ Time: April 26, 2012 Open House - 5:30 p.m. to 6:30 p.m. Public Meeting - 6:30 p.m. to 8:00 p.m.

. Location: One Liberty Lane Conference Center 1 Liberty Lane

815 Lafayette Road Hampton, NH 03842 603-474-1776 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will host an open house and public meeting to discuss the NRC's assessment of safety performance at Seabrook for 2011, as described in the annual assessment letter dated March 5, 2012. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: A. Burritt, Chief, Division of Reactor Projects, Branch 3 M. Khanna, Chief, Division of Operating Reactor Licensing, Plant Licensing Branch 1-2 W. Raymond, Senior Resident Inspector, Seabrook J. DeBoer, Acting Resident Inspector, Seabrook

Public Participation: This is a Category 3 Meeting. The NRC will host an open house to discuss NextEra's performance at Seabrook during calendar year 2011.

NRC staff will be available, in an informal setting, to answer questions from individuals and discuss issues or concerns related to Seabrook. In addition, the NRC will hold a formal public meeting followed by a question and answer session, during which members of the public will be able to ask questions or make statements in a public meeting.

Meeting Contact: Arthur Burritt, Chief, Projects Branch 3 610-337-5069 E-mail: arthur.burritt@nrc.gov

2 The NRC's annual assessment letter regarding Seabrook's performance during 2011 can be found in the NRC's Agencywide Documents A ccess and Management System (ADAMS) with Accession Number ML12061A239 , ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC' s annual assessment process and the safety performance of Seabrook can be found on the NRC's website at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.

The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to

the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 24, 2012

via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/ Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects

cc: Distribution via ListServ

ML12111A199 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCline ABurritt DATE 04/20/12 04/20/12

3 Distribution w/encl. (via email)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OED (RIDSEDOMAILCENTER) Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation NRR (RIDSNRROD) Director, Division of Inspection & Regional Support, NRR/DIRS (RIDSNRRDIRS) Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL) Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)

W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS A. Burritt, DRP L. Cline, DRP A. Turilin, DRP R. Montgomery, DRP W. Raymond, DRP, SRI A. Cass, DRP, AA D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO L. Chang, RI, OEDO G. Matakas, ORA

K. Heater, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource PMNS

4 Agenda NRC's Annual Assessment Meeting

Seabrook April 26, 2012 6:30 p.m. - 8:00 p.m.

One Liberty Lane Con ference Center located at 1 Liberty Lane 815 Lafayette Road Hampton, NH 03842 603-474-1776

Formal Meeting

Introduction-------.........................................................................................(3 minutes)

Discussion of Seabrook performance in 2011-------................................(10 minutes)

Discussion of Alkali-Silica Reaction (ASR)...............................................................(5 mi nutes)

NRC to address public questions ------------..................................(60 minutes)