ML20236J807

From kanterella
Revision as of 01:35, 3 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SALP Rept Covering Period 961124-980530.Rept Will Be Discussed at Public Meeting to Be Held at Plant Facility on 980715
ML20236J807
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/29/1998
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20236J811 List:
References
50-348-98-99, 50-364-98-99, NUDOCS 9807090016
Download: ML20236J807 (6)


Text

.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

\\

1 c,

June 29, 1998 L

Southern Nuclear Operating Company Inc.

ATTN: Mr.' D.N. Morey, Vice President P.O. Box 1295 Birmingham. AL 35201

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE. FARLEY NUCLEAR PLANT (REPORT NOS, 50-348/98-99 AND 50-364/98-99)

Dear Mr. Morey:

The NRC Systematic Assessment of Licensee Performance (SALP) has'been completed'for your Farley' nuclear facility.

The facility was evaluated for the period of November 24, 1996, through May 30. 1998.

The results of the evaluation are documented in the enclosed SALP report. This report will be L

discussed with you at a public meeting to be held at the Farley nuclear facility site at 10:00 a.m.

on July 15, 1998.

.- The SALP process assessed the Farley nuclear facility's performance in fec

' functional areas: _ Plant Operations, Maintenance. Engineering and Plan!

Support.

Performance in Plant Operations and Engineering remained superior.

L Reliable equipment performance was a key contributor to performance improving to superior in the maintenance area.

Performance in the Plant Support area j

remained at a good level. Adherence to radiological control procedures and material condition of fire protection equipment and systems detracted from j

. attaining a superior category rating.

The self-assessment program continued to be strong in identification of

(

problems. Assessments were thorough'and corrective actions resulted in few l

repetitive problems, r

Should you have any questions or comments. I would be pleased to discuss them ff with you.

I look forward to discussing this assessment with you on July 15, l

1998.

l Sincerely.

(Original signed by Luis A.

Reyes)

Luis A.

Reyes, Regional Administrator i

Enclosure:

SALP Report cc w/ encl:

(See Page 2) 9eo709o016 980629 l

l PDR ADOCK oSooo34e

{

e PDR b

s SNC 2

cc w/ enc 1:

M. J.. Ajluni. Licensing Services Manager. B-031 Southern Nuclear Operating Company. Inc.

42 Inverness Center Parkway Birmingham. AL 35201-1295 M. Stinson General Manager. Farley Plant Southern Nuclear Operating Company. Inc.

P. 0. Box 1295 Birmingham. AL 35201-1295 J. D. Woodard Executive Vice' President Southern Nuclear Operating Company. Inc.-

P. O. Box 1295 Birmingham. AL 35201-1295 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery. AL 36130-1701 M. Stanford Blanton i

Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham. AL 35201 Chairman Houston County Commission P. O. Box 6406 Dothan.- AL 36302 INPO 70 Galleria Pkwy. NW Atlanta, GA 30330.

l l

l l

_.____m________.m.____.m_.

r i

SNC 3

bcc w/ encl:

l Chairman Jackson Commissioner Diaz Commissioner McGaffigan Commissioner Dicus L. J. Callan. EDO H. L. Thompson, Jr.. DEDR M. Tschiltz, Regional Coordinator. EDO S. Collins. NRR A. Galante. CIO J. Funches. CF0 B. Boger NRR F. Miraglia. NRR W. Hehl, RI G. Grant, RIII P. Gwynn. RIV K. Perkins. WCF0 J. Zimmerman. NRR H. Berkow. NRR J. Lieberman. OE

.A.

Hodgdon. OGC B. Keeling CPA/CA D. Gamberoni. SALP Program Manager. NRR K. Clark. RII. PA0 T. Ross SRI. Farley K. Landis. DRS T. Peebles. DRS P. Fredrickson. DRS K. Barr. DRS G. Belisle. DRS i

PUBLIC

)

Federal Emergency Management Agency ATTN: Mr. William McSwain. Chief Technical Hazards Branch 3003 Chamblee-Tucker Road Chamblee. GA 30341

  • SEE PREVIOUS CONCURRENCE l

I l

1 l

OfflCE RII:DRP NRR:PDil RII:DRP RII:DRP Ril:DRS RII:0Rg SIGNAT15tE

[h NAE Chstapp:cSta*

HNBerkow*

PHSkinner*

LRPlisco*

JPJaudon*

Mf A

DATE 6/

/98 6/

/98 6/

/98 6/

/98 6/

/98

'6/M /98, 6/

/98 CEPY?

YES NO YES NO YES ND YES NO YES NO YES/

6)

YES NO d

OFFICIAL RECORD COPY D0Q2ENT NAE: G:\\FARLEY\\9799SLP.RPT i

r SNC 3

b-bcc w/ enc 1:

Continued aga com a, 5 s uw L. J. Callan. EDO H. L. Thompson, Jr.. DEDR M. Tschiltz. Regional Coordinator. EDO S. Collins NRR l

A. Galante. CIO J. Funches. CFO B. Boger. NRR F. Miraglia. NRR l

l W. Hehl. RI

(

G. Grant. RIII l

P. Gwynn RIV l

K. Perkins WCF0 l

J. Zimmerman. NRR H. Berkow. NRR l

J. Lieberman. OE l

A. Hodgdon. OGC B. Keeling. CPA/CA l

D. Gamberoni. SALP Program Manager. NRR i

K. Clark. RII. PA0 T. Ross. SRI. Farley K. Landis. DRS T. Peebles. DRS i

l P. Fredrickson. DRS K. Barr. DRS G. Belisle. DRS l-PUBLIC Federal Emergency Management Agency ATTN: Mr. William McSwain. Chief Technical Hazards Branch 3003 Chamblee-Tucker Road Chamblee. GA 30341 t

I I

l OFFICE All:DRP NRR:POII Ril:DRP RII:DRP RII:DRS RII:0RA SI M T N f

k Sh g

,Mb dK NAfE CnRepp:da NNBerkow PMSkiivwr LRPlisco

.U. E f Mhm n

DATE 6/

/98 6/

/98 6/_4, @ /98 6/

/98 6/ l b /98 6/ h /98 6/

/98 CCPY?

YES 11 0 YES 11 0 TES/

NO YES 11 0 4YES l 10 0 YES NO YES NO OfflCIAL RECORD COPY DOUT IIAfE: G:\\IARLEY\\97995LP.RPT U

h JM.-

tWJat,4 C#%4rp.

i

3 becw/ encl: C tinued L. J. Callan, E H. L. Thompson,

,DEDR M. Tschiltz, Regiona Coordinator, EDO

S. Collins, NRR A. Galante, CIO J. Funches, CFO B. Boger, NRR

- F. Miraglia, NRR W. Hehl, Rl

- G. Grant, Rlli P. Gwynn, RIV

. K. Perkins, WCFO J. Zimmerman, NRR

' H. Berkow, NRR J. Lieberman, OE A. Hodgdon, OGC K - - [::. a C P A/

\\.

-B.(CFa

' D.

s bero

  • P Program Manager, NRR K.

, PAO T. Ross, SRI, Farley.

. K. Landis, DRS T. Peebles, DRS P. Fredrickson, DRS K. Barr, DRS G. Belisle, DRS

i. " "7 e. """." P

' *' ' r::r, CN."3

' C:fr, CN".^3 PUBLIC Federal Emergency Management Agency ATTN: Mr. William McSwain, Chief Technical Hazards Branch 3003 Chamblee-Tucker Road -

Chamblee, GA 30341.

r' OFFICE RII DRP.

NRR PDIZ RII DRP RII DAP RII DRS RII ORA SIMATURE g

,/ %

NAME CNRappsdka MV PRSkinner LRPlisco JPJeudon L&Reyes DATE 6/

/98 6/ ly /98 6/

/98' 6/

/98

-6/

/98 6/

/98 6/

/98 COPY?

YES NO IRA / NO YES NO' YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: Ge\\FARLEY\\SALP\\97998LP.RPT

.,4

__---.-_--.L_---_----------..-----l--.--------------------------------------------

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' - - - - - - - - - - '- - - - - - ~ - - - - - ' - - ' - -

\\

I SNC 3

bcc w/ enc - Continued L. J. Calla. EDO H. L. Thomps Jr.. DEDR M. Tschiltz, ional Coordinator.

O S. Collins, NRR A. Galante. CIO J. Funches. CFO B. Boger. NRR F. Miraglia. NRR W. Hehl, RI-G. Grant. RIII P. Gwynn. RIV K. Perkins. WCFO i

J. Zimmerman.-NRR H. Berkow. NRR J. Lieberman. OE A. Hodgdon. 0GC B. Keeling. CPA/CA D. Gamberoni. SALP Program Manager, N K. Clark RII. PA0 T. Ross. SRI. Farley K. Landis. DRS T. Peebles. DRS P. Fredrickson, DRS K. Barr. DRS G. Belisle. DRS E. McAlpine. DNMS M. Lesser. DNMS T. Decker. DNMS PUBLIC Federal Emergency Management Agency ATTN:

Mr. William McSwain. Chief Technical Hazards Branch 3003 Chamblee-Tucker Road Chamblee. GA 30341 A

OFFICE (M

NRR:PDil Ell:DRP Ril:DRP, Ril:DRS RII:0RA

$1GMTURE I,P y'

/)

IIAIE Qaa@&a NNBerkow PNSkinner LRPl g JPJaudon LAReyes DATE pp } 7 /98 6/

/98 6/

/98 6/ K 3 /98 6/

/98 6/

/98 6/

/98 GPY7

/I YES / 10 0 YES NO YES NO YES 11 0 YES 10 0 YES NO YES 10 0 oFfik1ALRECORD00PY DOCUMENT llAfE: G:\\FARLE \\97995LP.RPT I,

h W

b o

1