ML20198A013

From kanterella
Revision as of 19:01, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Evaluation of Proposed Tech Spec Change to Administrative Controls Section in Response to 850709 Request.Proposed Change Acceptable.Salp Input Also Encl
ML20198A013
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/09/1985
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0809, CON-WNP-809 TAC-59236, NUDOCS 8509170433
Download: ML20198A013 (3)


Text

..

&h .f, J?' 5 h- k NC(( k DISTRIBUTION:

h DHFS R/F - 2 SEP 0 91985 HBooher LCrocker FAllenspach MEMORAf;DUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM: Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety

SUBJECT:

(IASHIETONPUPLICPOTEPSUPPLYSYSTITbNUCLEARPLANTNO.2, TECHNICAL SPECIFICATION CHANGE, ADMINISTRATIVE CONTROLS SECTION, (TAC NO. 59236)

Washington Public Power Supply System '(WPP35) has requested by letter dated July 9, 1985, 6 change to the Administrative Controls Section of the Technical Specification for their Nuclear Plant No. 2. The proposed change involves a revision to the composition of the Nuclear Safety Assurance Group.

We have reviewed the proposed change and found it ccceptable. Enclosure I contains a brief description of the proposed change and our evaluation.

Enclosure E contains our 9 ALP input in accordance with Office Letter No. 44.

This review was performed by Frederick R. Allenspach. There are no known dissenting opinions.

OMr.ui @vn?

Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety cc: W. Butler J. Bradfute k509270433850909Xh ADOCK 05000397 p '

FotL ~ *Wj { 4

' DW/FRA3/ WASHINGTON PPSS .. j[

/

o,ne, p . . . L QB FS LQB LQB:DHFS *' ADD:DHFS

....... :m f.A el.l . ,n, , p a,c h, y,d b, , ,L C,r o, , , e,y

      • > r, , ,

r HB,c o,h e ,,,,,, ,D,Z,i ema n,r) , ,,,, ,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,

em) 9

. . ./. f. ...

. ./. 85. .. .. .. .... 9. /. 4. . ./ 85.. .. ...9

. . .../.. 5 /. 8. 5.. .. .. . .9.. /.. . . . . 8. 5.....................

. M at* E AL a.a 11 & i 1.a n .a. . L. n .* u t'. . a .*. A F* E" R #* l A T P F'" #* A f"1 h J'* A M L/ Otii fin 12A 1 - A." .*

Enclosure 1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PLANT NO. 2 TECHNICAL SPECIFICATION CHANGE ADMINISTRATIVE CONTROLS SECTION

\

Washington Public Power Supply System (WPPSS) has requested by letter dated July 9, 1985, a change to the Technical Specification regarding the Nuclear Safety Assurance Group (NSAG) for their Nuclear Plant No. 2. The NSAG is the term used hy the licensee corresponding to the more generic term Independent Safety Engineering Group (ISEG) used by the staff.

The NSAG is a group of at least five, dedicated, full-time engineers who perform the independent safety reviews. The existing technical specification requires a minimum of three NSAG members to be located on site and two at the home of fice. WPPSS proposes to change this technical specification to require a minin.um of three members on site, and allow flexibility in the assignment of the other NSAG members.

The proposed change meets the acceptance criteria for the Independent Safety Engineering Group of Section 13.4 of NUREG-0800, the Standard Review Plan, and therefore is acceptable.

e

~

Enclosure 2 WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PLANT NO. 2 SALP INPUT Functional Area: Licensing Activities

1. Management involvement in assuring quality Our rating is based on licensee's submittal of this change.

Rating: Category 2 2., Approach to resolution of technical issues from a safety standpoint Rating: N/A

3. Responsiveness to NRC initiatives.

Rating: N/A

4. Staffing The change is aimed at improving the capability of the on-site staff.

Rating: Category 2

5. Reporting and analysis of reportable events Rating: N/A
6. Training and qualification effectiveness -

Rating: N/A

7. Overall rating for Licensing Activity functional area: 2