ML20125D219

From kanterella
Revision as of 01:50, 24 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-134/92-01 on 921104-05.No Violations Noted
ML20125D219
Person / Time
Site: 05000134
Issue date: 12/04/1992
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bobek L
WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA
Shared Package
ML20125D221 List:
References
NUDOCS 9212150056
Download: ML20125D219 (3)


See also: IR 05000134/1992001

Text

C

DS l

'l

o i

DEC. 0 41992  :

Docket No. 50-134

hir. L. M. Bobek

Director, Nuclear Reactor Facility

Worcester Polytechnic Institute

Worcester, Massachusetts 01609

Dear Mr. Bobek:

Subject: Inspection No. 50-134/92-01  :

An inspection of the radiation protection program at your facility was conducted on

November 4-5,1992 by Mr S. Holmes. Discussions of our findings were held by Mr.

Holmes and Mr. T. Dragoun with you and members of your staff at the conclusion of this

inspection.

Areas reviewed during inis inspection are important to public health and safety and are

described in the enclosed inspection report. The areas examined included dosimetry,

instrument calibration, radiation surveys and postings, staffing, procedures and policy,

training, and Safety Committee oversight. Within these areas the inspection consisted of

observations by the inspector, selective examinations of procedures and representative

records, and interviews with personnel.

Within the scope of this review, we noted that staffing, Safety Committee oversight,

postings, and personnel dosimetry were good. However, we noted that written procedures

for some health physics operations were not formalized. Your staff agreed to review this

matter and to folloc up on an issue with potential safety significance related to the

calibration of a neutron meter. We will evaluate your actions on these matters during a

future inspection. No violations of regulatory requirements were identified. No reply to

this letter is required.

Your cooperation with us is appreciated

bEfdifsfSigned By*

James H.-Joyner

James H. Joyner, Chief

Facilities Radiological Safety

y4 ,

UU and Safeguards Branch

Division of Radiation Safety

and Safeguard.;

Enclosure: NRC Region 1 Inspection Report No. 50-134/92-01

I

9212150056 921204

PDR

D

ADOCK 05000134

PDR

0FFICIAL RECORD COPY

fk

g Q-

-

I

_ - _ _ _ _ _

_ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

'

.

-

DEC. O 41992

Worcester Polytechnic Institute 2

ce w/ encl:

Dr. R. Goloskie, Reactor Safety Committee

Dr. J. Mayer, Chairman, Nuclear Engineering Progra m

Dr. William Vernetson, TRTR

Dr. D. Apelian, Provost

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2) _

_

'

OFFICIAL RECORD COPY

- _ _ _ - _ - - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

-,

,

DEC. O 41992

Worcester Polytechnic Institute 3

,

F

bec w/ encl: '

Region I Docket Room (with concurrences)

T. F. Dragoun, DRSS

S. Holmes, DRSS '

S. Weiss, NRR (OWFN 10D21)

J. Caldwell, NRR/LOLD (OWFN 10D22)

V. McCree, EDO (OWFN 17G21)

,

l'

't

?WOh

DRSS;RI DRSS:R1 DRSS:RI DRSS:RI

Holmes Dragoun Miller o er

12A/92 12D(/92 12///92 12/7 /92  :

OFFICIAL RECORD COPY

, ._,. . , _ . _ _ _ . _ _ _ _ _ - - _ .