Forwards Revised Sar/Tech Specs & Results of Calculations Performed by Anl as Application to Convert Institute Fuel to Low Enriched U.All Licensed Operators Will Undergo Requalification & Exam
ML20214M888
Person / Time
Site: 05000134
Issue date: 05/26/1987
From: Newton T
WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20214M890 List:
References
NUDOCS 8706010459
Download: ML20214M888 (1)


Text

60-/99

- -'- ~

l WORCESTER Worcester l

. POLYTECHNIC Massachusetts 01609 l

[ _ INSTITUTE May 26, 1987 (617)793-5000 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Director of Nuclear Reactor Regulation

Dear Sirs:

As per discussion with Ted Michaels, the NRC project manager for the WPI reactor, the application to the NRC for authorization to convert the WPI fuel to low enriched uranium is enclosed under separate cover, as required by 10 CFR 50.64. This application includes five copies of the revised safety analysis report / technical specifications, with two copies of the results of calculations performed by Argonne National Laboratory in support of this application.

The only changes in the technical specifications occurred in sections 4.2, 4.4, and 4.5.2. The latter two sections are changed as a result of fuel dimension changes and changes as a result of the ANL calculations.

The change in section 4.2 is a result of the Washburn Building renovation in 1985. Since the upstairs rooms are now in use quite frequently, the addition of shielding for operation chove 1 KW would reduce the radiation levels to below that of a restricted area, and result in a decrease of exposure to personnel in these areas.

There are no necessary changes in the physical security or emergency planning as a result of the conversion to LEU. Compliance with 10 CFR 73 will be maintained since WPI possesses less than 5 Kg of U-235.

All licensed operators will undergo requalification training and examination by the WPI Reactor Facility Director for the LEU core before being allowed to operate the reactor under their normal operating duties.

If we can supply further information, please let us know.

Sincerely, l

& bO & y 0500 P

B70526 4

fe Y Thomas H. Newton, Jr. 0 Director, Nuclear Reactor Facility 3 THN:amt Commonwealth of Massachusetts Worcester, ss. May 27, 1987 cc: Prof. J.A. Mayer Prof. R. Goloskie Then personally appeared the above-named Prof. D. N. Zwiep THOMAS H. NEWTON, JR., and signed the Provost R. Gallagher foregoing instrument, before me, declaring same to be his free act and deed.

o <7 Ted N.R.C.

U.S. Michaels, WPI Project Manager / - )M// 5 /u /'i'm"% /O b b, 4 h 631 Park Avenue Marcia (Germagian) Kwederis, Notary Public King of Prussia, PA 19406 My Commission Ex'pires: 2-25-88