Docket No: 50-134 Worcester Polytechnic Institute ATTN: Mr. T. H. Newton, Jr.
Director Nuclear Reactor Facility Worcester, Massachusetts 01609 Gentlemen:
This letter is being sent to inform you of a recent realignment within the NRC Region I Division of Reactor Projects that affects responsibility for the inspec-tion of research and test reactor facilities. We had in the past retained that
, responsibility within a designated section of the Region I organization, using various elements of the organization as necessary to complete the regional inspec-tions. We have now distributed the inspection responsibility for individual re-search and test reactor facilities throughout the various Sections of the Division of Reactor Projects as indicated in the enclosure. Overall coordination of re-search and test reactor inspections will continue to receive my attention as well as that of Tom Elsasser, Chief, Reactor Projects Section 3C.
Our selection criteria for the realignment were based primarily on the location of each research or test reactor and its proximity to an " associated resident of-fice" at a power reactor facility. A resident inspector at that facility may as-sist in conducting routine or non-routine operations inspections at your facility, or in responding to operational events. However, routine contacts regarding in-spection matters and communications, including event reporting, shall be with the regional project inspector and supervisors listed below:
Name Position Telephone Number Donald R. Haverkamp Project Inspector (215) 337-5120 William J. Raymond Associated Resident Inspector at the Vermont Yankee Nuclear Power Station (802) 257-4319 Thomas C. Elsasser Chief, Reactor Projects Section 3C (215) 337-5378 Edward C. Wenzinger Chief, Projects Branch No. 3 (215) 337-5224 A separate administrative matter, regarding recent issuance (on January 5, 1987) of the final rule, " Communications Procedures Amendments, 10 CFR Part 50," needs to be addressed. That rule was published in the Federal Register on November 6, 1986 (copy enclosed) and is now incorporated in the Code of Federal Regulations, Title 10, revised as of January 1,1987. The rule changes the way licensees shall submit written communications. Under the new procedures the licensee shall send the signed original of all Part 50 submittals to the NRC Document Control Desk with copies to the appropriate Regicnal Office and Resident Inspector. This includes many submittals for which the Regions were previously the primary recipient. For B70bo40257 870527 h PDR ADOCK 05000134 k/ y G PDR l \
f ,
., -Worcester Polytechnic Institute 2 MAY 2 7198F Region I research and test reactor licensees, we request that, in addition to the copy provided to the Regional Office (ATTN: Chief, Reactor Projects Section 3C) and to the associated Resident Inspector, you also send a copy to the Project In-spector listed above. It appears that these communication procedure changes were not being incorporated by most research and test reactor licensees. Therefore, please review the enclosure and the revised 10 CFR 50. If you have any questions regarding this matter, you should contact the Project Inspector.
Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects :
Enclosures:
As' Stated cc w/encls:
Dr. R. Goloskie, Radiation Safety Officer and Safeguards Comitttee Dr. J. C. Strauss, President Mr. J. A. Mayer, Professor of Mechanical Engineering cnd Chairman, Nuclear Engineering Program Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealt,h of Massachusetts (2) bcc w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Robert J. Bores, DRSS T. Elsasser, Chief, RPS 3C, DRP W. Raymond, SRI (Vermont Yankee), DRP D. Haverkamp, Project Inspector, DRP 1
l l
I RI:DR RI- R P
! Ha 5/ 87 kamp/meo Elsasser gdr}
e zi ger g f t1%
OFFICIAL RECORD COPY l
l l
- e. o MAY 1987 Rev. 1 DIVISION OF REACTOR PROJECTS Di recto r - Wil l iam F. Kane - 5229, 5230 Deputy Di rector - Samuel J. Collins - 5126, 5127 Secretary - C. Matakas - 5384 Reactor Licensing / Risk Engineer - B. Hillman - 5236 PROJECTS BRANCH NO.I PROJFCIS BHANCH NO,_2 PROJECTS BRANCH NO.3 Chier - S. Collins ( Act9) 5126, 5127 Chief - R. Callo - 5225, 5228 Chier - E. Wenzinger - 5224, 5219 Sec reta ry - M. Diconato - 5226 Sec re ta ry - R. Levin - $383 Secreta ry - M. E. Oprendek - $133 Opsrator Licensing - V. Curley - $379 Assistants D. Gruber - $123 Section No m_2A Section No. 3A Section No. IA Chier - J. Linville - 5122 Chief - L. E. Tripp - $227 Project Engineer - H. Williams - 5318 Project Eng ineer - D. Limroth - 5121 Chier - R. Blough - $146 Reactor Engineer - L. Scholl - $173 Reactor Engineer - A. Sidpa ra - Sil2 P roject Eng ineer - W. Baunack - 5232 Limerick l&2 Beaver Va l ley 1&2 Rasctor Engineer - S. Peteschak - 5134 Peach Bottom 2&3 Calvert Cliffs I &2 (Entry Level) Ginna Maine Yankee AFRfll/ Catholic Univ./ SUNY-Buffalo NBS/ Univ of Ma ryland TMl - I Westinghouse TR Oyster Creek Sec Qor3_fJo,_2 H Penn State /Saxton Section No. 3B Chier - L. J. Norrholm - 5314
- Section No. IB Project Eng ineer - R. Summers - Sil5 Chier - E. C. McCabe - 5231 Reactor Engineer - R. Brady - 53 i6 Project Engineer - E. Conner - 5104 Chief - J. Wiggins - 5128 Reactor Engineer - M. kray - 5356 Project Engineer - L. Doerflein - $132 Indian Point 2 Reactor Engineer - R. Fuhrmeister - 5355 Hope Creek Haddam Neck Rsactor Engineer - P. lia b igho rs t - $316 Salem I&2 Millstone I&2 Cintichem Millstone 3 Susquehanna I&2 Rhode Island AEC Sho reham Section No. 2C Pilgrim Section No. 3C Manhattan College / Columbia Univ. Chier - J. Johnson - 5234 MIT/ Army (Watertown) Project Engineer - G. Meye r - 5 8 83 Chief - T. C. Elsasser - 5378 Reactor Engineer - N. Pe rry - 5173 Project Engineer - D. Haverkamp - 5120 Section No. IC Reactor Engineer - C. Ca rpenter - 5222 indian Point 3 Chier - R. M. Kel ler - 5214 FitzPatrick Sea b roo k Lead Reactor Engineer - N. Dudley - 5240 Nine Mile Point I&2 Vermont Yankee (Examiner) D. Lange - $12fs Co rne l l Univ. (Tank /TRIGA) Yankee Rowe D. Coe - $174 RPl/ Univ. of Lowell Reactor Engineer - H. Norris - $289 Worcester Poly Examiner A. Howe - 5084 S. H rber - 5060 R. T u rne r - 518 7 11 . Temps - 5389 T. Lumb - 5388 *- Pa u l Swetland. Section Chief L. Eolonauski - 5175 effective 7/12/87 D. Silk - 5327 E. Yachimiak - 5060 a
f '
l
[7590-01]
Attachment 1 e.
NUCLEAR REGULATORY COMMISSION i
10 CFR Parts 50 and 51 ,
Comunications Procedures Amendments AGENCY: Nuclear Regulatory Comission.
ACTION: Final rule.
SUMMARY
- The Nuclear Regulatory Comission (NRC) is amending its regulations that est'ablish the procedures for submitting correspondence, reports, applica-tions, or other written communications pertaining to the domestic licensing of production and utilization facilities. The amendments indicate the correct mailing address for delivery of the comunications and specify the number of copies required to facilitate action by the NRC. The proposed amendments will resolve a number of problems that have developed during the past several years regarding the submission of applications and reports. In addition to clarify-ing the procedures, these amendments will result in a reduction in reproduc-tion and postage costs for the affected licensees.
EFFECTIVE DATE:
FOR FURTHER INFORMATION CONTACT: Steve Scott, Information and Records Management Branch, Division of Technical Information and Document Control, Office of Administration, Nuclear Regulatory Comission, Washington, DC 20555, Telephone: (301)492-8585.
SUPPLEMENTARY INFORMATION: Because of varying and sometimes conflicting requirements for the submittal of information by applicants and licensees, confusion has arisen with regard to copy requirements and proper submittal procedures. In an effort to clarify these matters, the NRC issued Regulatory Guide 10.1 (Revision 4) " Compilation of Reporting Requirements for Persons Subject to NRC Regulations" and on August 8, 1982 the Director Division of Licensing. Office of Nuclear Reactor Regulation, issued Generic Letter 82-14
" Submittal of Documents to the Nuclear Regulatory Comission." While these qW
.$U 16
[
4 . .
[7590-01) e efforts at clarification resolved much of the confusion, these guidance documents contain outdated infonnation and in many cases conflict with re-quirements in regulations or individual licenses. Therefore, the NRC is issuing this rule to specify copy requirements and provide mailing in-structions. The rule also clarifies the current requirement in 150.30 for making an updated copy of the application available at an appropriate office near the site for inspection by the public.
This rule supersedes all existing requirements and guidance with respect to the number of copies and mailing procedures. The Consnission's guidance documents dealing with communications procedures will be revised to conform with the rule. Licensees whose technical specifications contain conflicting submittal directions are authorized by this rule to delete the conflicting directions by pen-and-ink changes to their technical specifications. The Commission does not expect formal applications for amendment of license to result from this rulemaking.
This rule codifies NRC actions to reduce copy requirements. With few exceptions, copy requirements for licensee reports and applications are reduced to three. By reducing the number of copies transmitted to the Comission, the rule will result in reduced reproduction and postage costs for licensees.
Undesignated paragraphs in the amended text have been designated and obsolete titles of NRC personnel have been updated to reflect current NRC titles.
PROPOSED RULE On March 26, 1985, the Comission published a proposed rule in the Federal Register (50 FR 11884) that would: (1) clarify and standardize, to the extent practical, the proceduros for making Part 50 submittals to the NRC; I (2) reduce overall the number of copies of Part 50 submittals that applicants and licensees are required to send to the Comission; and (3) facilitate the flow of written comunications from the affected licensees to NRC staff by 1
2 i
f .
[7590-01]
eliminating the need for NRC to re-transmit Part 50 submittals between NRC Headquarters and the Regional Offices. After consideration of the public coments received, the Commission has modified the proposed rule as discussed in the following section. In addition, conforming amendments to 10 CFR Part 51 have been included to eliminate conflicting submittal directions.
COMMENTS ON PROPOSED RULE The Commission received fif teen letters commenting on the proposed rule.
Copies of those letters are available for public inspection and copying for a .
fee at the NRC Public Document Room,1717 H Street NW, Washington, DC.
Thirteen letters were fron utilities, one from a major nuclear vendor and one from a national organization representing non-power nuclear reactors. There was a total of 53 individual coments that are discussed by subject below.
Copy Requirements Comment: Eight commenters responded that the rule should go further in reducing the number of copies of submittals required by the Comission. The comenters recomended that NRC reduce the requirements for the following types of submittals: (1) applications for license amendments; (2) various descriptive material, such as analyses of hydrogen control systems, analyses to ensure safe plant operation pending completion of equipment qualification, information demonstrating compliance with requirements for reduction of risk from anticipated transients without scram (ATWS) events, and information l
concerning modification of structures, systems or components of a facility; and (3) submittals required of non-power nuclear reactors, l
l Response: The Commission is reducing its copy requirements as suggested by the comenters. The Comission found that in many cases NRC did not fully utilize copies of the submittals named by the commenters when multiple copies were furnished by licensees. As a result, the copy requirements for the l submittals named by the commenters were reduced to avoid unnecessary copying i and postage costs for licensees.
l r
i i
(
[7590-01]
Citation of Regulatory Requirement Coment: Eight commenters addressed the section of the proposed rule that requires applicants and licensees to cite in the upper right corner of the first page of each Part 50 submittal, the specific regulation requiring the submission of the comunication. The coments ranged from supportive to strongly opposed. Several commenters stated that a single submittal may be governed by several regulations. In addition, many licensee communications are in direct response to NRC requests for information, such as generic letters, inspection and enforcement bulletins, and Comission orders. For these responses, identifying the governing regulation would be burdensome to the licensee and a subjective decision open to interpretation.
Response: The Commission has revised this section to make citing the governing regulation on the upper right corner of the first page of the submittal a recomendation rather than a requirement for licensees and applicants. Standardizing the method of citing the regulation governing a submittal will help NRC administrative staff quickly and accurately sort (for distribution purposes) the large volume of correspondence, reports, applications, etc., received at NRC. The quick and proper handling of submittals that results from citing the basis for the submittal is in the best interest of the respondent as well as the NRC. However, as the comenters' have pointed out, establishing this procedure as a requirement can cause var.ious interpretive problems for licensees and the Comission has revised the rule accordingly.
Apparent Conflict in proposed Rule Comment: Three comenters responded that the proposed rule contained conflicting directions for submitting infonnation concerning the modification of structures, systems, or components of a facility pursuant to 650.109. This submittaltypeislistedinboth150.4(b)(1)and150.4(b)(2). These sections have different copy requirements.
4
I
- [7590-01]
e' Response: The conflicting language in the proposed rule was the result of a crafting error. In the final rule, format changes were made that removed the sections containing the conflicting language noted by the comenters.
Additional Submittal Types for inclusion in Rule Comment: Three commenters recomended that the rule be modified to add several types of submittals. Two of these commenters cumulatively suggested expanding the coverage of the rule to 10 CFR Parts: 2, 20, 21, 55, 70, and 73.
The one other commenter suggested providing general guidance on submittal procedures for the types of written comunications that are not specifically mentioned in the regulations, but frequently occur in the comunication process with applicants and licensees.
Response: The Comission is presently working to standardize the comunication procedures in the other parts of Title 10. However, those efforts will be reflected in different.rulemakings and are beyond the scope of this particular rule. In response to the third comenter, language was added to 650.4(b)(1) to identify types of written comunications made pursuant to 10 CFR Part 50, not specifically mentioned in the regulations.
Waiver of Fee For License Amendments Resulting from Rule Comment: Three comenters responded that applications for amendment of license technical specifications, which may result from promulgation of the rule, should not be subject to fees since they only address administrative matters.
Response: Since the rule does address only administrative matters and it clearly supersedes any conflicting submittal directions which may be found ir.
an individual licensee's technical specifications or license conditions, licensees are not required to submit fonnal applications to amend their licenses to conform with the revised comunications procedures. The Comission authorizes 10 CFR Part 50 licensees to delete any conflicting submittal requirements from their licenses or technical specifications by 5
[
[7590-01]
pen-and-ink changes. The Office of Inspection and Enforcement, through the NRC inspectors, will work with individual licensees to see that their procedures are updated.
Address Requirements Coment: Three comments were made regarding the change in the address requirements contained in the proposed rule. Two comenters questioned whether comunications would actually be addressed to the Document Control Desk or whether they would be addressed to the current NRC recipient and mailed to the Document Control Desk. The third comenter asked why other NRC organizations, such as the Office of Inspection and Enforcement, were not identified to receive separately mailed copies.
Response: The address requirernents in the rule specify that the signed original of 10 CFR 50 comunications must be addressed to the "U.S. Nuclear Regulatory Comission, ATTH: Document Control Desk,blashington, DC 20555."
The purpose of this rule is to establish one primary addressee for 10 CFR 50 submittals. Applicants and licenstes will no longer be required to determine which NRC organization is the correct primary or secondary recipient.
Nonetheless, it is required that copies of submittals be sent to the appropriate Regional Office and NRC Resident Inspector. No other NRC organizations were identified in the rule as recipients because the NRC internal distribution system will service them.
Elevation of Administrative Matters to Regulatory Requirements Coments: Two comenters responded that the administrative requirements such as those contained in the rule (i.e. address requirements, distribution requirements, fonns of comunication, and delivery of comunications) would be more appropriately issued in a guidance document (e.g. a regulatory guide or a generic letter) rather than placed in the regulations. One comenter stated that it would be too cuinbersome to change the regulations every time NRC's administrative needs change. The other comenter considered the proposed rule to be divergent from the directives of the Atomic Energy Act of 1954 because administrative matters, such as photocopying, do not impact the health and 6
(
~
a -
[7590-01]
safety of the public and as such should not be managed by rule, regulation or order. The commenter also felt that the rule is diametrically opposed to the spirit of the Paperwork Reduction Act of 1980 since licensees will have to develop strict procedures to assure compliance with administrative guidelines that have been elevated to regulatory requirements.
Response: The Comission recognizes its responsibilities to minimize the number of administrative requirements placed in the regulations. It is also understood that administrative requirements are usually minor in nature when viewed within the full scope of NRC's programs for protecting the public health and safety. However, some administrative requirements are necessary to effectively implement these programs and therefore must be based in regulation. During the development of this rulemaking, compliance with the intent of the Paperwork Reduction Act of 1980, i.e. minimizing the Federal paperwork burden for individuals, small businesses, State and local governments and other persons, was a prime consideration. Based on a detennination of actual NRC needs, the Comission, through this rulemaking, is reducing the administrative burden placed on licensees especially with respect to copying requirements. The Comission has also, in response to comenters' concerns, revised the final rule to make citing the governing regulation on the upper right corner of the first page of the submittal, a recomendation rather than a requirement for applicants and licensees.
The administrative requirements which are contained in the rule are similar to those requirements which were previously found in 10 CFR Part 50. This rule has compiled and to a great extent standardized those earlier requirements. The Comission has detennined that the Comunications rule will actually reduce burden on licensees and is in full compliance with the Atomic Energy Act and Paperwork Reduction Act.
Clarify Subsection of Rule Regarding Reports Pursuant to 150.71(b)
Comment: Two commenters recomended that 150.4(b)(2)(xviii) of the proposed rule be clarified to better define what types of reports are covered by this subsection.
7
r
[7b90-01]
Response: Section 50.4(b)(2)(xviii) of the proposed rule was removed from the final rule. However, in response to the commenter's suggestion language was added to 150.4(b)(1) to specifically identify additional types of written comunications covered by the rulemaking.
Distribution Requirements to Resident Inspector Coment: Two commenters responded that the Comission should clarify what is meant by the requirement to send one copy of certain 10 CFR Part 50 submittals to the " appropriate NRC Resident Inspector, if applicable."
Response: The Comission intends that licensees and applicants, with NRC Resident Inspectors stationed onsite, send copies of certain 10 CFR Part 50 submittals to the Resident inspector. This has been clarified in the final rule.
Procedures for Proprietary Information Coment: One comenter recomended that special procedures be established to protect submittals containing proprietary infonnation. The comenter suggested that proprietary infonnation, along with the appropriate application for withholding from public disclosure, be submitted to the O
responsible NRC management person and a copy (minus the proprietary information) sent to the Document Control Desk.
Response: NRC's internal document control procedures provide specifically for the proper handling and distribution of proprietary infonnation.
Currently, the Document Control Desk is responsible for receiving and disseminating proprietary 10 CFR Part 50 submittals sent to NRC Headquarters.
Adopting the comenter's suggestion to send proprietary infonnation directly to the responsible NRC management person would unnecessarily impede NRC's dissemination process and would not improve NRC control of proprietary information. Licensees and applicants who wish to have proprietary infermation withheld from public disclosure should submit the infonnation in accordance with 10 CFR 2.790. When submitted, the proprietary infonnation should be clearly identified and accompanied by a request containing detailed 8
o
[7590-01]
reasons and justifications that the proprietary infonnation be withheld from public disclosure. A nonproprietary sumary describing the general content of the proprietary information should also be provided.
Submission to Project Manager Coment: One comenter suggested that it would speed up the processing of submittals if the NRC licensing project manager was specified as the primary addressee with a copy or copies sent to the Document Control Desk.
The comenter stated that this method of addressing comunications is encouraged in Generic Letter 82-30 " Filings Relating to 10 CFR Part 50 Production and Utilization Facilities" dated December 28, 1982.
Response: In actual practice, the Document Control Desk is the direct recipient of all 10 CFR Part 50 submittals mailed to NRC Neadquarters. This includes those submittals addressed in the manner described in Generic Letter 82-30. This rule designates the Document Control Desk as the official addressee so that (1) the regulations more accurately reflect NRC's internal procedures and (2) correspondence procedures are made simpler for applicants and licensees. It is true that some licensees have arranged or have been requested to mail informal or courtesy copies directly to key NRC personnel and this practice will likely continue after issuance of the communications rule. However, licensees should note that in general, courtesy copies are not regarded by NRC as substitutes for fonnal submittals.
Clarify Submittal Due Dates Coment: One commenter recomended that the rule fonnally clarify how submittal due dates are adjusted should the date occur on a weekend or .
holiday.
Response: Provisions for adjusting due dates were added to the rule in section 150.4 paragraph (d).
(
9
r
[7590-01]
Implementation Schedule Coment: One comenter recomended that the rule include an implementation schedule in view of the extensive changes to internal j procedures and technical specifications that will be needed to implement the l
new requirements.
Response: The effective date of the rule is 60 days after publication in the Federal Register. This will allow those affected by the rule sufficient time to revise their internal procedures accordingly. As mentioned in a re-sponse to a previous coment, it will not be necessary for licensees to formally apply for changes to their technical specifications. Instead,the Comission authorizes licensees to make pen-and-ink changes to correct l conflicting procedures in individual licenses and technical specifications.
i j Subnittals in Media Other than Paper i
coment: One comenter objected to the provision requiring applicants and licensees to contact the Division of Technical Infonnation and Document Control before making submittals in other than paper form. The commenter stated that this requirement would unnecessarily impede the timely flow of I
information to the NRC.
Response: The Commission recognizes the need to keep the flow of information to the NRC as timely as is reasonably achievable. This is the
- primary reason the rule contains provisions for submissions in alternative media. The requirement to contact the Division of Technical Infomation and Document Control before making alternative media submissions is included to ensure that a submittal is in a fonn usable by NRC, i.e., compatible with NRC equipment.
Exemptions to the Copy Requirements Coment: Two comenters recomended modifying the provisions in the rule regarding requests for exemptions to the copy requirements. One comenter objected to the requirement for specific exemption under 10 CFR 10
. ,, [7590-01]
50.12 in order to submit other than the number of copies specified in the proposed rule. The commenter questioned whether the Comission really wants to tie up the exemption process with such trivial matters. The other comenter suggested that the rule include provisions allowing licensees to negotiate copy requirec.ents with the NRC project manager. The comenter states that this would codify an existing desirable practice.
Response: The Comission has modified the section to allow licensees to request case specific exceptions to the communications procedures through the NRC's Division of Technical Information and Document Control.
Determination of Receipt Date Coment: One comenter recomended that the rule be changed to specif-ically state that the NRC Document Control Desk is the official NRC organization responsible for determining whether submittals have been filed within the required time period.
Response: For the past several years, the Document Control Desk has served as the receipt point for 10 CFR Part 50 submittals mailed to NRC Headquarters. Af ter submittals are received, they are entered, or accessioned, in the NRC's document control system. It is at this point that 10 CFR Part 50 submittals are generally regarded as being fonnally filed with NRC Headquarters. This practice will continue under the provisions of the revised comunications procedures. In parallel with NRC Headquarters, the Regional Offices serve as the official receipt determination point for 10 CFR submittals mailed to them.
Draf ting Channes Coment: There were numerous other coments that suggested minor editorial changes in the rule.
Responst: These suggestions were evaluated in 11ght of the revised struc-ture of the rule and changes were made when they improved the rule.
11
r ,
a
[7590-01]
ENVIRONMENTAL IMPACT: CATEGORICAL EXCLUSION i
The NRC has determined that this final rule is the type of action described in categorical exclusion 10 CFR 51.22(c)(3). Therefore, neither an environmental impact statement nor an environmental assessment has been prepared for this final rule.
PAPERWORK REDUCTION ACT STATEMENT This final rule amends infonnation collection requirements that are subject to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.). These require-ments were approved by the Office of Management and Budget approval number 3150-0011.
l REGULATORY ANALYSIS The Comission has prepared a regulatory analysis on this final regulation.
The analysis examines the costs and benefits of the alternatives considered by the Comission. Interested persons may examine a copy of the regulatory l analysis at the NRC Public Document Room, 1717 H Street NW, Washington, DC.
Single copies of the analysis may be obtained from Steve Scott, Office of Administration U.S. Nuclear Regulatory Comission Washington, DC 20555:
l telephone 301-492-8585.
REGULATORY FLEX 1BILITY CERTIFICATION STATEMENT As required by the Regulatory Flexibility Act of 1980, 5 U.S.C. 605(b), the Comission hereby certifies that this rule does not have a significant economic impact upon a substantial number of small entities. This rule amends 10 CFR 50 by specifying submittal procedures which facilitate NRC processing.
This rule affects nuclear generating facilities by reducing the overall regulatory burden of reproducing and transmitting submittals to the l
Comission. Therefore, it is not expected to have a significant economic impact on any licensee.
12
e
[7590-01)
APPLICATION OF BACKFIT RULE The Comission has determined that the backfit rule,10 CFR 50.109, does not apply to the final rule. The final rule is purely administrative in nature, and therefore does not result in the " modification of or addition to systems, structures, components, or design of a facility...or the procedures or organization required to design, construct, or operate a facility...". See 10 CFR50.109(a)(1).
LIST OF SUBJECTS 10 CFR Part 50 Antitrust, Classified information, Fire prevention, Incorporation by reference, Intergovernmental relations, Nuclear power plants and reactors, Penalty, Radiation protection, Reactor siting criteria, Reporting and record-keeping requirements.
10 CFR Part 51 Administrative practice and procedure Environmental impact statement, Nuclear materials, Nuclear power plants and reactors, Reporting and recordkeeping requirements.
For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and 5 U.S.C. 553, the NRC is adopting the following amendments to 10 CFR Parts 50 and 51.
PART 50 - DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION OF FACILITIES
- 1. The authority citation for Part 50 continues to read as follows:
13
[7590-01]
AUTHORITY: Secs. 103, 104, 161, 182, 183, 189, 68 Stat. 936, 937, 948, 953, 954, 955, 956, as amended, Sec. 234, 83 Stat.1244, as amended (42 U.S.C.
2133, 2134, 2201, 2232, 2233, 2239, 2282); secs. 201, 202, 206, 88 Stat.1242, 1248(42U.S.C.5841,5842,5846), unless otherwise noted.
Section 50.7 also issued under Pub. L.95-601, Sec.10, 92 Stat. 2951 (42 U.S.C. 5851). Sections 50.57(d),50.58,50.91,and50.92alsoissuedunder Pub. L.97-415, 96 Stat. 2071, 2073 (42 U.S.C. 2133, 2239). Sec. 50.78 also issued under sec.122, 68 Stat. 939 (42 U.S.C. 2152). Secs. 50.80-50.81 also issued under sec.184, 68 Stat. 954, as amended (42 U.S.C. 2234). Secs.
50.100-50.102 issuedundersec.188,64 Stat.955(42U.S.C.2236).
For the purposes of sec. 223, 68 Stat. 958, as amended (42 U.S.C. 2273),
ll50.10(a),(b),and(c), 50.44, 50.46, 50.48, 50.54, and 50.80(a) are issued undersec.161b,68 Stat.948,asamended(42U.S.C.2201(b));ll50.10(b)and (c) and 50.54 are issued under sec. 1611, 68 Stat. M 9, as amended (42 U.S.C.
2201(1));andil50.55(e),50.59(b),50.70,50.71,50.72,50.73and50.78are issued under sec.161o, 68 Stat. 950, as amended (42 U.S.C. 2201(o)).
- 2. Section 50.4 is revised to read as follows:
i 50.4 liritten communications.
(a) Address requirements. The signed original of all correspondence, reports, applications, and other written communications from the applicant or licensee to the Nuclear Regulatory Comission concerning the regulations in this part or individual license conditions must be addressed to the U.S. -
Nuclear Regulatory Commission. ATTN: Document Control Desk, Washington, DC 20555.
(b)Distributionreevirements. Copies of all correspondence, reports, and other written communications concerning the regulations in this part or individual license conditions must be submitted to the Nuclear Regulatory Commissionatthelocationsandinthequantitiessetforthbelow(addresses for the NRC Regional Offices are listed in Appendix D of Part 20 of this chapter).
14
[7590-01]
1 (1) Applications for amendment of semits and licensest reportst and '
other communications. All written comunications (including responses to:
generic letters, bulletins, infomation notices, inspection reports, and ,
miscellaneous requests for additional infomation), that are required of holders of operating licenses or construction permits issued pursuant to this part, must be submitted as follows, except as othemise specified in paragraphs (b)(2) through (b)(7) of this section: the signed original to the Nuclear Regulatory Comission, Document Control Desk, Washington, DC 20555, one copy to the appropriate Regional Office, and one copy to the appropriate NRC Resident inspector, if one has been assigned to the site of the facility. ,
(2) Applications for pemits and ifcenses, and amendments to applications. Applications for construction permits, applications for l
- operating licenses and amendments to either type of application must be l submitted as follows, except as otherwise specified in paragraphs (b)(3) l through(b)(7)ofthissection.
(1) Applications for licenses for facilities described in 550.21(a) and
- (c)andamendmentstotheseapplications
- the signed original must be sent to the Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 and one copy to the appropriate Regional Office.
(ii) Applications for permits and licenses for facilities dercribed in j 650.21(b) or i 50.22, and amendments to these applications: the sige.ed
- original and 37 copies must be sent to the Nuclear Regulatory Comission, Document Control Desk, Washington, DC 20555, one copy to the appropriate Regional Office, and one copy to the appropriate NRC Resident Inspector, if !
4 one has been assigned to the site of the facility. '
l (3)Acceptancereviewapplication. Written comunications required for an application for determination of suitability for docketing pursuant to 150.30(a)(6)mustbesubmittedasfollows: the signed original and 13 copies t i to the Nuclear Regulatory Comission. Document Control Desk, Washington, DC
! 20555 and one copy to the appropriate Regional Office.
l (4) Security plan and related submittals. Written comunications, as defined in paragraphs (b)(4)(1) through (iv) of this section must be submitted 4
as follows: the signed original and three copies to the Nuclear Regulatory Comission Document Control Desk, Washington, DC 20555, and two copies to the appropriate Regional Office; (1) physical security plan pursuant to i 50.34; 1
15 1
-. _ . . - - - - . , ~ - , . ~ , , , - - - - - - - - - - - - - - - _ - - - - - - - - - -
r
[7590-01]
(ii) Safeguards contingency plan pursuant to i 50.34; (iii) Change to security plan, guard training and qualification plan, or safeguards contingency plan made without prior Comission approval pursuant to i50.54(p);
(iv) Application for amendrent of physical security plan, guard training and qualification plan, or safeguards contingency plan pursuant to i 50.90.
(5) Emergency plan and related submittals., Written communications as defined in paragraphs (b)(5)(1) through (iii) in this section, must be submitted as follows: the signed original to the Nuclear Regulatory Comission Document Control Desk, Washington, DC 20555, two copies to the appropriate Regional Office, and one copy to the appropriate NRC Resident inspector if one has been assigned to the site of the facility.
(i) Emergency plan pursuant to i 50.34; (11)Changetoanemergencyplanpursuanttoi50.54(q);
(iii)EmergencyimplementingprocedurespursuanttoAppendixE.Vof this part.
(6)UpdatedFSAR. An updated Final Safety Analysis Report (FSAR) or replacementpages,pursuanttoi50.71(e)sustbesubmittedasfollows: the signed original and 10 copies to the Nuclear Regulatory Comission Document Control Desk, Washington, DC 20555, or.e copy to the appropriate Regional Office, and one copy to the appropriate NRC Resident Inspector if one has been assigned to the site of the facility.
(7) Quality Assurance related submittals. (1) A change to the Safety Analysis Report quality assurance program description pursuant to 6 50.54(a)(3) or 6 50.55(f)(3), or a change to a licensee's NRC-accepted quality assurance topical report pursuant to 6 50.54(a)(3) or i 50.55(f)(3),
must be submitted as follows: the signed original to the Nuclear Regulatory Comission, Document Control Desk, Washington, DC 20555, one copy to the appropriate Regional Office, and one copy to the appropriate NRC Resident inspector if one has been assigned to the site of the facility.
(ii) A change to an NRC-accepted quality assurance topical report from nonlicensees(i.e., architect / engineers,NSSSsuppliers,fuelsuppliers, constructors, etc.) must be submitted as fellows: one signed original to the Nuclear Regulatory Comission. Document Control Desk, Washington, DC 20555.
(c) Fonn of comunications. All copies submitted to meet the requirements set forth in paragraph (b) of this section must be typewritten, 16
[7590-01J printed or otherwise reproduced in permanent form on unglazed paper.
Exceptions to these requirements may be granted for the submittal of micrographic, photographic, or electronic fo ms. Prior to making any submittal in other than paper form, the applicant or licensee must contact the Division of Technical Information and Document Control. Nuclear Regulatory Connission, Washington, DC 20555, telephone (301) 492-4885, to obtain specifications, copy requirements, and prior approval.
l (d) Delivery of communications. Written casuunications may be delivered l
to the Document Control Desk at 7920 Norfolk Avenue, Sethesda, MD, between the hours of 8:15 a.m. and 4:00 p.m. Eastern Time. If a submittal due date falls on a Saturday, Sunday, or Federal holiday, the next Federal working day becomes the official due date.
(e)Regulationgoverningsubmission, l.icensees and applicants submitting correspondence, reports, and other written communications pursuant to the regulations of this part are requested but not required to cite whenever practical, in the upper right corner of the first page of the submittal, the l
! specific regulation or other basis, requiring submission.
(f)Conflictingrequirements. The communications requiresents contained in this section and 1650.12,50.30,50.36,50.36a,50.44,50.49,50.54,50.55, 50.55a 50.59, 50.62, 50.71, 50.73, 50.82, 50.90, and 50.91 supersede and l
replace all existing requirements in any license conditions or technical specifications in effect on . Exceptions to these requirements must be approved by the Division of Technical Infomation and l Document Control, Nuclear Regulatory Comission Washington, DC 20555, Telephone (301)492-8585.
l
- 3. In 6 50.30, paragraphs (a) and (b) are revised to read as follows and paragraph (c) is removed. ,
5 50.30 Filing of application for licensest oath or affimation.
l (a) w rving of applications. (1) Each filing of an application for a license to construct and/or operate a production or utilization facility (in-j cluding amendments to the applications) must be submitted to the U.S. Nuclear Regulatory Comission in accordance with i 50.4.
l (2) An additional 10 copies of the general information and 30 copies of l
the safety analysis report, or part thereof or amendment thereto, must be 27
[759001]
retained by the applicant for distribution in accordance with the written instructions of the Director, Office of Nuclear Reactor Regulation, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate.
(3) Each applicant shall, upon notification by the Atomic Safety and Licensing Board appointed to conduct the public hearing required by the Atomic Energy Act for the issuance of a construction pemit, update the application and serve the updated copies of the application or parts of it, eliminating all superseded information, together with an index of the updated application, as directed by the Atomic Safety and Licensing Board. In addition, at that timo the applicant shall serve a copy of the updated application on the Atomic Safety and Licensing Appeal panel. Any substquent' amendment to the application must be served on those served copies of the application and must be submitted to the U.S. Nuclear Regulatory Comission as specified in i 50.4.
(4) The applicant must make a copy of the updated application available at the public hearing for the use of any other parties to the proceeding, and shall certify that the updated copies of the application contain the current contents of the application submitted in accordance with the requirements of this part.
(5) At the tinc of filing an application, the Comission will establish a Local Public Document Room near the site of the proposed facility, for the use of the public, where a copy of the application, subsequent amendments, and other records pertinent to the facility will be available for public inspection and copying.
(6) The serving of copies required by this section must not occur until theapplicationhasbeencocketedpursuanttoi2.101(a)ofthischapter.
Copies must be submitted to the Comission, as specified in i 50.4, to enable the Director, Office of Nuclear Reactor Regulation, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, to detemine whether the application is sufficiently complete to pemit docketing.
(b)Dathoraffirwation. Each application for a license, including whenever appropriate a construction pemit, or amendment of it, and each amendment of each application must be executed in a signed original by the applicant or duly authorized officer thereof under oath or affirmation.
- 4. In I $0.36, paragraph (c)(5) is revised to read as follows:
16
. [759001]
\
6 50.36 Technical specifications.
(c) * *
(5) Administrative controls. Administrative controls are the provisions relating to organization and unagement, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe u nner. Each Itcensee shall submit any reports to the Comission pursuant to approved technical specifications as specified in i 50.4.
i 5. In50.36a, paragraph (a)(2)isrevisedtoreadasfollows: ,
I 50.36a Technical specifications on effluents from nuclear power reactors.
(a)
(2) Each licensee shall submit a report to tht Comission within 60 days af ter January 1 and July 1 of each year, that specifies the quantity of each of the principal radionuclides released to unref.tricted areas in liquid and in gaseous effluents during the previous six months of operation, including any other information as my be required by the Comission to estimate maximum potential annual radiation doses to the public resulting from effluent releases. The report must be submitted as specified in i 50.4. If quantities of radioactive sterials released during the reporting period are significantly above design objectives, the report must cover this specifically. On the basis of these reports and any additional inforation the Comission my obtain from the licensee or others, the Comission my require the licensee to take action as the Comission deems appropriate.
- 6. In i 50.44, paragraphs (c)(3)(vi)(A) and (c)(3)(vii)(A) are revised to ,
read as follows: r l 50.44 Standards for combustible cas control system in Itcht water cooled power reactors.
19
[7590-01]
O (c)
(3)
(vi)(A) Each applicant for or holder of an operating license for a boiling Ilght water nuclear power reactor with a Mark !!! type of containment or for a pressurized light-water nuclear power reactor with an ice condenser type of containment issued a construction permit before March 28,1979,shall submit an analysis to the Comission as specified in 150.4.
(vii)(A)ByJune 25, 1985, each applicant for or holder of an operating Itcense subject to the requirements of paragraphs (c)(3)(iv) (v) and (vi) of this section shall develop and submit to the Comission a proposed schedule for meet'ing these requirements. The schedule may be developed using integrated scheduling systems previously approved for the facility by the NRC.
- 7. In i 50.49, paragraph (h) and the introductory language of paragraph (i) are revised to read as follows.
I 50.49 Environmental qualification of electric equipment important to safety for nuclear oower plants.
(h) Each licensee shall notify the Comission as specified in i 50.4 of any significant equipment qualification problem that may require extension of the completion date provided in accordance with paragraph (g) of this section within 60 days of its discovery.
(1) Applicants for operating licenses granted after February 22,1983, but prior to November 30,1985, shall perfom an analysis to ensure that the plant can be safely operated pending completion of equipment qualification required by this section. This analysis must be submitted, as specified in l 50.4, for consideration prior to the granting of an operating license and must include, where appropriate, consideration oft
- 8. In 50.54, the introductory language of paragraph (a)(3), (a)(3)(1), (f),
and the introductory language of (p), (q) and (w)(4) are revised to read as follows:
20
[7590-01) 6 50.b4 Conditions of licenses.
(a)
(3) After March 11,1983, each licensee described in paragraph (a)(1) of this section may make a change to a previously accepted quality assurance program description included or referenced in the Safety Analysis Report, provided the change does not reduce the comitments in the program description previously accepted by the NRC. Changes to the quality assurance program description that do not reduce the comitments must be submitted to the NRC at least annually in accordance with the requirements of i 50.71. Changes to the quality assurance program description that do reduce the commitments must be submitted to NRC and receive NRC approval prior to implementation, as follows:
(1) Changes made to the Safety Analysis Report must be submitted, as specified in i 50.4 Changes made to NRC-accepted quality assurance topical report descriptions must be submitted, as specified in i 50.4.
(f) The licensee shall at any time before expiration of the license, upon request of the Comission, submit, as specified in i 50.4, written statements, signed under oath or affinnation, to enable the Comission to determine whether or not the .tcense should be modified, suspended, or revoked.
(p) The licensee shall prepare and maintain safeguards contingency plan procedures in accordance with Appendix C of Part 73 of this chapter for effecting the actions and decisions contained in the Responsibility Matrix of the safeguards contingency plan. The licensee may make no change which would decrease the effectiveness of a security plan prepared pursuant to 6 50.34(c) or Part 73 of this chapter, or of the first four categories of infonnation (Background, Generic Planning Base, Licensee Planning Base Responsibility Matrix) contained in a licensee safeguards contingency plan prepared pursuant to 150.34(d) or Part 73 of this chapter without prior approval of the Comission. A licensee desiring to make such a change shall submit an application for an amendment to a license pursuant to 6 60.90. 1he licensee may make changes to the security plan or to the safeguards contingency plan without prior Comission approval if the changes do not decrease the safeguards effectiveness of the plan. The licensee shall maintain records of 21
[7590-01]
changes to the plans made without prior Comission approval for a period of two years from the date of the change, and shall submit, as specified in i 50.4, a report containing a description of each change within two months af ter the change is made. Prior to the safeguards contingency plan being put into effect, the licensee shall have:
(q) A licensee authorized to possess and/or. operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in i 50.47(b) and the requirements in Appendix E to this part. A
- Itcensee authorized to possess and/or operate a research reactor or a fuel l l
facility shall follow and maintain in effect emergency plans which meet the requirements in Appendix E of this part. The nuclear power reactor licensee j may make changes to these plans without Comission approval only if the 1
changes do not decrease the effectiveness of the plans and the plans, as l
changed, continue to meet the standards of I 50.47(b) and the requirements of i Appendix E of this part. The research reactor licensee and/or the fuel facility licensee may make changes to these plans without Comission approval, only if these changes do not decrease the effectiveness of the plans and the plans, as changed, continue to meet the requirements of Appendix E of this part. Proposed changes that decrease the effectiveness of the approved emergency plans shall not be implemented without application to and approval by the Comission. The licensee shall submit, as specified in i 50.4, a report of each proposed change for approval. If a change is made without approval, the licensee shall submit, as specified in 5 50.4, a report of each change within 30 days af ter the change is made.
(w)
! (4) The licensee shall report, as specified in i 50.4, on April 1 of I each year, the present levels of . insurance or financial protection it l maintains and the sources of the insurance or protection.
)
- 9. In l 50.55, paragraphs (e)(3), (f)(3), and (f)(3)(1) are revised to read as follows!
l 50.55 Conditions of construction permits.
[7590-01] ,
(e)
(3)(1) The holder of a construction pemit shall also submit, as specified in i 50.4, a written report on a reportable deficiency within 30 days.
(ii) The report must include a description of the deficiency, an analysis of the safety implications and the corrective action taken, and sufficient information to permit analysis and evaluation of the deficiency and of the corrective action. If sufficient information is not available for a definitive report to be suomitted within 30 days, an interim report containing all available infomation shall be filed, as specified in i 50.4, together with a statement that indicates when a complete report will be filed.
(f) * * *
(3) After March 11, 1983, each construction permit holder described in paragraph (f)(1) of this section may make a change to a previously accepted quality assurance program description included or referenced in the Safety Analysis Report, provided the change does not reduce the comitments in the program description previously accepted by the NRC. Changes to the quality assurance program description that do not reduce the commitments must be submitted to NRC within 90 days. Changes to the quality assurance program description that do reduce the comitments must be submitted to NRC and receive NRC approval before implementation, as follows:
(i) Changes to the Safety Analysis Report must be submitted for review as specified in i 50.4. Changes made to NRC-accepted quality assurance topical report descriptions must be submitted as specified in i 50.4. >
- 10. In i 50.55a, paragraphs (g)(5)(11) and (g)(5)(iii) are revised to read as follows:
6 50.55a Codes and standards.
(g) Inservice inspection requirements.
(5) 23
[7590-01.1 e
a (ii) If a revised inservice inspection program for a facility conflicts with the technical specification for the facility, the licensee shall apply to the Consnission for amendment of the technical specifications to confonn the technical specification to the revised program. The licensee shall submit this application, as specified in i 50.4, at least six months before the start of the period during which the provisions become applicable, as detennined by paragraph (g)(4) of this section.
(iii) If the licensee has detennined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in i 50.4, infonnation to support the determinations.
- 11. In i 50.59, paragraph (b) is revised to read as follows:
9 50.59 Changes, tests, and experiments.
(b)(1) The licensee shall maintain records of changes in the facility and of changes in procedures made pursuant to this section, to the extent that these changes constitute changes in the facility as described in the safety analysis report or to the extent that they constitute changes in procedures as described in the safety analysis report. The licensee shall also maintain records of tests and experiments carried out pursuant to paragraph (a) of this section. These records must include a written safety evaluation which pro-vides the bases for the determination that the change, test, or experiment does not involve an unreviewed safety question.
(2) The licensee shall submit, as specified in 550.4, a report containing a brief description of aily changes, tests, and experiments, including a
- sumary of the safety evaluation of each. The report must be submitted l
annually or at such shorter intervals as may be specified in the license.
(3) The records of changes in the facility shall be maintained until the l date of termination of the license, and records of changes in procedures and records of tests and experiments shall be maintained for a period of five j years.
- 12. In i 50.62, paragraphs (c)(6) and (d) are revised to read as follows:
l 24
[' [7590-01]
e -
5 50.62 Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants.
(c) *
(6) Information sufficient to demonstrate to the Comission the adequacyofitemsinparagraphs(c)(1)through(c)(5)ofthissection I
shall be submitted to the Comission as specified in i 50.4.
(d) Implementation. By 180 days after the issuance of the QA guidance
]' for non-safety related components, each licensee shall develop and submit to the Commission, as specified in i 50.4, a proposed schedule for meeting the requirenients of paragraphs (c)(1) through (c)(5) of this section. Each shall !
l include an explanation of the schedule along with a justification if the I schedule calls for final implementation later than the second refueling outage after July 26, 1984, or the date of issuance of a license authorizing operation above 5 percent of full power. A final schedule shall then be l mutually agreed upon by the Comission and licensee. ,
i ,
- 13. In i 50.71, paragraphs (a), (b) and (e)(1) are revised to read as
! tollows:
l 6 50.71 Maintenance of records, making of reports.
l (a) Each licensee and each holder of a construction perinit shall maintain all records and make all reports, in connection with the activity, as may be.
i required by the conditions of the license or pemit or by the rules, regula- i 1 tions, and orders of the Comission in effectuating the purposes of the Act,
! including section 105 of the Act. Reports must be submitted in accordance I with i 50.4 (b) With respect to any produc' tion or utilization facility of a type described in il 50.21(b) or 50.22, or a testing facility, each licensee and l each holder of a construction pemit shall submit its annual financial report, i
including the certified financial statements, to the Comission, as specified in i 50.4, upon issuance of the report.
l (e)
(1) The licensee shall submit revisions containing updated infomation ,
i ;
25 i__ , _ .
% [7590-01) to the Commission, as specified in 5 50.4, on a replacement-page basis that is accompanied by a list which identifies the current pages of the FSAR following page replacement.
- 14. In i 50.73, paragraphs (c) and (d) are revised to read as follows:
6 50.73 Licensee event report system.
(c)Supplementalinformation. The Commission may require the licensee to I
submit specific additional information beyond that required by paragraph (b) of this 'section if the Commission finds that supplemental material is necessary for complete understanding of an unusually complex or significant event. These requests for supplemental information will be made in writing and the licensee shall submit, as specified in 5 50.4 the requested informa-tion as a supplement to the initial LER.
(d)Submissionofreports. Licensee Event Reports must be prepared on Form NRC 366 and submitted within 30 days of discovery of a reportable event or situation to the U.S. Nuclear Regulatory Commission, as specified in l 50.4.
- 15. In i 50.82, paragraph (a) is revised to read as follows:
6 50.82 Applications for termination of licenses.
(a) Any licensee may submit an application to the Commission, as speci-fled in i 50.4, for authority to surrender a license voluntarily and to dis-mantle the facility and dispose of its component parts. The Commission may require information, including information as to proposed procedures for the disposal of radioactive material, decontamination of the site, and other l procedures, to provide reasonable assurance that the dissentling of the l facility and disposal of the component parts will be performed in accordance with the regulations in this chapter and will not be inimical to the connon defense and security or to the health and safety of the public.
26
[7590-01]
- 16. Section 6 50.90 is revised to read as follows:
6 50.90 Application for amendment of license or construction permit.
Whenever a holder of a license or construction permit desires to amend the license or permit, application for an amendment must be filed with the Commission, as specified in i 50.4, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.
- 17. In i 50.91, paragraph (a)(1) is revised to read as follows:
6 50.91 Notice for public comment; State consultation.
, (a) Notice for public comment. (1) At the time a licensee requests an amendment, it must provide to the Commission, in accordance with the distribution requirements specified in i 50.4, its analysis about the issue of no significant hazards consideration using the standards in 5 50.92.
- 18. In Appendix E, section V is revised to read as follows:
l l Appendix E - EMERGtNCY PLANNING AND PREPAREDNESS FOR PRODUCTION AND l UTILIZATION FACILITIES V. Implementing Procedures No less than 180 days prior to the scheduled issuance of an operating license for a nuclear power reactor or a license to possess nuclear material the applicant's detailed implementing procedures for its emergency plan shall be submitted to the Commission as specified in i 50.4. Licensees who are au-thorized to operate a nuclear power facility shall submit any changes to the emergency plan or procedures to the Commission, as specified in i 50.4, within 30 days of such changes.
1
- 19. In Appendix G, section V, paragraph E is revised to read as follows:
Appendix G - FRACTURE TOUGHNESS REQUIREMENTS 27
e
[7590-01]
i V. Inservice Requirements - Reactor Vessel Beltline Material l * * * *
- E. The proposed programs for satisfying the requirements of sections V.C. and V.D. of this appendix must be submitted, as specified in i 50.4, for review and approval on an individual case basis at least three years prior to the date when the predicted fracture toughness levels will no longer satisfy the requirements of section V.B. of this appendix.
- 20. In Appendix H, section II, paragraph B.3 and section III, paragraph A are revised to read as follows:
Appendix H - REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM REQUIREMENTS II. Surveillance Program Criteria B. * * *
- 3. A proposed withdrawal schedule must be submitted with a technical just'fication as specified in 5 50.4. The proposed schedule must be approved prior to implementation. -
III. Report of Test Results A. Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in 5 50.4, within one l
year after capsule withdrawal unless an extension is granted by the Director, Office of Nuclear Reactor Regulation.
- 21. In Appendix I, section IV, paragraph A.3. and paragraph A.3.a of the
! " Concluding Statement on Position of the Regulatory Staff (Docket-RM-50-2)"
are revised to read as follows:
Appendix I - NUMERICAL GUIDES FOR DESIGN OBJECTIVES AND LIMITING CONDITIONS FOR OPERATION TO MEET THE CRITERION "AS l
LOW AS IS REASONABLY ACHIEVABLE" FOR RADIOACTIVE MATERIAL IN LIGHT-WATER-COOLED NUCLEAR POWER REACTOR EFFLUENTS e
28 l
[7590-01)
.Sec. IV. Guides on technical specifications for limiting conditions for operation for light-water-cooled nuclear power reactors licensed under 10 CFR Part 50.
A.
- 3. Report these actions as specified in i 50.4, within 30 days from the end of the quarter during which the release occurred.
Concluding Statement on Position of the Regulatory Staft (Docket-RM-50-2)
A. * * *
- 3. * * *
- a. The applicant submits, as specified in 6 50.4, an evaluation of the potential for effects from long-term buildup on the environment in the vicinity of the site of radioactive material, with a radioactive half-life greater than one year, to be released; and
- 22. In Appendix J. section V, paragraph B.I. is revised to read as follows:
Appendix J - PRIMARY REACTOR CONTAINMENT LEAKAGE TESTING FOR WATER-COOLED POWER REACTORS V. Inspection and Reporting of Tests B. Report of test results. 1. The preoperational and periodic tests must be the subject of a summary technical report submitted to the Commission, as specified in 5 50.4, approximately three months after the conduct of each test. The report must be titled " Reactor Containment Building Integrated Leak Rate Test."
- 23. In Appendix K, section II, paragraph 1.c. is revised to read as follows:
Appendix K - ECCS EVALUATION MODELS 29
6
- - [7590-01]
II. Required Documentation 1.
- c. The licensee shall submit to the Commission, as specified in 5 50.4, a complete listing of each computer program, in the same fonn as used in the evaluation model.
- 24. In Appendix M, Paragraph 2 is revised to read as follows:
Appendix M - STANDARDIZATION OF DESIGN; MANUFACTURE OF NUCLEAR POWER REACTORS; CONSTRUCTION AND OPERATION OF NUCLEAR POWER REACTORS MANUFACTURED PURSUANT TO C0f911SSION LICENSE
- 2. An application for a manufacturing license pursuant to this Appendix M must be submitted, as specified in 5 50.4, and meet all the requirements of il50.34(a)(1)-(9) and 50.34a(a) and (b), except that the preliminary safety analysis report shall be designated as a " design report" and any required information or analyses relating to site matters shall be predicated on postulated site parameters which must be specified in the application. The application must also include information pertaining to design features of the proposed reactor (s) that affect plans for coping with emergencies in the operation of the reactor (s).
- 25. In Apperdix N, paragraph 2. is revised to read as follows
I l APPENDlX N - STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS:
LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF DUPLICATE DESIGN AT MULTIPLE SITES I
- 2. Applications for construction permits submitted pursuant to this l Appendix must include the information required by ll 50.33,50.33a,50.34(a) and 50.34a(a) and (b) and be submitted as specified in 5 50.4. The applicant i
shall also submit the information required by 5 51.50 of this chapter. ***
i * * * *
- 30 I
- [7590-01]
- 26. In Appendix 0, paragraph 2 is revised to read as follows:
Appendix 0 - STANDARDIZATION OF DESIGN; STAFF REVIEW OF STANDARD DESIGNS
- 2. The submittal for review of the standard design must be made in the same manner and in the same number of copies as provided in il 50.4 and 50.30 for license applications.
- 27. In Appendix Q, paragraph 2 is revised to read as follows:
Appendix Q - PRE-APPLICATION EARLY REVIEW OF SITE SUITABILITY ISSUES
- 2. The submittal for early review of site suitability issue (s) must be made in the same manner and in the same number of copies as provided in il 50.4 and 50.30 for license applications. The submittal must include suffi-cient information concerning a range of postulated facility design and opera-tion parameters to enable the Staff to perform the requested review of site suitability issues. The submittal must contain suggested conclusions on the issues of site suitability submitted for review and must be accompanied by a statement of the bases or the reasons for those conclusions. The submittal must also list, to the extent possible, any long-range objectives for ultimate development ot the site, state whether any site selection process was used in preparing the submittal, describe any site selection process used, and explain I what consideration, if any, was given to alternative sites.
PART 51 - ENVIRONMENTAL PROTECTI0tl REGULATIONS FOR DOMESTIC LICENSING AND
! RELATED REGULATORY FUNCIIONS
- 28. The authority citation for Part 51 continues to read as follows:
/ AUTHORITY: Sec.161,68 Stat.948,asamended(42U.S.C.2201); secs. 201, as amended, 202, 88 Stat. 1242, as amended, 1244 (42 U.S.C. 5841, 5842). 5
~
! Subpart A also issued under National Environmental Policy Act of 1969, secs. 102, 104, 105, 83 Stat. 853-854, as amended (42 U.S.C. 4332, 4334, 31
I
[7590-01]
4335); and Pub. L.95-604, Title II, 92 Stat. 3033-3041. Section 51.22 also issued under sec. 274, 73 Stat. 688, as amended by 92 Stat. 3036-3038 (42 U.S.C. 2021).
- 29. Section 51.54 is revised to read as follows:
9 51.54 Environmental Report - Manufacturing License.
Each applicant for a license to manufacture a nuclear power reactor or, for an amendment to a license to manufacture seeking approval of the final design of the nuclear power reactor, pursuant to Appendix M of Part 50 of this chapter, shall submit with its application, as specified in i 50.4, a separate document *, entitled " Applicant's Environmental Report - Manufacturing License,"
or " Supplement to Applicant's Environmental Report - Manufacturing License."
The environmental report shall address the environmental matters specified in Appendix M of Part 50 of this chapter, and shall contain the information spec-ified in i 51.45, as appropriate.
- 30. Section 51.55 is revised to read as follows:
6 51.55 Environmental Report-Number of copies; Distribution.
(a) Each applicant for a license to construct and operate a production or utilization facility covered by paragraphs (b)(1), (b)(2), (b)(3) or (b)(4) of
$51.20 or for a license amendment covered by paragraph (b)(5) of 9 51.20 shall submit to the Commission an environmental report, or any supplement to an environmental report in the manner specified in i 50.4. The applicant shall retain an additional 109 copies of the environmental report or any supplement j
to the environmental report for distribution to parties and Boards in the NRC proceeding, Federal, State, and local officials and any affected Indian tribes, in accordance with written instructions issued by the Director of Nuclear Reactor Regulation or the Director of Nuclear Material Safety and Safeguards, as appropriate.
- (b) Each applicant for a 1icense to manufacture a nuclear power reactor,
! or for an amendment to a license to manufacture seeking approval of the final j design of the nuclear power reactor, pursuant to Appendix M of Part 50 of this l chapter shall submit to the Commission an environmental report or any
. 4 32 l
, [7590-01]
- supplement to an environmental report in the manner specified in i 50.4. The applicant shall retain an oditional 109 copies of the environmental report or any supplement to the environmental report for distribution to parties and Boards in the NRC proceeding, Federal, State, and local officials and any affected Indian tribes, in accordance with written instructions issued by the Director of Nuclear Reactor Regulation.
Dated at Eethesda, Maryland, this $ / g day of 1986.
For the Nuclear Regulatory Comission.
,.- . -Q' Nctor Stello, Jr.,
Acting Executive Di ctor for Operations.