ML20153G903

From kanterella
Jump to navigation Jump to search
Informs of Plans for Training & Examining Licensed Operators Prior to Operating W/Leu Fueled Core.Training Will Consist of Operators Studying All Core Related Changes & Changes in Wpi Safety Analysis Rept & Tech Specs as Submitted to NRC
ML20153G903
Person / Time
Site: 05000134
Issue date: 03/07/1988
From: Newton T
WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA
To: Michaels T
Office of Nuclear Reactor Regulation
References
NUDOCS 8809090025
Download: ML20153G903 (1)


Text

-.

e WORCESTER Worcester POLYTECHNIC Massachusetts 01609 INSTITUTE (617)793 5000 March 7, 1988 M'. Theodore L. Michaels, Project Manager Standardization and Non-Power Reactor Project Directorate Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Michaels:

As we discussed in our telephone conversation on 4 March 1988, all WPt licensed operators will be trained and examined before being allowed to operate with the LEU fueled core.

The training will consist of operators studying all core related changes, such as those discussed in the ANL report on the WPI fuel conversion, as well as changes in the WPI Safety Analysis report and technical specifications as submitted to the NRC. Examinations will be given as part of the annual requalification exams which will cover all significant reactor parameters relating to the LEU fuel change.

if I can be of further assistance, please let me know.

Sincerely, fr Thomas H. Newton, Jr.

Director Fur. lear Reactor Facility THN/ns cc:

J. A. Hayer, Jr., SR0 K. Matthews, R0

{$2'$$8EE$$$$((g4

*