ML20140J456
| ML20140J456 | |
| Person / Time | |
|---|---|
| Site: | 05000134 |
| Issue date: | 03/27/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Wilbur L WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA |
| References | |
| NUDOCS 8604040337 | |
| Download: ML20140J456 (2) | |
Text
.
n 9
\\
MAR 2 7 M Docket No:
50-134 Worcester Polytechnic Institute ATTN:
Professor L. C. Wilbur Director Nuclear Facility Worcester, Massachusetts 01609 Gentlemen:
Subject:
Projects Realignment in Region I The purpose of this letter is to inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility.
Mr.' Elsasser can be reached on 215-337-5378.
I will retain responsibility as the cognizant Branch Chief.
This realignment will become effective on March 31, 1986.
~
Sincerely, Mriginal Signed By:
Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:
Dr. R. Goloskie, Radiation Safety Officer and Safeguards Comitttee Dr. E. Cranch, President Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center'(NSIC)
Commonwealth of Massachusetts (2) 8604040337 860327 PDR ADOCK 05000134 I
P pm I g 1
78c/
r-
)
3 Worcester Polytechnic Institute 2
IIAR 2 71986 bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA-(w/o encl)
J. Grant H.'Berkow, NRR
/
RI:DRP RP-R.DRP Uk Grant /meo El ser inger thrqstecki 3/21/86 yh fv N_
i 0FFICIAL RECORD COPY